CITY OF EDMONDS
CONSTRUCTION PERMIT APPLICATION
ER N*AE/NAME OF "us,
in, /1 4\4 z if-V rxsLs L/, C.
Zip
0-,
, liffitX)i 9vll(p
t-
0 L V_
LU
t ADDRESS
NAME
14� mfeAkl,%tv
TELEPHONE
2V6
Aw-
ZIP TELEP14ONE
fb
CEIL
&_ 61
t(43-016*
�J
.
USE
ZONE
JOB
ADDRESS,�)
ievskl) PLAT NAME/SUBDIVISION NO
city ZIP TELEPHONE
2,0 & 363 - 6) -,79,S'
STAT� LICENSE NUM13ER EXPIRATION DATE CHECK 13Y
C) M
Kl�xfp bl C 01
PROPERTY TAX ACCOUNT PARCEL NO.
19
NEW
RESIDENTIAL
PLUMBING / MECH
IADDITION
3
COMMERCIAL
COMPLIANCE OR
CHANGE OF USE
REMODEL
MULTIFAMILY
SIGN
REPAIR
GRADING CYDS
1 Izig
FENCE X FT)
( —
DEMOLISH
TANK
OTHER
GARAGE
CARPORT
RETAINING WALL
ROCKERY
FIRE SPRINKLER
FIRE ALARM
(TYPE OF USE, BUSINESS OR ACTIVITY) EXPLAIN-
U)
ull NUMBER UMBER OF CRITICAL
0 OF WELLING AREAS
M NITS NUMBER
0 STORIES rDU
DESCRIBE WORK TO BE DONE
A I
-3
Flue 53 it q_1
PLA14 CHECK NO:
PERMIT
NUMBER
S E/APT#
L ��
LID NO
LID FEE S
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP
EXISTING __ PROPOSED
REQUIRE[) DEDICATION— FT
METER SIZE LINE SIZE NO. OF FI
/J� -11 1 .,A it I
TESCP Approved
RW Permit Required
Street Use Permit Req'd
Inspect,on Requited
Sidewalk Required
Underground
Woring required
- -IRFS I PRV REQUIRED
,T
YES hif NO 0
REMARKS
OWNER/CON TRACI OR RESPONSIBLE FOR EROSION CONTROLIORAINAGE
e�y"� ek\1%L_T(A0,_> fcr— V06f—
W
z
z
a
z
III
ENGINEERING REVIEWED BY
DATE
FIR(TI WE.D
DATE
W
VARIA CE OR CU
SHORELINE OR ADB#
INSPECTION
BOND
t I
�'EQ'D
1
POSTED
IS
0 1 - 2- 2
rUC) - ( �u 1
Zh'ES ONO
SEPA REVIEW
COMPLETE EXEMPT
SIGN AREA
ALLOWED PROPOSED
HEIGHT
ALLOWED PROPOSED
;V,DNs
EXP5/0�
I 0
3 3ol
,
LOT COVERAGE
REQUIRED SETBACKS (FT)
PROPOSED SETBACKS (Fr.)
ALLOWED PROPOSED
FRONT SIDE REAR
FRONT L/R SIDE REAR
37
45,7.- 167,
9t
1,1 to
IG
ll�s, yrz- 134,
zz
PARK17NG
PROVIDED
LOT AREA
LOT
PLANNING REVIEWED BY DATE
Z) 4-
R�Q'D I
0/
'piII- 9+
1 lit)
REMARKS
,iEnx
CHECKED BY
t 1
JTYPV�_T.�WION
1
SPECIAL INS9ECTION
JAREA POO)
i -1
OCCUPANT
LOAD 2LX-7
I
REQUIRED�&YES
1 La 11-5
5ikw
1-1) 1
REMARKS
PROGRESS INSPECTIONS
PER UBC 108/ IBC109
/ IRC109 FINAL
INSPECTION REQ'D
z
GLA
I'A j �
_7"
- . __> - 1 1 . - A A ,
i2 rl-14, " A I) df �-1,42
11% - `1
VALUATION
fC�z �� 4- 1
T
$ -Z q
Description FEEaDescription
S rg
Plan Check State Surcharge
LOT SLOPE % Building Permit toe/ 13 City Surcharge
Plumbing Base Fee
THIS PERMIT AUTHORIZES ONLY THE WORK AOTED. THIS PEAMIT CCIVERS WORK TO
BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC
DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE
SEPARATE PERMISSION.
PERMIT APPLICATION: IBODAYS
PERMIT LIMIT. I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS
IN INTEREST. AGREES TO INDEMNIFY. DEFEND AND HOLD HARMLESS THE CITY OF
EDMONDS, WASHINGTON. ITS OFFICIALS, EMPLOYEES. AND AGENTS FROM ANY AND
ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE. ARISING DIRECTLY OR INDIRECTLY
FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF 1111S PERMIT SHALL NOT BE
DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE
NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION. -
I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION
GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF
THE OWNER. I AGREE 1-0 COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRLIC-
TION; AND IN DOING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED
�K-VT,N AT 0 CODE OF THE STATE OF WASHINGTON RELATING TO
"'n, (kl_ tj!O N
I URANCE AND RCW 1827.
DATE
I 7,.rl / 0
e.
FEE
Mechanical (so flli� h_TL_ r ij C e c
Grading J1 V_ 418 (3, Y1
Engr. Inspection
�l
Fire Review
Plan Chk. Deposit
='C—�
15
Fire Inspection
C, c)
Receipt #
4-
Landscapelnsp.
Total Amt. Due
1,-� 7 77
Recording Fee
-4
r
Rec ipt #
CALL
FOR INSPECTION
(425)
771-0220
APPLICATION APPROVAL
I his application is not a permit until signed by the
Building ofiicial or his/her Deputy: and Fees are paid, and
feccipt is acknowledged in space provided,
FIE[ EASEDBy/
AWENTIUN F.A 1 1,11300
ITIS UNLAWFULTO USE OROCCUPYABUILDINGOR STRUCTURE UNTILA FINAL L-71—
INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCU-
PANCY HAS BEEN GRANTED. UBC109/IBC110/IRCIIO.
09/03 PRESS HARD -YOU ARE MAKING 4 COPIES
E
RIG
.41NAL ILE YELLOW - INSPECTOR
PINK - 01NER GOLD - ASSESSOR
z
0
1
0
M
-4 -n
0 M
C:
M 0
0
--1 0
0 C:
M
M z
_z
x
W
0 71
Tl
M M
0 6
0 r-
0 M
C: cf)
90)
M 0
Z
z
CO
z
0
M
RECEIVer)
MICROFILM
Attn: mike snook A UG -
Reference to: permit 4 2004-0952 PERMIT COUNTER
Ballinger court apartments
ollowing
I Jereme Wickstrom project engineer would like to state the f
info in regards to pressure relief blow off lines that are ran interior of
-ety for the tenants of ballinger court
building for the reasons of saf
apartments. On all retirement type facility unit's it is standard practice to
rs
keep any safety lines with in the boiler room, reason being a pe on in a
wheel chair or a person with slower reflex's can not move out of the way
inter time becomes a factor
fast enough to not be hit with 145 f water. Also w
of explanation
with freezing slicks across walk ways. I hope this is the type
you were looking for, if not please feel free to contact me at any time.
1V
-Flo
Thank -you LAI
Jereme at wolfe plumbing
CA25 750 6564
0:360 794 8621
Jereme l.wolfeplumbing@vcrizon.net
AUG -
1PEIRM COL)N'ER
'Inu
Z
0
0
M
GARY HAAKENSON
C ITY OF EDMONDS MAYOR
121 5TH AVENUE NOR1 H EDMONDS, W A 98020 (425) 771-0220 FAX (425) 771-0221
website: vmmci.edmondsmams
DEVELOPMENT SERVICES DEPARTMENT
Planning Building Engineering
ALIgtist 31, 2005
Z
0
4
0
Ever Trust Fit iancial
Cheryl M Rosh, Manager
1.8001 Bothell-EVerett I-lighway
M
Bothell, WA 98012
0
0.
m
m Z
RE: Performance Frozen Mind account 9 5150292861, Ballinger Colift Associates
>
Limited Partnership @ 22707 76 Av entie W, E dmonds, WA
0 -m
-n ;0,
rn
To Whorn It May Concern:
rp
0 —cn
0
:om
maining $2 000-00 fron-i the above
Tile City of Edmonds hereby authorizes the release of the re 7
M 0
referenced Perfoi -mance Frozen Rind account. All interested City Divisions have inspected the
Z r-
required ptiblic improvements and have granted fund release.
;U
Irther6are any qitestions, please contact our office at 425-77t-0220.
>;
W
Sincerely,
Z
0
Marie Harrison
m
Senior Permit Coordinator
Cc: Applicant
File
ijjgejjjejq'j)j-jjj;jjjce.doc 10/00
Incorporated August 11, 1890
15a,
-0�
GARY HAAKENSON
CITY OF EDMONDS MAYOR
1215TH AVENUE NORTH -EDMONDS. WA98020 (425) 771-0220 *FAX (425) 771-0221
Websile: wwwxi.edmondsmams
DEVELOPMENT SERVICES DEPARTMENT
Planning Building Engineering
11, C. Q�
August 5, 2005
Z
0
0
ticial
Ever Trust Fina m
Cheryl M Rosh, Manager
5i
1_8001 Botlicil-Everett 1jighway
co
Bothell, WA 98012
m
C
m
0
0
0 C
X
m
m Z
ount 5150292861, Ballinger Court Associates
RE: Performance Frozen Fund acc JO —1
Limited Partnership @ 22707 76"' Avenue W, Edmonds, WA C —
Z
Cn
01-n
To Whom It May Concern:
m M
of $53,716.00 from tile above
The City of Edmonds hereby authorizes tile partial release 0 r
0 m
referenced Perforniance Frozen Fund account. A balance of $2,000.00 must be held as a Cn I r
Cn
landscape performance bond. All interested City Divisions have inspected tile required public m
Z 0
improvements and have granted partial fund release.
