Loading...
20041009.pdfDATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAME/NAME OF BUSINESS C--, Q N () t%. 3 0 0 MAILING ADDRESS 1-74 2-1 L tj PC-10 vc=. CITY ZIP ELEPHONE zorb- 51-40aer Lltjo '7811--2 10 64 0 NAME ADDRESS TELEPHONE NAME I/J Ae,— H [10 t,) F7 i er-- < P OVA ADDRESS -7 CITY ZIP TELEPHONE Sf 8 .3 V ,)&eU0_C0P '1B.3 I 0�1-7 STATE LICENSE NUMBER EXPIRATION DATE A i:- Fs Qf I Z- F 61 -Z-7-0(p PROPERTY TAX ACCOUNT PARCEL NO. 005 &`7 0000 1&0-+ NEW �j�ESIDENTIAL 1 1:1 PLUMBING / MECH � COMMERCIAL COMPLIANCE OR ADDITION MIXED USE E] CHANGE OF USE REMODEL El MULTIFAMILY SIGN REPAIR GRADING CYDS FENCE ( X FT.) DEMOLISH TANK OTHER GARAGE r.ARPnRT RETAINING WALL ROCKERY �FIR SPRINKL R11) �9 FIREA FTYPE OF USE, BUSINESS�ORA��TIVITN�6KPLAIN. NUMBER NUMBER OF OF DWELLING STORIES UNITS DESCRIBE WORK TO BE DONE eF 5 160 111,,) P-0-51 � HEAT SOURCE jrMIRM P (2-f /,J) 2� LOT PERMIT EXPIRES P P17RrV11 1 "0/ v NUMBER U4 JOB ---? ADDRESS f, ­;i, SUITE/APT# -I 1-/_� � o� P PLAT NAME/SUBDIVISION NO LOT NO LID NO I UD FEE S PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP P TESCPApprov0d R,tj Peraid Redulled 13 E3 Street Use Permit Requited [3 EXISTING PROPOSED E inspei:ijon Required 0 S.de*aik Required 13 REQUIRED DEDICATION FT Unatitgiound 0 METER SIZE LINE SIZE OF FIXTURES PRv REQUIRED YES 13 No 0 Oz R LU REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE IU z z W .- 11.1 — ?X4,4,01 1,2eo-o ENGINEERING REVIEWED BY FIRE REVIEWED BY VARIANCE OR CU CAft WAIVERO STUDY 13 LOT COVERAGE ALLOWED PROPOSED PARKING REO'D , PROVIDED REMARKS SPECIAL INSPECTION REQUIRED 13YES REMARKS t-r L�L_, GEOTECH REPORT BY: STRUCTURAL DESIGN JIB Y: ii� LIE P?,— VALUAT ON rz) $ L VESTED DATE PLAN CHECK NO: THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBIC DONMAIN (CURBS, SIDEWALKS, DRIVEWAYS. MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: SEE ECDC 19.00.005(A)(5) PERMIT LIMIT: SEE ECDC 19.00.005(A)(6) SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESSORS IN INTEREST, AGREES TO INDEMNIFY. DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON, ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY. WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION. - I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPEN�AyoNjt�U RANCE AND RCW 18:27. DATE SIGNED Description Plan Check Building Permit Plumbing Mechanical Grading Engr. Review Engr. Inspection Fire Review Fire Inspection Landscapeinsp. Recording Fee DATE DATE Lu 5 LL SHORELINE ORAD1111 I INSPECTION SEPA REQ'D COMPLETED EXEMPT OYES CI NO ZONE SIGN AREA HEIGHT ALLOWED . PROPOSED ALLOWED , PROPOSED REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (FT.) FRONT SIDE REAR FRONT UR SIDE REAR z 2 z LOT AREA I PLANNING REVIEWED BY DATE I � OCCUPANT GROUP occu LOAD FEE Description 817 State Surcharge City Surcharge Base Fee /00_ Plan Chk. Deposit 2 /0 Receipt # 9 CALL FOR INSPECTION 14251 FEE Total Amt. Due Receipt # I APPLICATION APPROVAL This application is not a permit until signed by the Building Official or hisither Deputy and Fees are paid. and receipt is ac�nowledged in space provided FICIAI.$ SIGNATI DATE `7 y. ISIGNA RE OW,NER ALi N 1 V )7� E­7z '0 _J 771-0220 srE sE ------- r___ EXT. 1333 ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL E-2/4 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI- FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109 / IBC110 / IRC110- 10104 PRESS HARD - YOU ARE MAKING 4 COPIES BY DrE ORIGINAL - FILE YELLOW - IN6PEC7f PINK -OWNER GOLD - ASSESSOR a z z 0 A 0 M -i -n 65 j x 0 M C M 0 0 0 0 C M Mz 10--11 Cy �x 55 o -n n M M 0 C-1) 0 r, 0 M C 0 F, Cn Q C) Z z z 0 M I 14 FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE, DEPARTMENT DATE I'LLASESIGN ENGINEERING DIVISION DATE z 0 PLEASE SIGN PLANNING DIVISION DATE M PLEASE SIGN PROJECT Q 1IL14 10V 3-- 0 OM C 0 M SITE ADDRESS �L� L 5L -I PERMIT #R�C �)— �-�(_�ADB# DATEINSPECTED DESCRIPTION OF WORK TO BE INSPECTED C_" k. A field inspection was condncted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 1:1 Copy of CONDITIONS given to owner/contractor by inspector 2, 2- C' /,/X FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 1. 2- 6 J, 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature I:tei-ni):bldg:fortils:ocapi-N,I 3/25/04 0 0 C: —i K x M M Z co 0 -n n;u .-I > x 9 M M 0 0 0 M C Cn 9 Cn M Z ;u --i 3: z --i X (0 z 0 M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall.......................... Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... 0 M PLUMBING: Underground ............. Rough -In ................... M C M Commercial Final ...... -4 0 0 0 C HEATING: -4 x M Gas Test .................... M z g) --I C Gas Piping ................. > Equipment ................. Cn 0 _Tl Commercial Final ....... EXTERIOR SHEATHING M M NAILING .......................... 0 C—n 0 r- FRAMING ........................ 0 M C Cn FIRST FLOOR FRAMING ... F. C0 M 0 Z INSULATION ................... Floor Insulation ......... Wall Insulation ........... > z Ceiling Insulation ....... Cn SHEETROCK NAILING ... z 0 SPECIAL INSPECTION --A 0 ITI MISCELLANEOUS .......... FINAL APPROVAL FOR M OCCUPANCY .................. 00 ar too 0 1: lei 0 fto 0 ��