Loading...
20050199.pdfNTS RECEIVED //-30—'0-5t I PERMIT EXPIRES PERMIT CITY OF EDMONDS NUMBER On CONSTRUCTION PERMIT APPLICATION '29DREES OWNER OF OU INESS /� I / / - _PILAT NAMEISUBDI'ASION NO LOT NO, LI .0. MAILINGAODRESS I Lt. FEE IC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP4M,W F.= R­ CI :ISTING _ PROPOSED :OUIRED DEDICATION __ FT NAME METER SIZE I LINE SIZE I NO, OF FIXTURES PRV REQUIRED ' /,f YES 13 No 13 ADD ESS REMARKS OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROLDRAINAGE CITY ol STATE A i'(C' 1`111"i "I I — __"` U fj NEW RESIDENTIAL PLUMBING I MEC R COMMERCIAL COMPLIANCE OR ADDITION MIXED USE CHANGE OF USE REMODEL MULTIFAMILY 13 SIGN REPAIR GRADING Yos C] FE CE X FT.) DEMOLISH TANK T7_ HER GARAGE C AIRPORT RETAINING WALL ROCK RY F SPRINKLER RE ALARM FIR I I 41. A) JT�LEPH­ i'2 11 �w' 'uz�' <I,;,< -77�, 1 ICELe _57006 E GINEERING REV S 7 7� FIRE REVIEWED BY ZIP dir A ITELEPHO E 1- 11 (' ) - ')� ­7'��'­ '?'� DATE (-01­222 izzq 10 YES O'Nol I CAo !7 `� - 11, ZONE SIGN AREA I HEIGHT WAIVER AULOWED I 1B.I.SE. AULOWE. E 2,5, STUDY 2 LOTCOVERAGE REQUIRED SET ACKS (FT) PR P SED SETBACKS (FT.) ALILOW�ED PROPOS%EO ' FR NIT L FRONT SIDE REAR �SIOE REAR V 25_ 1 ZS. 3S,7 12. 5 z-,5 Z5 27 LOT � E L R 4 1 P PA,KING LOTAREA I-ANNING REVIEWED By IOZE. REOrD . PROVIDED E F ION 0 GUPANTp I"' T' C Up TYPE ""I" UCT GR T NUMBER 1111EI OF OF DWELLING SPECIAL T"� CONSULTA�� GCAlUFANT OF . I, L STORIES UNITS "_RYEPQUIR�. �YE. U '0 DESCRIBE WORK TOO) DONE 0 S a-f4m i -t -7-1) All;'I'll _V ", W""� V T R REP T U�J,'M GEOTECH REPORT B Sy Y: 11ft 1) j -,Zq, $57, ))51 $� — 1 ffiriAr", a. C'ip" FEE Description FEE ou I ' Plan Check plan Check V.WDescription State Surcharge HEATPOURCE LOT.I.P.1 VESTED DATE dle rant Building Permit in City Surcharge ) ir g PLAN CHECK 110�.3Z '5� I b rg Plumbing A� Base Fee THI PERMIT AUTHORIZES ONLY THE WORK NOTED, THIS PERMIT COVERS WORK TO ..ch.nical BE DONE ON PRIVATE PROPERTY ONLY. ANY C NSTRUCTION ON THE PUBIC Grading DONMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES. ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPL CATION: SEE ECDC 19.00.ODS(A)(S) EGgr, Review PERMIT L�Mrr. SEE ECDC 19.0a005(AIRI) Engr. Inspection SEE SACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT. ON BEHALF OF HI: OR HER SPOUSE. HEIRS, ASSIGNS AND SUCCESSORS Fire Review Plan Chk. Deposit IN INTEREST. AGREES T IND NIFY, DEFEND AND HOLD HARMLESS THE CITY OF OFFICIALS, EMPLOYEES, AND AGENTS FROM A14Y AM. M Inspection Receipt # I EDMONDS' TS WASHINGTON' I ALL CLAIMS FOR DAMAGES 0, WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY Fire FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL Nor BE CITY ORDINANCE Landscapensp. Total Amt. Due DEEMED TO MODIFY. WAIVE OR REDUCE ANY REQUIREMENT OF ANY NOR LIMIT IN ANYWAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PRO ISION.' Recording Fee Receipt It 1 HEREBY ACKNOWLEDGE THAT I HAVE REA. THIS APPLICATION; THAT THE INFORMATION APPLICATION APPROVAL GIVEN IS CORRECT; AND THAT I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF T',E p tonm­ not , permit met �,Xd by the THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL Elmiding O"!`LnmhoehmDIPuIY ,dF,,,.,Ip,id,.,d TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLAT OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO Tice nic FOR INSPECTION ,or I, cle,1111d9ld 11 space Omvidedo WORKM EN'S COMPENSATION IN SUR,U`1C E AND ROW 18:27. ISO (425) E DATE 771-0220 DATE _4T_TEN_Ti3O_N EXT. 1333 )v)_ IT IS UNLAWFULTO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL U. 1 '4&)'V' A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI- bRIGINAL -FILE YELLOW -INSPECTOR FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109 / IBC110 I IRC110. PINK -OWNER GOLD - ASSESSOR 10104 A pn _vnii A 12p: MASCI Mr. A z 9 0 71 q9 C: ITI M 0 1 0 0 0 C IT M Z 0 —1 C Z Cn 0 -n -1 3: 9 M M U 0) 0 r- 0 M C cn F. CI) ITI 0 Z z --I x co z 0 0 T1 RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... wall .................... PiedPorch .. . ............. Retaining Wall ........... Slab Insulation .......... PLUMBING: Underground ............. Rough -in Commercial Final HEATING: Gas Test .................... Gas Piping ................. Equipment ................. Commercial Final EXTER OR SHEATHING 1(: NAILING .......................... FRAMING ........................ FIRST FLOOR FRAMING... INSULATION ................... Floor Insulation Wall Insulation ........... Ceiling Insulation SHEETROCK NAILING SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. ;2z The Initials MT are Milton Thompson, a temporary contract inspector for the City. z 0 M 0M C: m 10 0 C: I x Fn TIZ 0-4 C: 0 -n _n __4 af m ITI CI C-1) 0 0- 9 0) m 0 z --I 2; (j) z 0 4 0 ITI NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. OL'Ilt W10J. 9NINNVId Aia (33AO)JddV a:jzing ONVI13M,GZ N Id A.1019 =10 301 - - - - 133NII Nn(911,10-1,9 - - - - .99'VLI =V UN-= 0, 13) ilvasis -&,ksoqaWl � s JAol �VSO (lYNINON) 301M.0 10 rm �lz M yl ............... tL) \0 /it it' —r—B 'I'.. ... ......... ,got CD,--- - — — — — — Lij 2z, c j/� -op c() 2ril", i\ migK I , >- a; C5 " a zk- i-Z 1�0 ar cl c) tr) 3:2 LU In 11i a tit -7— LIJ < u- < �7 to �: m 4N��3 I/ Dennis M. Bruce, RE. M.S.C.E., M.B.A. Geotechnical /Civil Engineer August 29, 2005 RECEIVED SEP 0 - 2005 City of Edmonds DEVELOPMENT SERVICES Community Services Division 121 5"' Ave. N Edmonds, WA 98020 'j— Subject: C7F...l �Rgplt� Geotechnical Inspections �5_917 74" 01 W Edmonds, Washington Michel Construction - New Residence Edmonds Permit No. 2004 - 0050 This engineering report presents the final results of on -site Y, eotechnical inspections for the Michel Construction new residence at 15917 74 PI. W, Edmonds, Washington. These inspections were required as a condition of permit authorized January 22, 2004 by City of Edmonds. REFERENCES: • Geotechnical Report by D. Bruce, P.E. • City of Edmonds approved Project Plans • Structural Designs by A. Moresos, P. E. • Seasonal Grading Extension Letter by D. Bruce, P,E. dated December 1, 2003 • Site photographs, pile logs and layout • Previous Inspection Reports INSPECTIONS: This engineer has provided on -site geotechnical inspections, as required for the new residence and associated geotechnical aspects at 15917 74 th pl. W. City of Edmonds Special Inspection Items: 1 Start of Work Letter: Previously completed. 2) General Site Monitoring: Project contractor had properly installed temporary erosion control measures consisting of., rocked construction entrance, siltation fencing, straw bales, plastic tarps on exposed earth surfaces, and diligent cleanup. SOILS - FOLINDA FIONS - SITE OEVELOPMEN7' - INSPECTION - DRAINAGE - DESIGN& PERvIr . LEGAL P.O. Box 55502 - Shoreline, WA 913155 - (206) 546-9217 - FAX (206) 546-8442 Z 0 1 0 M M 0 -4 0 0 0 C M M Z 0-4 Z V) 0 _n M M 0 M C (D 90) M 0 Z .'T ;U Z co Z M City of Edmonds Commercial Services Division Re: Michel Construction August 29, 2004 Page 2 All temporary erosion control measures were properly maintained throughout the project. Permanent Erosion Control Measures: The recent (August 26, 2005) site inspection verified proper installation of permanent erosion control measures: landscaping shrubbery, final grading, grass plantings and completion of all landscaping rockeries. All permanent erosion control measures have been properly installed and are geotechnically approved. 3) Excavation and Grading: All excavation and grading for this project has complied with the recommendations of the Geotechnical Report and on -site inspections. All excavations encountered dense sub -grade soils with no erosional sloughing or geotechnical instabilities. All excavation and grading are peotechnically approved. 4) Soil Bearing Verification: Note that the residence itself was founded on pin -piles with reinforced grade beams (discussed previously). Areas of the project outside the house foundation itself encountered dense sub - grade soils providing 2,000 p.s.f. bearing capacity. These sub -grade soils provided a stable base for site rockeries, driveways and appurtenances. All soil bearing is approved. 5) Pin -Piles: Previous inspection reports dealt in specific detail regarding the number of pin -piles, specific refusal depths, and proper "tie in" with the reinforced grade beams. All pin -piles are approved. 6) Reinforcing Steel for Grade Beam: Previously discussed and approved. 7) Concrete Testing: Performed by other agencies. 8) Placement of Fill and Compaction: No significant quantity of imported fill was required for the foundation aspects for the residence. Localized grading for the driveway and rockeries did require importation of gravel. This engineer verified proper placement of gravel behind rockeries and as a sub -base for the access driveway. All fill material is geotechnically approved as placed. Z 0 =j 0 C: M rn 0 __10 0 M M M Z 'D -i C 2 o -n --4 M 7- MM a- 0 C: M M 0 Z Z Z 0 M City of Edmonds Commercial Services Division Re: Michel Construction August 29, 2004 Page 3 9) Retaining Wall / Catchment Wall: The rear foundation stem wall for the residence was properly constructed in accordance with approved plans. The up -slope portion of the property contains a driveway access wall with rockeries. The slope above the driveway wall contains dense shrubbery and trees. This slope was not impacted by construction of this residence and remains stable. 10) Rockery Construction: All rookeries were properly founded in dense sub -grade soils as verified by this engineer. Rock size, linkage, batter, and drainage zone were properly placed. All rockeries are approved as constructed. 11) Perimeter Foundation Drainage Installation: All subsurface drainage, including perimeter drainage was properly installed and inspected by this engineer. Drainage for the access driveway and keystone block wall (at the base of driveway) utilized an effective drainage zone with tight line release into the storm water system. All perimeter foundation drainage is approved. 12) Subsurface Drainage Installatio : Previously verified and approved. SUMMARY: • All special geotechnical inspection items for 15917 74 1h Pl. W have been properly completed and are approved. • This report completes the on -site geotechnical inspections for the new residence and property. If there are any questions, do not hesitate to call. Dennis M. Bruce, P.E. Geotechnical / Civil Engineer DMB:abj cc: Michel Construction Z 9 0 0 M C: M --1 0 0 0 M M Z -4 C: 2 W 0 _111 MIT! a 0 0 M C C) 9 ri) M 0 Z � Z Z 0 M Dennis M. Bruce, RE. M.S.C.E., M.B.A. Geotechnical/Civii Engineer RECEIVED September 29, 2004 OCT 12 2004 BUILDING DEPT, City of Edmonds Community Services Division 121 51h Ave. N Edmonds, WA 98020 Subject: , Geotechnical Inspections Michel Construction — New Residence 1591774 1h Pl. W, Edmonds, Washington Edmonds Permit No. 2004 - 0050 This engineering report presents the results of on -site geotechnical inspections for the Michel Construction new residence at 15917 74 th PI. W, Edmonds, Washington. These inspections were required as a condition of permit authorized January 22, 2004 by City of Edmonds. REFERENCES: • Geotechnical Report by D. Bruce, P.E. • City of Edmonds approved Project Plans • Structural Designs byA. Moresos, P.E. • Seasonal Grading Extension Letter by D. Bruce, P.E. dated December 1, 2003 • Site photographs, pile logs and layout • Previous Inspection Reports INSPECTIONS - This engineer has provided a minimum of one inspection visit per week, with additional inspections during periods of heavy rain. City of Edmonds Special Inspection Items: I Start of Work Letter: Previously completed. 2) General Site Monitoring: Michel Construction continues diligent protection of the area by use of siltation fencing, straw bales, plastic tarps, and rocked construction entrance. Additionally, diligent cleanup of the street is performed daily. SOILS - FOUNDA r10/VS - S17E DEVELOPMENT - INSPECTION - DRAINA05 DESIGN &PERMIT . ZHGAL P.O. Box 55502 - Shoreline, WA 98155 - (206) 546-9217 - FAX (206) 546-8442 Z 0 j 0 C M Ma 0 80 C �c M M Z jo E: 4 0 n M M 0 Vi 0 F_ 0 M C: cl) C ca M 0 Z r- ;0 Z co Z 0 0 M City of Edmonds Commercial Services Division Re: Michel Construction September 29, 2004 Page 2 Temporary erosion control measures are approved through this date (September 29,2004). 3) Excavation and Grading: No significant grading activity has occurred since last inspection report (May 19, 2004). Rockeries have been undertaken with minor excavation performed satisfactorily under this engineer's inspections. All excavation and grading approved through this date (September 29, 2004). 4) Soil Bearing Verification: In areas outside of the pin -pile and grade beam foundation zone, this engineer has verified localized sub -grade soils capable of providing 2,000 p.s.f. bearing. Soil bearing is approved. 5) Pin-Pi(es: Previously approved. 6) Reinforcing Steel for Grade beam: Previously approved. 7) Concrete Testin _q: Performed by others. 8) Placement of Fill and Compaction: No significant quantities of imported fill has yet to be required for this project. Appropriate gravel drainage zone has been placed behind the rockeries. Inspections are ongoing. 9) Retaining Wall / Catchment Wall: The rear foundation stem wall for the residence has been properly constructed in accordance with approved plans. The rear (easterly) catchment wall has yet to be constructed. Inspections are ongoing. 10) Rockery Construction: This engineer verified proper placement of base rock in dense sub -grade soil. Rock linkage, Tace batter, and chinking was verified. Additionally, the drainage zone and perforated drainage pipe were properly installed behind all site rockeries (see photographs). All rockeries are approved through this date (September 29, 2004). 