X
l Fund account
The remaining funds nlay be used as the required Landscape Performance Frozei
picted. Prior to tile
which is required to be held to ensure that tile landscaping will be com Z
expiration of this account the City sliall conduct a site inspection to detmmine whether or not
5i
-s are n
corrections or repan ceded. Only written City authorization may release this Pcrfori ance Z
Frozen Funds. 0
0
Please be advised, tile owner may replace these funds at any time with a bonding company bond. m
please call feel fi-ce to contact our office at 425-771-0220.
Iftherc are any questions,
�inccrely,_
4/1,141, Ifaer-c-isoll
ScIlior Perillit Coordinator
Cc: Applicant
Incorporated August 11, 1890
Sister City - 11ekinan, Japan
ST A
State of Washington
DEPARTMENT OF FISH AND WILDLIFE
Region 4 Office: 16018 Mill Creek Boulevard - Mill Creek, Washington 98012 - (425) 775-1311
0`4
November 30, 2004
DEC -
Covenant Construction Management, Inc. 2004
ATTENTION: Patrick G. Carroll
z
PO Box 60
0
Lynnwood WA 98046-0060
0
M
Dear Mr. Carroll:
Cn
X
0
SUBJECT: Request for Letter of Compliance; HPA ST-F9887-01, Ballinger Court
M,
Senior Housing, WRIA 08, SW 1/4, Section 29, Township 27 North, Range 04
M
0
East, Snohomish County
0
0
C'
M z
On November 24, 2004, you requested that the Washington Department of Fish and Wildlife
—Z
>
(WDFW) provide a letter stating that Covenant Construction Management, Inc. has completed
the permitted project and complied with all the provisions of the Hydraulic Project Approval
0 -n
-n
(HPA), Log Number ST-179887-01. This letter is intended to meet that request.
M
M
On November 29, 2004, 1 met you at the site and inspected the project. All provisions stated in
0
the HPA were met.
0 M
(0, 1,:
Cn
M 0
Thank you for the opportunity to provide this information. If you have any questions, please
Z
contact me at (425) 379-2305
Sincerely,
>
z
z
0
Ginger Holser
0
M
Area Habitat Biologist
GH:gh:
cc: Meg Gruwell
�110=�
Le
n I
It
It
.61
I.,
N
I
no
Corner Flag.
A tual
Setbacks tLcLu�ired
Front 'VOV 0 3 2004
Sides c0tjjvTErj
Rear
Other ------- 3 1).
3c,
06
L *N
& I IIIII.Xv
it
WA Eck 4
& W
ai
ISSUE DATES
A".&" —it.� 91 C
Awwon
amowcommm Amiih�
Lmd-q*Amw�
M-hq
Ica
bm* -,"w
�10(41141111m)
I.-my"41WI
—m4RRP
O,sg L. AM M. AIR
SHEET INFOMA11ON
W L NW
air
a
NCO
'd I*
0
OEM
so 0 Imp
10. ASOF
APPROVED BY PLAW, VG
4
SITE PLAN
left 1'. 3w. or
Lr%mrm"
w 0 K " morl.
r
z
w
0
w
U)
1--
0
cf
0 !,q
Us 'm
z
�
< -j
a
M
IN.
PROJECT 8
On$
FILE NME.
M&A
DRAM By
LPIJ6
SITE PLAN
A010
MAYESTESTING ENGINEERS, INC.
Everett Office
917-134th Street SW
Suite A-i
Everett, WA 98204
ph 425.742.9360
fax 425.745.1737
May 12, 2005
Tacoma Office
10029 S. Tacoma Way
Suite E-2
Tacoma, WA 98499
City of Edmonds Building Department
ph 253.584.3720
fax 253.55EW.3707
121 5th Avenue N
Edmonds, WA 98020-3146
Portland Office
7911 NE 33rd Drive
Suite 190
z
Portland, OR 97211
ph 503.281.7515
0
Attn.: Jean nine Graff
fax 503.281.7579
M
Re: Ballinger Court Apartments
th
2271776 Avenue SW Permit # 2004-0952
3:
Edmonds, WA
M
C
MTE Project No. E4300
M 0
--10
M
Dear Ms. Graff,
Mz
This is to inform you that registered special inspections have been completed for
this project as
C z
per our reports, copies of which have been sent to you.
cl)
0 -n
Special inspection was provided for:
-n
M M
Reinforced Concrete
0 U5
Epoxy Grouted Anchors
0 17-
0 M
C C0
To the best of our knowledge, all work inspected was either performed in accordance with, or
9 co
Q 0
corrected to conform to, the city approved drawings, or engineer approved changes.
Z
We trust that this provides you with the information which you require. Should you
have any
questions give us a call.
Sincerely,
z
MAYES TESTING ENGINEERS, INC.
0
M
Timothy �eck'e'rle, P.E.
Branch Manager
CC: Patrick Carroll- Ballinger Court Apartments LP
Tri-County
Land Surveying
Company
4610 2001h St. S.W. Suiiv A. Iynnwood, \VA 980,56
Phone: -12.'--)-770.2()2() Fax: -125-776-2850
April 28, 2005
City of Edmonds
121 5" Avenue North
Edmonds, Washington 98020
Subject: Ballinger Court- Asbuilt roof elevation for Covenant Construction.
To Whom It May Concern:
On April 15112005 a survey crew from Tri-County Land Surveying Company went to
the Ballinger Court site located on the East side of 751" Avenue West just North of
2281h Street Southwest to obtain an asbuilt elevation on the highest part of the roof.
The elevation was found to be 369.96 feet.
Please call me if you have any questions. fnAy ao"� k'� >
Sincerely,
Tri-County Land Surveying Company
Reid Speegle
Survey Manager
71- ED
M
DEVELO! CES CM.
RECEIVED CC .:t--,AaNDS
MAY 0 5 20
DEVELOPMENT SERVICES CTH.
CITY OF EDMONDS
z
0
4 .:'?.
0
M
PILLG (2063285-0618 P.2
ALIT.-Ol 05 o3:58a CT Engineering
ISO Nickttrsun
P L 4 C Suite 302
Scatue. WA
98109
Fax. 285-0618
August 1, 2005
City of Edmonds
St.
Building Divi5ion
121 5th Avenue North
0
Gdmonds, WA 98020
-I
0
M
Attn: Ann Bullis, Assistant 8uilding Official
pr=& Ballinner Court Senior ADartments
r
22707 76"' Avc W
Door Ann:
We are writing this letter to summarize our structural observation for the Bellinger Court
Senior Apartments Project.
In accordance with USC Section 1702, our structural observation included visual observation
of the structural system for general conformance to the approvcd plan5 and specificationa. A
variety of clarification bulletins was relayed in writing to the contractor. These bulletins were
available for the Building Official's review on site. The bulletin items have been resolved to
our satisfaction.
Please call if you have any questions.
Sincerely,
Craig F. Roberts. P.E.
structural Enalneere
0 M
C
M 0
0
-40
0 C
M
M
SN.
AL-Ig-01 05 0s:58a CT Engineering PLLC (206)285-0618
P.1
C T
PLLG
190 Nickcmn SL
Suilc 302
Scattle, WA
f'-
931U9
(206) 2gs-4512(v)
(206) 285-061 8M
FAX COVER SHEET
Z,
DATE: August 1, 2006 TIME: 9:49 AM
01
TO; Pat Carroll FAX: 425-743-3896
FROM: Craig Roberts
CA
R F.- Structural Observation letter
3:
M
M
CC:
0
0
0
C,
Number of pages including cover shoot: 2
M.
M z
Message
-71'
C
Pat-
>
Here's a oopy of the Structural Observation Letter that you requested on Niday. We are 3ending
yau
C/)
the original letter in the mail today.
:0 -T1
-T1
Please call if you have any questions.
x
M M
Thanks,
0 co
0
0 M.
Craig
Cn
M 0,
Z r-
;U
M
z
z
0
M
struc:tural Engineers
Zipper Zeman Associates, Inc.
Geotechnical Engineers and Environmental Consultants
1.8905 33rd Ave. W, Suite 117, Lynnwood, WA 98036 (425) 771-3304 / FAX (425) 771-3549
DAILY FIELD REPORT# DATE, - PAGE OF
:J7_ p
ZZA JOB NO:
PROJECT. -0,40-- C-0 +
CLIENT: 'ic CONTRACTO
ZZA FIELD REP: Mooc.-E-n le4a, LOCATION: G A4— Au LW
ARR./DEP. TIME: 3 S -3 PERMIT NUMBER:
WEATHER: S EQUIPMENT USED: -I- Kin 1(
Q— )Ont�L- C-- 0A C 1-, q,
c1le
:6 LA.- C4. A
C- 'A- QV)r- Ot-eA V, 16
ICCA-C-
V, V- A-
JA-
D. 1.0 1 Q-X '.I
.3
4
AA� cx,
V"%- IA. JJ'—
ej N
Q-VIZ , -1,
P, 1 6 641%
L
4,L —Jld� dn::
IA
Cc, rzt- S 1,-% 6 P- V,
-- I
—Vt-�
V
de A V 0 \A,--
�14 Wll�
REVIEWED BY:
This report presents opinions formed as a result of our observations of the contractors activities relating to geotechnical engincefing. We rely on the contractor to comply wi h
the plans and specifications throughout the duration of the project irrespective of the presence of the ZZA field representative. The presence of our field representative will
be fort lie purpose of provid ing observation and field testing services. Our work does not include supervision or direction of the actual work of the contractor, its employees,
or agents. Neither the presence of the ZZA field representative nor the observation and testing by ZZA shall excuse the contractor in any way for defects discovered in its
work. ZZA will not be responsible for job site safety on this project.
1-Y
z
0
1
0
IT!
-4 -n
M
C
M
0
0
0 C
M
M Z
C
> z
cl)
o -n
n
M M
0
0
0 M
C C/)
M 0
Z r-
z
z
0
i
5
IT!
