20040935A.pdfDATE RECEIVED
C1W OF EDMONDS
CONSTRUCTION PERMIT APPLICATION
OWNER NAME1*ME OF BUSINESS
e 1,� e
J_0L CI�T 1111Al L C,
MAILING ADDRESS
�1� 0'/
fE _rE
CITY ZIP TELEPHONE
C/
NAME
ADDRESS
CITY
ZIP ITELEPTIONE
NAME CULT U
ADDRESS
CITY ZIP ITELEPHONE
/P ;z P6
STATE LICENSE NUMBER EXPIRATION DATE CHECKED BY
j PROPERTY TAX ACCOUNT PARCEL NO.
'54
M NEW 0,201 RESIDENTIAL PLUMBING/ MECH
00
COMPLIANCE OR
ADDITION COMMERCIAL CHANGE OF USE
REMODEL MULTIFAMILY SIGN
GRADING FENCE X FT)
REPAIR CYDS El (
DEMOLISH E] TANK El OTHER
GARAGE RETAINING WALL FIRE SPRINKLER
z CARPORT ROCKERY FIRE ALARM
(TYPE OF USE, BUSINESS OR ACTIVITY) EXPLAIN:
rx 1911,114r,�F F
U) EfR CRITICAL
Lu NUMBER B OF
U
'3 OF OW IELLING AREAS
Ts
0 STORIES JUN: A
M NUMBER
DESCRIBE WORK TO BE DONE
k/
r
LOPIZ�-` /TAP, Z),41r1,4V Aa--lie-125�7eZ
H�AT 09OURCE
el,zll
GLAZIN_G %
I
LOT SLOPE %
I rlk%�Iel
PLAN CHIECK NO: 05��
I VESTED DATE
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO
BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC
DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE
SEPARATE PERMISSION.
PERMIT APPLICATION: 180DAYS
PERMIT LIMIM I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS
IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF
EDMONDS, WASHINGTON, ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND
ALL CLAIMS FOR DAMAGES OF WHATEVER NAT URE, ARISING DIREC FLY OR INDIRECTLY
FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT HE
DEEMED TO MODIFY, WAIVE OR REDUCE ANY REOUIREMEN T OF ANY CITY ORDINANCE
NOR LIMIT IN ANY WAY THE CIrYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION.'
REBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION, THAT THE INFORMATION
RIZED AGENT OF
I VtEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHO
��iE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC.
TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED
IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO
WORKMEN'S COMPENSATION _NSURANCE AND RCW 18,27.
SIGNATURE (OWNE 0 GEN
DATE SIGNED
! J, /17 r) IJ
USE
ZON
JOB
ADDRESS
PLAT NAMEISUBDIVISION NO
E
PERMITEXPIR S 4�6
PERMIT
NUMBER
SUITEIAPT11
, 0.1
LOT NO.
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP
EXISTING - PROPOSED
REQUIRED DEDICATION- FT
ME I ER SIZE LINE SIZE NO. OF FIXTURES
LID NO,
LID FEE S
ILSCP Approved
9
RW Permit Required
13
Street Use Porma Rnq'd
13
Inspection Roqtjltod
Q
Sidewalk Fiequited
E3
Underground
13
Wiring required
PRV REQUIRED
YES 13 NO E3
REMARKS
OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE
ENGINEERING REVIEWED BY DATE
FIRE REVIEWED BY DATE
VARIANCE OR CU SHORELINE OR ADB# I INSPECTION BOND
O'D POSTED
13 - 116 M - 02- - it 7__1 E-YES 11NOIS
SEPA REVIEW SIGN AREA HEIGHT
COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED PROPOSED
tl�_ 1 0 !I4A
EXP /,4n -1, 1
LOT COVERAGE REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (FT)
ALLOWED PROPOSED FRONT SIDE REAR FRONT LJR SIDE REAR
tVA i 0, /%/A
PARKING LOT AREA I PLANNING REVIEWED BY DATE
REO'D I PROVIDED
tVII
REMARKS x
WA pym4- llsye)l 10/17-/0-4 O&At 7-- 0 2-413
CHECKED BY TYPE OF)O�NSTRUCTION C6f)E OCCUPANT
1 1 z?3 GROUP
SPECIAL INSPECTION JM�EA� OCCUPANT
REQUIRED rl YES LOAD
a
Z
ac
W
z
z
5
rLi
LU
tr
11:
0
z
E
z
5
12.
