Loading...
20050009.pdfI DATE RECEIVED CITY OF EIJMONDS CONSTRUCTION PERMIT APPLICATION OWNER NA E/NAME OF BUSINESS , Dict r'�'� / / , �r- 7T MAILINU ADDRESS LA -k -7 C k-\ A CITY DA-� NAME TDDRESS CITY ZIP TELL 6L� rV1 HONE '?-.5 CA_�_ ZIP TELEPHONE I C770 PERMIT EXPIRES :2 USE ZONE PERMIT 12 'z NUMBER,_��j JOB ADDRESS GUITE/APT# PLAT NAME/SUBDIVISION NO. LOT NO LID NO �l LID FEE S PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TLSCP Appfovod 0 AW Poinut f4a(wifod EXISTING 51tent use Flemw Floqrj � PROPOSED Insfection Rwimfod soe.alk H"quir"d REQUIRED DEDICATION zff_ FT Undorgmaid Witing tact,juml E3 METER SIZE LINE SIZE OF FIXTURES PAV REQUIRED —I--- YES 13 No 0 FREMARKS OW R/ OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/ORAINAGE __ L&- Pc -It 0 iJ 045 Mao 1Ae A ^I n I A, ADDMt 7 9 CITY ZIP TELEPHONE L 4,�: 7 �)5- 3qq ,a - STATE LICENSE NUM13ER EXPIRATION DATE CHECKED BY eVi t4 _)4tyj- I 4d 0 5e_�f �_ q _ I/ I PROPERTYJA�X ACCOUNT PARCEL NO NEW RESIDENTIAL PLUMBING / MECH ADDITION MMERCIAL COMPLIANCE OR XCO CHANGE OF USE REMODEL MULTIFAMILY SIGN REPAIR GRADING CYDS E:] FENCE X FT) DEMOLISH TANK OTHER z o GARAGE CARPORT RETAINING WALL ROCKERY FIRE SPRINKLER FIRE ALARM 0 E (TYPE OF USE, BUSINE OR ACTIVITY) EXPLAIN: (n ui a NUMBER OF OF DWELLING .. __— I CRITIC L AREAS o STORIES "91 UNITS NUMBER DESCRIBE WORK TO BE DONE k i Ste., x ).15ell 'j HEAT SOURCE GLAZING % le LOT SLOPE % PLAN CHIECK NO?.,1. VESTED DATE THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK To t: BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC 2 DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE zi SEPARATE PERMISSION. uj PERMIT APPLICATION: ISO DAYS IL PERMIT LIMIT! I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF rE EDMONDS, WASHINGTON, ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND q ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY r FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE J DEEMED TO MODIFY. WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION.* REVJJFWED BY FIRE REVIEWED BY 0 z M W 0 6 TEL 114 DATE w M a: RIANCE OR CU HORELINE OR ADB# INSPECTION BOND 4mft-v" 441P 1 REQ'D ffYES ONO POSTED I s SEPA REVIEW SIGN AREA HEIGHT COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED PROPOSED ExP------]— 6tf 1 16.7 41 1 +1 1 '�—_ 14, LOT COVERAGE REQUIRED SETBACKS (FT) PROPOSED SET13ACKS (Fr.) ALLOWED PROPOSED FRONT SIDE REAR FRONT URSIDE REAR IN /, 0 z 1 PARKING LOT AREA PLANNING REVIEWED BY DATE REO'D PROV113ED IL I M ) z—/ , REMARKS — -CHECKED BY "Li Am OCCUPANT GROUP S6 SPECIAL INSPECTION JAREA OCCUPANT REQUIRED [_1 YES LOAD REMARKS PROGRESS INSPECTIONS PER USC 1081IBC109/IRC109 FINAL INSPECTION REO'D VALUATION Description FEE Description FEE Plan Check State Surcharge Building Permit City Surcharge Plumbing Base Fee Mechanical Grading Engr. Review )ze- Engr. Inspection Fire Review Plan Chk. Deposit Fire Inspection Receipt # Landscapelnsp. Total Amt. Due 14'c;s� Recordino Fee po�ninf 14 I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION - AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF GIVEN IS CORRECT, A TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYE This application is not a permit until signed by the THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC APPLICATION APPROV I IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON D CALL Building 011icial or his/her Deputy: and Fees are paid, and WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. RELATING TO FOR INSPECTION receipt is acknowledged in space provided. S IG FIML, SjNA RE DATE SIGNATUR�E OR GEN DATE SIGNED (425) 17(0 SED BY D ATTENTION R IT IS UNLAWFULTO USE OR OCCUPYABUILDING OR STRUCTURE UNTILA FINAL EXT 1333 INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCU- PANCY HAS BEEN GRANTED. UBC109/IBC110/IRC110. ORIGINAL - FILE YELLOW - INSPEC70 09/03 PRESS HARD -YOU ARE MAKING 4 COPIES PINK - OWNER GOLD - ASSESSOR z 0 1 0 M -n M C M 0 0 ­10 0 C M M Z 0 -1 C _z o -n n __-I 3:9 M M 0 0 0 M C 0) 9 Cn M C) Z X z C/) z 0 i 0 M I E FINAL PROJECT A'P'PROVAL FORM TO: I H!0 DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PLEASr SIGN ENGINEERING DIVISION DATE z PLEASE SIGN 0 0 PLANNING DIVISION DATE �Z /q G =n PROJECT M 0 0 SITE ADDRESS 4' __10 0 PERMIT ADB# -DATEINSPECTED 3/t 2/0--1 3: M M Z DESCRIPTION OF WORK TO BE INSPECTED I -approved plans. Final approval in - A field inspection was conducted to determine compliance witl 0 -n denotes that there are no objections from the above signed Department to the release of -n x > PERFORMANCE BONDS and the granting of: M M 0 0 M C cn LZ(GRANT FINAL PROJECT APPROVAL 90) M Z GRANT PROJECT APPROVAL WITH CONDITIONS NOTED z 0 Copy of CONDITIONS given to owner/contractor, by inspector Cn z 0 1 0 M FAILED FINAL INSPECTION - OUTSTANDING ISSUES [:1 Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:teinp:b1dg:fbrnis:ocaprv1 3/25/04 I FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PLEASE SIGN li__w ENGINEERING DIVISION DATE PLFASESIGN PLANNING DIVISION DATE PLEASE SIGN PROJECT. SITEADDRESS— PERMIT �-ADB# DATE INSPECTED 5- DESCRIPTION OF WORK TO BE INSPECTED A field inspection was conducted to determine compliance with . approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date SiDiature 1:temp:b1dg:roniis:ocaprv1 3/25/04 z 0 1 0 M —i -n U5 --I 3: M 0 0 __10 0 C: -4 K 3: M M Z C Cn 0 _n n --I 3:9 M M 0 U5 0 r- 0 M C Cn C Cn M 0 Z 71 r > z Cn z 0 i 0 M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall .......................... z Pier/Porch ................. 0 Retaining Wall ........... 0 M Slab Insulation .......... =n PLUMBING: M C Underground ............. M 0 0 Rough -in ................... 0 0 C Commercial Final ...... M M Z HEATING: C _Z GasTest .................... Gas Piping ................. o -n -n Equipment ................. Commercial Final ....... M M a 0 EXTERIOR SHEATHING 0 M NAILING .......................... C (n (n FRAMING ........................ M 0 Z FIRST FLOOR FRAMING ... INSULATION ................... > Floor Insulation ......... z —4 3: Wall Insulation ........... Ceiling Insulation ....... z 0 _11 SHEETROCK NAILING ... 0 M SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. 0, 000q Poe, 005