Zipper Zeman Associa
Geotechnical Engineers and Environmental Consultants,
18905 33rd Ave. W, Suite 117, Lynnwood, WA 98036 (425) 771-3304 / FAX (425) 771-3549
DAILY FIELD REPORT # a DATE PAGE k OF
PROJECT: (\% Qr- CA ZZA JOB NO: (C>
CLIENT:
CONTRACTOR-
ZZAFIELDREP: LOCATION: �7 >
ARR./DEP. TIME: PERMIT NUMBER:
X,
WEATHER: EQUIPMENTUSED:
C-�e cL C—\ �3'
r A
W-s
�nt) Ak (\Q,\
-A
A\,-
eS �blz�%Je\ A-
\v�� C37R 6 reN 0
U eA V�el
vi- oe- �0. ruk o�se-i,�
X
REVIEWED BY:
This report presents opinions formedasa result of our observations of the contractors activities relating to geotechnical engineering. We rely on the contractor to comply with
(tic plans and specifications throughout the duration of the project irrespective of the presence of the ZZA Field representative. The presence of our field representative will
be for the purpose of providing observation and field testing services. our work does not include supervision or direction of the actual work ofthe contractor, its employees,
or agents. Neither the presence of the ZZA field representative nor the observation and testing by ZZA shall excuse the contractor in any way for defects discovered in its
work. ZZA will not be responsible forjob site safety on this project.
z
0
M
--i -n
US -1
:C
0 M
C
M 0
0
-40
0 C
M
M Z
10--i
C
0 -n
n
-4
M M
0 U;
0 r-
0 M
C cl)
9 Cn
Q 0
Z
z
C/)
z
0
i
0
M
Zinver Zeman Associates, --Inc.
Geotechnical Engineers and Environmental Consultants
18905 33rd Ave. W, Suite 117, Lynnwood, WA 98036 (425) 771-3304 / FAX (425) 771-3549
)AILY FIELD REPORT# ra DATE PAGE *--'I OF
RROJEcT: c\' ZZAJOBNO: --5--�777-1-�o
7-
\De--,\ C2
C.1-15��I - h � �'t -
z
0
4
0
M
M
c
Mo
0
-A 0
0 c
3: M
M z
c
CD
0 -n
n
3:9
M M
0 —cn
of-
0 M
c cn
K cn
M 0
z
co
z
0
M
ZiDDer Zeman Associa
Geotechnical Engineers and Environmental Consultants
18905 33rd Ave. W, Suite 117, Lynnwood, WA 98036 (425) 771-3304 / FAX (425) 771-3549
DAILY FIELD REPORT 4t 3 DATE PAGE � 0 F
PROJECT: b11A\1r\5er7 CA ZZA JOB NO: V11-1- � Q
CLIENT: C.OQQA.-�-- CONTRACTOR! cr�kxl-\Jl-
ZZA FIELD REP: LOCATION:
ARR./DERTIME: PERMIT NUMBER:
WEXrHER: EQUIPMENTUSED:
C- S a e -Lis, Lk,,S. 12��
12�& AVP
\1'AS--J ox�
Z\
C
t 1)
LA
Nrr2% n.
rl
REVIEWED BY:
This report presents opinions formed as a result of our observations of tile contractors activities relating to geotechnical engineefing. We rely on the contractorto comply with
tile plans and specifications throughout the duration of the project irrespective of the presence of the ZZA field representative. The presence ofour field representative will
in for tile purpose of providing observation and field testing services. Our work does not include supervision or direction of the actual work ofthe contractor. its employees,
or agents. Neither tile presence of the ZZA field representative nor the observation and testing by ZZA shall excuse the contractor in any way for defects discovered in its
work. ZZA will not be responsible forjob site safety on this project.
z
0
i
0
M
-4 -n
M
C
M
0
0
M
M z
C
> z
iv)
0 -n
n
M M
0
0
0 M
C (J)
Kw
M 0
Z
X
-4
X
z
-q
M
z
0
1
0
M
& nmmawn—A-s —So -cha —te S-- a I —nc -
zipper Z
Geotechnical Engineers and Environmental Consultants
18905 33rd Ave. W, Suite 117, Lynnwood, WA 98036 (425) 771-3304 / FAX (425) 771-3549
1
DATE PAGE OF
DAILY FIELD REPORT #
-S
P OJr 9 \� -
CT. ::"\
PROJECT:
co 1.r� ZZA JOB NO:
C-4,
A5 -c- A
W
'Sx
3�-
L-16-
6 0- C� 0 t2
A
NLA2 .
5A-
z
0
A
0
M
Zipper Zeman Associates, Inc.
Geotechnical Engineers and Environmental Consultants
18905 33rd Ave. NV, Suite 117, Lynnwood, WA 98036 (425) 771-3304 FAX (425) 771-3549
T # 0 "AGE OF
DAILY FIELD REPOR DATE I -
PROJECT: ko" ZZA JOB NO:
CLIENT: ce f 2 a a1z': e: 2 CONTRACTO
ZZA FIELD REP: LOCATION: 250L-004d
ARR./DERTIME: PERMIT NUMBER:
WEATHER: tj e'L'd EQUIPMENT USED:
71� C-It-le,0026- J---> e
CJ
zz� zez f��ezaa 46.�r—
Aoe
be
e-" cyl
7Z 2!:d,
4- -rL C50-
L
00,
1-01
Af vllt/.
7e'
0.,/
die fV64"
REVIEWED BY:
This repoit piesents opinions forined asa result of our obser-vations of the contractors activities relating to geotechnical engineering. We rely on the contractor to comply with
[lie plansand specifications throughout the duration of the project iff espective of the presence of the ZZA field representative. 'The presence ofour field representative will
lie for the purpose of providing observationand field testing services. our work does not include supervision or direction of the actual work of the contractor, its employees.
or agents. Neithet the presence of the ZZA field representative nor the observation and testing by ZZA shall excuse the contractor in tiny way for defects discovered in its
work. ZZA will not be responsible forjob site safety on this project.
I -Win It I
z
0
4
0
M
-n
0 M
M 0
0
0
0 C
M
M Z
C
0)
0 Ti
n
M M
q
0
0 M
C C()
9 Cn
M 0
Z
X
z
W
z
0
i
0
M
M!
Zipper Zeman Associates, Inc.
Geotechnical Engineers and Environmental Consultants
18905 33rd Ave. W, Suite 117, Lynnwood, 'vVA 98036 (425) 771-3304 / FAX (425) 771-3549
Z4 4" ... a 0-111/ 2— OF
DAILY HE LD REPORT # DATE PAGE
PROJECT: — ZZA JOB NO: 7:21
A411
4�
CZ6 az� ea jo��Z�
f -26 S� -*1 el'
e--<
Az�
mom! an d &20,4 7:4,
49,6nk
'e>?z
Z&Z!� ell�
c-,
6961� f— �e 16 42 Azc
42 2S2
ore
I Ack-
v
F'orm 113
z
0
1
0
m
-49
55 -4 1
3:
M
c
m
0
--10
0 C
M
M Z
0 -n
-n
mm
0
0
0 rm-
C cn
c cn
M 0
Z
z
z
0
m
Zipper Zeman Associates, Ine
Ge-otechnical Engineers and Environniental Consultants
18905 33rd Ave. W, Suite 117, Lynnwood, Washington 98036 (425) 771-3304 / FykX.(425) 771-3549
DAILY FIELD RE PORT DATE: q /RID -Y PAGE-1 OF -3
PROJECT: 54111,1CVt& A-ek;1 ZZA JOB NO.: 1-7-71 — /D
Test
No.
Test
Date
General
Location
Elcv.
(ft)
Feet
to
Grade
Mat']
Type
Field
Dry
Density
(PcO
%
Field
Moist.
%
Cornp.
Field
Pass
Fail
0
1x1i-
14
W
x
12d .9
�4
cell' le,4r"
I 4t
e"ain-,
3
Id 5
Percent Compaction Based on:
F-1 Standard Proctor, ASTM D 698
P Modified Proctor, ASTM D 1557
n Other
LEGEND
DT = DensityTest
RT = Retest
TEST METHOD
FqDN =Nuclear (ASTIA D 2922)
rl SC = Sand Cone (ASTM D 1556)
F] DC = Drive Cylinder (ASTM D 2937)
orin H 2
Specification: 90% 95%
D 698 D 698
F1 90% 95%
D 1557 FD 1557
Fj Other
Material
Type
Reference
Sample
Material
Descri fion
Max. Dry
Density (pco
Optimum
Moisture
I?
z
0
1
0
M
=1 :—n
Zipper Zeman Associates, Inc.
Geotechnical Engineers and Environmental Consultants
.18905 33rd Ave. W, Suite 117, Lynnwood, 1VVA 98036 (425) 771-3304 54AX (425) 771-3549
DAILY FIELD REPORT# D A' r E ZO, Z 5 7/'-0 3 1 "A G E OF
PROJECT: AE/-./ ZZAJOBNO:
CLIEN,r: (�'OL-"PMZ94 Z— I'AW 5; 74-21C�� CONTRACTOR-
ZZA FIELD REP: LOCATION: 252W-6-&31-7)15
ARR./DEP.TINIE: 49140'1412-5— PERMITNUrVIBER:
wi,?xrim R:.---AtA e7loydg% old EQUIPMENT USED: 717AcZ41 ogs
.Ltl�l azfx1v!!f� ax. 41
4z aegoo"7
Zp� tZ od,4e,.21f
L
a f/- 7L =eleza L.-%4- /A,-� �,2 Ze Za/
&Q,�Z -574e6&g6.2 ZL4�-:,5 94 OeC,7Z X (rj;�
�C(
J-�
rV
-OL/
e:!2 ZL 6",4,2
10�
/-Z 2eAW2f2 1!57A
P W
11 '�Ze AZ 71- 4��
'00,
10— ly
—:5-111'111V1 A
REVIENVED BY: eto,� k`>
This iepoa presents opinions forined as; a result of ourobset-vations of the contractors activities relating to geotechnical engineering. We rely oil the contractor to comply with
the plans ;in(] specifications throughout the duration of the project iff espective of the presence of the ZZZA field representative. The presence of our field representative will
be for the purpose of providing observation and field testing services. Our work does not include supervision or di?ection of the actual work ofthe contractor, its employees.
oi agents. Neither tile presence of tile ZZA field representative nor the observation and testing by ZZA shall excuse tile contractor in any way for defects discovered in its
work. ZZA will not be responsible forjob site safety oil this project.