0
REMARKS z
PROGRESS INSPEC71ONS PER UBC 108 / IBC109 If IRC1 09 FINAL INSPECTION REO'D FS
I
VALUATION
Description
FEE
Description
FEE
Plan Check
State Surcharge
Building Permit
City Surcharge
IY_
Plumbing
Base Fee
Mechanical
Grading
Engr. Review
Engr. Inspection
Fire Review
Plan Chk. Deposit
Fire Inspection
Receipt #
Landscapelnsp.
777JTotal
Amt. I
Recording Fee
Receipt #
CALL
FOR INSPECTION
(425)
771-0220 L
APPLICATION APPROVAL"
This application is not a permit until signed by the
Building 011icial or his/her Deputy: and Fees are paid, and
receipt is acknowledged in space provided
OFFICIALS SIGNATURE DATE
--w—r fV, BY DATE
ATTENTION I
IT IS UNLAWFULTO USE OR OCCUPYABUILDING OR STRUCTURE UNTILAFINAL
INS P ECTI ON HAS 6 E EN MAD E AN D APPROVAL OR A C E RTI FI CATE OF OCCU -
PANCY HAS BEEN GRANTED. UBC109/IBC110/IRC110.
09/03 PRESS HARD -YOU ARE MAKING 4 COPIES
IWJ/ 4 z � a 2 / //
ORIGINAL - FILE YFI I OW � IN
PINK - OWNER GOLD - ASI
z
0
i
0
M
--I -n
0 M
I:=
M
0
0
0 C:
4 K
X M
M z
x
(n
0 _n
n
M M
0 _Cn
0 r_
0 M
Cn
Cn
Q 0
Z
71
X
z
--i
z
0
1
0
M
0
HORIZONTAL DATUM: ASSUMED
BASIS OF BEARING: PLAT OF BALLINGER SHORES
Source: Reid Middleton 2001
_0
X11
M
C)
C-3
rn
M
Welland 6oundary
0 monument in case
0
0
CD
------ Welland 6uffer zone
0 Welland flag, as noted
C:ON
6uilding 3el-6ack
x t23.45 spot elevation
Approximate Scala in Foot
=71
C=
rn
4
_r_-
01 sample plot location
fence line
M
COX -LAKE BALLINGER
_1^ M
Message
Graf, Jeannine
From: Pater, David [DAPA461 @ECY-WA.GOV]
Sent: Thursday, February 10, 2005 2:22 PM
To: 'Gruwell, Meg'
Cc: 'brockdwb@dfw.wa.gov'; 'Alan'; Graf, Jeannine
Subject: RE: Cox lake BaIllinger dock permit SM-02-112
Meg,
Thanks for the project follow-up. The photos document the pier removal well. I'll include them in the permit file.
David Pater
Shorelands and Environmental Assistance Program
Department of Ecology
3190 160th Avenue SE
Bellevue, WA 98008
tel. (425) 649-4253
Pagel of3
z
0
q
0
M
C _Z
----- Original Message -----
X
From: Gruwell, Meg [mai Ito: G ruwell@ci.edmonds.wa -us]
Sent: Thursday, February 10, 2005 1:40 PM 0 -n
n
To: Pater, David
Cc: 'brockdwb@dfw.wa.gov'; 'Alan'; Graf, 3eannine
Subject: RE: Cox lake BaIllinger dock permit SM-02-112 m m
0 5
0
On February 10, 2005, 1 did a final inspection of the Cox Dock on Lake Ballinger and confirmed that the 8- by 24-foot section 0 rn
of the "L" portion of the pier located immediately parallel along the shoreline had been removed as required by the December C (D
9 Cn
18, 2002, letter from Jeannie Summerhays. That letter requested that photos be forwarded to Ecology. I am e-mailing them M 0
to you, but if for some reason that doesn't work, could you please let me know if you want them to be mailed? The Z r—
oved. The posts in the water and the dead
photographs are all taken looking across the area where the pier was rem
X
vegetation on the land show where the pier used to be. Thank you.
z
CD
----- Original Message ----- z
From: Pater, David [mailto:DAPA461@ECY.WA.GOV] 0
Sent: Tuesday, November 23, 2004 8:27 AM I . i
0
To: 'Alan' m
Cc: 'brockdwb@dfw.wa.gov'; 'gruwell@ci.edmonds.wa.us'
Subject: RE: Cox lake BaIllinger dock permit SM-02-112
Alan,
Enclosed is copy of the extension letter. I have sent hard copies to the Coxs WDFW and Edmonds too.