11) Perimeter Foundation Drainage Installation: This engineer verified proper installation of the foundation footing drains, as well as the perimeter drainage system incorporated behind the up -slope rockeries. All drainage systems are approved. NOTE: Final perimeter drainage work has yet to be completed. Inspections. are ongoing. Z 0 1 0 0 C: rn rn 0 10 00 X M rn Z C. 0 _n n rn M a- 0 V) 0 F_ M U) 0) M 0 Z r- Z Z 9 0 M City of Edmonds Commercial Services Division Re: Michel Construction September 29, 2004 Page 3 12) Subsurface Draina -ge Installation: This engineer verified proper installation of subsurface drainage through this date (September 29, 2004). Additional S bsurface drainage work is ongoing, u SUMMARY: All special geotechnical inspection items for 15917 741h Pl. W have been properly z completed through this date (September 29, 2004). M. Geotechnical inspections are ongoing. 05 See separate letter dated September 29, 2004 allowing for grading to continue 0 M past September 30, 2004 "rainy season" date. M 0 C 1A If there are any questions, do not hesitate to call. --19 M M :, M Z M. C -Z > WAS 0) 00 0 -n -4 M M 0 U) 0 C: M Q 0 EXPIRES Dennis M. Bruce, P.E. ;a Geotechnical / Civil Engineer DMB:abj z M cc: Michel Construction z 0 M Dennis M. Bruce, RE. M.S.C.E., M.B.A. Geotechnical /Civil Engineer May 19, 2004 ]RECEIVE[) City of Edmonds OCT 12 2004 Community Services Division BUILDING DEPT, 121 51h Ave. N Edmonds, WA 98020, 1. Subject: Geotechnical Inspections Michel Construction — New Residence 1591774 1h Pl. W, Edmonds, Washington Edmonds Permit No. 2004 - 0050 This engineering report presents the results of on -site geotechnical inspections for the Michel Construction new residence at 15917 74 th pl. W, Edmonds, Washington. These inspections were required as a condition of permit authorized January 22, 2004 by City of Edmonds. REFERENCES: • Geotechnical Report by D. Bruce, P.E. • City of Edmonds approved Project Plans • Structural Designs by A. Moresos, P.E. • Seasonal Grading Extension Letter by D. Bruce, P.E. dated December 1, 2003 • Site photographs, pile logs and layout • Previous Inspection Reports INSPECTIONS: This engineer has provided a minimum of one inspection visit per week since piling and active grading has been completed. Additional visits are made during days of heavy rain. City of Edmonds Special Inspection Items: 1 Start of Work Letter: Previously completed. 2) General Site Monitoring: Michel Construction continues diligent protection of the area by use of siltation fencing, straw bales, plastic tarps, and rocked SOILS - FOUIVDA 7'10NS - SITE DEVROPMENr - (INSPECrYON - DRAINAGE , DESIGN & PERM17 - LEGAL P.O. Box 55502 - Shoreline, WA 98155 - (206) 546-9217 - FAX (206) 546-8442 Z 9 0 am C ma 0 M M Z 10 -1 C 2 0) om n I X 9 m M a 0 0 M C co 90) M X Z Z 0 m City of Edmonds Commercial Services Division Re: Michel Construction May 19, 2004 Page 2 construction entrance. Additionally, diligent cleanup of the street is performed daily. Temporary erosion control measures are approved through this date (May 19, 2004). 3) Excavation and Grading: No significant grading activity has occurred since last inspection report (February 26, 2004). The foundation grade beams (interconnection pin -piles) has been completed with final concrete pour pending. The upper (easterly) excavation has remained stable, with temporary Eco-Block shoring performing as intended. All excavation and grading approved through this date (May 19, 2004). 4) Soil Bearing Verification: The primary foundation support for this residence is achieved through the pin -piles and reinforced grade beams (previously discussed). Localized isolated footing pods were excavated per this engineer's on -site inspections. This engineer verified dense, native sub -grade soils providing 2,000 p.s.f. bearing capacity in foundation areas outside of the pin -piles and grade beams. Soil bearing is approved. 5) Pin -Pile and Stirrup Installation: Previously discussed and approved. 6) Reinforcing Steel for Grade Beam: As of this date (May 19, 2004) all grade beams have been properly constructed in accordance with structural design plans. Final concrete placement is pending. All pin -pile and reinforced grade beam formwork and steel are approved. 7) Concrete Testing: Performed by others. 8) Placement of Fill and Compaction: No significant quantities of imported fill have been required to date. The access driveway consists of compacted gravel and has performed well. Inspections are ongoing. 9) Retaining Wall / Catchment Wall: Not yet. 10) Rockery Construction: Not yet. Z 9 0 C M M 0 --1 0 0 0 C � C MM Z -4 o -n n M rn 06 0 0 F; C (a K W M 0 Z ;U Z Cn Z 9 0 M City of Edmonds Commercial Services Division Re: Michel Construction May 19, 2004 Page 3 11) Perimeter Foundation Drainage Installation: This engineer has observed and verified initial installation of footing drains around the grade beams completed to date (see photographs). All drainage work is approved through this date (May 19, 2004). Inspections are ongoing. 12) Subsurface Drainage Installation: Not yet. SUMMARY: • All special geotechnical inspection items for'! 5917 74 th Pl. W have been properly completed through this date (May 19, 2004). • Geotechnical inspections are ongoing. If there are any questions, do not hesitate to call. .1 WAS goo+ EXPIR S 12Z23/ q- DMB:abj cc: Michel Construction E- Dennis M. Bruce, P.E. Geotechnical / Civil Engineer z 9 0 M M C: M 0 80 C -4 M M z jo c: o -n n --I M M 0 0 0 M C CO 9 CD M 0 z z 0 1 0 M 2004 Dennis M. Bruce, P.E. M.S.C.E., M.B.A. Geotechnicall Civil Engineer March 26, 2004 City of Edmonds Community Services Division 121 5" Ave. N Edmonds, WA 98020 Subject: Geotechnical Inspections Michei Construction 15917 741h Pl. W, Edmonds, Washington Edmonds Permit No. 2004 - 0050 This engineering report presents the results of on -site geotechnical inspections for the Michel Construction new residence at 15917 741h Pl. W, Edmonds, Washington. These inspections were required as a condition of permit authorized January 22, 2004 by City of Edmonds. REFERENCES: • Geotechnical Report by D. Bruce, P.E. • City of Edmonds approved Project Plans • Structural Designs by A. Moresos, P.E. • Seasonal Grading Extension Letter by D. Bruce, P.E. dated December 1, 2003 • Site photographs, pile logs and layout • Previous Inspection Reports iNSPECTIONS: This engineer has provided a minimum of three inspection visits per week, with daily inspections during periods of heavy rain. City of Edmonds Special Inspection Items: I Start of Work Letter: Previously completed. General Site Monitoring: Michel Construction continues diligent protection of erosion potential (siltation fencing, straw bales, plastic tarp over excavation spoils, rocked construction entrance). Erosion control measures approved through this date. - , SOILS - FOUNDATIONS - SITE DEVELOPMENT - INSPECTION - DRAINAGE - DESIGN & PERMIT - LEGAL P.O. Box 55502 - Shoreline, Washington 98155 - (206) 546-9217 - FAX 546-8442 Z 0 =j 0 M rn M 0 0 80 C �K A M Z in 0 -n -4 3: M M a 0 C: rn co 9 C0 M Z Z 0 rn City of Edmonds Commercial Services Division Re: Michel Construction March 26, 2004 Page 2 3) Excavation and Grading: No significant grading activity since last inspection report (February 26, 2004). Foundation grade beam work, currently underway, requires no excavation. 4) Soil Bearing Verification: Not yet. 5) Pin -Piles: Previously discussed and approved. 6) Grade Beam: Foundation grade beam work underway. Inspections are ongoing. SUMMARY: • All special geotechnical inspection items for 15917 74 th Pl. W have been properly completed through this date (March 26, 2004). • Current work involves reinforced grade beam placement. • Geotechnical inspections are ongoing. If there are any questions, do not hesitate to call. JURRE8 JWY V/cDMB:abj c: Michel Construction Dennis M. Bruce, P.E. Geotechnical / Civil Engineer z M M C 0 M 0 C M M Z 10-4 .1� C 0 -n 0 C M CD . 0) mo z Cn z 0 M A Dennis M. Bruce, P.E. M.S.C.E., M.B.A. Geolechnical I Civil Engineer February 26, 2004 RECEIVED City of Edmonds MAR 0 3 2004 Community Services Division 121 5 1h Ave. N DEVELOPMENT SERVICES Edmonds, WA 98020 Subject: Geotechrical inspections Michel Construction 1591774 1h Pl. W, Edmonds, Washington Edmonds Permit No. 2004 - 0050 This engineering report presents the results of on -site geotechnical inspections for the Michel Construction new residence at 15917 74'h Pl. W, Edmonds, Washington. These inspections were required as a condition of permit authorized January 22, 2004 by City of Edmonds. REFERENCES: • Geotechnical Report by D. Bruce, P.E. • City of Edmonds approved Project Plans • Structural Designs by A. Moresos, P.E. • Seasonal Grading Extension Letter by D. Bruce, P.E. dated December 1, 2003 • Site photographs, pile logs and layout INSPECTIONS: This engineer has provided a minimum of three inspection visits per week, with daily inspections during periods of heavy rain. I CitV of Edmonds Special Inspection Items: I Start of Work Letter: City of Edmonds received start of work authorization letter by this engineer as of December 12, 2003. 2) General Site Monitoring: This engineer has provided regular inspections to YEEL site work complies with Project Plans, City of Edmonds erosion control practices and normal work methods. Contractor began clearing the lot on January 30, SOILS - FOUNDATIONS - SITE DEVELOPMENT - INSPECTION - DRAINAGE - DESIGN & PERMIT - LEGAL P.O. Box 55502 - Shoreline, Wasnington 98155 - (206) 546-9217 - FAX 546-8442 . Z 0 1 0 Ri 55 M Ma -40 0 0 C __19 X M M Z 0-1 a Q) o n "n rn M 0 V; 0 0 C C u) M Z X Z Z 9 0 rn City of Edmonds Commercial Services Division Re: Michel Construction February 26, 2004 Page 2 2004. Contractor properly installed siltation fencing and straw bales. Erosion control inspections are ongoing. 3) Excavation and Grading: Contractor properly prepared the site in preparation for installation of pin -piles. Site sub -grade conditions were as anticipated by the geotechnical investigation. No adverse conditions were created during the initial site excavation and grading. 4) Soil Bearing Verification: Not yet. 5) Pin -Piles: This engineer provided on -site inspections to Y2[!ht proper installation of pin -piles. A total of fifty-one 4-inch diameter pin -piles (including select battered piles at specific locations) were driven by pile contractor (McDowell NW Pile King, Inc.). All piles were driven to refusal depths (less than one -inch penetration per 15 seconds of full driving effort with an 1,100 ft.-lb. hammer. Pile Load Test: This engineer observed a pile load test on Pile No. 7 on February 10, 2004. Pile No. 7 was driven to a depth of 37.5 feet. This engineer observed increasing load capacity applied to the pile with corresponding instrument gauge readings. Load increments were applied up to 20 tons (40,000 lbs.) and held for 5 minutes. No pile creep or deformation was observed. A gradual un-loading process resulted in zero permanent deflection. Thus, Pile No. 7 (which is typical of all piles installed on the lot) easily provides a minimum of 20 ton capacity. 6) Grade Beam: This engineer approves of all foundation pin -piles as installed. "OK" to proceed with grade beam formwork, reinforcing steel placement, and concrete in accordance with City of Edmonds and ongoing inspections. 7) Geotechnical inspections are ongoing for remainder of inspection items. SUMMARY: • All special geotechnical inspection items for 15917 741h Pl. W have been properly completed through this date (February 26, 2004). • tl<" to proceed with foundation grade beam formwork, reinforcing steel, and concrete placement per approved Plans. Z 9 0 C: M M 0 0 80 C X rn M Z 10-1 Z 0 -n n M M 055 0 0 C M 0 Z X Z Z 9 0 rn City of Edmonds Commercial Services Division Re: Michel Construction February 26, 2004 Page 3 Geotechnical inspections are ongoing. If there are any questions, do not hesitate to call. A4. 0 NAL EXPMFS 12w Dennis M. Bruce, P.E. Geotechnical Civil Engineer DMB:abj cc: Michel Construction z 0 :j, 0 . 1� �. m -10 0 C 3! K . — M M Z 0-4 C 0 n -1 M M 0 0 0 M C M 0 Z z z 0 I 0 Feb-fts'll4"'dYl dld� McDowell NW Pile King 425-251-594TJ p.2 Lan "nu McDowell HW Pile King, Inc. ,PILE LOG Customer Name Job Address k1 it b,-1 C"' 516 Project/Job Name o� W.- F mOAA-T_ Date Completed I& 3 L a: oi 91 121 2 �4q , !;I I .12 4-1) 62 92 122 3 i4 4? 33 q. 63 93 12:1 4 itf 34 7. S 64 94 124 A" A 6 65 95 17" z 0 30 36" 66_ 'Jf� 126 0 Loo 1 7-15- :17 61 97 127 !19 8 38 GS 9H 128 —n 1.) 19 12's Cn 0 12 31' 40 31.5, 0() 130 m C rn 11 41 /1 101 1 0 0 1 42 102 13 43 7�_103 .,.I M M z 14 3.3' 44 17' /'l 104 13 C: > 1'5 3 4S 75 105 .5 E: 16 46 7tL 106 CO 0 n 1/ 41 to I Oe 8 48 78 108 4 ON x C M M 11) 49 /1) 1 m) 319 Cl 0 CA r- . L(i -M MO .1 10 38 0 M C Ca 71 yo, 51 8 1 111 141 M 0 52 82. 1 1 �l 142 Z !,3 14 1 13 143 ;a .1-11 -1 HI_ 1 14 1.1.1 B5 IS 14" z 26 56 86 1 1 Fj CO V/ 147 z 2t, Li SH I 11`� 148 "1 149 M it) ALI .1, W UO 15 0 Pilo SiZe/Grado: q" Lf,f-k &W,d, yo All pile driven to refusal" '3 C 5 of I*SS than 11" in Using a 1(40 FTILS me h.r" r��� econcis InSlall.d by Ch,rl;P- 31!J101- Total LF: I PIN JOPE) PH C- FOUNDATIONS- R177AINING WALLS- MANIA RAYANCNORS - C-LOC VINYL SHEETPIL17 18006 1141h AvenUr. 9 - KPnI, WA 98032 - (425) 2.51-8535 - Rix (425) 251-5940 Wob: �w Oi1i*nfp:OrY, - Email: mr.dnwpk@iO1.COn, Feb 26 04 01:09p MODOWC11 NW Pile King 425-251-5940 P., 3 A U-11.6 ZM6 McDowell NW Pile lOng, Inc. . . . . ......... T .4 —7 12, . . . .... . . . If . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ' -4z� r 1U. L1 . . . . . . . . . . . cl ONAL fEXPIRE�a2_Zj HETAINW6 WALLS PIN IPIPE) PILE MANU RAY EARTH ANCHORS - C-LOC VINYL SHEETPILE SHIP TO: 18905 84th Avenue S. Kent, WA 98032 (425) 25 1 -8535 Fax (425) 25 T -5940 REMIT TO: 16000 80m Place S. Kent, WA 98032 (425) 251-8570 Fax (425� 251-8628 z 0 C M m to o -n m 0 mo� z m FIELD REPORT RF—CSIVED APR 2 2 2004 Date: April 9, 2004 Location: 1591774"1 PL SW PEFUTPOUNTER Jurisdiction: City of Edmonds, Snohomish County WA PermitNumber: Owner: Michel Construction Item inspected: Grade beam, size and reinforcement. Custom design and Engineering (CDE) was contracted to inspect the grade beams on above referenced project. The grade beams were inspected and found to comply with drawing requirements. The 4" steel piles were slightly of center from the grade beam, however additional reinforcement (adjacent to piles, 3-No 4) was added to reduce torsional effects. inspection details Grade beam width 14" * ......................... * ............................. ............................. P '10 011FUli r.eW. 