Loading...
20040887.pdfDATE RECEIVED 1 PERMIT EXPIRES USE PER MIT ZONE CITY OF EDMONDS NUMBER, JOB SUITE/�PT# CONSTRUCTION PERMIT APPLICATION ADDRESS OWNER NAME/NAME OF BUSINESS Z PLAT NAME/SUBDIVISION NO. IOT NO. LID NO. Ir MAILING ADDRESS LID FEE $ UJI TESCP Approved U Zo S E N a E I JNJAOD D R I P LA1 PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP RW Prifirut RequIred 3.3 to cc 47'r Street Use Penrut Roq'd XIS CITY EXISTING - PROPOSED Inspection Required ZIP TELEPHONE Sidewalk Required q2 REQUIRED DEDICATION- Fir Underground inn is ui_ NAME METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED YES 13 NO E3 t,77 I I- - - ADDRESS Y/ CITY ZIP I TELEPHONE _/3S7 NAME C8L# - Cv_ m ADDRESS 0 15 P , (_ I /I - (7 X' CITY ZI P TELEPHONE 0 OA LY,�, v u- loo s`rATE LICENSE NUM13ER EXPIRATION DATE CHECKED L _ C / ;�JPROPERTY TAX ACCOUNT PARCEL -NO. 0 / C') NEW RgSIDENTIAL ADDITION REMODEL MULTIFAMILY REPAIR GRADING CYDS DEMOLISH TANK GARAGE o RETAINING WALL z CARPORT ROCKERY (TYPE OF USE, BUSINESS OR ACTIV" EXPLAIN: NUMBER NUMBER OF DWELLING OF 0 STO UNITS RIES DESCRIBE WORK TO BE DONE HEAT.SOLI�CE GLAZING % 13 PLUMBING / MECH 1:1 COMPLIANCE OR OF USE CHANGE 1:1 SIGN FENCE I X F9 E] 071)ER K e QL ri c t> FIRE SPRINKLER FIRE ALARM CRITICAL [411fj AREAS 41 NUMBER L?T L PE % DATE --?If re, V_-� I THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: 180DAYS PERMIT LIMIT. I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS IN INTEREST, AGREES TO INDEMNIFY. DEFEND AND HOLD HARMLESS THE CITY OF 2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE 0 NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION. - I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- TION: AND IN DOING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND FIC W 18,27. SIGN7 ,)RE (OWNER ��G`ENT),­) DATE SIGNED .ZIA REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE EERING REVIEWED BY DATE V DATE L cl �CLI�NER ADB# INSPECTION BON D REO'D POSTED f!^­lp7 JOYES XNO S 0 z z 6 z W LLJ SEPA REVIEW SIGN REA HEIGHT COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED PROPOSED __XF` x, LOT COVERAGE REQUIRED SETBACKS (Fr.) PROPOSED SETBACKS (FT) ALLOWED PROPOSED FRONT SIDE REAR FRONT,, LIRSIDE REAR z PARKING I LOT AREA PLANNING R VIEW 0 Y DATE REQ-0 I PROVIDED --I— I I f(d REMARKS CHECKED BY JTYPE?�F T51LICTION CODE OCCUPANT 'VON GROUP SPECIAL INSPECTION JAREA OCCUPANT REQUIRED F] YES IOAD PROGRESS INSPECTIONS PER UBC 108 / ISCII 09 If IRCII 09 FINAL INSPECTION REQ'D bl 724A/I'D /11 . ./i r- i2l-.r )��;-Af- VALUATION $ /) /rl ­ DescriptIon FEE Description FEE Plan Check State Surcharge 'Building Permit City Surcharge .:f2 Plumbing Base Fee Mechanical Grading Engr. Review Engr. Inspection Fire Review Plan Chk. Deposit Fire Inspection Receipt # Landscapelnsp. Total Amt. Due Recording Fee Receipt # APPLICATION APPROVAL 1 CALL This application is not a permit until signed by the Building Official or his/her Deputy: and Fees are paid, and FOR INSPECTION receipt is acknowledged in space provided. I OF -IC-IALTSIGYATUPE DATE (425) i, 144134; 41,- 771-0220 do TBY_ 6ATE 1� � I A77ENTION t:A I IT IS UNLAWFULTO USE OR OCCU PYA BUILDING OR STRUCTURE UNTILA FINAL INSPECTION HASBEEN MADE AND APPROVALOR A CERTIFICATE OF OCCU- PANCY HAS BEEN GRANTED. UBC109/IBC110/IRC110. 09/03 PRESS HARD -YOU ARE MAKING 4 COPIES ORIGINAL -FILE YELLOW' INSPE?tTC PINK - OWNER GOLD - ASSESSOR z 0 M -I -n 0M C M 0 0 0 0 C rn M Z JO —i 0 _n n X > M M 0 i-n 0 r- 0 M Cn Cn M Z z -1 3: Cn z 0 4 0 M I SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT EXEMPTION Project Location: 336 Admiral Way Applicants: Robert Yeager for tile Port of Edmonds Project Description: Replacement of fuel float gangway with one (1) new gangway. Replacement of kayak float gangway with gangway from fuel float. Floats to rei-nain in same location; no new over water coverage proposed. See Attached: R1 Site Plan 0 Elevation lber: PC-04-0466 Plan Check Nun Date Issued: October 18, 2004 SEPA Determination: Exempt Issued by: Ross Beckley, Planner The above project has been determined to be. exempt from the requirement to obtain a Shoreline Substantial Development Permit under WAC 173-27-040(2)(b), which states: Normal maintenance or repair of existing structures or developments, including damage by accident, fire or elements. "Normal maintenance" includes those usual acts to prevent a decline, lapse, or cessation from a lawfully established condition. "Normal repair" means to restore a development to a state comparable to its original condition, including but not limited to its size, shape, configuration, location and external appearance, within a reasonable period after decay or