I-orni 9 1
z
0
1
0
M
--i -n
M
M
0
-40
0 C
M
Mz
JO -i
C
r
J)
o -n
Ti
M M
0
0
0 M
C cl)
K Cl)
M 0
Z r—
X
--I
M
>
z
—4
M
Cn
z
0
i
0
M
Zilpy r Zema C.
Geotechnical Engineers and Environmental Consultants
18905 33rd Ave.
W, Suite 117, Lynnwood, WA 98036 (425) 771-3304 / FAX (425) 771-3549
DAILY FIE LD REPORT
DATE PAGE 1-2 OF
- 6;9
PROJECT:
ZZA JOB NO: -- Z 721--
ee;ww Ci
7111a-6
71(e
1/7
iq IC
7-�
C
C11
kf z
C:! 2 2
'2
2g4- ale
1511 Ap
D DAD 1=0 I
"-D
.jV 1 d_4
10 —11
ep
1--orm It 3
z
0
A
0
M
--i -n
M
c
M
0
--A0
0 c
M
M z
c
> z
cl)
0
.M
-4
M M
0
0
0 M
(j)
M 0
Z
-c
z
-4
M
c/)
z
0
A
0
M
U
E
Zim)er Zeman Associatesinc.
Geotechnical Engineers and Environmental Consultants
18905 33rd Ave. NV, Suite 117, Lynnwood, NVA 98036 (425) 771-3304 / FAX (425) 771-3549
DAILY FIELD REPORT# DA,rE PAGE OF
PROJECT: A01114,1� ZZAJOB NO: 177
CLIENT: —C4,2 —O�Za422— CONTRACTOR-
ZZA FIELD REP. LOCATION:
Zoe
ARIUDER TUME: ��."ZAkoo-,PERNIIT NUMBER:
WExrHER: <Z//n 00
EQUIPMENTUSED:
J
4 2 2 a
/01
L2
&1&2 -/Or
4A C; 4-ze -Y4 7-4z
;;Z
66� o2� d5nsz!��W
A 0-1 �0 e 0 7 eh -�M 0. r, e,
ooe��
AzeZo/
'00,
oOP7-
7,--6 X�,eeAe- r/
2— z gf� 00,
-- 4n�,,V�bov&,
C,
/00
REVIEWEDBY:
This report presents opinions forined;Ls a result of ourobservations of tile contractorsactivitics relating to geotechnical engineefing. We rely oil the contractor to comply with
tile plansand specifications throughout tile duration of the project irrespective of the presence of the ZZA field representative. 'File presence ofour field representative will
be for tile purpose ofproviding observationand field testing services. Our work does not include supervision or direction ofthe actual work ofthe contractor, its employees.
oragenis. Neither the presence of the ZZA field representative nor tile observation and testing by ZZA shall excuse the contractor in any way for defects discovered in its
work. ZZA will not be responsible forjob site safety oil this project.
i Urni ff i
P
I
z
0
i
0
M
--i -n
M
C
M
0
0
0 C:
M
M Z
IC) —4 1
C
cl)
0 -n
n
M M
0
0
0 M
Cn
0)
M 0
Z
z
—q
M
z
0
M
I �.j
18905 33rd Ave.
Zipper Zeman Associates, Inc.
Geotechnical Engineers and Environmental Consultants
W, Suite 117, Lynnwood, WA 98036 (425) 771-3304 / FAX (425) 771-3549
DAILY FIELD REPORT #
PROJECT-
D A T E /'� 1 /9///) 5! � PAGE 01% OF
ZZA JOB NO:
-97Z'**
JV
A0
Z4�
hp—�7 e
e- e-J
Aze 461ncz'lc�
7'L ��ZA� Aft-1,0elf
"eo-s- 'a
1
'ga:a�
--I "
000,
Form It 3
z
0
i
0
M
—i -n
cn
X
fn
M 0
0
0
0 c:
M
M Z
0 -n
n
M M
0
0
0 M
C cn
F, CD
M 0
Z
M
>
z
cn
z
0
M
General
Location
Feet
to
Grade
F ield
Dry
DensityE
C
Pass
Fail
am
Em
Percent Compaction Based oil:
R Standard Proctor, ASTM D 698
Modified Proctor, As'rM D 1557
Other
LEGEND
Ur = DensityTest
RT = Retest
TEST MEI 'HOD
[2fN = Nuclear (ASTM D 2922)
E] SC = Sand Cone (ASTM D 1556)
Ej DC = Drive Cylinder (ASTM D 2937)
-in It 2
Specification: 90%
95%
D 698
D 698
090%
5%
*D
D 1557
1557
El Other
Material
Type
Reference
Material
Description
Max. Dry
Density (pco
Optimum
Moisture
z
0
M
:; 5i
ZioDer Zeman Associates, Inc.
Geotechnical 1"Ingineers and Environmental Consultants
1.8905 33rd Ave. W, Suite 117, Lynnwood, Wk 98036 (42S) 771-3304 / FAX (42S) 771-3S49
Zo
DAILY FIELD REPORT# DATE 1�,>,ev PAGE OF
PROJECT: 6-uar4plv ZZAJOB NO:
CLIENT: CONTRACTOR-
ZZA FIELD REP: 2. a 2 S, LOCATION:
ARR./DEP. TIME: -ZA) 7 Z,01!eO 1,La -z S PERMITNUINIBER:
WEATHER: &)I;,. old EQUIPINIENTUSED:
.4<
if y �-r-
Ar
f 112a
-,Yxr-6 74
7L 17,� �,2
e
7'
4::L &qe K, a.-.e 04z.%,
401� 1�91
7—
VkR"d
Ae e,
7Z
1 - o0e, Z/
10�
REVIE NVED BY:
This report prese tits opi nions forinctlas it j esult of our observations of I lie cont raciorsacti vit ies relat ing to geotechni cal engi neering We rely on tile com ractor to comply with
the plans and speci fical ions i liroughout i lie (its rai ion of i lie project it respect i ve of tile prese lice of the ZZA field represental i ve . The presence of our field representati ve will
lie forthe purpose of providing observation and field testing services. Out woik (foes not include supervision or (Wection ofthe actual work ofiliecontrictor, its employees,
or agents. Neither the presence of tile ZZA field representative nor tile obseivation mul testing by 7ZA shall excuse tile contractor in any way for defects discovered iFi its
work. ZZA will no[ he responsible forjob site safety oil this project.
Form It I
z
0
i
0
m
--i -n
m
0
-40
0 C
--4 -C I
m M
M Z
,C) -i I
C
0 -n
n
m M
0
0
0 M
C Cl)
?I co
M 0
Z
M
z
--q
V5
z
0
i
0
m
0:
Zbmer Zeman Associa
Geotechnical Engineers and Environmental Consultants
18905 33rd Ave. W, Suite 117, Lynnwood, WA 98036 (425) 771-3304 / FAX (425) 771-3549
DAILY FIELD REPORT# 4 DATE PAGE e-V OF
PROJECT. 4�:� 411 ZZAJOB NO:
de ee�z—
el 4n�� Age- 2 S lle�
LZ&l 1-4 Zud ZZ& 4�-
f-&'cn�e2zz', 4EW e2le:cA
1 4�
azz 6-02gi4z<
H
4oe - zweptl A4 49"'S; "j;
erV4!±o:�1 q,,444 Is
NR 501)-s
10-11
l'orm H 3
z
0
i
0
M
—i -n
M
M
0
-10
0 C
--I ic
3: M
M Z
10-1 1 11
c
F-
3:
cn
0 -n
-n�' -.-
MM
0
0
0 M
C cn
9 cn
M 0
Z r—
>
z
cn
z
0
0
M
Zipper Zeman Associatesjnc.
Geotechnical Engineers and Environmental. Consultants
18905 33rd Ave. W, Suite 117, Lynnwood,VV,-k 98036 (425) 771-3304 / FAX (425) 771-3549
DAILY FIELD REPORT# DA'rE PAGE OF
-7
PROJECT: ZZA JOB NO: 7
CLIENT: LeV CONTRACTOR-.(feLX/�e4—� Z,
ZZA FIELD REP:
LOCATION-
ARR./DEP. TIME: Y'&"�"'Y-wPERrVIITNUNIBER:
I(OUD -;2(r3d
WEATHER: EQUIPMENT USED: r-eJ�fk
_s
Z,*
57
-4e
5,4f 1-� - .
1A A,A.Ae
g
1/0 W V 61-4
7- ;- �01
e�e J M al d Sp,,�-r
V-- 4W
eA C4- a-,eA�
Lp
dw
-2%4
e-1 �enY- �<Z�t
5Q VV-.4_ a all
Cis - -%:P�
REVIEWED BY:
This leporipresents opinions forniedas a result of ourobservafions of the contractors activities relatinglogeolechnical engineefing.We rely on thecontractortocornply with
the plansan dspeci ficat ions throughout the duration of the project irrespective of [lie presence of the ZZA Field representative. The presence ofour field representative will
be forthe purpose ol'providing observation and field testing services. Our work does not include supervision or direction of the actual work oft lie contractor, i Is employees,
oragenis. Neithei the piesence of the 72-A field representative nor the observation and testing by ZZA shall excuse the contractor in any way for defects discovered in its
work. ZZA will not be responsible for jot) site safety on this project.
l'orni It I
z
0
1
0
M
--I -n
0 M
C
M 0
0
0
0 C
M
M Z
CD
0 -n
n
M M
0
0
0 M
C1)
CJ)
M 0
Z
;U
--I
M
z
--I
M
C1)
z
0
i
0
M
ZiDDer Zeman Associates
Geotechnical Engineers and Environmental Consultants
18905 33rd Ave. W, Suite 117, Lynnwood, WA 98036 (425) 771-3304 / FAX (425) 771-3549
DATE ZP PAGE OF
DAILY FIELD REPORT
PROJECT: ZZA JOB NO: L-7
Z_
z-lie
0
M
5;
M
c
M
0
--10
0 c
M
M Z
C
3:
o -n
M M
0
0 M
c c/)
W
Mo
Z
M.
