Loading...
20041057.pdfI DATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAME/NAME OF EIVEKNESS MAILING ADDRESS CITY ,FJ ,I, i NAME 141 el ZIP TELEPHONE /,� c q2 �) - - � -"/z '72 d-1 -l" !,,v8 CITY ZIP 33 NAME ADDRESS V 1411VII Irl T S E 0 NE j 3 AOD D R E :SS - c -1% #�, J-/ ) 1, Vic, — TELEPHONE - 3 '7 C13L # F E7j,,Vj -1 (� ZIP I TELEPHONE STATE LICENSE NUMBER EXPIRATION DATE I CHECKED BY ? PROPERTY TAX ACCOUNT PARCEL NO. 00.:�_ &�, 9- �70 11 NEW 13 RESIDENTIAL A. I bl­�fr, ADDITION �,@QMME444rtirt REMODEL MULTIFAMILY REPAIR GRADING CYDS El DEMOLISH El TANK GARAGE RETAINING WALL CARPORT ROCKERY (TYPE OF USE, BUSINES OR ACTIVITIO EXPLAIN: NUMBER OF V. NUMBER OF DWELLING Ajl!-� STORIES UNITS DESCRIBE WORK TO BE DONE � /00 PLUMBING / MECH COMPLIANCE OR CHANGE OF USE SIGN FENCE t X FT) Q1HPR - �eeile_,11 �IRE 9PRINKLER FIRE ALARM NAME/SUBDIVISION NO. PERMIT EXPIRES PERMIT N U M BE R - llx)I)1117 ii;� LOT NO. PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP EXISTING — PROPOSED REQUIRED DEDICATION— FT METER SIZE I LINE SIZE I NO. OF FIXTURES LID NO. LID FEE S TESCP Approved E3 RW Permit Required 13 Street Use Permit Roq'd Q Inspection Required E3 Sidewalk Required 13 Underground wiring required PRV REQUIRED YES C3 NO 13 REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROLiDRAINAGE ENGINEERING REVIEWED BY DATE 0 Z cc LU z z E5 z UJI FrEYV DATE CE OR �U �E HORELINE OR ADBI INSPECTION BOND 1 REO'D I OYES EKO POSTED lf�X-4 S SEPA REVIEW SIGN AREA HEIGHT COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED PROPOSED I 0 I I EXP LOT COVERAGE REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (Fr.) ALLOWED PROPOSED FRONT SIDE REAR FRONT UR SIDE REAR z z 5 PARKING LOT AREA PLANNING REVIEWED BY DATE CL REO'D I PROVIDED jj . (�, 1 1.7,-/ -710 -f REMARKS CHECKED BY ITYPE O��ONSTRUCTION COUE OCCUPANT CRITICAL I 1_45�4� 10 3 GROUP SPECIAL INZPE;TION AREA OCCUPANT AREAS IV/s.7' LOAD NUMBER REQUIRED X YES REMARKS z PROGRESS INSPECTIONS PER UBC 108/IBC109/IRC109 FINAL INSPECTION REO'D e I A A A.:, fll",_v t 1/47 / I 1�1 e -It-, yjl�fcr, Y &- Ig —j /1,-. 4,,7 k v.-; Vle %('C�A HEAT SOURCE GLAZING % ILQT SL E % 1V /V VP P N ED'DATE LA ��E�/C�H NO: VEST THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO t BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: 1BO DAYS W IL PERMIT LIMIT. I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION U) 'APPLICANT. ON BEHALF OF HIS OR HER SPOUSE. HEIRS, ASSIGNS AND SUCCESORS fn �j IN INTEREST. AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF 2 EDMONDS. WASHINGTON. ITS OFFICIALS, EMPLOYEES. AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE. ARISING DIRECTLY OR INDIRECTLY x FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE C1 DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE _j 0 NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION.' I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGR�E TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. SIGNAT7E �OWNER OW21�p� ) —6, 91 I DATE SIGNED Z r ^ ' /0 )_ / VALUATION $ Description Plan Check Building Permit Plumbing Mechanical Grading Engr. Review Engr. Inspection FEE Description FEE State Surcharge City Surcharge Base Fee Fire Review Plan Chk. Deposit Fire Inspection Receipt # �2 Z�2 Landscapelns Total Amt. Due Recording Fee Receipt # APPLICATION APPROVAL CALL FOR INSPECTION This application is not a permit until signed by the Building Otficial or his/her Deputy: and Fees are paid, and receipt is acknowledged in space provided. 