Loading...
20040997.pdfa FDATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAME/NAME OF BUSINESS ir�- LC_� V I MAILING ADDRESS I C-, o t, u, CITY TELEPHONE EI.-) V%,� 0 �\. (� C--, I Li 1 5, - -7 -7 S NAME U0191fi*0P ZIP I TELEPHONE PERMIT EXPIRES PILRMIT 41 NUMBER .JOB SUITE/APT# ADDRESS I O'c-1, 0 1 C—S PLAT NAFAEiSUBDIVISION NO. LOT NO. LID NO I LID FEE S PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Approved RW Permit Requml C3 Streel Use Permit Required 13 EXISTING PROPOSED irispeclion Required 13 Sidewilk Required 0 REQUIRED DEDICATION FT Underground 0 Wifitic? u.qutfed [3 METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED I I YESO NOE3 REMARKS OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROLIDRAINAGE a z 2 tu W z E5 z W NAME CBL# -2 ENGINEERING REVIEWED BY DATE 0: ADDRESS 0 I— U L,.L) FIRE REVIEWED BY DATE Uj CITY ZIP TELEPHONE U q L0 47: Ev k, v eJ� 1� L4 Lt 2 5, _S STATE LICENSE NUMBER EXPIRATION DATE CUECKED BY VARIANCE OR CU ,.SHORELINE OR ADB# INSPECTION SEPA REO'D COMPLETED EXEMPT -(2- S L+ lo's �w t YES [3 N I .-� 01 CAH ZONE SIGN AREA HEIGHT J < PROPERTYTAX ACCOUNT PARCEL NO. WAIVER 13 ALLOWED, PROPOSED ALLOWED PROPOSED Uj _j STUDY 13 F-':. ;--k NEW RESIDENTIAL PLUMBING / MECH 1:1 LOT COVERAGE REQUIRED SETBACKS (FT) PROPOSED SETBACKS (FT.) REAR ALLOWED PROPOSED FRONT SIDE REAR FRONT URSIDE I COMMERCIAL COMPLIANCE OR ADDITION P0 -1 1:1 + z z CHANGE OF USE n MIXED USE REMODEL MSIGN PARKING LOT AREA PLANNING REVIEWED BY DATf El MULTIFAMILY REQ'D PROVIDED GRADING FENCE REPAIR 1:3 CYDS E] x FT.) Rky�iRKS- TANK OTHER DEMOLISH 1:1 11 GARAGE RETAINING WALL FIRE SPRINKLER z CARPORT ROCKERY FIRE ALARM Y (TYPE OF USE, BUSINESS OR ACTIVIT PLAIN. TYPE OF CONSTRUCTION OCCUPANT GROUP U V) LU 0 C a NUMBER NUMBER 0—F OF DWELLING SPECIAL INSPECTION CONSULTANT OCCUPANT LOAD 0 STORIES UNITS REQUIRED 13YES DESCRIBE WORK TO BE DONE Q - REMARKS z GEOTECH REPOR BY: STRUCTURAL DESIGN BY: VALUATION $ Description FEE Description FEE I Plan Check State Surcharge HEAT SOURCE LOT SLOPE% VESTED DATE Building Permit City Surcharge ECK NO: Plumbing Base Fee Mechanical THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBIC Grading OONMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES. ETC.) WILL REQUIRE SEPARATE PERMISSION. Engr. Review Uj PERMIT APPLICATION: SEE ECDC 19.00.005(A)(5) PERMIT LIMIT: SEE ECDC 19.00.005A)(6) Engr. Inspection SEE BACK OF PINK PERMIT FOR MORE INFORMATION V) 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESSORS Fire Review Plan Chk. Deposit W IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON, ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND Fire Inspection Receipt # ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY Total Amt. Due FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Landscapelnsp. 0 NOR LIMIT IN ANY WAY THE CITY's ABILITY TO ENFORCE ANY ORDINANCE PROVISION.* Recording Fee Receipt I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION APPROVAL GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF This application is riot a perunit until signed by the THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL Building Official or hisihor Deputy and Feesare paid.and TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED receipt sacknowledged in space provided IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION v�paKmews-etWRE.NSATloq4tkSURANCE AND RCW 18:27. " OF ICIftS SIGNATU9E DAT� '-SIGNATURE-W AGENT DATE SIG�D (425) j 771-0220 R F 4�1 f ATTENTION EXT. 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE LINT I fic t1)12j1V111 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109 i IBC110 f IRC110., 10104 PRESS HARD - YOU ARE MAKING 4 COPIES D BY 190 ORIGINAL -FILE YELLOW - INSPECIC PINK -OWNER GOLD - ASSESSOR z 0 A 0 M ­11 -n 0 M C M 0 0 -4 (-) 0 C --i r, 7- M Mz _z 3: 0 M M 05S 0 r- 0 M C M 0 Z X z z 0 1 0 M FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE ['LEASE SIGN ENGINEERING DIVISION DATE PLEASE SIGN T C2.c,�__,V::�I�,,.�L_PLANNING DIVISION DA E PLEASESIGN PROJECT__2�)�� SITE ADDRESS I Ohl -7 PERMIT #aOD4 - NqJ _ADB# INSPECTED DESCRIPTION OF WORK TO BE INSPECTED f)j hN) A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: >< GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 1. 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date SignatUrc 1:temp:b1dgA'ornis:ocaprv1 3/25/04 z 0 M --i -n M M 0 C) 0 C: ­4 K M M M Z 0 -1 C Cn o -n nx --i > a: 9 M M 0 Y) 0 r- M U) U) M Z r z --I r Cn z 0 M ,OWN RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing...................... Wall.......................... Pier/Porch ................. z 0 Retaining Wall ........... 0 Slab Insulation .......... PLUMBING: Underground ............. M C Rough -In ................... M 0 Commercial Final ...... 0 -4 3: M HEATING: M Z --I Gas Test .................... z Gas Piping ................. Equipment ................. 0 _n Commercial Final ....... M M EXTERIOR SHEATHING 0 NAILING .......................... 0 r- M C: a) FRAMING ........................ C CD ITI 0 FIRST FLOOR FRAMING ... Z r- INSULATION ................... ;U Floor Insulation ......... > z Wall Insulation ........... --I x Ceiling Insulation ....... (n z SHEETROCK NAILING ... 0 I SPECIAL INSPECTION ... 0 M MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY ..................