Dear JoAnne,
Please find attached revised site plans, which reflect the changes as requested in the plan
review dated March 25,2OI9. Our response to each comment is shown below in bold.
GENERAL
1. Submit side sewer permit application.
This has been submitted by the property owner.
2. This requires a review, please submit as soon as possible. A Stormwater Covenant is
required to be recorded against the property based on the proposed stormwater facilities for
the project. Please complete the covenant, including notarization and any required exhibits
and submit to the city. Ensure the stormwater covenant meets Snohomish County Record
Drawing requirements. The document must be complete, but will not be recorded prior to
permit issuance. Prior to construction, final location of facilities are to be verified (by field
inspection and asbuilt) and then the covenant will be recorded.
Noted.
3. There is a side sewer easement that benefits Lot 2 across Lot 1. Show all private
easement information for this lot only within the plan set submittal.
Noted.
TESC
4. Construction entrance is to protect the right of way from debris. It should be located at
the entrance of the short plat on Lot 3. The area where the construction entrance is shown
now is proposed to have pervious pavement. Outline the area and make note that heavy
equipment should avoid the area as much as feasible. Show construction entrance on the
plans and incorporate and reference New City standard details.
LAKfrW*ç* örrÍth.
*.Ë
RES8J,ffi
5920 100ú St 5W, Ste #25
Lakewood, WA 98499
phone: 253-301-4157
fax: 253-336-3950
Plan. ÐesiEza. Manage
clvx. &. s113..rlcTÐQ/\L tat{ütf'tHt?t?rNú | L"p.rnl} 5t}llvL:.ïN# | l}r/\¡iNtt'IG
?Rû3Êr.T MÁf'.,ÂGËMïNT I FrÁ$rnlrTTY I rfB.MIT frXrçûTTï.Nttr
AU6 f, t, çi;;:i
zuéflry'?ffi8-Åjgb,-
The entrance of the short plat on Lot 3 will have been constructed and therefore
paved, so the construction entrance cannot be placed in that location. It has been
moved north to be away from the permeable pavement area.
5. Add around pervious pavement area. Orange protective barrier fencing shall be placed at
the drip line of trees to remain and around areas proposed for low impact development
techniques, such as rain gardens, infiltration systems, etc., to protect the area from
compaction.
Orange protective fencing has been added to infiltration BMP's and around trees.
ET'IDM
6. Note on C3 states footing drains discharge into surrounding soil. Please show where this
is going to happen. Show where the footing drains will discharge,
Footing drain discharge location has been shown on the plans.
Thank you for your time and assistance in the review of this project. Should you need any
additional information, please do not hesitate to contact me at 253-984-2900 or via email at
m kel ler(ô bevlerconsu lti no. com.