Loading...
20040880.pdfDATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNERPE/NAME OF BUSIVESS MAILING ADDRESS CITY ZIP NAME 15 W t: ADDRESS x 0 NIA CITY zip NAME r11C L/ el - ADDRESS goix 31 ;-' ZIP CITY STATE LICENSE NUMBER L Lec c r & Sri ptl PROPERTY TAX ACCOUNT PARCEL NO. .*�, A0`1 A. TELEPHONE h',�2, � — /9& N 1�153e, TELEPHONE CBL # r _�) 6 TELEPHONE EXPIRATION DATE E NEW RESIDENTIAL ADDITION COMMERCIAL REMODEL MULTIFAMILY REPAIR GRADING CYDS DEMOLISH TANK GARAGE RETAINING WALL CARPORT ROCKERY (TYPE QF USE, BUSINESS 09 ACTI�.R EXPLAIN: I A . I _� .4 uj NUMBER NUMBER OF 0 OF DWELLING UNITS 0 STORIES DESCRIBE WORK TO BE DONE HEAT SOURCE GLAZING % PLUMBING / MECH COMPLIANCE OR CHANGE OF USE SIGN EFENCE ( — X OTHER FIRE SPRINKLER FIRE ALARM 7 *1 avi CRITICAL AREAS Nhv NUMBER LOT SLOPE % r PLAN CHECK NO: VESTED DATE <��� I THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: 180 DAYS PERMIT LIMIT 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS IN INTEREST, AGREES TO INDEMNIFY. DEFEND AND HOLD HARMLESS THE CIT-Y OF EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECILY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIF'� WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION.' 7 j PERMIT EXPIRES / I I Li- 7 L L�; u PERMIT ZONE NUMBER U-1- L'Le�3a� JOB SUITE/APT# ADDRESS PLAT NAME/SUBDIVISION NO. LOT NO. LID NO. LID FEE $ TESCP App(croad [3 PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP RW Permit Required D Street Use Permit Roq'd E3 EXISTING — PROPOSED inspection Required [3 Sidewalk Required 13 Underground REQUIRED DEDICATION— FT Wiring required 13 METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED YES 13 No z REMARKS z OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE G z I W I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT; AND THAT I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LADQLLCODE OF THE STATE OF WASHINGTON RELATING TO WORKMEJWa-CGMPENSAV0Q INSURANCE AND RCW 18.27. DATE S�I�NED� I DATE ENGINEERING REVIEWED BY rihil�- MAKSHAL P IR c OF N T Fn PL_ W FIRE REVIEWED!ANK FILL, t9%r_-A%0VAL, OR CW0 cc rL VARIANCE OR CU SHORELINE OR ADB# INSPECTION I BOND REO'D POSTED 111YES ONO S SEPA REVIEW SIGN AREA HEIGHT COMPLETE , EXEMPT ALLOWED I PROPOSED ALLOWED , PROPOSED EXP LOT COVERAGE REQUIRED SETBACKS (Fr.) PROPOSED SETBACKS (Fr.) ALLOWED PROPOSED FRONT SIDE REAR FRONT URSIDE REAR z z PARKING LOT AREA I PLANNING REVIEWED BY DATE REO'D I PROVIDED REMARKS CHECKED BY jTypE_7MrN C�Df�2 OCCUPANT. GROUP SPECIAL INSPECTION JAREA OCCUPANT REOUIREDE] YES LOAD REMARKS z PROGRESS INSPEC11ONS PER UBC 108/ IBC109/ IRC109 FINAL INSPECTION REO'D - VALUATION Description Plan Check Building Permit Plumbing Mechanical Grading Engr. Review Engr. Inspection Fire Review Fire Inspection Landscapelnsp. Recording Fee CALL FOR INSPECTION (425) I I I -ur-r.111,111 ATTENTION EXT 1333 IT IS UNLAWFULTO USE OR OCCUPYABUILDING OR STRUCTURE UNTILAFINAL INSPECTION HAS BEEN MADE AND APPROVALOR A CERTIFICATE OF OCCU- PANCY HAS BEEN GRANTED. UBC109/IBC110/IRC110. FEE Description FEE State Surcharge City Surcharge P-5 Base Fee Plan Chk. Deposit Receipt # Total Amt. Due Receipt # APPLICATION APPROVAL This application is not a permit until signed by the Building Official or his/her Deputy: and Fees are paid, and receipt is acknowledged in space provided. OFFICIALS SIGNATURE DAT 17 7 09/03 PRESS HARD -YOU ARE MAKING 4 COPIES BY ORIGINAL -FILE YELLOW -INSPECTOR PINK -OWNER GOLD-ASSEsson z 0 i 0 M -i -n M C M 0 ­10 0 C: M M Z C) --I C: W o -n n M M 0 0 0 M C U) 90 M 0 Z z --I M Cn z 0 1 0 M FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: C --------FIRE DEPARTMENT DATE,�L__­L/ OLrASP SIGN ENGINEERING DIVISION DATE P1.13ASE SIGN PLANNING DIVISION DATE I'MASL SIGN PROJECT SITE ADDRESS- C, t,6/ PERMIT# 2_(J ffS_ 0 ADB# DATE INSPECTED 1A Y DESCRIPTION OF WORK TO BE INSPECTED A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to tile release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED El Copy of CONDITIONS given to owner/contractor by inspector I . FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fomis:oca1)rv1 3/25/04 z 0 M --i -n M M 0 0 0 C --i g = M M Z (n 0 -n n;U __q > x 9 11 M M 0 0 0 M C co 9 C/) M 0 z r z z 0 A I F5 M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing...................... Wall.......................... Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -In ................... Commercial Final ...... HEATING: Gas Test .................... Gas Piping ................. Equipment ................. Commercial Final ....... EXTERIOR SHEATHING NAILING .......................... FRAMING........................ FIRST FLOOR FRAMING ... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APRwVA6-RW 0 j)zew%Rff'cy .................. Ono z 0 i 0 M