>
W
z
0
M
Fonn It 3
� I
Zipper Zenian Associates, Inc.
Geotechnical Engineers and Environmental Consultants
18905 33rd Ave. W, Suite 117, Lynnwood, WA 98036 (425) 771-3304 / FAX (425) 771-3549
DAILY FIELD REPORT 4 DATE PAGE OF I
PROJECT: ZZA JOB NO: Z—
Z�—
CLIENT: (6V&742Z177 CONTRACTOR- �9�0 ee�-
LOCATION:
ZZA FIELD REP: —(� I—
ARR./DERTIME: PERMIT NUMBER:
WEATHER: EQUIPMENT USED:
Jda It-0 1 4-0 epuww 4f, (r F--1f-
6e C7,-7 'e, zz -3e�-
44W CL %4
V Ap
YLZ) e-
0 C"k-1
a.*7 A (�/'Oy wzejdez"�2 *4
REVIEWED BY:
This repoit presents opinions fortned as a result of our observations of the contractorsactivities relating to geotechnical engineering. We rely on the contractor to comply with
the plans and specifications throughout the duration of the project irrespective of the presence of the ZZA field representative.The presenceofour field representative will
be forthe purpose of providing observation and field testing services. Our wcuk does not include supervision or direction of theactual work ofthe contractor, its employees,
oragents. Neiiher the presence of the ZZA field representative nor the observationand testing by ZZA shall excuse the contractor in any way for defects discovered in its
work. ZZA will not be responsible for job site safety on this project.
1--orili It I
z
0
i
0
M
=i =n-
M
C
M
0
C-)
0 C:
M
MZ
C
C0
0 -n
-n
M M
0
0 M
C CJ)
9 C()
Q C)
Z r-
;U
--i
X
z
C/)
z
0
M
Zipper Zeman Associates, Inc.
Geotechnical Engineers and Environmental Consultants
18905 33rd Ave. NNI, Suite 117, Lynnwood, 'Washington 98036 (425) 771-3304 / FAX.(425) 77.1-3549
DAILY FIELD REPORT#--- DATE: PAGE, C;2 OF
PROJECT: V.Vlalv Coue-k Ali(,q ZZA JOB NO.: 0 -77 -
Table —. Summary of Field Density Test Results.
Test
No.
Test
Date
General
Location
Elev.
(ft)
Feet
to
Grade
Mat'l
Type
Field
Dry
Density
(pef)
%
Field
Moist.
%
Comp.
Field
Pass
Fail
4 1 D Vj 04
'9
L
.q
7
-3
W a � XW
"W -96wo-z-,
&V (AV ZA-
Percent Compaction Based oil:
El Standard Proctor, ASTM D 698
51 Modified Proctor, ASTM D 1557
0 Other
LEGEND
DT = Density -Test
RT = Retest
TEST METHOD
N = Nuclear (ASTM D 2922)
Ej SC = Sand Cone (ASTM D 1556)
Fj DC = Drive Cylinder (ASTNI D 2937)
Forin # 2
Specification: El
90%
95%
D 698
D 698
El
90%
D 1557
'C995%
D 1557
Fj
Other
Material
Type
Reference
Saniple #
Material
Description
Max. Dry
Density (peo
Optimurn
Moisture
z
0
1
0
M
—1 -n
—C
0 M
C t "
M 0 . ,
0
0
0 C
M
M z
Co
0 -n
n
rn M
0
0
0 M
C Cn
9 Cn
M 0
Z
M
z
-A
3:
Co
z
0
M
Zipper..Zeman Associates, Inc.
Geotechnical Engineers and Environmental Consultants
.18905 33rd Ave. W, Suite 117, Lynnwood, WA 98036 (425) 771-3304 / FAX (425) 771-3549
DAILY FIELD REPORT # DA r rE N1 L PAGE 0 F
-7
PROJE,CT: ^61el— 5eminlal V ZZA JOB NO: —
CLIENT: a CONTRACTOR- 600 1
ZZA FIELD REP: LOCATION:
ARR./DEP-TINIE: qg'004—%o-,o t1,'00Ay,-- PERIMITNUMBER:
EQUIPMENT USED:
WEATHER: 1--) :7 V
be�e 5%W T t, 1.4 )nKL�
i'v
Ao;t d—
a'rV^FVA-L-,1 1A
r
jn�, 36
76 Q-
1AA-i on :5 Lie
Y6444
/"V
Z Z 4:�-
4�/�
_:5 d p J�� e;;;� :51,e-- jZ,
�-tvl 4-'!f'4 D41c5inc Lo�el d
4—
LZ/� __d:�dZe-c X 94��tlzl
7�7
r4
r
REVIEWED BY:
This reput I presents opinions forrned asa result of our observations of I lie contractors activities relating to geotechnical engi necring. we rely oil the contractor to comply wi III
tile plans and specifications throughout tile duration of tile project irrespective of the presence of the ZZA field representative.'rlie presence orour field representative will
be for tile purpose of providing observation and field testing services. Our work does not include supmisioll or direction of theactual work ofthe contractor, its employees.
the presence of the ZZA field representative not- the observation and testing by ZZA shall excuse the contractor in any way for defects discovered in its
agents. Neither
%. ZZA will not be responsible forjob site safety oil this project.
z
0
4
0
M
=i =fi
M
C
MID
0
0
0 C
—1 M
MM
MZ
C —Z
Cn
0 -n
n
M M
0
0
0 M
C/)
CO)
M 0
Z
z
C()
z
0
1
0
M
F— Zipper Zeman Associates, Inc.
Geotechnical Engineers and Environmental Consultants
1,8905 33rd Ave. W, Suite 117, Lynnwood, VVA 98036 (425) 771-3304 / FAX (425) 771-3549
DAILY FIELD REPORT4 DATE PAGE 1 0 F
-7 -7
PROJECT: L-AU,,tnc� Se4l) ZZAJOBNO:
CLIENT: C-DL)ev\ T- CONTRACTORLDO&A %
LOCATION: bc)c
ZZA FIELD REP:
110?dinf PERMIT NUMBER:
ARR.[DEP.TIME: EQUIPMENT USED:
WEATHER: 'SuAno :7
I
VO
, Cee
jy�� 36 n_eJ'r"z
� / Z.
r L) C44 &
/,4 1 AOaA MAgAt I
74 it !�2 Lpnlkfr
%W Elz I A�X-5' Z- d
Iz? —1a e- 4 4
J
REVIEWED BY:
This report presents opin ions forined w% a result of our observations of the contractors act i vitics relati ng to geotechnical engi necring. We rely on I lie contractor to comply with
I lie plans and speci ficntions throughout the durat ion of the project irrespective of I lie presence of the ZZA field representati ve. The presence of our field representative wil I
be forthe purpose of providing observation in(] field testing services. Our work does not include supervision or direction of theactual work of the contractor, its employees,
agents. Neither the presence of the ZZA lield representative nor the observation and testing by ZZA shall excuse the contractor in any way for defects discovered in its
... ;n — i— fnr inh qiie unfetv on this nroiect.
z
0
4
0
M
M
C
M
0
C)
0 C
-4 K
X M
M z
o -n
n
M M
065
0 r-
0 M
C 0)
K Cn
M
Z
z
z
0
1
0
IT!
-.,. m
E, �
Test
No.
'rest
Date
General
Location
Elev.
(ft)
Feet
to
Grade
Mat']
Type
Field
Dry
Density
(pcf)
%
Field
Moist.
%
Comp.
Field
Pass
Fail
ol
C9 0 .0 /V-- e.,
Aw
9-5
0/
'w (AO,
Percent Compaction Based on:
El Standard Proct or, ASTM D 698
Modified Proctor, ASTM D 1557
Other
LEGEND
DT = Density'rest
RT = Retest
TEs'r METHOD
N = Nuclear (ASTM D 2922)
El SC = Sand Cone (ASTM D 1556)
El DC = Drive Cylinder (ASTM D 2937)
Specification: 90%
95%
D 698
D 698
El 90%
�995%
D 1557
D 1557
Other
Material
Reference
Sample
Material
Description
Max. Dry
Density (pcf)
Optimum
Moisture (%)
z
0
1
0
m
z sociates, Inc.
Geotechnical Engineers and Environmental Consultants
.18905 33rd Ave. W, Suite 117, Lynnwood, NVA 98036 (425) 771-3304 / FAX (425) 771-3549
I b
12
PAGE OF
DAILY FIELD REPORT#
DATE —1
PROJECT:
ZZA JOB NO: M-7-7
—12
V
CLIENT:
R
CONTRACTO COL-t'16
46 1;J
S,
LOCATION:
ZZA FIELD REP:
ARR.IDERTINIE: 6'OOA4—%—
qERMIT NUMBER:
6,i1p?4q
-7
EQUIPMENTUSED:
DC)XV5.10
WEA'rIIER:
I.- P7
y
7-
IAl /;4.— IC-1 7-) V 6,
'77�e
VIA
0 9-
1-1 A /-2 4/ e— dq 7-4o, 1,," /4
V I
J04
oil -
'&tAE,-W-LA --
Z � --7— F r
0 iC
Af-
6-e- uteoe'2? Z- 6-'o 47 C7 �1
0A
"D
REVIEWED BY: VV'6 V V)
/b,7 outz 0#01Y)l0kA,
This report presents opinions for-nic(l asa result of our observations of the contractors activities relating to geotechnical engineering. We rely on tile contractor to comply Willi
the plans and specifications throughout tile duration of tile project irrespective of (lie presence of the ZZA field representative. The presence of our field rellresentati ve will
be for the purpose of providing observation and field testing services. Our work does not include supervision or direction of tile actual work ofthe contractor, its employees,
or agents. Neither the presence ofthe 7—ZA field representative nor the observation and testing by ZZA shall excuse the contractor in any way for defects discovered in its
Work. ZZA will not be responsible for jot) site safety on this project.
