Loading...
20050170.pdfA 0: W a DATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWN NAM it - OF USINESS f MAILING ADDRESS CITY ZIP TEL�F`IiONE Zl", X�, NAME NAME ADDRESS CITY STATE LIC TELEPHONE CBL# Y� ZIP I TELEPHONE EXPIRATION DATE I CHECKED BY PROPERTY TAX ACCOUNT PARCEL NO. M�03-a -/30 -000 NEW RESIDENTIAL ADDITION COMMERCIAL MIXED USE REMODEL MULTIFAMILY REPAIR El GRADING CYDS DEMOLISH TANK GARAGE 1:1 RETAINING WALL E] CARPORT ROCKERY (TYPE OF USE, BUSINESS OR ACTIVITY) EXPLAIN: ,­n — 1 .1 C- I — .— PLUMBING I MECH COMPLIANCE OR CHANGE OF USE XSIGN FENCE ( X FT.) OTHER FIRE SPRINKLER FIREALARM NUMBER NUMBER OF OF DWELLING STORIES UNITS DESCRIBE WORK TO BE DONE 0� .��27 0 LOTSLOPE% elll�_ PLAN CHECK NO: VES:�� THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBIC DONMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: SEE ECDC 19.00.005(A)(5) PERMIT LIMIT: SEE ECDC 19.00.005(A)(6) SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT. ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESSORS IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITY's ABILITY TO ENFORCE ANY ORDINANCE PROVISION.' I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- TION; AND NG THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOL2� qOOOIF T HE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WnRKM N'S OMPENSATION INSUFIANCE AND RCW 18:27. SIGNED 0 ERMIT EXPIRES I FP PERMIT NUMBER JOB SUITEIAPTts ADDRESS PLAT NAME/S UBD IVI SION NO, LOT NO LID NO I LID FEE S PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCPAppfoved RW Permit Required Street LIS11 PeMil Required EXISTING f' PROPOSED inspection Required Side*alk Required REQUIRED DEDICATION FT Unoetqfound W111nq required METER SIZE LINE SIZE NO OF FIXTURES PRV REQUIRED 1___� I 1_� I YES 13 NOO REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE ENGINEERING FIRE REVIEWED BY VARIANCE OR CU CAH E k- DATE SHORELINE OR ADB# I INSPEC�ION SEPA REQ D COMPLETED PT o It- YES 13NO I 4(l 1 1 � ZONE SIGN AREA HEIGHT ALLOWED LLOWED PROPOSED c� 12,&-I,ql4 v LOT COVERAGE REQUIRED SETBACKS (FT) PROPOSED SETBACKS (FT.) ALLOWED PROPOSED FRONT SIDE REAR FRONT LIRSIDE REAR IQ li"�, — __� z z PARKING LOT AREA NING REVIEWED BY DATE REQ'D . PROVIDED U.1 LU z 0 z W W REMARKS SPECIAL INSPECTION REQUIRED 13 YES REMARKS GEOTECH REPORT BY: STRUCTURAL DESIGN BY: VALUATION Description Plan Check Building Permit Plumbing Mechanical Grading Engr. Review Engr. Inspection Fire Review Fire Inspection Landscapelnsp Recording Fee CONSULTANT CALL FOR INSPECTION (425) 771-0220 ATTENTION tX L I J,5-5 IT IS UNLAWFUL TO * olR�OCCLIPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI- FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109 I IBC110 / IRC110. OCCUPANT GROUP M OCCUPANT LOAD FEE Description FEE state surcharge City Surcharge Base Fee Plan Clik. Deposit Receipt # Total Amt. Due LReceipt # APPLICATION APPROVAL This application is not a permit until signed by the Building Official or histher Deputy and Foes are paid, and receipt is acknowledged in space provided FICIALS SICINATLJAE DAJE 10104 PRESS HARD - YOU ARE MAKING 4 COPIES ORIGINAL - FILE YELLOW - INSPECTOR PINK -OWNER GOLD - ASSESSOR 0 z z 0 i 0 M -n 0 M C M 0 0 ­10 0 C: M M Z x 0 o -n n M M 0 _Cn 0 r- 0 M C W 9 Cn Q 0 Z X z z 0 I 0 M FINAL PROJECT APPLROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PLEASE SIGN �Twmi7 E nqa ENGINEERING DIVISION DAT fLEASEW,N PLANNING DIVISION DATE PLEASESIGN PROJECT U SITE ADDRESS- IU PERMIT ADB# DATE INSPECTED �31'2,q /01— DESCRIPTION OF WORK TO BE INSPECTED 0 A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES El Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fonns:ocaprv1 3/25/04 z 0 4 0 M --I -n 0 M C M 0 0 0 C M M Z 10-1 C Cn o -n n M M 0 0 0 M C/) C() M Z z C/) z 0 M FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PLEASE SIGN ENGINEERING DIVISION DATE PLEASE SIGN PLANNING DIVISION DATE PLEASE SIGN PROJECT_C-'1-,_�'T_ L-A 0 97 SITE ADDRESS — IT ff C96- — 0 ADB# DATE INSPECTED 4-10 5- PERM a -A 8 DESCRIPTION OF WORK TO BE INSPECTED A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of -GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED c3 Copy of CONDITIONS given to owner/contractor by inspector I . FAMED FINAL INSPECTION - OUTSTANDING ISSUES o Copy of CORRECTION NOTICE given to owner/contractor by inspector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Si ocaprvl.doc.l:temp:bldg:fom-isIO/OI 0 M --I -n Fn ­4 0 M C M 0 0 --1 0 0 M M Z cf) 0 -n n M M 0 0 rn cf) CID M C-) Z r- I 71 M X z Cf) z 0 i 3 M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing...................... Wall.......................... z Pier/Porch ................. 0 Retaining Wall ........... 0 M Slab Insulation .......... PLUMBING: M Underground ............. C 171 0 Rough -In ................... 0 C Commercial Final ...... M M Z HEATING: _Z Gas Test .................... Gas Piping ................. C/) 0 -n Equipment ................. -n Commercial Final ....... M M EXTERIOR SHEATHING 0 NAILING .......................... 0 M C Cl) 9 C#) FRAMING ........................ M 0 Z FIRST FLOOR FRAMING ... INSULATION ................... 3: Floor Insulation ......... > z Wall insulation ........... :r Ceiling Insulation ....... z 0 SHEETROCK NAILING ... —i 0 SPECIAL INSPECTION ... M MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. 70