'U- .......... .......... ......................... ........ 1 f�& btm bar size No 6 ........... .......... .......... ...................... .. ......................... 2!iK�yp e.&.�.p.�p!nq ........... ..... 4 ....... I ................ ... .... . . ...................................................... Reinforcement to lower surface = 4" 2 .......... .......... I ............................ .......... I .......... p 12" ............ .......... ......................... ........... distance of reEGRi��Wi--=- 9 Tig.f. 9-r-a-da lb-e-a-m--a . s . s .. am . b . ly ................................... ............ ........ .......... colum 1 ............... ................................ ....... .................. ..... ............ 4 ............ tersection .... ly I ....... .......... ................ ........ ........ .......... .................. Twical basement wall reinforcei��W 1-91*i� q : Alex K Moroseos, PE No 36923 Custom Design I D. a. Analysis Document: Page: I And Engineering, Inc 4;,a, tl i2 0 0 4 (425) 343-7517 1 Job Number: D4-176 Z rn M C m 0 0 M M Z 0) 0 -n m M C) V5 0 0 C: co M 0) M 0 Z r- Z -4 X V5 1 1 1 Z 0 rn FIELD REPORT RECE") AUG z 6 -:% DEVELOPMENT SERVICE� Date: August 20, 2004 CITY OF EDMONDS Location: 1591774 TH PL SW Jurisdiction: City of Edmonds, Snohomish County WA Permit Number: Owner: Michel Construction Item inspected: Retaining wall reinforcement & concrete compressive strength. Custom design and Engineering (CDE) was contracted to inspect the reinforcement of the retaining wall. Findings: We measured the vertical & horizontal reinforcement and found it to comply with the drawing requirements. The vertical & horizontal bar diameter comply with drawing requirements. The footing and wall dimensions comply with drawing requirements. Also, upon evaluation of the concrete mix batch report provided by Michel construction (for the above referenced), we found the compression strength to nxceed 3000 psi. Alex K Moroseos, PE No 36923 ICustom Design Date' Analysis Document: Page: I And Engineering, Inc 81,411004 (425) 343-7517 1 1 Job Number. D4-176 Z 0 M -n 3: M Inn o —10 0 C: --I C X M Inn � V6 C: 3: O"n n 3: Irn Inn - rn 0 � 0 M C CO) cl) M 0 X --I Z --I Z 9 0 Inn LP*,24 FAX 4257127279 Q 001 NO EXCISE TAX REQUIRED NOV 14 2002 BOB DAIlTim, snonunssl.duhly Ifeasurar AFTER RECORDING MAM TO: dy� BOB DANTINI Name: Rqb Micbrl- Address: 7907 2122 LNV #102 City/State- Edmoridn, )MA 98026 CONFORMED COPY 200211140882 11/14/2002 04.10 PM Snohomish P.0003 RECORDED county ACCESS EASFIAENT, uTILITY BASEMENT ANI) AGREEMMENT Whereas "Thomas W. Hillman and Linda B. Ijillman trustees for the Hillman Family Trust dated Februar I y 25, 1999."Are the owners of the following legally described property: All that portion of Tract 33, supplemental plat of Meadowdale. 13cach, according to the plat thereof recorded in Volume 5 of Plats, page 42, in Snohomish County, Washington, &scribed as follows: Beginning at the Northwest comer of said Tract 33, Thence East along the North line said Tract 220.91 feet; Thence South in a straight line to a point of the South line of said Tract, which is 230.29 feet West of the Southeast corner of said Tract;Thcnce West along the South line of.said Tract to the Southwest comer of said Tract 33; Thence Northerly along Westerly line of said Tract 33 to the point of beginnitig. New Tax account number. 00-5133-000-033-00 Commonly know as 15915 70 place West, Fdmonds, WA 98026 Where&, Michel Con truction, Inc. is the owner of the following legally described property-. Tract 34, supplemental plat of Meadowdale Beac . h, according 10 the plat thereofiecorded in Volume 5 of Plats, page 42, in Snohomish County, Washington, FAcePt the East half thereof. New Tax account number. 00-5133-000-034-00 Commonly know as 15919 74�� Place West, Ecurtonds, WA Now, therefore, the panics agree as follows; Thomas W. Hillman and Linda B- Hillman, Trustees for the Hillman Family Trust dated February 25, 1998, Grantor, for valuable consideration, grants to Michel A:;R-1 2 i 20, P E R MI T C 0 UN E R z 0 0 M 0 M C 0 "1 . M 0 80 C --I C � I MM MZ jo -4 C —Z 0 -n n M M 0 0 C K to M 0 Z -4 z -4 z 0 M 11/16/02 15:25 FAX 4257­279 IN02 Construction, Inc- an access and utility easement over, tinder and across the f lowing described portion of its property! 01 Commencing at the Southwest comer of said Tract 33; Thence Easterly along the South property line 115.00 feet; thence rZorth, perpendicular to the South property line, a distance of 10.00: Thence; Westerly parallel to the South property line to a point on West property line, thence Southerly to the Southwest comer of said Tract 33- Michel Construction, Inc., for valuable consideration, grants to Thomas W. Hillman and Linda B. Hillman. Trustees for the Hillman Family Trust dated February 25, 199g,an access and utility easement over, under and across the following d6scgibed portion of its Property: Commencing at the Southwest comer of said Tract 34; Thence Easterly along the South property line 25-00 Lett; thence Northerly, parallel to the West to a point 10.00 South of the North property line*, Thence property line, I Tb n Easterly, parallel to the North property, a distance of 95-00 feet-, e cc icular to the North Property line, to the North property line; North, perpend perty line to the Northwest corner of said Lion- the North pro Thence West 2 ' er of Tract; Thence South along the West Property line to the Southwest corn said Tract 34. Both parties shall have the right and the duty to maintain the access road and utilities in equal shares. Dated this day o 2002, /z A, "Thoman W. Hillman and Linda B . Hillman, Trdstecs for the Hillman Family Trust dated February 25, 1998." Robin W. Michel, President, Michel Construction, Inc., STATE OFWASITINGTON CoiUNTY OF SNOHOMISH q4 e, i (_rlt ri Notary Public in and for the State 1. iA on this day 440tl-1 pq!S (A R14J-M A A) per�onally appeared before me, to me known to be the trustees ivy E= Hillman k-armly Trust dated February 25, 1999. Page 2 of 3. z C') M M 0 —1 0 0 M M z 0 -n - n M M 0 0 0 M C.) z z z 9 0 M __L1/18/02 15:25 FAX 425, 271— Q003 of described in and who executed the within instrument and acknowledged thatTh--Y signed and sealed the same a-'InMfree and voluntary act and deed for the uses and purposes herein mentioned. -1�1- day of M GIVEN under my hand and official seal this 2002. Notary Public in and for the State Washington, residing at F-40 ;M �s STATE OF WAsmNGTON ) ss. COUNTY OF SNOHOMISH ) EL - On 2 , before me, the undersigned, a Notary Public in and for the State of Washington, duly commissioned and xoz, usonally appeared 6 ('J. M I r--Ad F-- L- to me i;own to be the President of —,M I CHOT L CZ-306 �j —the corporation that executed the foregoing instrument, and acknowledged the said instrument to be the; fter, and voluntary � act and deed of said corporation, for the uses and purposes themm. and oath stated or proved to me on the basis of satisfactory eyidence that he is authorized to execute the said instrument. GIVEN h d d ffj' ' I seal this J_j�d.y of hk —1/ 2002. Nouitry Public in and for Washington, residing at_%B"A'0"O'�' Pago 3 of 3 Z 0 0 M M 0 C: M Z -Z 0 -n n M M a 0 0;; C V) (j) , 1i M 0 Z X Z Z 9 1 0 rn 7�Y- RE TURN ADDRESS: City of Edmonds, City Clerk 121 5th Avenue North 20040AONFORMED Copy 20405 5 PGS Edmonds, WA 98020 02-02-2004 01'33PM $23 oo SNOHOMISH COUhTY) WASHiNGTON COVENANT OF NOTIFICATION 'AND INDENINIFICATION/HOLD HARMLESS. ence #: Refer Val -,Q25e Grantor(s): (1) #16#La ditional on pg. —Ad Grantee(s): City of Edmonds Legal Description (abbreviated): Se - c Twn__4 Rog - Qtr V&l OR Lot lock Plat Assessor's Tax Parcel ED#(s). (1) 4XXV-3 '0000 ? 50,6,22 (2) __-_..Msessor's Tax Parcel 10# not yet assigned CITY OF EDMONDS APPROVED FOR RECORDING BY: DATE ��L PAGE _�L OF Under the review procedures established pursuant to the State Building Code, incorporating amendments promulgated by the City of Edmonds, and as a prerequisite to the issuance of a building permit for the construction of a residential structure and attendant facilities, the undersigned OWNERS of property do hereby covenant, stipulate and promise as follows: z -1 _n V in C M 0 0 C in Fo z jo-1 C r -4 X � 11 O'n n --I X M M 0 0 M C o) 9 (j) 11 rn 0 X -4 z -4 0) z 0 M -I R..E&RIDI, L 1. Description ofSuMect Property, This covenant of notification and indemnification/hold harmless relates to a tract of land at the street address of IS?l 7 S-JI (insert street address), Edmonds Suohomish County, Washington and legally described as: ?t4-4*� P�e-& 7 2. Notification and Covenant ofNotification. The above referenced site. (hereinafter "subject site") lies within an area which has been identified by the City of Edmonds as having a potential for earth subsidence or landslide hazard. The risks associated with development of the site have been evaluated by technical consultants and engineers engaged by the applicant as a part of the process to obtain a building permit for the subject site. The results of th e consultant's reports and evaluations of the risks associated with development are contained in building permit Me number4gj24��� (insert number) on rile with the City of Edmonds Building Department Conditions, limitations, or prohibitions on development may have been imposed in accordance with the recommendations of Z 0 1 0 9 0 C M r" 0 0 80 C M M Z g) -i , C Ca 0 -n n -q M M U C/) or- 0 M ,C C4) E CO M 0 Z Z 0) Z M IAP VED OR BY: DATE PA OF the consultants in the course of permit issuance. The conditions, limitations, or prohibitions may require ongoing maintenance on the part of any owner or lessee or may require modifications to the structures and earth stabilization matters in order to address future or anticipated changes in soil or other site conditions. The statements and conditions proposed by the OWNERS' geotechnical engineer, geologist, architect and/or structu . ral engineer are hereby incorporated by reference from the contents of the file as fully as if herein set forth. Any future purchaser, lessee, lender or any other person acquiring or seeking to acquire an interest in the property is put on notice of the existence of the content of the file and the City urges review of its contents. The file may.be reviewed during normal business hou rs or copies obtained at the Building Department, City of Edmonds, 121 5th Avenue North, Edmo nds, Washington 98020. 3. indemnification and Hold Harmless. The undersigned OWNERS hereby waive any and all liability associated with development, stating that they have fully informed themselves of all risks associated with development of the property and do therefore waive and relinquish any and all causes of action against the City of Edmonds, its officers, agents and employees arising from and out of such development In addition, the OWNERS on behalf of themselves, their successors in interest, heirs and assignees, do hereby promise to indemnify and hold harmless the City of Edmonds, its officers, agents and employees from any loss, claim, liability or damage of any kind or nature to persons or property either on or off the site resulting from or out of earth subsidence or landslide hazard, arising from or out of the issuance of any permit(s) authorizing development of the site, or occurring or Z 0 1 0 C M M 0 0 80 C �c PH mz jo E: C) 0 -n n M M W (J) 0 r- 0 M C 0) � Cn M 0 Z X Z Z M �App P�AG arising ,)ut of any false, misleading, or inaccurate information provided by the OWNERS, their employees, or professional consultants in the course of issuance of the building permit. 4. Insurance Requirement. In addition to any bonding which may be required during the course of development, the Community Services Director has/has not (strike one) specifically required the mainte nance of an insurance policy for public. liability coverage in the amount and for the time. set fortli'liclow in order to provide for the financial responsibilities established through the indemnification and hold harmless agreement above: 5. Covenant to Touch and Concern the Land. This covenant of notification and indemnification/hold harmless touches and concerns the subject tract and shall run with the land, binding, obligating and/or inuring to the benefit of future owners, heirs, successors and interests or any other person or entity acquiring an interest in property, as their interest may appear. This provision shall not be interpreted to require a mortgagor or lender to indemnify the City except to the extent of their loss nor to obligate such persons to maintain the insurance above required. z 9 0 C in in V 0 80 C --i C MM M Z 10-1 z CA O'n n --i M in W CO 0 � 0 M C 0) K 0) in C-) Z z CD z 9 0 M dayof -?0 AP DONEthis OWNER(S By: . .......... .. By: By STATE OF WASMNGTON COUNTY OF:5AY))46M ss: I certify that I know or have satisfactory evidence that P); signed this instrument and acknowledged it to be (his/her) free and voluntary act for the purposes mentioned in this instrument. V day L DATED this of, W9--. -T� NOTARY PU13LIC My commission expires: L:\TEMPkBUELDING�AMAI)OVACOVENANT z M M C 0 i M 0 0 C M M Z JD > 0 -n n M M 0 V; I 0,- 0 M C 0) K Ca M 0 z z -4 z 0 i 0 M CONFUt—ED COPY 200310080763 3 PGS 10-08-2003 12:02pm $21.00 SNOHOMISH COUNTY, WASHINGTON AFTER RECORDING MAIL TO: NO EXCISE TAX Name: Rob Michel REQUIRED Address: 7907 212" SW, #102 OCT 0 S 2003 City/state. Fdmonds, WA 98026 808 DANT161, Snonoinisn 6ounly frea,r. .r 9Y—BOB DANTINI ACCESS EASEMENT_ UTILITY EASEMENT AND AGREEMENT Whereas "Thomas W. Hillman and Linda B. Hillman trustees for the Hillman Family Trust dated February 25, 1998" are the owners of the following legally described property: All that portion ofTract 33, supplemental plat ofMeadowdale Beach, according to the plat thereofrecorded in Volume 5 ofPlats, page 42, in Snohomish County, Washington, described as follows: Beginning at the Northwest comer of said Tract 33, Thence East along the North line of said Tract 220.81 feet; Thence South in a straight line to a point ofthe south line of said Tract, which is 230.29 feet West ofthe Southeast comer ofsaid Tract; Thence West along the South line of said Tract to the Southwest comer of said Tract 33; Thence Northerly along Westerly line of said Tract 33 to the point ofbeginning. New Tax account number: 00-5133-000-033-00 Commonly known as 15915 74h Place West, Edmonds, WA 98026 Whereas Michel Construction, Inc. is the owner of the following legally described property: Tract 34, supplemental plat ofMeadowdale Beach, according to the plat thereof recorded in Volume 5 ofPlats, page 42, in Snohomish County, Washington, Except the East half thereof 'R -ECEIVF-D New Tax account number: 00-5133-000-034-0 0 0 C T h. 12 rl' ' `3 Commonly known as 15919 74 1h Place West, Edmonds, WA PERN11T COUNT—E;4 NOW, therefore, the parties agree as follows: I Thomas W. Hillman and Linda B. Hillman, Trustees for the Hillman Family Trust dated February 25, 1998, Grantor, for valuable consideration, grants to Michel Construction, Inc. an access and utility easement over, under and across the following described portion of its property: z 0 q 0 C M rn 00 80 a M M z —z o -n n M M a 0 02 C K Ca Q 0 X --I z ca z M Commencing at the Southwest comer of said Tract 33; Thence Easterly along the South property line 130.00 feet; thence North, perpendicular to the South property line, a distance of 8.50 feet; Thence Westerly parallel to the South property line to a point on West property line; thence Southerly to the Southwest comer of said Tract 33. Michel Construction, Inc., for valuable consideration, grants to Thomas W. Hillman and Linda B. Hillman, Trustees for the Hillman Family Trust dated February 25, 1998,an access and utility easement over, under and across the following described portion ofits property: Commencing at the Southwest comer ofsaid Tract 34; Thence Easterly along the South Property line 25.00 feet; thence Northerly, parallel to the West property line, to a point 6.50 feet South of the North property line; Thence Easterly, parallel to the North property line, a distance of 105.00 feet; Thence North, approximately perpendicular to the North property line, to the North property line; Thence West along the North property line to the Northwest comer of said Tract; Thence South along the West property line to the Southwest comer of said Tract 34. Both parties shall have the right and the duty to maintain the access road and utilities in equal shares. This easement replaces access easement recorded November 14, 2003 under recording #20211140882. Dated this 7 day of 2003. "Thomas W. Hillman and Linda B. Hillman, Trustees for the Hillmdn Family Trust dated February 25, 1998.11 Robin W. Michel, President, Michel Construction, Inc., Page 2 of 3 z 0, M n M rn 0 80 C --I M M M Z 0-4 C CA 0 -n .4 M M V) a In (n 0 z z 0 In STATE OF WASHINGTON ) ss. COLINTY OF SNOHOMISH ,,Tku,(-) HAP -A,' (--, A A J Notary Public in and for the State of . Washington, do hereby certify that on this — -2 21- d ofQC7-6AEk —2003�7t-64"Aa560-Hii-, m#6j-tL , tj il,4 -6. 7i L I- M 15 Aj — personally appeared before me, to me known to be the trustees for the Hillman Family Trust dated February 25, 1998 of described in and who executed the within instrument and acknowledged that they signed and sealed the same as their free and voluntary act and deed for the uses and purposes herein mentioned. GIVEN under my hand and official seal this-ilz- day of OC 2003. .::, It. Notary Public in and for the State COS .0 Washington, residing a . ......... 0 Z STATE OF WASHINGTON e 4� - ) as. COLNTY OF SNOHOMISH ) On This_ 7 M day OCT06F-P- 2003, before me, the undersigned, a Notary Public in and ,�orth tZ of��ngtoAduly commissioned and swom, personally appeared-- gS , C to me known to be the President of M i e-H F , CnQS'TPQC T-fO - the Corporation that executed the foregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein. and oath stated or proved to me on the basis of satisfactory evidence that he is authorized to execute the said instrument. GIVEN under my hand and official seal this day of (nC- —t .2003. Notary Public in and for die State Washington, residing at 6-� 1) Mb AJ 10 Page 3 of 3 0 C) or Z 0 C M 0 80 M M o -n MM 0 0 M C co; M 0 X Z 0 0 M Dennis M. Bruce, RE. M.S.C.E., M.B.A. Geotechnical /Civil Engineer December 1, 2003 Mr. Rob Michel Michel Construction, Inc. 7907 - 212th Street S.W. #102 Edmonds, Washington 98026 Subject: Grading Season Extension Geotechnical Proposed Single Family Residence 15917 - 74th Place West, Edmonds, Washington It is understood that the above- referenced property is subject to the ECC chapter for landslide hazard development, and rainy season regulations regarding excavation, drainage, grading and groundwork performed after September 30. This engineer has performed inspections on the property located at 15917 - 74th Place West, Edmonds, Washington, and is familiar with the site. Additionally, the property immediately to the north is currently under development, and evidences no adverse impacts due to this season's winter weather conditions. Based on this engineer's on -site inspections, and subject to installation and maintenance of temporary erosion control measures, it is geotechnical aRproved for Michel Construction to perform groundwork for the single family residence project at 15917 - 74th Place West, subject to this engineer's on -site inspections, beyond the nominal seasonal grading time table of September 30, 2003. . If there are any questions, do not hesitate to call. rl r- C_ E I V E J-L) DEC 12 2003 PERMIT COUNTER Dennis M. Bruce, P.E. 3eotechnicai / Civil Engineer DMB:vlb SOILS - FOUNDATIONS - SITE DEVELOPMENT - INSPECTION - DRAINAGE - DESIGN& PERMIT LEGAL P.O. Box 55502 - Shoreline, Washington 98155 - (206) 546-9217 - FAX 546-8442 Z 9 0 Ri '49 C M MO -40 0 0 C -4 C = M M Z 0 -1 C 0 n 1`11 M 0 0 0 C V) C 0 M 0 Z Z 0) Z 9 0 M Associated Earth Sciences, Inc., E A N a November 20 2003 Project No. i&03537A 01 "i City of Edmonds, Community Services Depar tment 12151' Avenue North Edmonds, Washington 98020 RE-CEIVED Attentio& Ms. Jeannine Graf NOV 2 4 2003 BUILDING DEPT. Subject: Geotechnical Corrections Plan Review Michel Residence 15917 74" Place West Edmonds, Washington References:. Geotechnical Plan Review. Associated Earth Sciences, Inc., Sept6mber 8, 2003 Grading Plan. Donna L Breske, P.E., October 28, 2002. 2 d Revision September, 2003 Architectural Plans Mc . Grew Michel, July 16,2003 Revised October.7, 2003 Dear Ms. Graf: As requested, Associated Earth Sciences, Inc. (AESI) his completed a geotechnicalreview of the abbve-referenced corrected development plans for t ' he'subject Michel residence.. These ents, which are plans have been revised to include, AEST's initial geotecbnical review ' comm are the previous AESI contained it ' i our letter of September 8, 2003. Presented below i i n italics comment items, and our responses to the corrections. shown on the revised plans. Review Comments. To mitigate the poten I rial for debris flow landsliding,. the fou�idarlon i�all along the. east perimeier.of the gara�e should be extended to the fidl ivall height of 9.5feer. nisivillprovide heights above the grotind line ranging from 2 to.5 feet. Altenzatively, so . me type of firqboard osed residence site. debris �7oiv containment it -all muld be constructed upslope ofthe prop 911 Fifth Avenue. Suite 100 Kikl��d. WA 98033 - Fhone 425 827-7701 Fax 425 827-5424 Z' 0 vz M to in M C3 01 fn m z 0 m M Bi a- 0 (a ['�. 0 Fn C co) z Cat M 0 z ca z 0 m The, foundation wall on the east wall of the garage has been raised uniformly to 10 feet, see Sheet A-1.2: This should provide mitigation for the potential risk of debris flow landsliding. No further modification appears necessary. Notes should be added to these sheets calling out that pile beating should be Within the undisturbed s6ils-at a minimum depth of 25 feet below the existing ground surface. Further, the notes should callfor pile inspection by the project geotechnical engineer, Notes 9dded to Sheets S-4 and'S-5 adequat ely address these comments. 77ze project geotechnical engineer should be on site to evaluate the suitability of any temporary z 0 slope cuts over 4 feet high. 77ze rockery planned to face cut soils on the south side of the 0 garage should be limited to a height of 4feet, unless anengineered rera ining wall is used. The rockery walls shown on the east and south elevation views of Sheet A1.2 have, been Ui --I modified to show the retained portion of the cut slope limited to 4 feet in height. No further C: M in 0 revision of rockery heights is required. Add a note to the grading plans that qate that the 0 0 project geotechnical engineer should be on -site to evaluate the suitability/siability of any temporary slope cuts over 4 feet high. . M M Z Detailsfor construction ofthe Keystone retaining wall along the driveway should be added to jo -4 C: 2 > theplanset. Include a -specific Keystone wall constiuction'detailf6r th e driveway embahkment designed by Alex K. Moroseos, P.E. The derail should show gfid placementand length, 0 -n drainage, and construction details. McGrew Michel, AESI understands. that the Based on the October 8, 2003 correction. lettef by I . I M M 0 Y) 0'_ Keystone retaining wall is not part of this permit per Jeanine Graf. It is part of the 0 rn C rJ) neighboring Hillman residence permit, and was reviewed and approved by AES1 in July of ?. Co 1003. Thus, no action is required concerning this comment item. Q 0 Z Add notes identibing the perimeter drainage trench ref�renced in -the reyiew letter by Dennis M. Bruce, P.E. The drain. within the rockery located adjacent to the driveway. parking ared z should not be used for this purpose, because the drain rock would be vulnerable to infi 11 by -4 slope sedimentation. . City 'code allows for non -building at -grade surface improvements i vithin 1 CD e -should be placed above the 15-foot building setback. Thus; a shallow graveled surfa�e swal 1 z 0 the rockery within the fiatter portion of the 15-foot'building setback. 77iis drainage feature would be intended to intercepi slope surface fiow and shallow ground waier seepage prio r to. M flowreaching therocketyandbuilding site. The sivale should be approximately 3 feet wide by 1.5feet.deep. Drainage swale details have been added t6 the to the revised Grading Plan, Sheet 2, by Donna . L. Breske, P. E. No further addition of draina ge swale details is required. Conclusion In summary, it is AESI's opinion that if the note concerning site cut slope review by the project geotechnical engineer -is added to the grading plans, then the construction plans for the ' proposed Michel residence substantially satisfy the requirements of Chapter 10.05 of the ECDC, and no further geotechnical plan review appears necessary. This letter has been prepared for the. . exclusiv . e use of the City of Edmonds Community'Services Department, Engineering Division and their agents, for specific application to ',this project.. Within the limitations of scope, schedule, and budget, our services have. been performed in - ted geotec nical engineering and engineering geology practices accordance with generally accep in effect in this area at the.time'our review was completed. No other warranty-, expressed or implied, is made. We appreciate the opportunity to be of service to the City of Edmonds on this project. Should ioject, please you -have any questions regarding this letter or. other geotechnical aspects of the p call us at your earliest convenience. Sincerely, ES, INC. ASSOCIATED EARTH SQIENC IGrkland, Washington Mc A I S 7--, 33222 JSTS MFRS 1:277�=� G. Aafon McMicha�l, P.E.. P.E.G. technical En-ineer, Senior Geo GAMIld KE03537A2 !­%1003537WE%WP - W29 3 z m 0 -10 0 C= X M m ;z o,n n m M 0 0 Fn C Co. z C9 M z ca z Associated Earth Sciences, Inc. September 8, 2003 Project No. KE03537A COPY City of Edmonds Community Services Department 1215' Avenue North Edmonds, Washingt6n 98020 c_- Attention: Ms., Jeannine Graf BUILDING DEFT. Subject: Geotechnical Plan Review Michel Residence 15917 74" Place West Edmonds; Washington References: Geotechnical Review r D. Bruce, P.E., dated July 14, 2003 Grading Plan Donna L Breske, P.E., October 22, 2002 Revised April 7, 2003 Architectural Plans McGrew Michel Revised July 16, 2003 Dear Ms. Graf: As requested, Associated Earth Sciences, Inc. (AESI) has completed a geotechnical review of the . above -referenced geotechnical report and development plans for the subject Michel residence. Our geotechnical -review was completed with respect to the MeadowdOe Earth Subsidence Landslide Hazard, Area Checklist criteria as -contained in the City of Edmonds Ordinance # 2661 and the Edmonds Community Development Code (ECDC) Chapter 19.05. Project. Summary AESI previously completed a similar geo�echnical review for the adjacent Hillman lot. The above -referenced geotechnical report contains information indicating that both the Hillman and Michel lots are underlain by landslide debris and may be susceptible to deep-seated landsliding, 911 Fifth Avenue. Suite.100 KiM,tnd. WA98033 Phone415 827-7701 Fax425 827-5424 0 M M MO 0 0 m M co 0 n --I x M M 0 5 0 5 Fn C cl), M 0 Z r, X Z Cn Z 9 0 in and shallow -seated debris flow landslides originating on the adjacent steep slopes. As such, pile foundation support, debris flow protection, and surface drainage control were recommended for the Hillman lot, and are also recommended for the Michel lot. Review of the above -referenced plans indicates that the residence will be constructed by. completing a tiered bench cut within the eastern section, and filling within the western section. The cut will be completed within the gently sloping area near the base of the steep bluff slope forming the eastern section of the lot. Maximum cut slope heights will range between approximately 4 to 10 feet, and maximum fill depths will range between approximately 2 to 6 feet. The residence will be supported on a pile foundation consisting of 4-inch-diameter pipe piles and grade beams. A 4- to 7-foot-high Keystone soil reinforced wall will be constructed along the northwest margin of the lot to provide driveway access. Review Conanents It is AESI's opinion that the most critical geotechnical issues associated with development of the site consists of landslide hazard mitigation, foundation support within the existing landslide debris, and site grading and drainage. A discussion and our conclusions regarding each issue are presented below. Review comments are shGwn in italics. Landslide Hazards The general landslide hazard risk at the site has been defined by the GeoEngineers Landslide Hazard Map as ranging between 2 to 30 percent. Project geotechnical information noted that fractured silt zones were encountered at depths of 9 to 20 feet, indicating. that the site has experienced deep-seated landsliding in the past. Medium dense to dense soils located below 25 feet do not appear to havebeen disturbed by landsliding. No definite signs of current deep seated landsliding are present. Given these site conditions, no change in the current landslide haza�d risk designation appears necessary. Since the landslide hazard risk does not exceed 30 percent, site development would not be restricted. The upper 15 feet of soil appears.to consist of unconsolidated landslide debris deposits with entrained peat and woody debris. This would indicate that the site does experience debris flow types of landslides within the site's -colluvial slope soils, which reach onto the proposed building site. To Mitigate the potential for deep-seated landsliding, we propose the use of deep foundations. These foundations should extend through the sheared, fractured silt zone and gain bearing, in the undisturbed soils 25 feet below the existing ground surface. 