There is an incorrect date for the original permit approval oil the hard copy letter. The date should be December 18th 2002. Sorry
for the mix tip.
2/10/2005
Message
Page 2 of 3
David Pater
Shorelands and Environmental Assistance Program
Department of Ecology
3190 160th Avenue SE
Bellevue, WA 98007
tel. (425) 649-4253
----- Original Message -----
From: Alan [nia i Ito: fo te 1, fro 11 tc o 11 s truc t i o 11. C o nl]
Sent: Monday, November 22, 2004 10:07 AM
To: Pater, David
Cc: 'brockdwb @dfw.wa.gov'; 'gruwell@ci.edmoiids.wa.us'
Subject: RE: Cox lake BaIllinger dock permit SM-02-112
M
David: Thank you very much for the forthcoming 60 Day extension. When you
—4
3:
have the letter ready, could you please send me an electronic copy as well.
C
For mailing, our address is:
0:
M 0
—10
Waterfront Construction, Inc.
0 C:
Alan D. Foltz. Permit Coordinator
M
205 NE Northlake Way, Suite 230
M Z
Seattle, WA 98102
C
>
Please be sure to send copies to David Brock at WDFW, Mill Creek, and to Meg
Cn
Gruwell at City of Edmonds.
0 -n
By copy of this communication to David and Meg, I am hopeful that WDFW may
M M
be able to send us a revised HPA (ST-G2493-01) or supplement letter on the
expiration date;
0 r-
0 M
and that Meg Gruwell may be able to send an email on the revised expiration
C Cl)
date for 2004-0935.
9 C/)
M Or
Both parties had agreed to allow the extension, with your approval at DOE.
Z
;U
We appreciate your help with this. Sincerely,
Z
A;an D. Foltz
Permit Coordinator
Waterfront Construction, Inc.
Z
Foltz@waterfrontconstruction.com <iliailto:Foltz eniwatel-frolitcolisti-tictioii.coin>
0
M
----- Original Message -----
From: Pater, David [SMTP:DAPA461@ECY.WA.GOV]
Sent: Friday, November 19, 2004 11:54 AM
To: 'foltz@waterfrontconstniction.coiii1
Subject: Cox lake BaIllinger dock permit SM-02-112
2/10/2005
Message
Page 3 of 3
Alan,
I'll be dealing with the permit time extension for the Department of
Ecology. I have received input from Meg Gruwell and David Brock on the
project.
I just put together an approval letter for a 60 day extension of the
construction/ demolition timeline for the L section of the dock.
I'd like to mail you a hard copy of the approval letter. Can you
Z,
send me your address.
0
T'hanks
O�
M
-v
Cn 4
'IJ
David Pater
0 M
C
�0
Shorelands and Environmental Assistance Program
M 0
Department of Ecology
0
0 0-
3190 160th Avenue SE
C,
Bellevue, WA 98007
M
M
tel. (425) 649-4253
cz,
0 -nt
M
M
0
Om
C cn�
M 0,
Z
X
Z
CO,
z
0
01
M
2/10/2005
a
S t A 7-t-
4t)
STATE Of WASHINGTON
DEPARTMENTOF ECOLOGY
Northwest Regional Office 3190 100th Avenue SE Bellevue, JAashinglon 98008-5452 (42.5) 649-7000
December 18, 2002
Meg Gruwell I certify that I mailed a copy of this
City of Edmonds document to the persons and addresses
121 Fifth Ave N listed thereon, postage prepaid, in a
Edmonds, WA 98020 receptacle for United States mail in
-Bellevue, Washington on 2002.
Murl and Jolene Cox
7409 242"d Place SW
Edmonds, WA 98020
Dear Ms. Gruwell and Mr. and Ms. Cox:
Re: City of Edmonds Permit #SM-02-112
Murl and Jolene Cox - Applicants
Shoreline Substantial Development/Variance Permit #2002-NW-30080
The Department of Ecology has reviewed the above -referenced shoreline permit to retain an existing
private -use dock on Lake Ballinger. The dock consists of an L-shaped pier at the shoreline edge with a
30-foot by 8-foot 3'V2-incli float attached to the pier. The pier section that is perpendicular to the take
edge (in line with the attached float) measures 8-feet by 20 feet 3 Y2-inches. The "L" portion of the pier
measures 8 feet by 24 feet and is connected along the north side of the perpendicular portion of the pier
12 feet 2 1/4-inches out from where the perpendicular portion is attached to the upland.
