Loading...
20040982.pdfDATE RECEIVEI i CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER N EINAME OF BUSINESS - 7o`r2,-r4 CP_L=5-7- MAILING ADDRESS z ?. 0 CITY ZIP TELEPHONE 77V NAME t W I= ADDRESS CITY ZIP TELEPHONE NAME CBL# W 0 ADDRESS 0 oy� 5�0 0 U CITY ZIP AA) �5r �60ZQ TELEPHONE STATE LICENSE NUMBER EXPIRATION DAIE E A10471-11C_�Dl 5-0 *b,4 7 PROPERTY TAX ACCOUNT PARCEL NO. -7 00? 0 `3 _j NEW RESIDENTIAL PLUMBING MECH ADDITION F-1 COMMERCIAL COMPLIANCE OR CHANGE OF USE REMODEL MULTIFAMILY F1 SIGN GRADING FENCE REPAIR CYDS ( — X FT) DEMOLISH E] TANK OTHER GARAGE RETAININGWALL FIRE SPRINKLER ROCKERY FIRE ALARM ZICARPORT .0 (TYPE OF USE, BUSINESS OR ACTIN 9NITii L NUMBER N 4BEA OF q Lr— U& LL 'AREA OF DWE IING S U IT UMB STORIES UNITS N ER DESCRIBE WORI? TO BE DONE _(7— 51 -7 HEAT �O_URCE I GLAZING % I LOT SLOPE % PLAN CHECK NO:_Aa_+5=_ I VESTED DATE THIS PERMIT AUTHORIZES ON'LY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: 180 DAYS PERMIT LIMIT 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON. ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY On INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT ISSUANCE OF 1 HIS PERMIT SHAI 1. NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION ' __PERMIT EXPIRES TSE _T PERMIT ZONE NUMBER '2, 0o o q,� JOB SUITEIAPT# ADDRESS 0_1q 10Z PLAT NAME/SUBD)VISION NO. LOT NO. LID NO 74 VA1,E LID FEE $ 7 L SIP �Iplllld PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP Rw Permit Required street use Porma Roq'd inspection Rociturod EXISTING — PROPOSED Sidewalk Harivired Underground REQUIRED DEDICATION� FT wiring required METER SIZE LINE SIZE T�NO. OF FI�XTURES PAV REQUIRED QU Y y 0�1 I I E SPE03 NO 1:1 REMARKS OWNER/CONTRACfOR RESPONSIBLE FOR EROSION CONTROLIDRAINAGE ENGINEERflMR2MFr%M1?5T 0 SIDE SEWMt MUST BE CAPPED AT FIRE REVIEWEd%Lft'bK11 U1415 DATE WA7= METER M B8 REMOVED 0 MWILLItui VARIANCE OR RIMAPPM M REO'D �L;; AT APPRZED11DUM PA RE SIGN AREA* H SE SYST M 7 rjMWED ETE VORT R(W V COMPL UST Qum SIPEC 0 0 CHEC IST N BACK OF JOB CA EXP I 1111,01rign-N BOND POSTED HT PROPOSED LOT COVERAGE . RE_Q_UI5FAih7_D' Efarc)k9'�fft"W60idt SET13ACKS (Fr.) ALLOWED PROPOSED FRONT SIDE REAR FRONT UR SIDE REAR PARKING REO'D I PROVIDED REMARKS CHECKED BY ITYPE SPECIAL INSPECTION REQUIRED [] YES LOT AREA I PLANNING REVIEWED BY DATE OCCUPANT GROUP OCCUPANT LOAD cc W z z U1 cc a: 0 z E z REMARKS PROGRESS INSPECTIONS PER UBC 108/ IBC109/ IRC109 FINAL INSPECTION REO'D J9 to VALUATION Description FEE Description FEE Plan Check State Surcharge City Surcharge Building Per it Plumbing Base Fee Mechanical Grading Engr. Review Engr. Inspection Fire Review Plan Chk. Deposit Fire Inspection Receipt # Landscapeinsp. Total Amt. Due 2 Recording Fee Receipt # I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION APPROVAL GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF This application is not a permit until signed by the THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL Building Otticial or his/her Deputy: and Fees are paid, and TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERS014 WILL BE EMPLOYED IN VIOLATION OF_jHE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt is acknowledged in space provided. WORKMEN'S 9&Mp-NSATION INSURANCE AND RCW 18.27. OFFICIALS TGNAT& DATE SIGNATURE ($WNER (�R AGENT) DATE SI ED (425) 1//7/ 771-0220 RFLFAS�' ATTENTION E)ff 1333 ITIS UNLAWFULTO USE OR OCCUPYABUILDING OR STRUCTURE UNTILAFINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCLI- PANCY HAS BEEN GRANTED. UBC109/IBC110/IRC110. 09/03 PRESS HARD -YOU ARE MAKING 4 COPIES I BY ORIGINAL - FILE YELLOW - INSPECTOR PINK - OWNER GOLD - ASSESSOR z 0 A 0 M :;:n- M c:: M 0 0 ­40 0 C: M M z Cl) 0 _n n M M 0 —C/) 0 r- 0 M C: W ?. Cn M 0 Z z W z 0 1 0 M DEVI OAr I I dsme "%op0% *6 Goi4 � z 1444* 7-zft-, 6TCO toot of PLII>. detTiclopiwe ar46 LEAVC tKP#Ai!wr A4 1*66APs C094$r A059� umv L tJ60 4MSL= le.7 l5tA[Lwr. clir le�� ea,�Vpt) /050, 1 0 0 m g) c > wn m 0 0 c C0 Cl) M 0 Z I k 214th Street N 90* 0' 0" E 340' .............. ............................................ -------------------------- ......... ...... ..... .. . ...... CW s7 Southwest 16.04'-* 11 Edge of pavement 51 - 0* + N 90* 0'0* E 95' N 90* 0' 0' E 93.81' N 900 0' 0' E 105' N 0 R T H 21 7.� " . T b PA$ GO SCALE: 10 40' 0' rlv4wag eI_ Driveway JIR 8010, 4W - 6' F co D C) C ,age b C.) _j W I i Legend E 'Y : cli *C 38, - 0* cri + Found Brass Plug .6 C ei Set Reber and Cap #8394 C iz C4 I - 1 0 t. 'z'l Lot 3 'z," *C Lot 1 : 1 !0 sq. till, r , �-� -;� - z 9942.0 sq. ft. Qnnn�-;t sif �'ft I SubdIvIslon Requirements c" - I Zoning: RS-8 P S.L�b k Cl) DrlYswW Existing Lot area: 28,386.95 sq. ft. Proposed Lot area of Lot 1: Proposed Lot area of Lot 2: 9,942.0 sq. ft. 9,006.8 sq. ft. W0'0'0"W 105' N90*0'0'W 95' N 90' 93.85' Proposed Lot area of Lot 3: 8,887.3 sq. ft. 5 Foot Street Dedication: 475 sq. it. . Parking Stalls: At I east 1 stall I Lot (8.5'xl 13') Roy Robinson Kathleen MacPherson Topography: Less than 3' change across lot Loren L Teresa Angiono Grading: None Proposed Typical Setbacks: Street 25-Feet Side 7.5-Feet D 15-Feet C Nonconformities All three structures are nonconforming 1, 1, Tin. in reg AUTHORIZED ex sti FOR RE-COPIDING by th, 101-1 Y OF EDMONDS a, cr mi dif RM 6;�i PP,G=- P L. arc to the street SeL a%, . ng nonconformity is not expanded subdivision, and no new nonconform eated except as described in the ication request. M U) M 5' Sidewtilk 60' Righf-of-Way Vi AN 1. *% % Bullock I Payne Short -Plat 0% ;-Y Z S -0 tw - j -r Northshore Land 3-Lot Short -Plat es 13 - 0% Surveying Property location: 21402, 21404, and 21408 80th L L 19706 80th Ave. NE Ave W EXPIRES 2 Bothell, WA 98011 Section/Township/Range - NE 30-27-04 3 — r2 —T-7— I Date: July 4, 1996 rev. January 8, 1998 31-11 =l0,kinvn03Hi013na si ii B3110N SlH.L NVH_L NV3-10 SSM Si 3IN"A SiHi NI INWmOO 31­11 =11 :30110N Agency Case No. PUGET SOUND CLEAN AIR AGENCY 10 Union Str�ct, Suitj 500 Seattle, WA 98101-2038 200400945 www.pscleanair.org NOTICE OF INTENT I.- U NOV 12 2004 A. Project Type: 1. El Friable Asbestos Removal 2. EI Friable Asbestos Removal & Demolition 3.,Q DemblifibIrOATV� B. Property -1)—V- Co Phone: (Q0 77 3 1 Owner: Mailing Address: c2 '340 City: G:bWl OA11)5 iState: Zip: '�OZ6) C. Asbestos PLF_15EP81,VTCLE,4RLY, THISRUL BE YOUR REMMMAILINGLIBEL Contractor: Owner/CEO: Contractor Mailing Address: Phone: Job No.: I City: State: Zip: Fax: _Tzip:'7TV2zP D. Site Address: 'E0 14- ZI L44k FLI. Site Manager: V-�AA'P-& LocalPhone:" 5-9;)-LIZ-4/57 I __F_ E. Asbestos Survey or No. of I Da se te f A b tos )l Was Friable Asbestos Identified? Yes No Was Nonfriable Asbestos identified? Yes No Mat'l Presumed: Structures: Survey: I I -z' A ttach a copy oJ'the survey when ftiabe asbestos A.HERA Building Certification #-' 10 1 02� 41f Inspector: 'BiLi. Expl kt,-�' to I ;C) 05,_ has not been identified I An AHERASurvey is requirea oelore att aemourion pruirca F. Demolitfo­n S= No. of Training Fire (List Fire Dept.) Information: Date: 17- (1 0 Structures: 2. Ordered Demolition (attach copy of Order) Demolition Insert demolition contractor's mailing address on back Will nonfriable asbestos be left in p ace during demo? Yes 0 No Contractor: CAJtAKI e7�4�q4yA-rWC_-,- If yes, list type and qty� �i 14 1 G. Friable Asbestos Project Information: Work Days: M T W Th F Sa Su Start Date: Completion Date: Hours: Will all friable asbestos material D Yes Total Qty. to be Removed: Linear Ft. I Scivare Ft. be removed'! L_J iNO Thermal System Insulation: Boiler\Furnace Ins. Duct Ins. El Pipe Ins. 0 Other: Sur -facing Mat'l: Fireproofing 0 Paints 0 Plaster El Textured Coatings El Other: Misc. Mat'l: I E] Cement Rd [J Cement Pipe U Friable Flooring or Roofing Mat'l F-1 Other- H. Asbestos/Demolition Project Categories: Notiflcation Period Project Demolition Fee Surchar2e 1. Single -Family Residence: A. Prier Notice A.S25 A. Asbestos Removal Project Only B. 10 Days* B.S50 B Demolition Project (with or without asbestos removal