77ze deep foundations would also be required to support the residence above the upper 15 feet of unconsolidated debris deposits. To mitigate the potential for debris flow landsliding, the foundation wall along the east perimeter of -the garage should be extended to the All wall height of 9.5 feet. Ihiswill provide fteeboard heights above the ground line ranging from 2 to 5 feet. Altern I atively, some 2 Z 9 0 0 in C: 0 in 0 0 C � C in m Z o -n m in a 6 0 r- 0 in C: ci) 9 V), M 0 Z Z CO) Z 9 0 m type of debris flow containment wall could be constructed upslope of the proposed. residence site. Foundation Support The upper 15 feet of soil within the proposed building area appears to consist Of unconsolidated landslide debris deposits with entrained peat and woody debris. Thus; this material would not provide suitable bearing support for conventional spread footing foundations� due to the long-term differential settlements. To mitigate these poor bearing conditions, potential f0i e undisturbed soils as discussed above should be utilized. deepJoundations bearing in th Review of the project structural engineering plans by Custom Design and Engineering, Sheets S-4 and S-5 dated July . 15, 2003 show that the residence will be supported on 4-inch-diameter driven pipe �iles, Notes should be added to these sheets calling out that pile bearing should be within the undisturbed soils at a minimum depth of 25 feet below the existing ground surface. Further, the* notes should call for pile inspection by the project geotechnical engineer. Site Gr g and Drainage improvements Given the variable consistency and loose to medium dense, unconsolidated, condition of the surficial site soils, the planned excavation slopes are likely to -be unstable and may require laying back the excavation face at 1.511AV (Horizontal:Vertical), or shallow er as necessary. ite to evaluate the suitability of any temporary The project geotechnical engineer should be on s ed to face 'cut soils on the south side of the slope cuts over 4 feet high. The rockery plann ss an engineered retaining wall is used. garage should be limited to a height of 4feet, uhle Details for construction of the Keystone retaining wall along the driveway should be added to the plan set. include a specific Keystone wall construction detailfor the driveway embankment designed by Alex K. Moroseos, P.E. 77te detail should show grid placement and length, drainage, and construction details. Site drainage improvement should consist of controlling surface water flow and ground water seepage from the base of the,adjacent slope.. Add notes identifying the perimeter drainage Bruce,.P.E. ne drain within the rockery trench referenced in the reviewi letter by Denni ' s M. ose, beca e the located adjacent to the driveway parking area should not be used.for this purp us drain rock would be vulnerable to infill by slope sedimentation. City code allows for no.n- building at -grade surface improvements within the 15-foot buildl 'ng setback. 77ius, a shallow graveled surface swale should be placed above the rockery within the flatter portion of the 15- foot building setback. This drainage feature would be intended to intercept slope surface flow and shallow ground water . seepage prior to flow reaching the rockery. and building site.. Die swale should be approximately 3 feet wide by 1.5 feet deep. 3 Z 0 0 C: M M 0 0 M M Z Z 0 -n 'n M M 0 Fn 0 � 0 M C U) K (D M 0 Z T Z Z 0 1 0 M Conclusion In summary, it is AESI's opinion that if the conditions discussed in this review are included with the construction plans for the proposed Michel residence, the requirements of Chapter 19.05 of the ECDC should be substantially satisfied. This letter has been prepared for the exclusive use of the City of Edmonds Community Services Department, Engineering Division and their agents, for specific application to this �rcject. Within the limitations of scope, schedule, and budget, our services have been performed in accordance with generally accepted geotechnical engineering and engineering geology practices in effect in this area at the time our review was completed. No other warranty . , expressed or implied, is made. We appreciate the opportunity to be of service to the City of Edmonds on this project. Should you have any -questions regarding this letter or other geotechnical aspects of the project, please call us at your earliest convenience. Sincerely, ASSOCIATED EARTH SCIENCES, INC. Kirkland, Washington Me AS 0 222 GISTS EXPIFtES 2/27 G. Aaron McMichael, P. E., P. E. G. Senior G66fechnical Engineer GAM/sn KE03537AI P,.j,.M\2003537\KMWP — W2K 4 z F1 rri 0 C M rn z 10 it- ca 0,n n � K m M 0 Fn 0 01- M m ;o z z 9 0 m Dennis M. Bruce, RE. M.S.C.E., M.B.A. Geotechnical/ Civil Engineer July 14, 2003 Z 0 City of Edmonds CITY (COPY c/o Michel Construction, nc. 7907 - 212th Street S.W. #102 Edmonds, Washington 98026 C m rn -i 0 Subject: Geotechnical Review - New single Family Residence 00 C 15917 - 74th Place West, Edmonds, Washington (Lot 34) rn This engineering repott presents the results of a geotechnical evaluation for the A Z jo C new residence at 15917 - 74th Place W., Edmonds, Washington. > REFERENCES: 0 n 'n • Geotechnical reports by D. Bruce, P.E., dated March 29, 2001. MM • City of Edmonds Geotechnical Consultant Report (AESI, Inc.) dated May 23, 6i 2003 • Grading plan by Donna Breske, P.E., dated June 9, 2003 C m C 0) MO • Historical report by Geotech Consultants dated December 27, 1990 GEOTECHNICAL BACKGROUND: This engineer has undertaken numerous investigations of the adjacent Hillman Z Lot (Lot No. 33), and the subject property. These investigations have included test ca pits, test trenches, review of historical bore hole data, and numerous on -site Z observations. All adjacent residences in the vicinity of this property have been founded on M standard reinforced footings (or possibly non -reinforced foundations if sufficiently old) in relatively shallow soils. None of these homes have experienced any significant settlements or foundation problems. Currently, the Landslide Hazard Map depicts a hazard risk as ranging between two and thirty percent. Interestingly enough, the original hazard risk was depicted at ninety percent, circa 1976. SOILS FOUNDATIONS - SITE DEVELOPMENT - INSPECTION - DRAINAGE - DESIGN & PERMIT LEGAL P.O. Box 55502 - Shoreline, Washington 98155 (206) 546-9217 - FAX 546-8442 City of Edmonds c/o Michel Construction, Inc. July 14, 2003 Page two FOUND TION PLANS - PIN -PILES WITH REINFORCED GRADE -BEAM: This engineer has reviewed the Custom Engineering foundation plans incorporating 4-inch diameter pin -plies and reinforced grade beam (see plans). This foundation design utilizes 4-inch diameter pin -piles driven to refusal depths (as monitored on -site by a qualified, experienced geotechnical engineer). Similar pin -pile designs have been used extensively in the Puget Sound area with documented load capacities and performance criteria. (submitted separately to City of Edmonds). Each properly driven, 4-inch diameter pipe -pile will provide a minimum of. 20,000 pounds (10 tons) vertical capacity. Extensive historical testing has verified lateral load capacity to be minimum of twenty percent (20%) of the vertical load. Additionally, the structural designs incorporate select locations of battered piles to resist any potential lateral forces. The battered piles shall be driven at a declination of 1 H:5V. Additionally, the reinforced grade beam design is significantly massive and heavily reinforced. This engineer anticipates refusal depths to be less than thirty feet (30'). The project plans also include a perimeter drainage trench with perforated pipe and gravel to collect any slope seepage and direct it to the project drainage system. The east garage retaihing wall will function as a "catchment wall" to mitigate any potential slope debris flow. NOTE: March 2003 slope test pits verifle extremely dense, native, glacially consolidated soils. SUMMARY: • To expedite the permit and review process, owner has chosen to use a deep foundation system: 4-inch pin -piles with reinforced grade beams. • The foundation design by Custom Engineering is geotechnically approved, for the proposed Michel Construction single family residence, and more than complies with the recommendations of the geotechnical invest igation and report. Z 0 M M 0 --1 0 0 0 C rn M Z D —4 C :E > __1 Mcn 0 _n n M M 0 M W M 0 Z Z Z M City of Edmonds c/o Michel Construction, Inc. July 14, 2003 Page three On -site inspections by a qualified, experienced geotechnical engineer to y9flUty proper installation of pipe -piles. Geotechnical inspections to mg[ift installation of perimeter drainage ditch and proper "tie-ins" to the overall storm water system. If there are any questions, do not hesitate to call. NA Dennis M. Bruce, P.E. Geotechnical'/ Civil Engineer rw 'Mm 8 1 vb cc: Michel Construction z 0 0 M _n M rn 0 0 80 C M M z > z 0 -n M rn U 0) 0 r- 0 M C co 90) mo� Z 71 z z 0 0 M ! N -i�— -- Dennis M. Bruce, RE. Geotechnical /Civil Engineer M.S.C.E., B.A March 29, 2001 Michel Construction, Inc. 7907 212th St. S.W., #102 Edmonds, WA 98026 RECEIVED DEC 12 2002 PERMIT COUNTER Subject: Geotechnical Evaluation and Foundation Recommendations Proposed Three New Single Family Residences 74th PI. W. - North of Meadowdale Rd. This engineering report presents the results of a geotechnical evaluation for three building lots on 7e Pl. W., north of Meadowdalle Rd. in Edmonds, Washington.' This evaluation was required due to developer concerns as well as City of Edmonds requirements. REFERENCES: • Vicinity map • Site Plan • Project plans (by Michel Construction) • Site photographs BACKGROUND: The three single family residence building lots (Lot 34, 33, and 32) are rectangular in shape (see site plan). Each lot is agproximately one hundred (100) to one hundred twenty-five (125) feet wide (along 74 PI. W), and approximately two hundred (200) to two hundred fifty (250) feet deep. These lots have never been developed and contain dense vegetation consisting of mature trees, shrubs and grasses. The entire area surrounding these three, lots slopes generally westerly toward the Puget Sound. These three lots contain relatively steeper slope portions toward the east, and relatively gently sloped to flatter portions in the central and western parts of the properties. The toe of steep slope zone has been delineated and indicated on the survey site plan, as well as the building requirement steep slope setback line. CITY COPY STREET FILE SOILS - FOUNDATIONS - SITE DEVELOPMENT - INSPECTION - DRAINAGE - DESIGN& PERMIT - LEGAL P.O. Box 55502 - Shoreline, Washington 98155 - J206) 546-9217 - FAX 546-8442 Z 0 i 0 M 0 CZ rn rn 0 0 80 M rn Z 0-1 C -Z --i X (n 0 -n n -1 M M M 0 Fn 0 r- 0 M CI) M 0 Z r- Z -1 X 0) Z 9 0 rn Michel Construction, Inc. March 29, 2001 Page 2 In addition, a seasonal historic streambed/water course has been identified in the southwest portion of Lot 34. Additionally, the City of Edmonds has installed storm water interceptor drains and discharge lines along the property line boundary between Lots 33 and 32. Several inlet catch basins have been constructed to service and feed the drainage line. NOTE: On site engineering investigations have revealed some deferred maintenance regarding proper tight line connections of the City of Edmonds catch basins. It is essential that the City of Edmonds inspect and maintain these drainage lines to prevent unwarranted discharge onto Lots 32 and 33. Visual evaluation of the three lots revealed no evidence of geotechnical distress. No sloughing, slides, no soil creep nor significant soil degradation was observed. As mentioned, the City of Edmonds catch basins and drain lines require proper maintenance to prevent future, unacceptable erosional degradation. EVALUATION: In order to augment the existing site geotechnical information, soil test pits were dug under this engineer's inspection on February 28, 2001 using a small track hoe (see photographs). A total of three (3) test pits were dug (one in the probable house location for each lot). Test Pit No. I was dug on Lot 32, Test Pit No. 2 was dug on Lot 33, and Test Pit No. 3 was dug on Lot 34 (see site plan for test pit locations). Test Pit No. I 0" to 6" Organics, roots, and organic silt. Moist andloose 6" to approx. 