We concur that the proposal, as conditioned by the City of Edmonds, meets the intent of the master
program and the criteria set forth in WAC 173-27-170 for granting a variance with the addition of the
following conditions:
I . To provide consistency with the goals and policies for preservation and restoration of shoreline
resources under the Shoreline Management Act (Chapter 90.58 RCW) and the Edmonds
Community Development Code Conservation Goals and Policies (ECDC 23.10.85) and in
support of the 1989 Presidential Order for "No Net Loss of Wetlands," the applicant shall
remove, within two years from the transmittal date of this approval letter, the 8- by 24-foot
section of the "L" portion of the pier located immediately parallel along the shoreline (see
Attachment A).
Following completioii of the removal of the pier section, photographs documenting the site shall
be forwarded to the City of Edmonds and to Ecology at the following address: Attn: Shoreline
permitting, Washington Department of Ecology, 3190 160"' Avenue SE, Bellevue, WA 98008.
2. Upon future reconstruction or repair of the remaining pier and/or float, the applicant shall obtain
appropriate permits and adhere to current Washington Department of Fish and Wildlife (WDFW)
design standards so as to minimize impacts to wetland functions and fish resources.
3. The applicant hereby authorizes Ecology staff and their designees to have access to the subject
property for the purposes of compliance inspection and monitoring. Such right of access shall
begin from the date of the receipt of this letter, during construction and extend for a period of
Z
0
0
M
OM
C
MO
0
--1 0
0 C
3: M
M Z
Cn
0 -n
n
M M
0
0
0 M
C CD
9 CO
Q 0
Z
M
Z
Z
0
i
0
M
Meg Gruwell
Murl and Jolene Cox
December 18, 2002
Page 2
five years following project completion. Ecology staff must provide reasonable verbal notice to
the applicant or their designee prior to coming onto the property.
The permit is hereby approved. This approval is given pursuant to requirements of the Shoreline
Management Act of 197 1. Other federal, state, or local approvals may be required.
Those developments and activities authorized by the subject permit may not begin until twenty-one (21)
Z
0
da s after the transmittal date of this approval letter, or until conclusion of any review proceeding
y
0
ap peal) initiated within the twenty-one day period. The Shorelines Hearings Board will notify you by
letter if this permit is appealed.
If you have any questions on the above action, please contact Joan Velikanje at 425/649-4253.
C
Sincerely,
M
00,
=ion �isor
C.
Jeannie Surnmerhays, Sec Supe
X M
M Z�
Shorelands and Environmental Assistance Program
C Z
JS.jv
Attachments
CD
0 -n
n ;d
cc: David Brock, WDFW
>
M M
0 0)
0
0 M
V)
0)
M 0'
Z
Z
Z
0
„t;STA
IV
� �n:t-
.0
3;) 04
STATE OF WASHINGTON PLAN/V11V(3 D6PT
DEPARTMENT OF ECOLOGY
Nortinvest Regional Office 3190 160th Avenue SE o Bellevue, Washirk4lon 980011-5452 (425) 649-7000
November 19, 2004 BUILDING
Meg Gruwcll NOV 3 0 2004
Development Services Department
City of Edmonds
121 - 5'hAvenue North
Edmonds WA 98020
RE: City of Edmonds Shoreline Permit #SM-02-112 extension
Dear Ms. Gruwell:
I am responding to a request from Alan Foltz of Waterfront Construction who is representing the
pernlitces, Murl and Jolene Cox. Tile original permit was required to allow the previous
unpermited dock to remain on Lake Ballinger.
A December 18, 200,X letter from tile Department of Ecology approved tile pen -nit based on a
-or removing the "L”
number of conditions. Condition number I discusses a two year deadline f
section of the dock. This deadline expires on December 18, 2004. Mr. Foltz is requesting a 30-
60 day extension of this construction/ demolition timeline.
You have indicated that the applicant and their contractor need this additional time to comply
-r
with the Department of Ecology pen -nit condition. I have also received an email f om David
Brock (State Department of Fish and Wildlife) indicating their willingness to extend the project
Hydraulic Project Approval Permit based on Ecology's decision.