Form It I
z
M
M
C
M
0
-10
0 C
M
M Z
C
< Cn
o -n
n
--i
3:9
M M
0
0
0 M
C C/)
?. Cn
Q 0
Z r-
3:
z
-i
X
U)
z
0
q
0
M
I
Zipper Zernan Associates, Inc.
Geotechnical Engincei-s and Environmental Consultants
18905 33rd Ave. W, Suite 117, Lynnwood, Washington 98036 (425) 771-3304 / FAX.(425) 771-3549
DAILYFIELD REPORT 4 I!b DATE: PAGE e:�L OF
PROJECT: a4-0 I ")af rz-, rc�'V4-5 ZZAJOBNO.: /-7-7-7—/L?
U F
Table Surnniai-v of' Field Densitv Test Results.
cl P4V
Feet
Field
Dry
%
%
Test
Test
General
Elev.
to
Mat'l
Density
Field
Comp.
Pass
No.
Date
Location
(ft)
Grade
Type
(pcf)
Moist.
Field
Fail
w 4- It; S 19 f N% 49
rL-
3
/"1
vo
r-I 1�
AS L") q 0
/'�V ,
;to ID
A./ r
+ 1:5 "S
4(
0 /V'=
7P
-0
6
4 30'6 "IF tom-
Yp
11-d v ( lue I
�on
4
.47P
A-1 /
11-7
:;z 6V
3
7V
-.5 D 'Vg:
7--
1��'
(9
7T->
3
ea,
Percent Compaction Based on:
Standard Proctor, ASTM D 698
Modified Proctor, ASTM D 1557
F-I Other
LEGEND
DT = Density Test
RT = Retest
TEST METHOD
Nuclear (ASTM D 2922)
Sand Cone (ASTM D 1556)
El DC = Drive Cylinder (AsTM D 2937)
Form 112
Specification: 90%
E] 95%
D 698
D 698
El 90 %
V653%
D 1557
D 1557
Other
Material
Type
Reference
ft�
Material
Description
Max. Dry
Density (pcf)
Optimum
Moisture
__��Ie
-5/44
k1 4
9 147 FI;e
z
0
M
I
Zipper Zeman Associates, Inc.
Geotechnical Engineers and Environmental Consultants
18905 33rd Ave. W, Suite 117, Lynnwood, WA 98036 (425) 771-3304 / FAX (425) 771-3549
DAILY FIELD REPORT # DATE PAGE OF
PROJECT: 641tkvvs:�? ZZAJOBNO:
V
CLIENT: 22 9A � M 7-- CONTRACTOR-
ZZA FIELD REP: LOCATION:
ARR./DEP.TIN,IE: PERMIT NUMBER:
WEXFHER: ��iel
EQUIPMENT USED:
4-a'
Z41e 'ed'rlve-� Oiel trp
4�AV (f a, Ae cy
oe— Z—'V� 400r�'
�t 14-1 A-1 -7-�r,- k
V-'e -7� 1A &&—arOte-
6e k-/ -or Z,-/ epo�-
/n OU k2-
OG A;c V'U 6 ZL C.'222
L- llokoe' IuZe rt2'A�e C tl-��wi�' Z'/�z e2'-:51
7-
41 4d4etz /,d 011 e—,z
REVIEWED BY:
'['his report presents opinions forinedasa result of our observations of the contractors activities relating to geotcehnical engineefing. We rely on the contractor to comply with
the plansnnd specifications throughout the duration of the project irrespective of the presence of the ZZA field representative. The presence ofour field representative will
be for the purpose of providing observation and field testing services. Our work does not include super -vision or direction of the actual work ofthe contractor, its employees,
or agents. Neither the presence of the 7-7-A field representative nor the observation and testing by ZZA shall excuse the contractor in any way for defects discovered in its
work. ZZA will not be responsible forjob site safety on this project.
Form H I
z
0
i
0
M
--I -n
M
M
0
-40
0 C
3: M
M z
Cl)
0 -n
Ti
x
M M
055
0 r-
0 M
cl)
cn
M 0
Z
X
z
z
0
0
M
DAILY FI . ELD RE PO]RT # DATE: PAGE a 017`�
1'110.1 ECT: p'10 t6 ZZAJOB NO.: -7 -1 -7 —) 0
Table Summary of Field Density Test Results
Field
1 c,�3
Feet
Dry
%
%
Test
No.
Test
Date
General
Location
Elev.
(ft)
to
Grade
Mat'l
Type
Density
(pcf)
Field
Moist.—
Comp.
Field
Pass
Fail
it — 1
10 4 /0- 4/ 2� 0 1661 A1,94-,wt
-
-7
10 +a 0 1.62 NO 4!) 01^4
ID
e2
0 _e, 5-2.
35 S-4-
'f -�e A 0 01 ',a 0 �
ol 'p(
7- 4� Aj!1_;
ew �—AAC
* t ev '24A/e
'I
4- 0
q0 e > A/
1A-_ A)EF
ol
A�o
Percent Compaction Based on:
Standard Proctor, ASTM D 698
F� Nlodified Proctor, ASTM D 1557
El Other
LEGEND
DT = Density Test
RT = Retest
TE.STMETHOD —
E�41 = Nuclear (ASTM D 2922)
F-1 SC = Sand Cone (ASTM D 1556)
[] DC = Drive Cylinder (ASTIA D 2937)
rin It 2
Specification: 90%
E] 95%
D 698
D 698
90%
;��-5%
D 1557
D 1557
E] Other
Material
Type
Reference
Sample fl
Material
Description
Max. Dry
Density (pcf)
Optimum
Moisture (%)
__
z
0
i
0
m
. . M
Zipper Zeman Associates
Geotechnical Engineers and Environmental Consultants
18905 33rd Ave. W, Suite 117, Lynnwood, WA 98036 (425) 771-3304 / FAX (425) 771-3549
DAILY FIELD REPORT # 17— DATE 1 0- lq-,oq PAGE I OF
'501 (t % vsj� I — / 0
PROJECT: (t ZZA JOB NO: -
CLIENT: to L)eAA"AA CONTRACTOR.
ZZA FIELD REP: LOCATION: WA-
ARR./DEP.TIME: PERMIT NUMBER:
WEATHER: o C- Lr, kk Ce- 61 EQUIPMENTUSED:
5pvp--
p, at t I\j cA o LA—
P, a7� 44,, t�nft Ae-- 6P,6ak� 4e 0 to
0 ka'e'--C� & 4- 'S -(� ",CA,-- N/ W k-V-
euoel Pr-,-4 - a A9 0 V-' 4V nv4a' -V—iC, 0
ka,-Ot (A
N C
V d"
,9,k4-L 0 5-. h
7
o;.� e, e7A- je't -4-U, etic
tA� 0 ht, ti, 4 �
L(
to /A- LAI k13 �Mev X-e-d kA-0UP\.;y-A-^- 'P (GIP L-N) a, Al M
REVIEWED 11
Y.
Thimport presents opin ions formed asaresult of our observations of the contractors activities relating to geotechnical engineering. We rely on the contractor to comply with
the plans in(] specifications throughout the duration of the project irrespective of the presence of theZZAficld representative. The presence ofourfield representative will
be for the purpose of providing observation and field testing services. Our work does not include supervision or direction of the actual work ofthe contractor, its employees.
or agents. Neither the presence of the ZZA field representative nor the observation and testing by ZZA shall excuse the contractor in any way for defects discovered in its
oik. ZZA will not be responsible forjob site safety on this project.
z
0
4
0
M
-n
M
0
--10
0
M
M Z
C
0 -n
n
M M
065
0 r-
0 M
C cl)
K C()
Q 0
Z
>
z
--q
3:
65 i
z
0
i
0
M
Test
No.
Test
Date
General
Location
Elev.
Feet
to
Grade
[Mat']
C
T e
Field
Dry
Density
(pef)
%
Field
Moist.
%
Comp.
Field
Pass
Fail
DTH
jo-Iq
w �w, yLvI:
.3
7,,�
to
CI 5--
t)T-
Vj er zX Ar—
7,
10
VT
75-
�5,-
Material
Type
Reference
Sample
Material
Description
Max. Dry
Density (pcf)
Optimum
Moisture
�aw a C
6?
Forin it 2
z
0
M
-q -n
W
M
0
0
3: M
M z
C —Z
o -n
M M
-C/)
0
0 M
CI)
90
M 0
Z
X
z
(j)
z
0
M
i I
E, -
ZZA
Zipper Zeman Associates, Inc.
Geotechnical and Environmental Consulting
J- 1777-10
August 1, 2005
0
Ballinger Court Associates Limited Partnership
c/o Covenant Construction Management, Inc.
M
P.0 Box 60
Lynnwood, Washington 98046
U5 --I
Attention: Mr. Pat Carroll
M 0
--10
0 C
Subject: Summary Letter
Geotechnical Observa tions During Construction
M
M Z
Ballinger Court Senior Apartments
C —z
Edmonds, Washington.
>
Cn
Dear Mr. Carroll:
0 -n
The letter provides a summary or our geotechnical observations during con struction of
rn M
the Ballinger Court Senior Apartments in Edmonds, Washington. Zipper Zeman Associates
06
(ZZA) also prepared a geotcclinical for this project dated June 4, 2004.
0
0 rn
Representatives from our Firm made fourteen (14) site visits between September 27,
C co,
7— Cn
rn 0�
Z
2004, and November 30, 2004, to observe the geotechnical aspects of selected portions of project
construction. Daily field reports prepared for each site visit are attached.