48" Increasingly dense silty sand. Fine grain, slightly moist, Medium to dense. 48" to approx. 8'(boftom of pit) Increasingly dense to very dense gray silt A very slight water trickle was observed at the contact layer at 4 foot depth. No sloughing or caving occurred. Test pit walls remained vertical and stable. Test Pit No. I 0" to 6" Organics, roots, and organic silt. Moist andloose 6" to approx. 40" Increasingly dense silty sand. Fine g rain, slightly moist. Medium dense to dense. 40" to approx. 8'(boftom of pit) Increasingly dense to very dense gray silt z 9 0 7 C: M M 0 --1 0 0 0 C � M M M z g) -1 C: -2 0 -n n MM D 0 0 M C co K 0) M 0 Z X -4 z --i X ri) z 9 0 m M�ichei Construction, i­;. March 29, 2001 Page 3 No water was encountered in Test Pit No. 2. No sloughing or caving occurred, Test pit walls remained vertical and stable. Test Pit No. 3 0" to 6" Organics, roots, and organic silt. Moist and loose 6" to approx. 40" Increasingly dense silty sand. Fine grain, slightly moist. Medium dense to dense. 40" to approx. 8' (bottom of pit) Increasingly dense to very dense gray silt. No water was encountered in Test Pit No. 3. No sloughing or caving occurred. Test pit walls remained vertical and stable. CONCLUSIONS / RECOMMENDATIONS: Based on the findings of this investigation, and experience with similar sites in the area, the three building lots on 74th Pl. W (Lot No. 34, Lot 33, Lot 32) are geotechnically approved for the Michel Construction new single family residences subject to the following: • Standard reinforced continuous and spread footings. Allowable bearing pressure: 2,000 p.s.f. • Equivalent fluid pressure of 40 p.c.f. is recommended for any retaining wall design provided drainage zone is inspected and verified by this engineer. • For retaining wall design, use friction factor of 0.55 and passive pressure of 350 p.c.f. • Geotechnical inspection by this engineer prior to any foundation concrete placement. The proposed structure can be supported on conventional continuous and spread footings bearing on undisturbed native soils or on structural fill placed above native soils. See the later sub -section entitled General Earthwork and Structural Fill for structural fill placement and compaction recommendations. Continuous and individual spread footings should have minimum widths of twenty-four (24) inches and should be bottomed at least eighteen (18) inches below the lower adjacent finish ground surface. On site geotechnical inspection to verify. Depending on the final site grades, some overexcavation may be required below footings to expose competent native soils. Unless lean concrete is used to fill the over Z 0 Z! 0 C rn M 0 0 80 C M M Z 10-4 c: 0 -n M M 0 0 0 M c: CO C (n M 0 Z Z 0 1 0 M Michel Construction, fric. March 29, 2001 Page 4 excavated hole, the width of the overexcavation at the bottom must be at least as wide as the sum of two times the depth of the overexcavation and the footing width. For G.L.C. Construction example, an overexcavation extending two feet below the bottom of a three-foot wide footing must be at least seven feet wide at the base of the excavation. Footings constructed according to the above recommendations may be designed for an allowable soil bearing pressure of three thousand (3,000) pounds per square foot (p.s.f.). A one-third increase in this design bearing pressure may be used when considering short-term wind or seismic loads. For the above design criteria, it is anticipated that total post -construction settlement of footings founded on competent, native soils (or on structural fill up to five (5) feet in thickness) will be about one-half inch, with differential settlements on the order of one -quarter inch. Lateral loads due to wind or seismic forces may be resisted by friction between the foundations and the bearing soils, or by passive earth pressure acting on the vertical, embedded portions of the foundations. For the latter condition, the foundations must either be poured directly against undisturbed soil or the backfill placed around the outside of the foundation must be level structural fill. We recommend the following design values be used for the foundation's resistance to lateral loading: Parameter Design Value Coefficient of Friction 0.55 Passive Earth Pressure 350 p.c.f. Where: (1) p.c.f. is pounds per cubic Foot. (2) Passive earth pressure is computed using the equivalent fluid density We recommend that a safety factor of at least 1.5 be used for design of the foundation's resistance to lateral loading. SLABS -ON -GRADE Slab -on -grade floors may be supported on undisturbed, competent native soils or on structural fill. The slabs may be supported on the existing soils provided these soils can be recompacted prior to placement of the free -draining sand or gravel underneath the slab. This sand and gravel layer should be a minimum of four (4) inches thick. We also recommend using a vapor barrier such as 6-mil. plastic membrane beneath the slab with minimum overlaps of 12 inches for sealing purposes. z 0 0 0 c: M M 0 -1 0 0 0 c: M M z > z X Cn 0 -n 'n m rn 0 �i 0 � M fn K CD M Z z W z 0 0 M Michel Construction, i,oc. March 29, 2001 Page 5 PERMANENT FOUNDATION AND RETAINING WALLS: Retaining walls backfilled on one side only should be designed to resist lateral earth pressures imposed by the soils retained by these structures. The following recommended design parameters are for walls less than twelve (12) feet in height which restrain level backfill: Parameter Design Value Active Earth Pressure' 40 p.c.f. Passive Earth Pressure 350 p.c.f. Coefficient of,Friction 0.55 Soil Unit Weight 125 p.c.f. Where: (1) p.c.f. is pounds per cubic foot (2) Active and passive earth pressures are computed using equivalent fluid - densities. For restrained walls which cannot defect at least 0.002 times the wall height, a uniform lateral pressure of one hundred (100 p.s.f. should be added to the active equivalent fluid pressure). The values given above are to be used for design of permanent foundation and retaining walls only. An appropriate safety factor should be applied when designing the walls. We recommend using a safety factor of at least 1.5 for overturning and sliding. The above design values do not include the effects of any hydrostatic pressures behind the walls and assume that no surcharge slo s or load will be placed above the __p@-_Ir loaas walls. If these conditions exist, then —those pressures should be added to the above lateral pressures. Also, if - sloping backfill is desired be—h—in—d—th—e—w—alls-, then we will need to be given the wall dim6nsiOns 6—n-d-s—lope of the backfill in order to provide the appropriate design earth pressures. Heavy construction equipment should not be operated behind retaining and foundation walls within a distance equal to the height of the wall, unless the walls are designed for the additional lateral pressures resulting from the equipment. Placement and compaction of retaining wall backfill should be accomplished with hand -operated equipment. z 0 0 M C: M M 0 --1 0 0 0 C M M z o -n 'n M M 0 0 0 M C: M 0 Z z CD z M Michel Construction, Inc. March 29, 2001 Page 6 Retaining Wall Backfill Back,fill placed within eighteen (18) inches of any retaining or foundation walls should be free -draining structural fill containing no organics. This backfill should contain no more than five (5) percent silt or clay particles and have no particles greater than four (4) inches in diameter. The percentage of particles passing the No. 4 sieve should be between twenty-five (25) and seventy (70) percent. Due to their high silt content, if the native soils are used as backfill, a drainage composite, such as Mirafi and Z 0 Enkadrain, should be placed against the retaining walls. The drainage composites 0 should be hydraulically connected to the foundation drain system. The pu rpose of these backfill requirements is to assure that the design criteria for the retaining wall as not exceeded because of a build-up of hydrostatic pressure behind the wall. The =i Fh subsection entitled General Earthwork and Structural Fill contains recommendations 0 M regarding placement and compaction of structural fill be6d retaining and foundation C M 0 0 walls. _q 00 EXCAVATION AND SLOPES: M M Z In no case should excavation slopes be greater than the limits specified in local, jo C > state and national government safety regulations. Temporary cuts up to a height of four (4) feet deep in unsaturated soils may be vertical. For temporary cuts having a 0 n height greater than four (4) feet, the cut should have an inclination no steeper than 1:1 A -A (Horizontal: Vertical) from the top of the slope to the bottom of the excavation. Under = M M specific recommendations by the geotechnical engineer, excavation cuts may be 0 Fn modified for site conditions. All permanent cuts into native soils should be inclined no 0 � 0 M steeper than 2:1 (H:V). fill'slopes should not exceed 1; 1 (H:V). It is important to note C CD 9 CD that sands do cave suddenly, and without warning. The contractors should be made M 0 Z aware of this potential hazard. Water should not be allowed to flow uncontrolled over the top of any temporary or permanent slope. All permanently exposed slopes should be seeded with an > Z appropriate species of vegetation to reduce erosion and improve stability of the sufficial layer of soil. DRAINAGE CONSIDERATIONS: Z 0 Footing drains are recommended at the base of all footings and retaining walls. 0 M These drains should be surrounded by at least six (6) inches of one -inch -minus washed rock wrapped in non -woven geotextile filter fabric (Mirafi 140N, Supac 4NP, or similar material). At the highest point, the perforated pipe invert should be at least as low as the bottom of the footing and it should be sloped for drainage. All roof and surface water drains must be kept separate from the foundation drain system. Michel Construction, ii,c. March 29, 2001 Page 7 Slight groundwater trickle was observed at four (4) foot depth in Test Pit No. I during the field work. Seepage into the planned excavation is possible, and likely if excavation occurs during winter months, and if encountered should be drained away from the site by use of drainage ditches, perforated pipe, French drains, or by pumping from sumps interconnected by shallow connector trenches at the bottom of the excavation. The excavation and site should be graded so that surface water is directed off Z the site and away from the tops of slopes. Water should not be allowed to stand in any area where foundations, slabs, or pavements are to be constructed. Any exposed M slopes to be covered with plastic to minimize erosion. Final site grading in areas :q =Fi adjacent to buildings should be sloped at least two (2) percent away from the building, U5 --I except where the area adjacent to the building is paved. 0 X M GENERAL EARTHWORK AND STRUCTURAL FILL: C:: M 0 -40 00 C The proposed building and pavement areas should be stripped and cleared of all -49 T M M Z surface vegetation, all organic matter, and other deleterious material. The stripped or 10 --4 C: removed materials should not be mixed with any materials to be used as structural fill. > Structural fill is defined as any fill placed under the building, behind permanent o n retaining or foundation walls, or in other areas where the underlying soils needs to support loads. This engineer should observe site conditions during and after excavation M M prior to placement of any structural fill. 0- CO All structural fill should be placed in horizontal lifts with a moisture content at or 0 0 � 1 1 M C CO r. U) near the optimum moisture content. The optimum moisture content is that moisture M 0 Z content which results in the greatest compacted dry density. The moisture content of fill soils is very important and must be closely controlled during the filling and compaction process. Z The allowable thickness ofthe fill lift will depend on the material type, compaction equipment, and the number of passes made to compact the lift. In no case should the lifts exceed twelve (12) inchesin loose thickness. The following table presents Z 0 recommended relative compaction for structural fill: 4 0 M Location of Fill Placement Minimum Relative Compaction Beneath footings, slabs or walkways 95% Behind retaining walls 90% Michel Construction, March 29, 2001 Page 8 Beneath pavements 95% for upper 12 inches of Subgrade, 90% below that level Where: Minimum relative compaction is the ratio, expressed in percentages, of the compacted dry density to the maximum dry density, as determined in accordance with ASTM Test Designation D-1 557-78 (Modified Proctor). Use of On -Site Soils If grading activities take place during wet weather, or when the silty, on -site soils are wet, site preparation costs may be higher because of delays due to rains and the potential need to import granular fill. The on -site soils are generally silty and thus are moisture sensitive. Grading operations will be difficult when the moisture content of these soils exceeds the optimum moisture content. Moisture sensitive soils will also be susceptible to excessive softening and "pumping" from construction equipment traffic when the moisture content is greater than the optimum moisture content. Ideally, structural fill which is to be placed in wet weather should consist of a granular soil having no more than five (5) percent silt or clay particles. The percentage of particles passing the No. 200 sieve should be measured from that portion of the soil passing the three -quarter -inch sieve. The use of "some" on -site soils for fill material may be acceptable if the upper organic materials is segregated and moisture contents are monitored by engineering inspection. DRAINAGE CONTROLS: No drainage problems were evident on Lots 34, 33 and 32. Surface water flows generally westerly following the natural topographic gradient. As discussed, the City of Edmonds's drainage intercept catch basin and tight