Ecology approves of extending the permit constiuction/demolition deadline date until February
16,2005.
If you have any questions please give me a call at (425) 649-4253.
le -A A6 4��Uwll
Iva,
1111W 4 6
v //, e- � lea
e), S—.
Sinc
i ter
Shorelands Specialist
DP:rc
cc: David Brock, State Department of Fish and Wildlife
Murl and Jolene Cox
Alan Foltz, Waterfront Construction
Z
0
q
0
M
NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE
IT IS DUE TO THE QUALITY OF THE DOCUMENT.
ATTAC11MENT B.
Basic Footprint of
Southern Dock and Float
Property Address:
7409 242nd Place S. W., Edmonds, WA 98026
C\1
8 ft, 3 1/2"
FLOAT
C4
r
1,1h
30 ft
V)
PERMANENT PIER
Removable
It Chains
ZZ,
8ft
L2O
20 ft
ft
Q�l
24 ft
r)
SHORELINE
LU
7L
TO BE REMOVED
SECTION
Site Plan - Cox dock illustrating "L"- shaped pier and 8- by 24-foot section to be removed per Ecology
Condition #1 of shoreline pennit.
','I A 14-t
to
40
STATE OF WASHINGTON P14 '9
4;IfV0 4969?
DEPARTMENT OF ECOLOGY L%Dr
Northwest Regional Office 3190 1601h Avenue SE Bellet'lle, W-3shinglon 98008-5452 (425) 649-7000
December 18, 2002
Meg Gruwell I certify that I mailed a copy of this
City of Edmonds document to the persons and addresses
121 Fifth Ave N listed thereon, postage prepaid, in a
Edmonds, WA 98020 receptacle for United States mail in
Bellevue, Washington on P4V
y1Y, 2002.
Murl and Jolene Cox
7409242 nd Place SW
Edmonds, WA 98020
Dear Ms. Gruwell and Mr. and Ms. Cox:
Re: City of Edmonds Permit #SM-02-112
Murl and Jolene Cox - Applicants
Shoreline Substantial Development/Variance Permit #2002-NW-30080
The Department of Ecology has reviewed the above -referenced shoreline pen -nit to retain an existing
private -use dock on Lake Ballinger. The dock consists of an L-shaped pier at the shoreline edge with a
30-foot by 8-foot 3 Y2-inch float attached to the pier. The pier section that is perpendicular to the lake
edge (in line with the attached float) measures 8-feet by 20 feet 3 Y2-inches. The "L" portion of the pier
measures 8 feet by 24 feet and is connected along the north side of the perpendicular portion of the pier
12 feet 2 1/4-inches out from where the perpendicular portion is attached to the upland.
We concur that the proposal, as conditioned by the City of Edmonds, meets the intent of the master
program and the criteria set forth in WAC 173-27-170 for granting a variance with the addition of the
following conditions:
I . To provide consistency with the goals and policies for preservation and restoration of shoreline
resources under the Shoreline Management Act (Chapter 90.58 RCW) and the Edmonds
Community Development Code Conservation Goals and Policies (ECDC 23.10.85) and in
support of the 1989 Presidential Order for "No Net Loss of Wetlands," the applicant shall
remove, within two years from the transmittal date of this approval letter, the 8- by 24-foot
section of the "L" portion of the pier located immediately parallel along the shoreline (see
Attachment A).
Following completioh of the removal of the pier section, photographs documenting the site shall
be forwarded to the City of Edmonds and to Ecology at the following address: Attn: Shoreline
permitting, Washington Department of Ecology, 3190 160thAvenue SE, Bellevue, WA 98008.
2. Upon future reconstruction or repair of the remaining pi,�r and/or float, the applicant shall obtain
appropriate permits and adhere to current Washington Department of Fish and Wildlife (WDFW)
design standards so as to minimize impacts to wetland functions and fish resources.