ZZA's primary emphasis was to observe the removal of unsuitable soils and the
>
z
placement of structural fill within the building footprint. Our firm also observed the condition of
the bearing soils exposed in theTboting excava tions. This included the removal soft, unsuitable
soils in the northern and southeastern portion of the building. Based on the results of our
0
observations, it appeared that unsuitable soils were removed from the building area as
—1
0
1." 1.
recommended. The results of the in -place density testing of the structural fill placed within the
building footprint indicated that this structural rill was compacted to at least 95 percent of the
maximum dry density determined in accordance with the ASTM D-1557 in accordance witli our
geotechnical recommendations. Hand probing of the footing subgrade generally revealed firrn
and unyielding conditions. Footing subgrade areas requiring additional preparation were
identified to Covenant Construction.
1890533,d Avenue West #117, Lynnwood, WA 98036 (425) 771-3304 Fax: (425) 771 -3549
ZZA
Ballinger Court Senior Apartments
-1777-10
August 1, 2005
2
Page
In still iniary, it is our opinion that tile 9 eotechnical aspects of project constniction
in accordance with our geote. clinical recommendations for the
observed by ZZA were general
proj ect.
Respectfully submitted,
ZIPPER ZEMAN AS SOCIATES, INC.
z
0
CO
0
M
ZZ
Cn
0 M
C
1940
James B. Thompson
M 0
—10
0
NAI,
Principal
-1
xM
L�XPIRES 4. 3 /2006
M z
C: z
3:1
-n
-n
M M
0
0 M
C Cn
M 0
z
;U
-4.
3:
z
Z�
0.
rn
J-1777-1008105
Zipper Zeman Associates, Inc.
Geotechnical Engineers and Environmental Consultants
18905 33rd Ave W. Suite 117, Lynnwood, Washington 98036 (425) 771-3304 / FAX: (425) 771-3549
DAILY FIELD REPORT # 13 DATE: November 29,2004 PAGE 1 OF I
PROJECT: Ballinger Court Apartments JOB NUMBER: J-1777-10
CLIENT: Covenant Construction CONTRACTOR: Covenant
ZZA FIELD REP: Greg Simons LOCATION: Edmonds, Wa.
ARR./DEP. TIME: 2:45pm- 3:15pni PERMIT NUMBER:
WEATHER: Cloudy 30's EQUIPMENT USED: Trackhoe
A site visit was made at the request of the client to observe footing excavations for the proposed
building. Upon arrival, we observed that a majority of the building footings had been excavated down to
bottom of footing elevation. Pat Carroll directed us to the north footing line where he had overcxcavated a
section of footing down to the previously placed quarry spalls and 2-inch crushed rock. Pat infon-ned us that he
was currently approximately 4 feet below the bottom of the footing elevation at this location. We informed Pat
of our recommendations for backfill of this section of trench.
1. We recommended that the width of the footing excavation be equal to the depth of overexcavation, if
structural fill is to be used to backfill the excavation.
2. We informed Pat that CDF could be used to backfill the footing excavations back up to bottom of
footing grade. We informed Pat that if CDF were used, the footings would not have to be widened to match the
overexcavation depth.
Pat informed us that he would use CDF to backfill this section of footing line. We were infort-ned that
we would be needed to observe the remaining footing excavations on 11/30/04.
REVIEWED BY:
ations or the contractors activities relatilig to geotechnical engineering. We rely on the contractor to
This report presents opinions formed as a result of our obsery
comply with the plans and specifications throughout the duration of the project irrespective of tile presence of the ZZA field representative. The presence ofour field
and field testing services. Our work does not include supervision or direction of the actual work of the
representative will be ror the purpose of providing observation . ntative nor the observation and testing by ZZA shall excuse the contractor in any way
contractor, its employees, or agents, Neither the presence of the ZZA field represe
for defects discovered in its work. ZZA will not be responsible for job or site safety on this project.
z
0
1
0
M
-n
0 M
C
M
0
--10
0 C
M
M z
0 -n
n
M M
0
0 M
C C/)
C Cn
Q 0
Z
X
z
CO)
z
0
M
Zi er Zeman Associates, Inc.
Geotechnical Engineers and Environmental Consultants
18905 33rd Ave W. Suite 117, LynnNvood, Washington 98036 (425) 771-3304 / FAX: (425) 771-3549
DAILY FIELD REPORT # 14 DATE: November 30, 2004 PACE I OF 2
PROJECT: Ballinger Court Apartments JOB NUMBER: J-1777-10
CLIENT: Covenant Construction CONTRACTOR: Covenant
ZZA FIELD REP: Greg Sinions LOCATION: Ednionds, Wa.
ARR./DEP. TIME: 9:30arn- 10:45am PERMIT NUMBER:
WEATHER: Cloudy 40's EQUIPMENT USED: Trackhoe
A site visit was made at the request of the client to observe footing excavations for the proposed
building. Upon arrival, we hand probed the entire footing excavations for the proposed building using a V2 inch
diameter steel probe. We generally found the footing subgrade soils to consist of native silty sand and silty sand
structural fill material. Hand probing revealed the subgrade to be generally firm aild unyielding and adequate
for the design bearing capacity of 2,500 psf, in our opinion. However, we encountered several small isolated
areas of softer soils within the footing lines. We marked these areas with paint and recommended to Pat that the
areas be overexcavated down approximately 12-inclies, ' We recommended that the excavations be backfilled
with on site 2-inch clean crushed rock. Pat informed us that lie would backfill tile small excavations with the
crushed rock.
Pat informed us that CDF would be poured today in the footings areas mentioned in field report #13.
Pat also infon-ned us that he was going to pour CDF in the southeast corner footing area. We had observed this
comer to have been overexcavated approximately 3 feet, down to firm and unyielding soils.
We observed one section of footing that had been left unexcavated due to accessibility to equipment.
Pat informed its that he would dig this remaining section today or tomorrow. We will return to observe this
remaining section of footing trench.
REVIENVED BY: � 1;
-1-1
This report presents opinions fornied as a result of our observations of the contractors activities relating to gcotcclinical engineering. We rely on the contractor to
cornply Witt, tile plans and specifications throughout the duration of the project irrespective of the presence of tile ZZA field representative. The presence ofour Field
representative, will be for tile purpose of providing observation and field testing services. Our work does not include supervision or direction ofthe actual work ofthe
contractor, its ernployces, or agents. Neither the presence of the ZZA Field representative nor tile observation and testing by ZZA shall excuse the contractor in any way
for derccts discoveicd in its work. ZZA will not be responsible for job or site safety on this project.
z
0
1
0
M
Zipper Zeman Associates, Inc.
Geotechnical Engineers and Environmental Consultants
18905 33rd Ave W. Suite 117, Lynnwood, Washington 98036 (425) 771-3304 FAX: (425) 771-3549
DAILY FIELD REPORT 4 15 DATE:. Dec6rft5-c7r0, 2004 PAGE I OF I
PROJECT: Ballinger Court Apartments JOB NUMBER: J-1777-10
CLIENT: Covenant Construction CONTRACTOR: Covenant
ZZA FIELD REP: Greg Simons LOCATION: Edmonds, Wa,
.ARR./DEP. TIME: 10:30arn- I 1:00am PERMIT NUMBER:
WEATHER: Cloudy 50's EQUIPMENT USED: Trackhoe
A site visit was made at the request of the client to observe the remaining footing excavations for the
proposed building. Upon arrival, we hand probed the portion of footing excavation which had previously been
unexcavated to allow construction traffic to entire the building area. The section of footing was located at
approximately grid line F and between grids 3 and 5. Hand probing this section of footing revealed soils that
appeared to be fin-n. unyielding, and adequate for the design bearing capacity of 2,500 psf, in our opinion. We
observed that the contractor had placed I inch to 1 V4 inch crushed rock in much of the footing excavations to
protect the subgrade from rain. We recommended that the footing excavations be free of all loose debris and
standing water prior to pouring concrete.
REVIEWED BY:
This report presents opinions forined as a result of our observations of the contractors activities relating to geotechnical engineering. We rely on the contractor to
comply with the plans and specifications throughout the duration ofthe project irrespective of the presence of the ZZA field representative. The presence of our field
representative will be ror the purpose of providing observation and field testing services. Our work does not include supervision or direction ofthe actual work of the
contractor, its employees, or agents. Neither the presence of the ZZA field representative nor the observation and testing by ZZA shall excuse the contractor in any way
for defects discovered in its work. ZZA will not be . responsible for job or site safety on this project.
z
0
M
q :H
E
1,
GARY HAAKENSON
CITY OF EDMONDS MAYOR
121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 FAX (425) 771-0221
Website: wwwdedniondsma.us
DEVELOPMENT SERVICES DEPARTMENT
C. C) Q� Planning - Building - Engineering
November 16, 2004
0
Mr. Peter A. Frame, Agent
Ballinger Court Associates, L.P.
0
M
Post Office Box 60
Lynnwood, Washington 98046-0060
:q --n
co
RE: Alternate Design Request for Ballinger Court Senior Apartments
M
C
M
Code: Uniforili Plumbing Code 2000 edition
0
-40
0
Dear Mr. Frarne,
C
3: M
M Z
The City is in receipt of your request for alternate desigli for reduced slope grade on portions of
underground horizontal drainage piping at the subject project. The basis of the request is that the
existing public sewer main in the street is constructed directly under tile public water main
Cn
0 -n
(confin-ned by Lyle Chrisman, Engineering Coordinator) thus impossible to add a new manhole
-n
for 2% drainage grade, without relocation of the main. The alternative is to pipe on -site sewer
M
lines to another street manhole which, due to grades, will result in a 1% grade on portions of the
M
0 Cn
piping. Although Uniform Plumbing Code Section 708 allows the administrative authority to
0 r- ,
reduce grade to a 1% minimum —experience has shown that long teni-i maintenance challenges
0 M
C cn�
can occur especially in buildings with heavy sewer usage. The developer/owner thus assumes all
K Cn
M 0
maintenance responsibility that may occur with such drainage piping slope reduction. The
Z
request for alternate design to reduce portions of underground horizontal drainage piping to not
X
less than a 1% slope is Approved.