line between Lot 33 and Lot 32 requires maintenance and probable improvements. This engineer would be happy to meet on site with City of Edmonds's drainage engineers and maintenance personnel to reach agreements as to scope of work required. The proposed three new residences should be constructed in compliance with City of Edmonds's standard storm water detention / management regulations. z 0 C: M M 0 0 80 C rn mz C 2 :E 0 -n af 9 M M U Cn 0 � 0 M C U) 9 co Q C.) Z r- z --I Tz V) z 0 rn Michel Construction, Inc. March 29, 2001 Page 9 CONCRETE: All foundation concrete (footings, stem walls, slabs, any retaining walls, etc.) shall have a minimum cement content of 5-1/2 sacks per cubic yard of concrete mix. INSPECTION: The recommendations of this report are only valid when key geotechnical aspects are inspected by this en-gineer during construction: • Foundation subgracle verification • Any retaining wall, or rockery placement • Any fill placement • Subsurface drainage installation SUMMARY: The proposed three new single family residences (Lot 34, Lot 33 and Lot 32) on 70 Place W., north of Meadowdale Rd. are geotechnically vialble when constructed in accordance with the recommendations herein, compliance with City of Edmonds approved plans and requirements, and key geotechnical inspection Aucing construction. GEOTECHNICAL REVIEW OF FINAL PLANS: This engineer continues to work with Michel Construction regarding specific site plans for the proposed three new residences. When each specific house plan has been determined and finalized, this engineer shall provide a geotechnical review to verify compliance with the recommendations of this geotechnical report. A final letter of geotechnical approval or recommended modifications will be issued at that time. CLOSURE: The findings and recommendations of this report were prepared in accordance with generally accepted professional engineering principles and practice. No other warranty, either express or implied, is made. The conclusions are based on the results of the field exploration and interpolation of subsurfdce conditions between explored locations. If conditions are encountered during construction that appear to be different than those described in this report, this engineer should be notified to observe the situation and review and verify or modify the recommendations. Z 0 1 0 C: M M 0 --1 0 0 0 C M M Z '0 C: > o -n n M 0 0 M a CD K 0 M 0 Z Z -4 Cn Z M Michel Construction, h— March 29, 2001 Page 10 If there are any questions, do not hesitate to call. Dennis M. Bruce, P.E. Geotechnical / Civil Engineer z am C a, mot 80 C m m; Z� 0. -n' m 0 0 w rn 0 Zr-1 z 0 C, Wetlalid 7�egow reo, Air Delineation/ Mitigation Restoration; Habitat Creation,, Permit Assistance 9505 19th Avenue S.E Suite 106' Everett, Washington 98208 (425) 337-3174 Fax (425) 337-3045 Wetland Mitigation Plan for th Michel Construction - 74 Place West Lots 15911, 15915 and 15917 Wetiond Resources, Inc. Project #03287 Prepared By: Wetiond Resources, Inc. 9505 19th Ave. SE Suite 106 Everett, WA 98208 (425) 337-3174 - APPROVED BY PLANNING I -f p. 7 For: Michel Construction Attn. Rob Michel RECEIVED 7907 212" St. SW #2.12 Edmonds, WA 98026 JAN 2 2 2004 . WILDING DEPT. 0 ctober 8, 2003 Revision 1: December 2, 2003 CITY Copy z M �n M C M 0 80 C E� C M M 10 a CA 0 -n "n m M 0 0 M M 0 z z z 0 0 M Is TABLE OF CONTENTS Site Description Project Description WetLand Functions and Values Assessment Mitigation Procedure Grass Seeding Project and Planting Notes Performance Bond Project Monitoring Program Maintenance Performance Goals Contingency Plan Use of this Wetland Mitigation Plan References Wetland Mitigation Map 2 4 5 5 6 7 8 8 8 9 10 1/1 z 0 q , P: 0 M M 0 0 0 0 M rn z C— ca 0 n M M 0 0 0 M C CA K (n, , " I M 0 z CD z M SITE DESCRIPTION Wetland Resources, Inc. conducted a wettand delineation on January 11, 2002 to locate jurisdictional. wetlands on three haLf-acre lots located at 15911, 15915, and 15917, 74th Place West in the city of Edmonds, Washington. The site is located as part of Section 5, Township 27N, Range 4E, W.M. All. three Lots were investigated for the presence of critical areas. Critical areas are present only on Lot 15917 and this it the only property that will be discussed hereafter. This site is located east of the right of way of an unopened portion of 74th Place West. This site is located on a hilt that slopes down from the east to the west. It appears that this hilt was terraced at some time in the past. Topography of the site slopes up from 74 th Place West in the west. A Category 3 wettand is Located in the western portion of this property. This wetLand drains to a Category 2 stream that flows along the southern property boundary. In the city of Edmonds, Category 3 wetlands and Category 2 streams are given 25 foot protective buffers. Typical vegetation on -site is represented by a canopy of big leaf maple (Acer mocrophyllum, FacU) and red alder (Alnus rubro, Fac), with an understory of salmonberry (Rubus spectobilis, Fac+), Himalayan blackberry (Rubus discolor, FacU), and dewberry (Rubus ursinus, FacU.). Vegetation in the wettand is represented by Himalayan blackberry (R. discolor, FacU), small fruit buRrush (Scirpus micro.corpus, Obt), field horsetail (Equiseturn arvense, Fac), and Lady fern (Athyrium filix-fernina, Fac). PROJECT DESCRIPTION The applicant is proposing to construct one single-family residence on this property. Due to site topography and the location of the on -site wettand, complying with ECDC 20.15B would deny reasonable use of the property, as found by the Hearing Examiner (Case No. V-2002-222, 223, 224, Et 225). To achieve a reasonable use of this property, the applicant is proposing to construct a single- family residence white minimizing impacts to the wetLand and on -site stream buffer to the greatest extent possible. As a result of site preparation and placement of the house, 2,445 square feet of the on -site wettand is proposed to be filled. In addition, the 25-foot buffer from the remaining non -impacted portion of the on -site Category 3 wettand is proposed to be graded to provide appropriate side slopes from the development. This will temporarily impact 1,195 square feet of buffer area which will be restored upon completion of grading activities. To accommodate the driveway and required setbacks from the house, a total of 585 square feet of buffer is proposed to be impacted. This buffer is currently dominated by Himalayan blackberry and Japanese knotweed. To replace lost functions and values provided by the filled wetland and to comply with the no net loss of size requirement in the City of Edmonds code, mitigation is offered in the following manner. The on -site portion of the Category 2 stream buffer (560 square feet) is proposed to be enhanced through control of invasive species and planting of native species. To prevent grading or other impacts to the stream buffer, silt fence shalt be placed around outer perimeter of this buffer prior to any site disturbance. To ensure that Z 0 3: C M M 0 -4 0 0 0 C M M Z Z M 0 -n n M M a 6 0 5 c: M U) cr) M 0 Z r- Z Z 0 M any inadvertent impacts are restored, the proposed buffer enhancement will take place after completion of grading activities and concurrent with buffer restoration (discussed below). Upon completion of grading within the 25-foot buffer from the existing wettand, this 1,195 square foot area will be restored through planting of native trees and shrubs. To comply with the no net loss of size requirement in the City of Edmonds code, the applicant is proposing to replace the 2,445 square feet of impacted wetland with additional buffer at a 2.5 to 1 (additional buffer to wettand impact) ratio. This will amount to 6,113 square feet of additional buffer. As mitigation for the 585 square feet of buffer impacts, the applicant is proposing to designate 585 square feet of additional buffer. This will amount to a total of 6,698 square feet of additional area as buffer. The area to be designated as additional buffer is represented by a canopy of big Leaf maple with sword fern in the understory. This is proposed to be enhanced by planting conifers throughout this area on 15-foot centers. To ensure that stream flows are not impacted by this project, a French drain WiLl be placed in the yard of the proposed -house. This drain will outflow into the stream buffer via a Level spreader trench. WETLAND FUNCTIONS AND VALUES ASSESSMENT Methodology The methodology for this functions and values assessment is based on professional opinion developed through past field analyses and interpretation. This assessment pertains specifically to the on -site wettand system, but is typical for assessments of similar systems common to western Washington. Functions and Values Components Wetlands in western Washington perform a variety of ecosystem functions. Included among the most important functions provided by wetlands are stormwater control, water quality improvement, fish and wildlife habitat, aesthetic value, recreational opportunities, and education. The most commonly assessed functions are Stormwater Storage/ Roodflow Attenuation, Water Quality, and Wildlife Habitat. Assessments of these functions for the project site are provided below. Analysis Stormwater Storage/ Floodflow Attenuation Due to the Location of this wetLand within the landscape, this wetLand has the potential to make beneficial contributions to the functions of stormwater storage and floodflow attenuation. The size of the wettand allows it to collect and store water as it drains from the surrounding hillside and slowly release it to the associated stream. Z 0 9i C rn MO 0 80 M M Z '0 c: W 0 -n n -4 M M 0 0 0 M a 0) M CO) Q 0 Z Z U) Z 9 0 M Water Quality This wettand has the ability to make moderate contributions to the function of water quality. As water passes through this wettand, the size and presence of emergent vegetation slows the water, allowing suspended sediments to settle. Along with this, the emergent vegetation takes up and traps nutrients, thus preventing downstream eutrophication. Wildlife Habitat Given the small size, lack of vegetative structure, limited species diversity, and proximity to surrounding development, this wetland on[y has the potential to make minimal contributions to wildlife habitat. The most important benefit is food and cover to birds, amphibians, and small mammals. Proposed Impacts to Functions and Values In order to accommodate a single-family residence and associated infrastructure on this site, the applicant is proposing to fill 2,445 square feet of the on -site Category 3 wetland and to impact 585 square feet of associated buffer. Post Mitigation Functions and Values As mitigation for impacts to the on -site wetland and buffer, the applicant is proposing to designate and enhance a total of 6,698 square feet of area as additional buffer. This 6,698 square feet of additional buffer along with the entire on -site portion of the stream buffer (560 square feet) is proposed to be enhanced through control of invasive species and planting of native species. In addition, the 1,195 square feet of wetland buffer to be graded will be restored using native shrubs. To ensure that stream flows are not impacted by this project, a French drain will be placed in the yard of the proposed house. This drain will outflow in to the stream buffer via a Level spreader. Although impacts are proposed to occur in the majority of the on -site wetland and portions of the buffer, the level of functions and values provided by this system will remain approximately equivalent or will improve. Preservation and enhancement of the on -site stream buffer, restoration of the 1,195 square feet of on -site wettand buffer to a better than existing condition, and designation and enhancement of 6,698 square feet of additional buffer area is proposed. This mitigation will help to increase species diversity, improve vegetative structure and control invasive species which are currently dominant in the stream buffer. Other benefits will be an increase in wildlife habitat, including a movement corridor along the southern border of the property. Planting conifer trees throughout the area designated as additional buffer will facilitate the transition from a deciduous to a mixed and eventually a coniferous canopy, and wilt result in Long term im I provements to functions and values of the site. Z 9 0 C: M MO --10 0 0 C �M M M Z 0 -1 C - Z -4 C0 0 -n n -i M M 0 U; 0 r- 0 M 0) M M 0 Z � M Z -4 M V; Z M Stormwater storage, floodflow attenuation, and water quatity values will. be maintained if not improved by collecting stormwater runoff from the site, treating it in a detention system and releasing it downstream. Stream flows will be maintained by collecting water from the yard in a French drain and releasing it into the stream buffer via a level spreader. Given the relatively low initial quality of this wetland and the proposed mitigation measures, this project should result in negligible impacts, or even slight improvements to analyzed functions and values. MITIGATION PROCEDURE As partial mitigation for on -site wettand and buffer impacts, the applicant is proposing to designate 6,698 square feet of area as additional buffer. This area will be enhanced through, control of invasive species and planting of native conifer trees. To accommodate existing native vegetation, these trees will be planted throughout this area on 15-foot centers. The 1,195 square feet of on -site wetland buffer will be graded as a part of site preparation. This grading will remove all invasive species. After grading the level spreader should be installed. Upon completion of site work, the buffer restoration area should be seeded with the grass seed mixture recommended in this plan, and planted with the species listed below. No grading will take place in the stream buffer. To ensure this, the edge of this buffer will be marked with silt fence before commencement of any grading activities. Should any inadvertent grading occur, the graded areas should be restored in the same manner as the