project) -(Asbestos removal can begin upon notification; demolition must wait 10 days) iVote: If the singlefamily residence is owned by onefamily who has been or will be using the residence as their domicile, the above box or IB may be checked. A single family residence does not include rental property, noulti-family u its, or any mLred-use building. $200 2._Z. All Other Demolitions With No Asbestos Removal Project 10 Days_ Friable Asbestos Projects (other than Single Family Residence): Asbestos Demo 3. > 10 - 259 linear feet or > 48 - 159 square feet of asbestos Prior Notice 10 Days $100 $100 4. El 260 - 999 linear feet or 160 - 4,999 square feet of asbestos 10 Days $200 $too [] 1,000 - 9,999 linear feet or 5,000 - 49,999 square feet of asbestos 10 Days $750 $250 6. [1 Emergency Asbestos Project or LJ Emergency Demolition Project Prior Notice Twice Project Fee I (Single -Family Residences art exempt from emergency fee; however. property owners must provide a written emergency request) I certify that the information contained in this notification & supplemental data is, to die best of my knowledge, accurate & complete Q E I Wklk �C--Y,5 t Pev- aK70 - , -, /P �( Ronroxontinp ' �rj , ". 1 111 ' Daie DEC 14 2004 Puget Sound Clean Air Agency For-m No.: 66-160 (Revised 9/03) TS DEVELOPMENT SERVICES CTR. CITY OF EDMONI)S I �! - - __ — C) C. JIT C, ai L i L_ R G Reviewed 1// '0 I I z 0 1 0 Ri =, =5 M M 0 C-) 0 C: M M Z IC) --I C _Z X C0 0 -n T1 M M 0 0 0 M C= (/) 9 C/) Q 0 Z z z 0 q 0 M The Puget Sound Clean Air Agency requires advance ' notification before any person commences a friable asbestos project involving materials equal to or greater in size than' 10 line�r feet or 49 squa�e feet Ind for all demolition projects (regardless of asbestos content) involving structures with a projected roof area greater than 120 square feet (Regulation 111, Article 4). All asbestus removal and demolition notifications must be submitted to the Agency on current Agency forms. Asbestos removal and demolition proiects involving materials and structures below the notification threshold are still subiect to all other requirements of Regulation 111, Article 4. After receiving a complete notification with the appropriate project fee, the Agency will review the ronn and return a copy to the asbestos and demolition contractor by mail. The returned copy will be your validated notification. J. Dernolidon PM4SEPRINTCLEWY Contractor: A J W �J E -/-CA V,47-1 Owner/CEO: ROL� 15 OvEU-1 t&Yf Mailing Address: -Z-0 (a ( 1 13 Y,_(eW47r H�.� #Zqq 9�gO12, Phone: (qz4 L4q 1 5& 5,q Contractor's Job rCi;7 B (7-T R 0 LL- State: t,4)+ I Zip: 9�,C>17_- I Fax: (1&4- 4 � -3 4L'� I GUIDELINES FOR SUBMITTING AN ASBESTOS\DEMOLITION NOTIFICATION Step 1. Check the appropriate project type in Box A. Friable asbestos includes popcorn ceiling material, sheet vinyl flooring, cement asbestos board siding, and duct insulation. Nonfriable asbestos is normally found in vinyl floor tiles, window putty and most roofing materials. Step 2. Enter property owner information in Box B. Step 3. Enter the asbestos contractor or property owner information, if the property owner is conducting a single-family residential project, in Box C. Print clearly this is your return mailing label. Step 4. Enter the site address for all notifications in Box D. For multiple -structure projects, attach supplemental sheet with a site map (include an address for each site) and a list of the type and amount of friable asbestos to be removed from each structure. Step 5. Check either asbestos survey or material presumed in Box E. All demolitions require an Asbestos Hazard Emergenc� Response Act (AEERA) asbestos survey be conducted by an AHERA certified building Inspector. Attach a COPV of the survey result to the notification of a demolition project when only nonfriable asbestos or no asbestos is identified on the survey. Step 6. Enter the project information in Box F. and check the training Fire or ordered demolition if appropriate (a