3. The applicant hereby authorizes Ecology staff and their designees to have access to the subject
property for the purposes of compliance inspection and monitoring. Such right of access shall
begin from the date of the reccipt of this letter, during construction and extend for a period of
Z
0
i
0
T
:i 9
M
C
M
0
0 C:
M
M Z
g) -i
C _Z
0)
o -n
n
M M
0 —C/)
0 r-
0 M
CI)
Cn
M 0
Z
X
Z
-4
X
C/)
Z
0
1
0
M
Basic Footprint of Southern Dock and Float
Property Address: 7409 242nd Place S. W., Edmonds, WA 98026
4 8 ft" 3 1/211 01
FLOAT E2=ZZR>
30 ft
t i0
PERMANENT PIER
Removable
Chains
8 ft
24 Tt
SHORELINE
Wood pilings 4 x 4 O's above M C=)
ood 2 x 6 M C-)
Surface w K., --1 0
Now
0
C=
J.- M
M
t BLDG.
Olt
0 ft
F
EDMONDS
WARTMENT
NUMBER
V6,
ff -
GARY HAAKENSON
CITY OF EDMONDS MAYOR
121 5TH AVENUE NORTH EDMONDS, WA 98020 (425) 771-0220 FAX (425) 771-0221
Website: www.d.edmondsma.us
DEVELOPMENT SERVICES DEPARTMENT
Planning Building - Engineering
C.
December 1, 2004
Zi
0
0
RI
Murl and Jolene Cox
nd
7409 242 Place SW
Edmonds, WA 98026
M
RE: Dock Demolition Pennit Number 2004-0935A C
M
0
-40
0
C
Dear Mr. & Mrs. Cox:
M
M
Z
JO
C —
Z
The City of Edmonds is in receipt of the letter from David Pater, Shoreline Specialist, >
Department of Ecology, dated November 19, 2004. In his letter Mr. Pater approved
C')
extending the subject dock demolition pen -nit until February 16, 2005. Meg Gruwell,
0 -n
Senior Planner in our Edmonds Planning Department has also recommended extending -n
the deadline until February 16, 2005.
MM
0 —Cn
Based on DOE and City Planning Department approvals, Pen -nit Number 2004-0935A for 0
0 M
16, 2005. Please be sure the C CD
partial dock demolition is hereby extended to February K Cn:
contractor calls for your required planning and building final inspections in order for tile M0
Z
permit to be closed out.
Sincerely,
Z
Cn
Z
0
Jeannine Graf
0
Building Official M
Cc: David Pater, Department of Ecology
Murl and Jolene Cox
Alan Foltz, Waterfront Construction
Incorporated August 11, 1890
Sister City - Hekinan, Japan
FINAL PROJECT APPROVAL FORM
TO:_07—
DATE:_L1 12:4be-'J
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: PLEASE SIGN FIRE DEPARTMENT DATE
ENGINEERJNG DIVISION DATE
PLrASr SIGN
PLANNING DIVISION DATE
PLEA(V.IGN
PROJECT
SITE ADDRESS
PERMIT It ADB# DATEINSPECTED Z11,1uE
DESCRIPTION OF WORK TO BE INSPECTED
A field inspection was conducted to determine compliance with -approved plans. Final approval
denotes that there are no objections from the above signed Department to the release of
PERFORMANCE BONDS and the granting of:
Z�GRANT FINAL PROJECT APPROVAL
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
El Copy of CONDITIONS given to owner/contractor by inspector
1.
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
0 Copy of CORRECTION NOTICE given to owner/contractor by inpector
I .
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signaftire
1:tcmp:b1dg:fbni1s:ocapr%,1 3/25/04
z
0
M
-i -n
M
0
0
0
M
M Z
01
C
cl)
0 -n
n m
-.i >
M 9
M M
0
0
0 M
C (1)
K Cn
Q
Z
M
z
__4
M
Cl)
z
0
M
RECORD OF INSPECTIONS
INSPECTOR DATE APPROVED
SETBACKS .....................
FOUNDATION:
Footing ......................
Wall ..........................
Pier/Porch .................
Retaining Wall ...........
Slab Insulation ..........
PLUMBING:
Underground .............
Rough -In ...................
Commercial Final ......
HEATING:
Gas Test ....................
Gas Piping .................
Equipment .................
Commercial Final .......
EXTERIOR SHEATHING
NAILING ..........................
FRAMING ........................
FIRST FLOOR FRAMING ...
INSULATION ...................
Floor Insulation .........
Wall Insulation ...........
Ceiling Insulation .......
SHEETROCK NAILING ...
SPECIAL INSPECTION ...
MISCELLANEOUS ..........
FINAL APPROVAL FOR
OCCUPANCY ..................
2
z
0
i
0
M
N =