--4
>
Z
Lastly, in response to the opinions expressed on page two of your letter, the City bears no
financial responsibility for existing conditions of tile street mains in question or, for any of your
X
costs to connect your private development project to the City utilities. hi fact, developer
Z
upgrades of existing mains is not uncommon to accommodate development and in such cases tile
0
developer bears the full cost of replacement or upgrades.
Sincerely,
Jeannine L. Graf
Building Official, C.B.O.
Incorporated August 11, 1890
Sister City - Hekinan, Japan
GARY HAAKENSON
CITY OF EDMONDS MAYOR
121 5TH AVENUE NORTH EDMONDS, WA 98020 (425) 771-0220 FAX (425) 771-0221
Website: www.d.edmondsma.us
DEVELOPMENT SERVICES DEPARTMENT
Planning - Building - Engineering
November 4, 2004
0
Covenant Construction 01
M
PO BOX 60
Lynnwood, WA 98046
0 M
C
MO
Peter, 0
00
C,
aining fees are as follows:
The permit for Ballinger Court is ready to be issued the rem
M
M
Additional Building Permit Fees $222.50
>
$65
Planning Inspection fee
Recording fee $40
Storm Development Charge $8,390 0 -nl
-n
Fire Review $200
Fire Inspections $100 M M
State Surcharge $4.50 0
City Surcharge $15 0 M,
Cn
Consultant fees $4,185.39 C co
M 0:
Total $13,222.39
X
If you have any questions feel free to contact me at 425-771-0220 Ext 1703
Sincerely,
z
0
IM
Jenny Readwin
Permit Coordinator
Incorporated August 11, 1890
Sister City - Hekinan, Japan
(Et'tp of TIA (Eb DINGS
DEPAR ENT OF BUIL
te lot (ott"kintT
PER UNIFORM BUILDING CODE SECTION 109
At:— 22707 76'h Avenue W, Edmonds, WA —Building Permit #: 2004-0952
Occupancy established by this Certificate: Dwelling Units: **94** No. Stories: Base + 2
R1 Type'Zonstruction: V-1 HR Basement: Yes
Maximum Occupant Load (Per U.B.C. 1002)
Room*capacity signs, wh"" remai . n posted at all times.
k98046
Owner of Building: Ballinger Court Asi_�"611ate�J., Adqjro"� .6iff6�x'6'6";'�,L.Xnnwoiod;,,W�
THE Ballinger Court Senior ApartrindMS, �-': . 1. 'It.. � 14 . , , ;; t
HAS BEEWINSP ICTED ND APPROV D AS COMPLYING WITH THE REQUIREMENTS
OF THE 1997 Edition of the UNIFORM BUILDINW.CO,,PE;�,,AS ADOPtED- B , Y, THE CITY FOR'THE' GROUP AND DIVISION OF OCCUPANCY AND THE
USE FOR WHICH THE PROPOSED OCCUPANCY 1§16-IMSIFIED.
Issued this 16 th —,,day of August 2005
BY: CHIEF BUILDING OFFICIAL
This Certificate Shall be posted in a conspicuous public area and 3hall not be removed, mutilated or ouscurea anc, Shall inea in legible condition at aii times. Any Change of occupancy or use requires a ouilding cermit and a nev,
Certificate of Occupancy issued oy the City of Edmonds Building Official.
------------ ---------------
FINAL PROJECT APPROVAL FoRM
TO:
DATE:
MEMO TO:
FROM:
PLEASESIGN
PLEASE SIGN
PROJECT
IG DIVISION
IRE DEPARTMENT DATE ct
NGINEERING DIVISION DATE
PLANNING DIVISION DATE
SITE ADDRESS Am, &)
0
P E R M I T ADBY DATE INSPECTED
DESCRIPTION OF WORK TO BE INSPECTED
A field inspection was conducted to determine compliance with -approved plans. Final approval
denotes that there are no objections from the above signed Department to the release of
PERFORMANCE BONDS and the granting of:
GRANT FINAL PROJECT APPROVAL
GWT PROJECT APPROVAL WITH CONDITIONS NOTED .
Rf. Copy of CONDITIONS given to owner/con tractor by inspector
1) JrJ 4-tC_e"z�*VIC+t
n, A
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
0 Copy of CORRECTION NOTICE given to owner/contractor by hipector
I .
2.
3
RE-INSP�CT,ED OUTSTANDING ISSUES - (
Date 0 13 SignatUre
1:teinp:b1dg:r6rms:ocaprv1 3/25/04
)VAL
z
0
i
0
M
--i -n
M
M 0
0
0
0 C:
-i K
2: M
M Z
cl)
o -n
n ;d
>
MM
0
0
C M C/)
M 0
Z
;U
z
z
0
0
M
FfNA-L PROJECT APPROVAL FORM
TO:
DATE:
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: FIRE DEPARTMENT DATE
PLEASE SIGN
ENGINEERING DIVISION DATE z
PLEASIS SIGN 0
—PLANNING DIVISION DATE
lei
PROJECT
SITE ADDRESS 2?_?Q-7 - I& " A,<
PERMIT ADB#_Z0 I - 7-(, —DATE INSPECTED
Cv- - 2-n 4- - Z7
DESCRIPTION OF WORK TO BE INSPECTED L--�f L
A field inspection was conducted to determine compliance with -approved plans. Final approval
denotes that there are no objections from the above signed Department to the release of
PERFORMANCE BONDS and the granting of:
Z'GRANT FINAL PROJECT APPROVAL
619,G T PROJECT V APPROVAL WITH CONDITIONS NOTED
Copy of CONDITIONS given to owner/contractor by inspector
��J I-u P � s;-,-t,4 i-0
P,61%,U pel, I-X—
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
El Copy of CORRECTION NOTICE given to owner/contractor by inpector
I .
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRAN FINAL OJECT APPROVAL
Date Signature
1:temp:b1dg:forms:ocaprv1 3/25/04
-n
0 M
0
0
0
M
M z
1C) --I
C
>
0 -n
n;U
_j >
= F.
MM
0
0
0 M
9 Cn
Q 0
Z
71
;U
--I
M
>
z
z
0
__q
0
M
FINAL PROJECT APPROVAL YORM
TO:
DATE:
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: FIRE DEPARTMENT DATE
PLEASESIGN
ENGINEERING DIVISION DATE
PL
PLANNING DIVISION DATE
PLEASE SIGN
I -n (' 17
PROJECT
SITE ADDRESS Ale- i/k/
PERMIT# ADB#________�DATE INSPECTED
DESCRIPTION OF WORK TO BE INSPECTED —
A field inspection was conducted to determine compliance with -approved plans. Final approval
denotes that there are no objections from the above signed Department to the release of
PERFORMANCE BONDS and the granting of:
GRANT FINAL.PROJECT APPROVAL
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
[:1 Copy of CONDITIONS given to owner/contractor by inspector
1.
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
0 Copy of CORRECTION NOTICE given to owner/contractor by inpector
1.
01
3.
RE-fNSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
1: temp: bldg: forms: ocaprvi 3/25/04
z
0
1
0
M
--i -n
0 M
C
M 0
0
0 C
M
M z
o -n
n
M M
0 �5
0 r-
M
Cn
Q 0
Z
>
z
z
0
i
0
M
-+4AAL-MUMIA.�1 APPROVAL FORM
o TO:
DATE:
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM:
PROJECT
FIRE DEPARTMENT DATE
PLEASI! SIGN
ENGINEERING DIVISION DATE z
PLUSESIGN 0
PLEASE SIGN
LANNING DIVISION DATE
M
M
SITE ADDRESS (ble KZ 0
0
0 C:
DATEINSPECTE
PERMIT# —ADB# D rn
rn Z
DESCRIPTION OF WORK TO BE INSPECTED
>
A field inspection was conducted to determine compliance with -approved plans. Final approval 15
0 -n
denotes that there are no objections from the above signed Department to the release of -n ;U
--I >
PERFORMANCE BONDS and the granting of: M F.
GRANT FINAL PROJECT APPROVAL
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
0 Copy of CONDITIONS given to owner/contractor by inspector
I .
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
El Copy of CORRECTION NOTICE given to owner/contractor by inpector
I .
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date SignatUre
I:tciilp:bl(lg:foi-i-ns:ocal)rvI 3/25/04
0
0
CAI
Z
z
--I
X
En
z
0
0
M
IA
vp 'S
/v
RECORD OF INSPECTIONS
INSPECTOR
DATE APPROVED
SETBACKS .....................
FOUNDATION:
Footing......................
Wall..........................
Pier/Porch .................
Retaining Wall ...........
MIS
Slab Insulation ..........
PLUMBING:
Underground .............
Rough -in ...................
Commercial Final ......
HEATING:
Gas Test ....................
Gas Piping .................
Equipment .................
C,
Commercial Final .......
EXTERIOR SHEATHING
NAILING ..........................
FRAMING ........................
—13
FIRST FLOOR FRAMING ...
INSULATION ...................
Floor Insulation .........
Wall Insulation ...........
Ceiling Insulation
.......
SHEETROCK NAILING ...
SPECIAL INSPECTION
v
tAt
MISCELLANEOUS ..........
FINAL APPROVAL FOR
M0
OCCUPANCY ..................
)g� C --� .-,;) 6.- (3 S 1�
", ..(Gjd . vy-0
ipt#,
AwoutW'd$ - I """o "A%—
Dabbsued 4Ji/e.6—vvwra
I t
WiderNeterffize
2A j IIA-0/11 n
Anmwid N1146 "I a film -
ROW
AM0oftPWd$ APPPI110 -
Ddelnued E=- Im—
z
0
11
0
M
=n-
M
0
0
__40
0 C
:r M
M z
Cl)
o -n
n
MITI1
0 C—/)
0 r-
0 M
C1)
Cn
M 0
Z
z
z
0
0
M