additional buffer area. In areas not graded, all invasive species (mainly Himalayan blackberry and Japanese knotweed) should be removed by the root. Of the 560 square feet of on -site stream buffer, 215 square feet of this is wetland. This area will remain wetLand. Following control of invasive species, the species recommended below should be installed in the appropriate locations. Additional Buffer 6,698 square feetl Common Name Latin Name Size Spacing Quantity 1. Douglas fir Pseudotsuga menziesH 1 gallon 15' 10 2. Western hemlock Tsuga heterophyllo 1 gallon 15' 10 3. Western red cedar Thuja plicata 1 gation 15, 10 Stream Buffer (upland 345 square feetl Common Name Latin Name Size Spacing Quantity 1. Vine maple Acer circincturn 1 gallon 91 2 2. Sitka mountain ash Sorbus sitchensis 1 gallon 91 2 3. Snowberry Symphoricarpos albus I gallon 4.5' 7 4. Oregon grape Berberis nervosa 1 gallon 4.5' 7 Z 9 0 M M C m 0 80 M M Z 10-4 in Oil n m m 0 —00 0 0 Fn C (1) 9 Cn M 0 Z X Z —4 :r C') Z 0 0 m Stream Buffer (wetland 215 square feet Common Name Latin Name Size Spacing Quantity 1. Red -osier dogwood Cornus sericea 1 gallon 91 1 2. Black twinberry Lonicera involucrata 1 gallon 91 1 3. *Stough sedge Carex obnupta plugs 1.5' 20 4. *Small -flowered butrushScirpus microcarpos plugs 1.5' 20 *Stough sedge and smatt-ftowered bulrush should be planted in clumps, each covering 20 percent of the wettand area. Z Wettand Buffer Restoration (1, 195 square feLtJ 0 Common Name Latin Name Size Spacing Quantity 1. Vine maple Acer circinaturn 1 gatlon 91 8 2. Sitka mountain ash Sorbus sitchensis 1 gallon 91 7 22 3. Snowberry Symphoricarpos albus 1 gallon 4.5' C M 4. Oregon grape Berberis nervosa 1 ga[Lon 4.5' 22 rn 0 0 0 c: GRASS SEEDING ALI disturbed soil within critical areas and buffers shall be seeded to the M M recommended, certified grass seed mixture below. Fertilizer shalt only be used CE when absolutely necessary due to potential runoff into sensitive stream and > wettand systems. If deemed absolutely necessary by the consulting biologist Cn and/or the County Biologist, a fertilizer such as 16-16-16 shalt be applied at 100 0 -n n pounds per acre. M rn Buffer Grass Seed Mixture 0 Common Name Latin Name tbs./1,000 s.f. 0 m C CA Colonial bentgrass Agrostis tenuis 0.6 rn 0 Annual ryegrass Lolium multiflorum 0.3 Z White clover Trifollum repens 0.2 X Wetiand Grass Seed Mixture > Z Common Name Latin Name lbs./1,000 s.f. Annual ryegrass Lolium multillorum 0.4 Redtop bentgrass Agrostis alba 0.4 Z 0 Meadow foxtaiL Alopecurus pratensis 0.6 American sloughgrass Beckmannia syzi.gachne 0.6 M PROJECT AND PLANTING NOTES A meeting wilt take place between the consulting biologist and the contracted Landscaper prior to commencement of enhancement activities. This will provide an opportunity to clarify any questions that may arise and ensure success of the enhancement project in a timely manner. Siltation fencing shalt be placed as shown on the TESC design and be inspected prior to any mitigation site disturbance. These measures wilt help to ensure that the on -site construction activities will have 5 the minimum impact to on -site critical. areas necessary to achieve completion of the project. Mulch: Wood chips, or other appropriate material, shalt be used for mulching in the planting area. Any existing vegetation is to be removed from a two -foot diameter area at each planting site. Wood chips are to be placed in this two -foot diameter area at a depth of three to four inches. A four -inch diameter ring around the base of each plant shalt be kept free of mulch. Ptanting holes should be dug to twice the required size and partially backfilled with a high quality compost. Plant in the early spring or late fall. Order plants from a reputable nursery. Care Z 0 I and handling of plant materials is extremely important to the overall success of the 0 m project. All plant materials recommended in this plan should be available from local and regional sources, depending on seasonal demand. Some limited species =i substitution may be allowed, only with the agreement of the consulting wetLand m professional. c: M 0 0 Plants shalt be arranged with the appropriate numbers, sizes, species, and 80 � : C distribution to achieve the desired vegetation coverage. The actual placement of 3: M M Z individual plants shalt mirmic natural, asymmetric vegetation patterns found on Z similar undisturbed sites in the area. > Lath stakes or similar approved marking system should be placed next to each o -n planted tree and shrub to assist in locating the plants during monitoring and while removing the competing non-native vegetation. This will be done for all installed M M plants. a 0 PERFORMANCE BOND 0 M c: 0) K ca A performance bond shalt be provided to the City of Edmonds for the period of M C) Z three years from the completion of the project, in the amount of 120% of the estimated cost for plant material and labor. Annual monitoring reports and seasonal maintenance witI. be required to assure the success of this enhancement plan. The City of Edmonds shalt release this bond at the end of the three years, Z upon successful determination for at[ portions of this mitigation project. The following is an estimate of plant materials and labor only. This does not represent a ca bid to install: Z 9 QUANTITY OF ONE GALLON PLANTS @ $8.25 per plant 109 0 M QUANTITY OF PLUGS @ $2.00 per plug 40 ESTIMATED COST OF PLANT MATERIAL AND LABOR $979.25 ESTIMATED COST OF MONITORING (3 YEARS@ $500/yr) $1,500.00 ESTIMATED COST OF MAINTENANCE (3 YEARS@ $500/yr) $1,500.00 6 979.2.5 TOTAL ESTIMATED COSTS (Plant Material and Labor) $979.25 1, 5DO � 120% OF TOTAL ESTIMATED COSTS $1,175.10 ,�Z,rhL; Plant prices are based on a quote from Van den Akker's Landscaping and include 112W tabor. PROJECT MONITORING PROGRAM Requirements for monitoring project: 1. Initial compliance report z 0 2. Annual site inspections (in the fall) for three years -4 3. Annual reports (One report submitted in the fall of each monitored year) M Purpose of Monitoring: The purpose of monitoring this project is to evaluate the success of the n a M enhancement plantings. Success will be determined if monitoring shows that at C 13 m the end of three years the performance standards are being met and that habitat 0 80 values in the enhancement areas are equivalent to similar ecosystems in the C immediate area. 3: A M z Inspection Schedule: Upon completion of the mitigation project, an inspection by a qualified wetLand C 2 > co biologist wilt be made to determine plan compliance. A compliance report (as -built) 0 will be supplied to the City of Edmonds regarding the completeness of the project. -n Condition monitoring of the plantings will be done by a qualified wettand biologist X 9 M M in the fall annually for the three-year monitoring period. A written report results will be submitted to the City of Edmonds shortly C) Vi 0 � . 0 M describing the monitoring after the fall inspection of each monitored year. Final inspection wilt occur three C: 0) C W A years after completion of planting. The contracted wetLand professional will M C.) z prepare a final report as to the success of the project. Definition of Success / Performance Standards: > The enhancement areas shall support at Least 8076 survivorship, and at Least 80% z areal coverage of the native plants set forth in this plan by the end of three years. The species mix should resemble that proposed by the planting plans, but strict z adherence to obtaining all of the species shalt not be a criterion for success. Reproduction of volunteer native species may be used to establish areal coverage more than 10% areal coverage of invasive, 0 M requirements. If a given area contains non-native species within the planting areas, the enhancement shall not be considered successful for that area. 7 MAINTENANCE The enhancement areas wilt require periodic maintenance during the monitoring period. These will be maintained at least one time during the spring and fall for each of the three monitored years, or as needed to assure the success of the mitigation project. Maintenance may include, but wit[ not be Limited to, removal of invasive vegetation (by hand or chemical means as necessary), thinning of volunteer red alder and black cottonwood to 10-foot centers, replacement of plant mortality, and/or the replacement of mulch for each maintenance period.. Chemical control, if necessary, shall be applied by a licensed applicator following all label instructions. The temporary irrigation system wilt be maintained for at [east two years or as necessary to achieve firm establishment of the planted species. I. PERFORMANCE GOALS The goat of this mitigation plan is to establish a self sustaining natural wetland system with supporting buffers. The mitigation area wilt become a functioning portion of the Larger stream and wetLand system to the south and help to support an overall complex natural environment. CONTINGENCY PLAN If more than 20% of the plants are severely stressed during any of the inspections, or it appears more than 20% may not survive, additional plantings of the same species or, if necessary, alternative species may be added to the enhancement areas. If this situation persists into the next inspection, a meeting with a representative for the City of Edmonds, the consulting wettand biologist and the property owner will be scheduled to decide upon contingency plans. Elements of the contingency plan may include, but will not be limited to more aggressive weed control, expansion of the irrigation system, plant mortality replacement, species substitution, fertilization, and/or soil amendments. 8 z 9 V M c: 0 rn 0 --10. 0 C --I K X M M z 0 --1 c: 2 0 -n n M M D — 0 ch 0 � M (n co M X --i 3: z ca z M USE OF THIS WETLAND MITIGATION PLAN This Wettand Mitigation Plan is supplied to Michel Construction as a means of mitigating critical area impacts, as required by the City of Edmonds during the �port is based largely on readily observable conditions permitting process. This rL and to a lesser extent, on readily ascertainable conditions. No attempt has been made to determine hidden or concealed conditions. Reports may be adversely affected due to the physical condition of the site and the difficulty of access which may lead to observation or probing difficulties. The laws applicable to wetlands are subject to varying interpretations and may be changed at any time by the courts or legislative bodies. This report is intended to provide information deemed relevant in the applicant's attempt to comply with the laws now in effect. The work for this report has conformed to the standard of care employed by wetland ecologists. No other representation or warranty is made concerning the work or this report and any implied representation or warranty is disclaimed. Wettand Resources, Inc. I - s Emlen r ior Wettand Ecologist 9 z 0 0 M C M 0 80 C M M z 0 -n > M M 0 0 M C CA Ch M 0 Z X z z 0 M REFERENCES City of Edmonds Code Chapter 20.1513 Critical Areas. Classification of Wetlands and Deepwater Mabitats of the United States. FWS/OBS- 79/31. December 1979. U.S. Department of the Interior, Fish and Wildlife Service. Washington, D.C. Corps of Engineers Wetlands Delineation Manual, 198 . TechnicaL Report Y-87-1. Environmental Laboratory. U.S. Army Engineer Waterway Experiment Station. Vicksburg, MS. Soil Survey of Snohomish County Area Washington United States Department of Agriculture, Soil Conservation Service (1978). National List of Plant Species that Occur in Wetlands, Northwest Region. 1996. U.S. Department of the Interior, Fish and WiLdLife Service. Washington, D.C. Washington State Wetlands Identification and Delineation Manual. Washington State Department of Ecology. Publication #96-94. March 1997. 10 I z 9 . ti' 0 M 0 M M 0 80, M M z c: 0 -n n -4 X M M I a. 0 o Fn C �MO z 7-1 ;0 .-I z --I z M MICHEL CONSTRUCTION - 74TH PLACE WEST WETLAND MITIGATION MAP PORTION OF SECTION 5, TOWNSHIP 27N, RANGE 4E, W.M. WETLAND BUFFER IMPACT - 585 SF TOTAL SCALE V 20' CATEGORY 3 WETLAND ----------------------------------- 2,445 SF TO BE FILLED 0 10 20 30 40 --------------- --------------- WETLAND ---- Dil PROPOSED --- - --- ----------- YARD WETLAND FILL . ........ ---- - ..... PROPOSED ---------------------- HOUSE WETLAND BUFFER TO BE 25' -- -------------------------- GRADED AND RESTORED - --- --- ----- -- BUFFER STREAM BUFFER (UPLAND) - ------ - .. ............................ . ADDITIONAL BUFFER TO BE ENHANCED ................................ 6,698 SF ....... .. .................. - --------- ---------- TO BE ENHANCED TLAND) STREAM BUFFER (WE TO BE ENHANCED --- - ------- --- BUFFERIMPACT ADDITIONAL BUFFER OUTFALL FROM CURTAIN TO BE ENHANCED DRAIN TO LEVEL SPREADER STREAM L- -IL- 11 - EXISTING 12" CULVERT WETLAND MTIGATION MAP I WETLAND BUFFER MICHEL CONSTRUCTION - 74TH PLACE WEST CATEGORY 2 STREAM TO BE GRADED AND RESTORED 1,195 9505 19 ffi Av—eS.E.�tte1G6E—tt.WashM9tw 8ZG8 Phone: (425) 337-3174 Sheet 1/ 1 Fax: (425) 337-3045 Michel Construction Job # 03287 STREAM BUFFER Ernafl! mai(box(pwet1andre=,ces.com Attn. Rob Michel Drawn by: L. Emenhiser ENHANCEMENT 7907 212th St, SW #212 Date:October 8, 20031 560 SF Edmonds, WA 98026 Revision 91: December 2, 20031 RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall .......................... Pier/Porch ................. z 0 1 Retaining Wall ........... 0 Slab Insulattlon .......... PLUMBING: —4 x lTI Underground M 0 0 0 Rough -In ................... C Commercial Final 9 A ITI z HEATING: C: Gas Test .................... A2 �2_- Gas Piping ................. Equipment ................. 0 -n Commercial Final M ITI w Cl) EXTERIOR SHEATHING 0 0 NAILING .� ........................ M T C (A C 0) ITIO FRAMING ........................ Z FIRST FLOOR FRAMING INSULATION ................... Floor Insulation z Wall Insulation ........... Ceiling Insulation z 9 SHEETROCK NAILING 0 M SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. SideSewer# 'Y= 7 Amout Paid $27,S' Date lssue4�".Plms— Water,MeterSize AmountPaId /"5,1 R Ipt# nf.D.—S. / P.4 asuu A"unit Paid _Vjj9_