copy of the official order must be attached). All asbestos must be removed prior to conducting a training fire. Additional training fire requirements are contained in Regulation 1, Secdon 8.08. If any nonfriable asbestos materials will be left in place during demolition, check yes and list the type and quantity of material. Step 7. Enter asbestos project information in Box G. List types of friable asbestos material to be removed; surfacing material such as popcorn ceilings or plaster, sheet vinyl flooring, duct and pipe insulation, cement asbestos board siding or pipe, etc. Step 8. For Single -Family Residential projects; check BOX 111A for renovation projects, BOX H1B for demolition projects with or xvidiout asbestos removal. Asbestos removal may be conducted after a complete notification is received, but demolition activities can only begin on the 10' day after the notification is received. iVote: If the singlefamily residence is onwed by onefamily 010 has been or will be using the residence as their domicile, bo.ces L-I or IB maj, be checked. A singlefami1j, residence does not include rental properrj,, multi-fami/j, units, or any mLved-use building. For Commercial asbestos projects (or projects that do not qualify as Single Family Residential); check the project category H2 - 5 that matches the amount of friable asbestos that will be removed. If a demolition is involved, include the appropriate surcharge (additional fee) in your payment. To file for an emergency asbestos or demolition project, check die appropriate box I - 5 and the applicable emergency box in H6. All emergency requests must be accompanied by a letter from the properry owner demonstratinp the need to conduct the �roiect inunediately in accordance with the requirements in Regulation III, Section 4.03 (c). Step 9. Please certify the accuracy and completeness of the information provided by signing the notification in Box 1. IN-landatory amendments to the notification are required for changes that increase the project category, change the types of asbestos materials to be removed and changes to start date, completion date and work schedule for asbestos projects. No fee is required for work schedule changes if the contractor is participating in die Agency work schedule fax program. A S25.00 processing fee is required for all amendments. Puget Sound Clean Air Agency asbestos regulations and forms can download from the Agency web page at www.pscleanair.org. For technical assistance contact (206) 689-4058 and for administrative inquiries contact (206) 689-4090. Puget Sound Clean Air Agency Fonn No.: 66-160 (Revised 9/03) TS Z 0 0 M q9 X M 0 0 0 0 C: M M Z 10 --1 c W o -n n M M 0 6) 0 r- 0 M C M 0 Z 3: Z —i 3: (1) Z 0 M FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PLEASE SIGN ENGINEERING DIVISION DATE PLANNING DIVISION DATE PLEASESiGN PROJECT 0- S'vV SITE ADDRESS-59361 PERMIT # ADB# DATE INSPECTED DESCRIPTION OF WORK TO BE INSPECTED — A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRE CTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:rbnns:ocaprv1 3/25/04 z 0 1 0 M —1 -n M M 0 0 0 M M z C :Cln 0 _n _n M M 0 _C() 0 r, 0 M C/) Cl) M 0 Z X z -4 M z 0 i 0 M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall.......................... Pier/Porch ................. Retaining Wall ........... Slab insulation .......... PLUMBING: Underground ............... Rough -In ................... Commercial Final ...... HEATING: Gas Test .................... Gas Piping ................. Equipment ................. Commercial Final ....... EXTERIOR SHEATHING NAILING .......................... FRAMING ........................ FIRST FLOOR FRAMING... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION PIE f— IV\ (a - so MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. (j, a rwo 44" The 111it""'s Contract T110111I)SO"' tcmporar) illspCetor Cot t1le City. c, A fv1 T 0 z 0 0 M M C M 0 C-) 0 C IT! 1711 z g) -1 1 1 . C — z 0 -ri n M M 0 0 0 M C Cl) K C/) Q 0 Z 3: z 3: z 0 0 M