Loading...
20050017A.pdf'FOATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAME/NAME OF BUSINESS S, E:-- Q $�_ MAILING ADDRESS CITY ZIP TELEPHONE NAME ADDRESS NA��ME�r _B1,1 ADDRESS CITY ZIP TELEPHONE P411 NUMBER e EXPIRATION DATE C BY C PERMIT NUMBER JOB ADDRESS PLAT NAMEISUBDMSION NO PROPERTY TAX ACCOUNT PARCEL NO u j -2:7o --'S-2!5) - C-) 675 - i (I 2� 0 4z�> NEW RESIDENTIAL E] PLUMBING / MECH F� ADDITION COMMERCIAL F-1 COMPLIANCE OR OF USE MIXED USE CHANGE IPJ r-1 REMODEL MULTIFAMILY SIGN F� REPAIR GRADING CYDS r_1 FENCE ( X FT.) TANK 12 OTHEeDEMOLISH �n ElGARAGE ED RETAINING WALL El FIRE SPRINKLER ZI CARPORT ROCKERY FIREALARM 0 (TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN. __3 ­ , - - I � � I — I - - - — zb4�_ to NUMBER NUMBER OF OF DWELLING C0 T..) UNITS 0 STORIES DESCRIBE WORK TO BE DONE C3 P—A -,t% !i�N P307P kk.-- Q--C) r,� F Lf--- C.7-1 e � Q� P 4 f_-- 6 HEATSOURCE t LOTSLOPE% VESTED DATE PLAN CHECK NO: THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBIC DONMAIN (CURBS, SIDEWALKS. DRIVEWAYS. MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: SEE ECDC 19.00.005(A)(5) PERMIT LIMIT: SEE ECDC 19.00,005(A)(6) SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESSORS IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITY's ABILITY TO ENFORCE ANY ORDINANCE PROVISION.* I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT: AND THAT I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. SIG� ATU (OWNER OR AGENT): DATE SIGNED PERMIT EXPIRES SUITEIAPTP LOT NO LID NO ILID FEE S PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP 7 E SCP Appfoyed RW Permit Renuired Street Use Permit Requited EXISTING PROPOSED inspection Required Side.wailk Requirej REQUIRED DEDICATION FT Underground METER SIZE LINE SIZE NO OF FIXTURES PRV REQUIRED YES 13 NO13 REMARKS OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE 119/ i 1�_v _.ra 14, 1 A 11 rItIA 11 (ITi 0 z LU Lu z W ENGINEERING REVIEWEQ BY UA I & BY DATE FIl(RE VI-D )7,13 A) U. ARIANCE OR C� SHO'6ELINE RADB9 INSPECTION SEPA I 1 REQ'D 14401 COMPLETED EXE!.YT [3 YES CA# ZONE SIGN AREA HEIGH WAIVER tt ALLO%VEO PROPOSED ALLOWED PROPOSED STUDY 13 LOT COVERAGE REQUIRED SETBACKS (FT) PROPOSED SETBACKS (FT.) ALLOWED PROPOSED FRONT SIDE REAR FRONT LJRSIDE REAR z z PARKING LOTAREA PLANNING REVIEWED BY DATE REQ'D PROVIDED -F� �— 6. /h 0 1,V REMARKS IF �* a TY SPECIAL INSPECTION CONSULTANT REQUIRED 13YES REMARKS GEOTECH REPORT BY: STRUCTURAL DESIGN BY: VALUATION Description Plan Check Building Permit Plumbing Mechanical Grading Engr. Review Engr. Inspection Fire Review Fire Inspection Landscapelnsp. Recordina Fee CALL FOR INSPECTION (42 5) 771-0220 OCCUPANT GROUP OCCUPANT LOAD FEE Description State Surcharge e-= _5 City Surcharge Base Fee FEE Plan Chk. Deposit Receipt # y Total Amt. Due Receipt # APPLICATION APPROVAL This application is not a pernia until signed by the Building Official or his/her Deputy and Fees are pa.d, and receipt is acknowledged in space provided FICIALS SlfV4ATURE DATE Lck L,ItAtED BY . j DATE OTENT110N t,& L 1.5.5,5 1 VZ,, IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI- FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109 / IBC110 / IRC110. 10/04 PRESS HARD - YOU ARE MAKING 4 COPIES ORIGINAL -FILE YELLOW 4 INSP/CTOR PINK -OWNER GOLD - ASSESSOR 15 z z 0 i 0 M :q =n- j X 0 M C M 0 0 0 C M M Z 10-1 —Z X C/) 0 -n n M M 0 —0) 0 r- 0 M C Cn r, 0) M 0 Z z z 0 M FINAL PROJECT APPROVAL FORM TO: DATE: nxXT t�nr'iDr%TKT I-% 1V1z1V1U lu: rr, D,,J::)U1J�LJU4UU1V101%J1-4 FROM: FIRE DEPARTMENT DATE nX.AU SM ENGINEERING DIVISION DATE-.�:� KEASE IGN PLANNING DIVISION DATE nx-ASE SM PROJECT kj!�- Ar A SITE. ADDRESS &ZACY Z S-r— SZ PERMIT c. v�� - Cr) / 7 —ADB# DATE INSPECTED DESCRIPTION OF WORK TO BE INSPECTED o= ea A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRAW PROJECT APPROVAL WITH CONDITIONS NOTED u Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES o Copy of CORRECTION NOTICE given to owner/contractor by inspector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Sign_ ocaprv1.doc.1:temp:b1dg:fbmis 10/0 1 z 0 M --I -n Fn --j r M 0 0 0 X M M Z 10 --4 C C0 o -n n ;d > M M 0 ui 01- 0 M Cn Cn Q 0 Z z --i r U5 z 0 i I 0 M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing...................... Wall .......................... Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -in ................... Commercial Final ...... HEATING: Gas Test .................... GasPiping ................. Equipment................. Commercial Final ....... EXTERIOR SHEATHING NAILING .......................... FRAMING........................ FIRST FLOOR FRAMING ... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. 7--7- ow 0140500171 z 0 0 ITI