0FFJ0I S SIGNAT)URE DATE 1 11 (4rlr—% 2.51 771.0220 I REF . ED BY I CrATE '? /I ATTENTION I I / i EXT 1333 1,/ 4 ... TURE UNTILA FINAL IT IS UNLAWFULTO USE OROCCUPYA BUILDING OR STRUC INSPECTION HAS BEEN MADE AND APPROVALOR A CERTIFICATE OF OCCU- ORIGINAL - FlI E YEI I ffi�PE��Ofl PANCY HAS BEEN GRANTED. UBC109/IBC110/IRC110. PINK - OWNER GOLD ASSESSOR 09/03 PRESS HARD -YOU ARE MAKING 4 COPIES I/ z 0 i 0 1711 ­4 -n 0 M C 0 0 0 0 C M M Z x CD o ­n n M M 0 _U) 0 r_ M Cl) (n M Z X z W z 0 171 111 EXEMPTION FROM SHORELINE MANAGEMENT ACT SUBSTANTIAL DEVELOPMENT PERMIT REQUIREMENT To: Christopher W. Keuss, Port of Edmonds, 336 Admiral Way, Edmonds, WA 98020 (Name and address of the applicant) The proposal b Port of Edmonds to undertake the (Name of applicant) the following development (please be specific): Replace the concrete dock on the north and east side of the floating bait house, which is between H dock and I dock (fuel dock), with new floats which will be half the depth of the existing floats and will have new connector pieces that will provide some "give" during the extreme low tides when the new docks do bottom out upon the following property (please list legal description, i.e., section to the nearest quarter section): That portion of Government Lot 3, Section 23, Township 27 North, Range 3 East. Willamette Meridian, in Snohomish County as further described on the attached legal description. within Puciet Sound and/or its associated (Name of water area) wetlands is exempt from the requirement of a substantial development permit because the development: Consists of normal maintenance or repair of existing structures or developments, including damage by the elements, and the repair being done is the common method of repair, and the structure shall be restored to a state the same as its original configuration, and the repair is being done (or permitted) within a year of.the damage per WAC 173-27-040.2.b. (Identify exemptions as outlined in WAC 173-14-040) The proposed development is consistent or inconsistent with: CHECK ONE: Consistent inconsistent &--- -L' -�M4 (Date) ' I " "IGROFILM V1 FORM: SHORELINE EXEMPTION UTEMPIFORMS�SMEXEMP. DOC Policies of the Shoreline Management Act. Edmonds Shoreline Master Program (see 23.10.160 — Use Regulations — Moorage structures and Facilities) (Sign9tur"f Authorized Local Governmental Official) Z 0 I 0 M M C M 0 0 0 0 C M M Z C Z 0 -n n M M 0 0 0 M C: Cn C Cn Q 0 Z Z Cn Z 0 i 0 M The project at 11 u Inber R,5cEiVED CITY OF EDMONDS NOV 0 5 2004 SPECIAL INSPECTION AND TESTING AGREEMENT 1'sz L' i rj 6 14el- 5 PERMIT CoUNTER 'ai4 ( ssued under building permit 13 (,52 AwM i Et complete list of special insp 7 requires special inspection and/or testing per I13C Chapter 17. The ons is attached to this document. BEFORE A PERMIT CAN BE ISSUED: The owner and contractor an([ special inspector shall complete this agreement and the attached structural test(s) and inspections schedule including the required acknowledgenients. APPROVAL OF SPECIAL INSPECTORS: Each special inspector sliall be approved by the Building Official prior to performing any duties or inspections. Each special inspector shall submit Statement of Qualifications to the Building Official for review. Special inspectors shall display identification when performing special inspections on site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector I . Observe Work The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be performed on a continuous basis—ineaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections, if an),, must have prior approval by the City based on a separate written plan reviewed and approved by the Building Official and the engineer or architect of record. 