Loading...
20040906.pdfDATE RECEIVEDY/ '0 V SE ONE U CITY OF EDMONDS Z CONSTRUCTION PERMIT APPLICATION A OWNER NAME/NAME OF BUSINESS L5es>j,-�L -/,-) e"— ;,-t) W M MAILING WRESS z ­7 0 CITY ZIP TELEPHONE ix—, CX�75_ z�ll 7z NAME t: ADDRESS CITY ZIP TELEPHONE NAM CBL# E m 0 ADDRESS I It .j CITY ZIP TELEPHONE 0 U I STATE LICENSE NUMBER EXPIRATION DATE CHECKED BY PROPERTY TAX ACCOUNT PARCEL NO. ul 49. �,/ W_ n �,_ /1 E 4:51 , - - NEW >�RESIDENTIAIL P LUMBING / MECH /XCOMPLIANCE OR ADDITION COMMERCIAL CHANGE OF USE REMODEL MULTIFAMILY SIGN GRADING FENCE REPAIR CYDS ( X FT) DEMOLISH TANK OTHER GARAGE RETAINING WALL FIRE SPRINKLER z CARPORT ROCKERY FIRE ALARM [TYPE OF USE, BUSI" OR ACTIVITY) EXPLAIN: NUMBER NUMBER OF CRITICAL OF DWELLING AREAS 0 UNITS NUMBER DESCRIBE MfRK TO BE DONE C; c-, -oe 7 7! ��14 /- < _15 HEAT SOURCE GLAZING % LOT SLOPE % ECK NO: VESTED DATE THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO I= BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. W PERMIT APPLICATION: ISO DAYS PERMIT LIMIT. I YEAR - PROVIDED WORK IS STARTED WITHIN 160 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT. ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF M EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND M ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE. ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE 0 NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION., I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONsrRuc- TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. SIGNATTU 'NER R AGENT) DATE S[NED )a DDRE' PLAT NAME/SUBDIVISION NO. PERMIT EXPIRES PERMIT NUMBER n,e 7UP LOT NO. PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP EXISTING — PROPOSED REQUIRED DEDICATION— Fr METER SIZE I LINE SIZE I NO. OF FIXTURES LID NO LID FEE $ TESCP Approved [3 RW Permit Required [3 street use Permit R0Q'd E3 In5paction Required 0 Sidewalk Required E3 Underground Wiring required [3 PRV REQUIRED YES 0 NO 13 IEMARKS )WNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE APRESSUREREGULATORWYE(PW NGINEERING 4 J:�,/ / :IRE REVIEWED BY -),7/- 4 VARIANCE OR CU AM SEPA REVIEW 'OMPLETE - EXEMPT 7fi-, FITA94 z z E5 z LU DATE LU cc SHORELINEORADBI I INSPECTION BOND REO'D POSTED OYES ONO IS GIN AREA HEIGHT FALLOWSE'D . PROPOSED I ALLOWED , PROPOSED1 LOT COVERAGE REQUIRED SETBACKS (Fr.) PROPOSED SETBACKS (IT) 11LOWED PROPOSED FRONT SIDE REAR FRONT L/R SIDE REAR z PARKING LOT AREA PLANNING REVIEWED BY DATE �EQ'D I PROVIDED I I a. 3EMARKS 'HECKED BY I TYP 0 STPUCTION E OCCUPANT GROUP SPECIAL INSPECTION OCCUPANT REQUIRED [:] Y JAREA LOAD a IEMARKS z IROGRESS INSPECTIONS PER UBC108/1EIC109/1FIC109 FINAL INSPECTION REQ'D - VALUATION 8 ' :PALL Bil INSFrALLBD ON THE $ Vt UN 8 TfW. 1111ILM-R? Description FEE Description FEE Plan Check State Surcharge Building Permit City Surcharge Plumbing Base Fee Mechanical Grading Engr. Review Engr. Inspection Fire Review I Plan Chk. Deposit Fire Inspection Receipt # Landscapelnsp. t.Due ;p Recording Fee CALL FOR INSPECTION (425) 771-0220 ATTENTION I I EXT 1333 ITIS UNLAWFULTO USE OR OCCUPYABUILDING OR STRUCTURE UNTILAFINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCU- PANCY HAS BEEN GRANTED. UBC109/IBC110/IRC110. I Receipt # W APPLICATION APPROVAL This application is not a permit until signed by the Building Official or hisitier Deputy: and Fees are paid, and receipt is acknowledged it) space provided. 09/03 PRESS HARD -YOU ARE MAKING 4 COPIES ORIGINAL - FILE YELLOW - INSPECTOR PINK - OWNER GOLD - ASSESSOR z 0 4 0 ITI —i -n 5-4 0 M C M 0 0 0 0 C —i K X M M z ,C) C: Cn 0 _n n M ITI 0 0 0 M C Cn r, cn M 0 Z 3: z --I a: 0) z 0 i 0 ITI I FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PLEASE SIGN ENGINEERING DIVISION DATE PLEASE SIGN PLANNING DIVISION DATE PLEASE SIGN PROJECT U5 SITE ADDRESS /1z_ V/ PERMIT #,Z&W4 - (Z -9 9 A—ADB# DATE INSPECTED f DESCRIPTION OF WORK TO BE INSPECTED A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED El Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 1. OA a RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:ten1p:b1dg:fomis:ocaprv1 3/25/04 0 M C M 0 0 C) 0 C: ­4 K = M M Z Cn 0 _n n M M 0 0 0 M cf) U) M C) Z r- M r z z 0 1 0 M i = 0 r- v INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall .......................... Pier/Porch ................. z 0 Retaining Wall ........... -4 Slab Insulation .......... ITI PLUMBING: Underground ............. M Rough -In ................... IT! 0 —10 0 Commercial Final ...... C --j HEATING: M M z Gas Test .................... C Z -4 Gas Piping ................. Equipment ................. 0 -n -n Commercial Final ....... M M EXTERIOR SHEATHING 0 NAILING .......................... 0 0 M FRAMING ........................ C: C/) Cn �AVIING ... M 0 Z TION it !,i,; Fldoelnsdlifion z Wall Insulation ........... __4 Ceiling Insulation ....... z SHEETROCK NAILING ... 0 I SPECIAL INSPECTION ... 0 IT! MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY ..................