partial destruction, except where repair causes substantial adverse effects to shoreline resource or environment. Replacement of a structure or development may be authorized I as repair where such replacement is the common method of repair for the type of structure or development and the replacement structure or development is comparable to the original structure or development including but not limited to its size, shape, configuration) location and external appearance and the replacement does not cause substantial adverse effects to shoreline resources or environment; This exemption is not being sent to the Department of Ecology because it appears to City staff that it is not subject to U.S. Army Corps of Engineers section 10 pernlit under tile Rivers and Harbors Act of 1899 (tile provisions of section 10 of the Rivers and Harbors Act generally apply to any project occurring on or over navigable waters. Specific applicability information should be obtained from the Corps of Engineers.) Nor does the project appear to City staff to require a section 404 permit under the Federal Water Pollution Control Act of 1972. (The provisions of section 404 of the Federal Water Pollution Control Act generally apply to any project which may gr-40py %-,, MICROFILM 4--mlT\v Z 0 1 0 M involve discharge of dredge or rill material to any water or wctland area. Specific applicability information should be obtained from the Corps of Engineers.) Robert Fritzen has advised us that per WAC 173-27-050, no letter is required to be sent to Department of Ecology. While this letter provides ail exemption from the need to obtain a Shoreline Substantial Development Permit from the City of Edmonds, it does not evaluate whether other State and Federal approvals arc required and leaves that responsibility to the applicants. Ross Beckley October 18, 2004 Name Signatur Date M cc: Street file for 336 Admiral Way Cn Shoreline Pen -nit Exemption File M C M 0 0 0 C M M Cn 0 -n -n M M 0 CI) 0 r 0 M C CO 9 Cn m 0 0 0 Page 2 ol'2 00or SOUTH MARINA M MID —MARINA u V, M,-, r FLkL FLOAT F G GWAY z -4 9 om c YAK mo 0 --40 NGWA 0 c: 3: M M Z jo -4 c —Z 0 -n OR -n TnTFTIT FFI m m 0 0 0 rn C C/) 9 c() M 0 —A-DIVII-RAt—WA-lf Z DRYSTACK YARD cn z Ida P �11 �TP R ��ObP E��R� Por7- 0-� 6-JA,%4AJ� 6-4,11w1k lqe Ocl— LOCATION MAP 0 50 100 200 300 FT. tmo� ow 02/24/2005 15:13 FAX 425 774 7837 PORT OF EDMONDS 002/006 MEMORANDUM Z, 0 0 M 0 M Date: Inuary 21, 2005 C M 0 0 To: Mr. Michael Snook 0 C Senior Combination Building Inspector M City of Edmonds M z C Rayjohnson From: 1.)ioject InspectOt of Record 0 -n M Subiect: Inspection Report —G-angway Replacement 3: M M 0 r- 0 M Noverabe-z 30, 2004 C Cn 9 CD M 0 r5en Construction CompvLny removed the old. gangway Z r- on November 30, 2004, S. L. La 9.y at the Kayak f102t All Biltj anchor bolts gan9w from the fuel dock- and re -installed the old X were jnstalled as per specifications at the Kayak- float gallgway' --I X z z 0 0 M MICROFILM CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT The projectat 9 a (—�/,r z number , — 4,�� — requires special ins'pecti4 complete list of special inspections is attached to this document. issued undel- building permit and/or testing per IBC Chapter 17. The BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector sliall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgenients. APPROVAL OF SPECIAL INSPECTORS: Each special inspector sliall be approved by the Building Official prior to performing any duties or inspections. Each special inspector sliall submit Statement of Qualifications to the Building Official for review. Special inspectors sliall display identification when performing special inspections on site. Special inspection and testing shall meet the mininitin, requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector 1. Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis—ineaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector sliall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any iteni not resolved in a tiniely manner sliall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or oinission. It sliall also be the duty of the special inspector to promptly iioti�y the engineer or architect. 3. Complete Daily Reports Each special inspector shall complete and sign both the special inspection record and the daily report form for each (lay's inspection. These records shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency sliall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated sliall also be copied on reports. Weekly reports must include the following: Description of daily inspections and tests made Nvith applicable locations List of all non-conforining items Report on status of non -conforming items (resolved or unresolved) Itemized cb.