2. Report Non -conforming Items The special inspector sliall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect. 3. Complete Daily Reports Each special inspector shall complete and sign both the special inspection record and the daily report form for each day's inspection. These records sliall remain at the jobsite with the contractor for review by the City Building Inspector. 4. Furnish Weekly Reports The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: Description of daily inspections and tests made with applicable locations List of all non-conforining items Report on status of non -conforming items (resolved or unresolved) Itemized changes authorized by the Architect, Engineer and City if not included in non- conformance items. 5. Furnish Final Construction Report The special inspector or inspection agency shall submit a final signed report to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of L:VI'EMP\BUILDING\SpeciaiiiispectioiiAgreciileiitIBC.doc 7/04 z 0 1 0 M q 5i V5 -j 0 M C M 0 --10 0 X M M Z 10-1 C CD 0 -n n M M 0 —co 0 r- 0 M C Cn 9 Cn M 0 Z M z Cn z 0 q 0 M his/lier knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of tile IBC- Items not ill conformance or unresolved items or any discrepancies in inspection coverage, (i.e., inissed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically itemized in this report. 11. Contractor lZesponsibilities 1. Notify the Special Inspector It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed oil the attached schedule and as noted on the approved plans and specifications are required to have special inspections. Adequate notice sliall be provided by tile contractor so that the special inspector has time to become familiar with tile project. 2. Provide Access to Approved Plans The contractor is responsible for providing the special inspector access to approved plans at the jobsite. 3. Retain Special Inspection Records The contractor is responsible to retain at the jobsite all special inspection records submitted by tile special inspector. These records are to be provided to the City building inspector upon request. C. Citv of Edmonds Buildinl! Department Responsibilities 1. Approve special inspectors or inspection agencies The building department shall approve all special inspectors and special inspection requirements. 2. Monitor special inspection and approve weekly reports Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building inspector. His/Her approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. Issue Certificate of Occupancy The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted. D. Owner Responsibilities The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. En2incer or Architect of Record Responsibilities enients oil the plans and The engineer or architect of record shall include special inspection requir specifications. ACKNOWLEDGEMENTS I have reati and agree to comply ivith the terms and conditions of this agreement. Owner Special inspector � — Date Date CD /* ate —113-5,Z General Contractor C� Date City Building Official L:VrEMP\BUILDING\SpccialltispectionAgreciiieiitIBC.doc 7/04 z 0 i 0 M =i =n- M M 0 0 0 M M Z 0 --1 C —z X 0 -n n M M 0 0 0 M C Cn 9 Cn M 0 Z z —i X Cn z 0 1 0 M SPECIAL INSPECTION AND iESTING SCHEDULE --�7 e2l� ECrNAME ;PERMrT W BUTI-DING 'Vo. �,Z-7"+01 , Ilk :JL4 5,0-11 1 r--l- L'-' , PROJECTADDRESS TEsmNGaNsPEcn0N AGENCY . SAOAL INSMCrM REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR: