Loading...
20050099.pdfDATE RECEIV CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAMEINAME OF BL�1111NESS MAILING ADDRESS z zip JITELI�P�l NE "AN t NAME ADDRESS CITY PROPERTY TAX ACCOUNT ;/)o 6- 71, NEW ADDITION REMODEL REPAIR DEMOLISH GARAGE CARPORT OF USE, BUSINESS CBLN ZIP I TELEPHONE PERMIT EXPIRES PERMIT NUMBER JOB ADDRESS SUITE/APT# PLAT NAME/SUBDIVISION NO. LOT NO. LID NO. LID FEE $ PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Approved E3 RW Permit Requirod E3 EXISTING PROPOSED Street Use Permit Requited 13 E3 Inspection Requited Sidewalk Requited REQUIRED DEDICATION FT underground - Worinq required METER SIZE LINE SIZE 0. OF FIXTURES PRV REQUIRED j YES No z REMARKS OWNER/�O�( , J RACTOR RESPONSIBLE FOR EROSION CONTROLJDRAINAGE Lu z FIRE REVIEWED BY i DATE DATE 0 z U) Lu 0: a: z - __144 4E VARIANCE OR cu SHORELINE OR ADB,1 I INSPEC O�ION RE 0 13 YES 13 NO SEPA COMPLETED EXEMPT a XPIRATIQ­_ F 9bATE A' .. , I le 101" CHECKED BY I I PARCEL NO. ­7 7(:� - j CA# WAIVER [3 TU I S DY 0 ZONE I SIGN AREA ALLOWED I PROPOSED HEIGHT ALLOWED I PROPOSED I ��ESIDENTIAL PLUMBING MECH . I I 1:1 COMMERCIAL A, COMPLIANCE OR 0 MIXED USE El CHANGE OF USE 1:1 MULTIFAMILY SIGN LOT COVERAGE ALLOWED PROPOSED -1 REQUIRED SETBACKS (FT.) FRONT SIDE REAR _ PROPOSED SETBACKS (FT.) FRONT LJRSIDE REAR I PARKING REQ'o PROVIDED LOTARE PLANNING REVIEWED BY DATE GRADING FENCE CYDS X FT.) REMARKS TANK OTHER RETAINING WALL ROCKERY FIRE SPRINKLER FIRE ALARM OR 1z �� r 4 . I GROUP ___rNUMBm6F /5'L m NUMBER 3 OF DW DWELLING SPECIAL INSPECTION CONSULTANT UNI STORIES UNITS OCCUPANT REQUIRED LOAD DESCRIBE WORK TO BE DONE REMARKS GEOTECH REPORT BY: wr2� Gr STRUCTURAL DESIGN BY: VAL LIATION Description FEE Description FEE Plan Check State Surcharge TED DATE _7_/ HEAT SOURCE LOTSLOPE% Building Permit City Surcharge PLAN CHECK NO: Plumbing Base Fee THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO Mechanical BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBIC DONMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE Grading. SEPARATE PERMISSION. a: Engr. Review uj PERMIT APPLICATION: SEE ECDC 19-00-005(A)(5) PERMIT LIMIT'. SEE ECDC 1i9-00.005(A)(6) SEE BACK OF PINK PERMIT FOR MORE INFORMATION Engr. Inspection APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS. ASSIGNS AND SUCCESSORS Fire Review (n Plan Chk. Deposit LLI _1 IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF 2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND a: Fire Inspection Receipt # ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE. ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Landscapelnsp. Total Amt. Due 0 NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION. - Recording Fee Receipt # I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC. This application is not a permit until signed by the TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED CALL Building Official or hi-Jher Deputy: and Foes are paid, and IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt is acknowledged in space provided. WORKMEN'S COM ,,��SATION INSURANCE AND RCW 18:27. F AILS SIGNAT PRE DATE SIGNATURE WNE'R 0' NT)" DATE SIGNED C' t6l (425) X; 771-022U R LEAS[fDi3Y ATTENTION EXT. 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI- ORIGINAL - FILE YELLOW - INSPECTOR FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109 / IBC110 / IRC110. PINK -OWNER GOLD - ASSESSOR 10/04 PRESS HARD - YOU ARE MAKING 4 COPIES 0 z 93 ca z 0 11 0 M ­11 -n X M C M 0 ­10 0 C: M ITI Z K) --I C ca 0 _n In -4 x M M 0 0 M C M 0 Z X > z CD z 0 11 0 M FiNAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT. COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PLEASE SIGN aENGINEERING DIVISION DATE 0 FLEXE SIGN PLANNING DIVISION DATE M PIPA E SIGN _n Y7 3: PROJECT 1 0M C M 0, 0 SITE ADDRESS 0 0 PERMIT # -21109 ��000' ADB# DATEINSPECTED. 9 Z9 //Z;,, _71 .-AK, I . X M M z DESCRIPTION OF WORK TO BE INSPECTED C > z 65 A field inspection was conducted to determine compliance with -a proved plans. Final approval p 0 -n denotes that there are no objections from the above signed Department to the release of -n PERFORMANCE BONDS and the granting of: MM 0 GRANT, FINAL PROJECT APPROVAL 0 M C cl) 9 ca M 0 Z r- GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector U5 M FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy. ofCORRECTION NOTICE given to owner/contractor by inpector 3. RE-fNSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fbnns:ocaprv1 3/25/04 RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall.......................... Pier/Porch ................. Retaining Wall ........... 0 Slab Insulation .......... M PLUMBING: Underground ........... 3: 0M C: Rough -In ................... M a Commercial Final ...... 0 C HEATING: M M z Gas Test ..................... C) C: z J Gas Piping ................. Equipment ................. 0 _n _n Commercial Final .... ITI EXTERIOR SHEATHING. IT! NAILING ....................... 0 IT11 FRAMING ........................ C: 0) r. 0) FIRST FLOOR FRAMING... rn 0 Z r INSULATION ............. Floor Insulation ......... 3:, Wall Insulation ........... z Ceiling Insulation ....... SHEETROCK NAILING z 0 SPECIAL INSPECTION ... 0 IT!