-i, 7es authorized by the Architect, Engineer and City if not included in non- conformance items. -5. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of L:\'I'EMP\BUILDING\SpecialliispectioiiAgreeiileiitIBC.doc 7/04 z 0 1 0 M =1 =n- CA -q 0 M C M 0 0 0 0 C -1 C X M M Z JD --I C —Z o -n n M M 0 0 0 M C 0) 90) Q 0 Z z 0) z 0 1 0 M his/her knowiedge tile project is in conformance with the'approyed plans and specifications, approved change orders and the applicable workmanship provisions of tile IBC- Itell's 'lot in conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed inspections, periodic inspection Whell continuous inspections were required, etc.) shall be specifically itemized in this report. 13. Contractor Responsibilities Notify the Special Inspector it is tile duty of tile contractor to notify the special inspector when work is ready for special inspection. Note, the items listed oil the attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. z 0 2. Provide Access to Approved Plaits The contractor is responsible for providing tile special inspector access to approved plans at the 4 0 M jobsite. q 9 3. Retain Special Inspection Records 55 0 1 records submitted by the The contractor is responsible to retain at the jobsite all special hispectio I M C 0 special inspector. These records are to be provided to the City building inspector upon request. M 0 —1 0 0 C C. City of Edmonds Builditill Department Responsibilities —i K M M 1. Approve special inspectors or inspection agencies M Z g) -1 The building department shall approve all special inspectors and special inspection requirements. C —Z r- 2. Monitor special inspection and approve weekly reports CD Work requiring special inspection and the performance of special inspectors shall be monitored by 0 -n -n the City Building Inspector. His/Her approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 9 M M 3. Issue Certificate of Occupancy after all weekly special inspection reports The Building Official may issue a Certificate of Occupancy 0 0 0 M C: Cn including the final report have been submitted and accepted. 9 Cn M 0 Z D. Owner Responsibilities of record acting as the owner's agent shall fund The project owner or the engineer or architect X --4 special inspection services. M > z E. EnIzineer or Architect of Record ResngR�!� the plans and The engineer or architect of record sliall include special inspection requirements on --I M CD specifications. ACKNOWLEDGENIENTS z 0 I I read a d agree to cotnplj� ivith the terins and conditions of this agreenient. C) M Lh;ve Date Owner Date Special Inspector )ate General Contractor n V, /4 Date City Building Official -77- L:\TEMP\BUILDING\SpcciallilspectioiiAgreciiieiitIBC.doc 7/04 FINAL PROJECT APPROVAL FORM TO: DATE: 'MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE_4�::_�(�:�)s PLEASE GN ENGINEERING DIVISION DATE PLEASC SIGN PLANNING DIVISION DATE PLEASESIGN PROJECT SITE ADDRESS _�3 6., A PERMIT # ADB# DATEINSPECTED 7-C) e-f C DESCRIPTION OF WORK TO BE INSPECTED A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: >�--GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fom1s:ocaprv1 3/25/04 z 0 M ,q 9 0 M C M 0 0 --1 0 0 C --I K r M M Z :cnE 0 -n n ;u __4 > r K M M 0 0 0 M Cn (n M C) Z r- M X z Cn z 0 A 0 M FINAL PROJECT APPROVAL FORINI TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: e- FIRE DEPARTMENT DATE2—,2--V =0 P UKX.9 E �1 G N ENGINEERING DIVISION DATE PLEASESIGN PLANNING DIVISION DATE PLEASUSIGN PROJECT SITEADDRESS A_-�XaA PERMIT # —9-(1 , �t. 0 kK 7 ADB#__________�DATE INSPECTED —2— —6-5 DESCRIPTION OF WORK TO BE INSPECTED L,-Q 01- 7-- A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GIANT PROJECT APPROVAL WITH CONDITIONS NOTED El Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor.by inpector I . 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fonns:ocaprv1 3/25/04 z 0 1 0 M --I -n 0 M C M 0 0 0 0 C: --I K M M M Z C) --I C Min 0 _n n ;u > M M 0 0 0 M C 0) 9 Cn M 0 Z r z z 0 M �' M . M nl.. RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall.......................... Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -In ................... Commercial Final ...... HEATING: GasTest .................... Gas Piping ................. Equipment ................. Commercial Final ....... EXTERIOR SHEATHING NAILING.......................... FRAMING........................ FIRST FLOOR FRAMING ... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. z 0 4 0 ITI --I -n 3: M C ITIO 0 C-) 0 C: --I K 3: M ITI z co 0 _n n MITI 0 0 0 M C C/) 9 Cn M 0 Z 7-1 z --I Z: Cj) z 0 IT!