STRUCTURAL STEELfWELDING: Co�e Gualte Grout Mortar — Sample and Test (list specific members below) Aggregate Tests — Shop Material Identification Reinforcing Tests — Welding Inspection 0 Shop 0 Field Mix Designs — Ultrasonic Inspection OShop 0 Field Reinforcing Piacenwnt — High-sti-ength Bolting Bitch Plant Inspection Inspection 0Shop D Field Inspect Placing 0 A325 Cast Samples 0 A490 0 0 0 F Pick-up Samples — Metil Dock Welding Inspection Compression Tests — Reinforcing Steel Welding Inspection — Metal Stud Welding Inspection PRECAST/PRESTRESSED CONCRETE: — Concrete Insert Welding Inspection FIREPROOFING: — Placement Inspection — Density Tests —ThicknessTcsts — Inspect 132tching INSULATING CONCRETE: — Sample and Test — Placement Inspection — Unit Weights FILL MATERIAL: — Acceptance Tests MASONRY: — Placement Inspection — Special Inspection Stresses Used — Field Density — Preliminary Acceptance Tests (Masonry Units. Wall Prisms) — Subsequent Tests (Mortar. Grout. Field Wall Prisms) STRUCTURAL WOOD: — Placement Inspection of Units — Sheu Wall Nailing Inspection — Inspection of Glu-Jam Fab. — Inspection of Truss Joist Fab. ADDITIONAL INSTRUCTIONS OR OTHER TESTS — Sample and Test Components AND INSPECTIONS: Form completed by: Telephone No.: — JTnr=WAW.1r-3VJRX VAU MIMAUANWARIZ 1117� z 0 1 0 M --i -n M C M 0 C) 0 C: —i C 3: M M Z I[) --i C —Z 3: CD 0 -n n M M 0 0 0 M Cn cn M 0 Z z Cn z 0 1 3 M 14005 02/24/2005 15:11 FAX .125 774 7837 PORT OF EDNIONDS FAX NO) 425*04�(14 FE��18-2005 FRI 11!52 AM M FIELD AND LABORAToRY CONCREETF_ TEST REPORT M A.7.C31.C39,C7@,CI4�',CI72,C23i,cic,64,CI231 HWAGEOSMENCES INC F7 AASHTOT73,T2Z-TI19-Tl4l.Tl52,"MOD TESTLS�#.9�1 CLIE T. port of Edmoq�t:�__ DATE CAST: 1/2112005 PROJECT: Rop!qccrnent. DATE REC'D'. 1/22/2005 0:��O_ 04-23 HWA PROJECT NC 13Y TH15 I DESCRIP I ION OF tON ;—�t�t_�7CEMtNTREFRF-rENT5-0 EEPier DeCkS %I PRE SIVE -TRENGTH TIES;FDATA ING TEST CY1_ DIA ETER X-SECT. MAX. COMPR. FRAC, TECH. CYLINDER AGE tq0TES DATE TYPE ARSA LOAD STRENGTH TYPE I.D. (mmlddfyy) (d"xl" ()nchOS) (sq. In.) (lbs) sl EJ8 NUMBER (CSOYS 112alo5 6x12 6.00 28.27 93190 3300 GM I 005-1004-23-C-1 7 2118106 6x12 6.99 28-18 122230 4340 Gh4 005-004-23-C-1 28 2118105 6X12 .00 28-27 125680 4450 005-004-23-C-1 28 ..................... . 4 FLEXURAL STRE GTH TEST DATA MAXI UPI NiODU 13EAM AGE TEST AVG, AVG. SPAN FRACTURE LW T ')AT T R A �AT:A TP A N] I L�R UR MAM M Ni()()ULUS OF TECH IM F C 'TIO f- AIU) R�P,TURE C U F I DATE WOT DEPTH LOcATION sl ill I.D. I'- I I (inA a (tin. NUMBER (dayr) (mmiddlyy) b (In. i led Mlr�JZ M. sled in 3 rno*lst surface mndolon usin leather �hl; S. speci led Minimurn: unless other -Ise ln(114-114 ��"'Plt)�' art 'a --INFO.-FROM sul�_PLIER _nCKET Time Batched: 6: 13 - Max: Agg, size (iin). 318 1. P ' N cLiacler NW -nme:'7.'l - 0 supplier Name:. CementType'. 1-11 Arrival um ;x1arrit �Number- Kenmorc Plan Start Unloading: 7:15 Load401UMB Nd); 6 0 of Mo, 3). 6 End Unloading: Unknown Mix Code I Cum. volume (yd — Truck Number: 7035_.,. Ticket Number: 5661 . 76 Admixl&lra�: AEA Fiber Reinforcino Time sampIsd:.7;.35....._ slum; (Inches): 4 Speciri9d -Slump (min -max)! Time CYI,s Cast: _D5-0— Spec(fied Ent. Air (irnifli-MWO' ------------- HW Entrained Air (%): 6.0 Cast 13y: AJPJP Conc. Temp. (F)-. 66 Ambient Air Temperature (F): 50 Initial Curin TomP (min-m 53al OF Mold e, Plasric. Density (Pcfl'. ?��js(;ELL&NEOUS INFORMATION I ComMENTS Contr7j�or/ SubConimcior. ------- concrete Placement Method,. (Contral;tor Representative on S',tA-) Field test lresulLs raparted to _Eny Johnson (Client/Owners Rep. on 5110) Field test results reporled to -------- Additanal slump tests on the following truckloads: none JHWA also visually assessed the following inickloads! none none Reviewed BY: oducadIn full. with wdtion approv-al of HWA GEOSCICNICES INC- Ttlis apart appliL-s onry to the Urn. Lnuted. and mry ba ropr z 0 1 0 ITI =i --fi W X M C M 0 __10 0 M M Z C —Z 0 -n n M M 0 0 M C CO 9 C/) Q 0 Z ;U z z 0 M 02/24/2005 - 15:10.FAX 425 774 7837 PORT OF EDMONDS FAX NO 003 42577412114 116. U L. JpIN-2i-2005,FR1 10126 Atl H�R GEOSO'ENCES 10 'Field Report NO-: FR-001 J9730-64%h Avenue Wast, SulLQ 200 Date (mmiddlyy): V21/2005 KV LWnwoad. WA 98036 HWA Project No.- 21305,04�23 U -r*L 42.5-77"10B HWA Task NO-: HWAGEOSCIENCES INC. r---- 42s.774-2714 Loc3lion or drtSS Of P101eCt Permil No. Project Narne Pier Rer%1:3rmmPnt Edmonds, WA Edmonds Flontino cl�grq epra3entauyc Wenther Cloyd 50* F citem Rav Johnson Port of Edmonds us an WrIanty Represen e tirchitem c, recor H A Project marwqL-, Pat Pierce Dearon AulhoritY (ungineer or live Ont Plprce General CantTWOr FIELD REPORT SLj MMARY OF FIELD TINAE SPENT ON P ROJECT TODAY: at site: 0655 Departed Site: 0805 EndTrUveI:0B`I5 0645 �krrlved d ement. pp -TED, Concr delivery an ploc 01-C, I'llw,'[' S I. _r ITEM BEING CONSTRUCTED: Floating Pier Der-kri TYPE OF INSPECTION* PariOcilc The concrete was being placed by t9ligating. Consolidation wav acco mplished.by OF MATERIAL: STATUS AND DETAILS OF PLACEMENT vl-.IL Concrete PlacOmOnt ended after our departure. about 4 y63 w3E? placed dur(ng our tory Concrete -rest Report for Set Ci for a summary Of 'Field Labora scmeding. A total of and HVVA INSPECTION ACTI\A71ES RELATED TO THIS ITEM: See HWNs with approved plans. Inspine,6om and test dsta. ted was found In conformance CONFORMANCE OF THtS rrEM-. To the best of tha;nspectoes knowledge, the Item inspec L''U''i"j,''I E0"US'j1`1.0 1141111 C)BSERVAT NS ANWOR ��OIVIMGNTS: 7— SIGNATURES,, RevIew 4 C Signed: HWA Prqa gInw or Reviewcr HWA Field Ropresentab SU ARY OF UNRESOLVED ISSLIE� ReportO IIOM# St3tus na There are no outstanding insues at this trne. nz Thl, In Ks ontircty. Report is not final until aIgnod by I.AVA field roPMrerTW6V6 amd HWA leviewer. Page 1 of 1 . repon should only be raProduccd z 0 i 0 ITI --I -Ti X 0 ITI C M 0 0 0 0 M M Z C W 0 _n n M IT! 0 0 0 M C cl) 9 V) M 0 Z 7-1 X z X Cl) z 0 0 ITI FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM- FIRE DEPARTMENT DATE P 4'9S E S; G N ENGINEERfNG DIVISION DATE PLEASESIGN PLANNING DIVISION DATE 111.1EASESIGN PROJECT SITE ADDRESS- 3 PERMIT #-2Aw 9 - 46,S -7 ADB# DATE INSPECTED 2 s- DES CRTTfON OF WORK TO BE INSPECTED A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: X,- GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES D Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:ten1p:b1dg:r6rms:oca1)rv1 3/25/04 z 0 i 0 M --i -n 0 M C M 0 0 —i (-) 0 C: M M Z Cn o -n n ;d > M M 06 0 r- 0 M (Z (J) 9 Cf) M Z M r z W z 0 A 0 M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall.......................... Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -In ................... Commercial Final ...... HEATING: GasTest .................... Gas Piping ................. Equipment ................. Commercial Final ....... EXTERIOR SHEATHING NAILING .......................... FRAMING ........................ FIRST FLOOR FRAMING ... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. P000 z 0 0 M ­4 -n 0 M C ITI 0 0 0 0 M M z 10--I I I C 0 _n "n MITI 0 C-0 0 r- 0 M C C/) 9 0) M 0 Z 7q z -1 M z 0 1 0