20050216.pdfDATE: RECEIVED
CITY OF EDMONDS
CONSTRUCTION PERMIT APPLICATION
OWNER NAMEINAME OF BUSINESS
I'v 4, 0 _-) U-7 e
MAILING ALDRESS
ue A)
CITY Vz, P I TELEPHONE
,etu&m x .110 )240 el7,5- - 7 76
NAME —
U4eL_ �A
%DDRESS
;ITY ZIP TELEPHONE
.e L
4AME�
ADDRESS
ZIP TELEPHONE
_7
STATE LICENSE NUMBER EXPIRATION DATE
ej— pim r 9w ikw 4--Iovee
PROPERTY TAX 6CCOUNT PARCf?LjNJO. 11 _z
NEW
ADDITION
REMODEL
REPAIR
DEMOLISH
RESIDENTIAL
COMMERCIAL
MIXED USE
MULTIFAMILY
GRlAY2 CYDS
TANK
RETAINING WALL
ROCKERY
OR ACTIVITY) EXPLAIN.
S
Q NUMBER N
a OF DWELLING
Im
STORIES UNITS
DESCRIBE WORK TO BE DONE
PLUMBING/ MECH
COMPLIANCE OR
CHANGE OF USE
SIGN
FENCE
If x
M OTHER
FIRE SPRINKLER
FIREALARM
#` ),.r .
PERMIT EXPIRES -
PERMIT
5
NUMBER
JOB SUITEIAPT#
ADDRESS 7-f—F-4)
PLAT NAMEISUBDIVISION NO
LOT NO.
LID NO
&5gsg at 80,
117
LID FEE S
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP
TESCIPApProvild
0
0
RW Permit Roquired
EXISTiNG PROPOSED
Street Use Permit Required
Inspection Required
13
13
/Y_%�—
Side�alk Required
13
REQUIRED DEDICATION FT-_.
Unduigiound
Witing fecluited
13
0
METER SIZE
LINE SIZE
NO. F FIXTURES
PRV REQUIRED
YESX N613
3
571-
0:
UJI
W
REMARKS z
OWNERiCONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE
7�_
W
6RE REViEWED BY DATE
EOR
VARIANCE CU
SHORELINE OR ADB
SPECTION
SFFA
D BY
REO'D
[ZES C3 NO
TED I EXEM PT
I COkiPLET
CA# ZONE SIGN AREA HEIGHT
(as -
-
WAIVE ALLOWED PROPOS ALL W D PROPOSED
�13 Is
STUD�
LOT COVERAGE QUIRrED4SETBACKS (FT.) PROPOSED SETBACKS (FT.)
tFT.)`
ALLOWED P �FO IDEN7r— FRO T L/R SIDE R&AR.-
ROPOSRE 0
)`W
Ll C)
��Jj 1 C7)
4-
PARKING
LOTAREA
PLANNING REVIEWED BY DATE
1
REO'D PROVIDED
11j,
�6
TYPE OF COr?)C
SPECIAL INSPECTIOI
REQUIRE;)d.YES
CO OCCUPAN
i:5:? GROUP
CONSULTANT OCCUPANT
J,_z71 i�_ I LOAD
GEOTECH REPORT.,,kEo
BY:
0 STRUCTURAJ22LN
BY:
VALUATION
az $ 22
l;iijp FZ&yel� 76:,;3;Z* Description
Plan Check
HEAT SOURCEJ6 LOTSLOPE% VESTED DATE
Building Permit
PLAN CHECK NO Plumbing
Mechanical
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO
BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBIC
DONMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE Grading
SEPARATE PERMISSION.
Engr. Review
PERMIT APPLICATION: SEE ECDC 19.00.005(A)(5)
PERMIT LIMIT: SEE ECDC 19,00.005(A)(6) Engr. Inspection
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
'APPLICANT. ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESSORS Fire Review
IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF
EDMONDS, WASHINGTON, ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND Fire Inspection
ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY
FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE
DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE LandscapeInsp.
NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION..
Recording Fee
I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION
GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF
THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL
TION; AND IN DOING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED
IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION
WORKMEN'S COMPENSATI RANCE AND RCW 18:27.
- 74_4T
SIGN MT2N: I O�,A6 ENTI) (425)
DATE SIGNED 771-022
=_e,
12
. I _ 3,a5' 0(
z
b
Pzn D /C- ;_:�-
Description
F E E
State Surcharge
-eiv
city Surcharge
Base Fee
Plan Chk. Deposit Aw
Receipt #
Total Amt. Due
Receipt #
APPLICATION APPROVAL
This application is not ? permit until signed by the
Building Official or titsiher Deputy: and Fees are paid, and
receipt is acknowledged in space provided
V+GIALS SIGNAAURE DATE
ATT N*ION tx 1. 1,5,5,3 vpj�
--r., -
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI-
FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109 / IBC110 / IRC110.
110/04 PRESS HARD - YOU ARE MAKING 4 COPIES
By� DATE
r4w /) /_� lj� � L
ORIGINAL -FILE - YELLOW - INSPE6011
PINK -OWNER - GOLD - ASSESSOR
z
0
4
0
M
--i -Ti
65 --1
X
0 M
C 0 ,
M 0
-1 0
0 C
-4 K
X M
M Z
C
r-
0
0 -n
n
M M
0 5)
0 f-
0 M
C C11)
M 0)
Q 0
Z
z
z
0
0
M
5"13- Tl
NOTE: THIS SITE
429.1
427.8 427.7. 428.5 PLAN DRAWING
w
GAS SHOWS THE
NTIN P. LIN SCHEMATIC
uj AR GAS
z _G A LOCATION OF
POWER, WATER,
a:
% 428.8 GAS, AND SEWER
0 428.4
427.8
WR LINES AND THEIR
UNI
CONNECTIONS TO
PLAN TYPE B EVERSE
EACH RESIDENTIAL
B� h
7539 210t SW.
. Ila, UNIT UNIT. REFER TO
(n ji 6
GARAGE SLAB E
N�EV: 422.40 PLAN TYPE THE UTILITY
T. SW ENTRY FLOOR E EV: 431.25
ELEV: 432.25
LOWEST FOOT ELEV: 420.9
B1 ELEV: 423.4
A 0 C>*. 7529 210 CH DETAIL ON
ACCEPTABLE TpHTLINE
L ENTRY FL( TREN
OING ELEV: 421 901 1 ERK SHEET A-1.2 AND
0
MAT
5' 3' D� R. N�Ct. GARAGE S
SDR 35 LOWEST F( CIVIL DRAWINGS
C�"
SCH 40
FOR LOCATIONS
-12
N AND INSTALLATION
F-810 HANCOr�
4 �7 3 =1 25.5- INFO ON ALL
27.31 427.2
UTI LITI ES.
POW. ILL -
REFER TO CIVIL
PATI
DRAWINGS -FOR
1 oll f.
251 LOCATION & INFO
'Aut"11%w W STORMWATER
3611 PLANTIN
AREA VAULT
HAN RAILS J0.
'E
PROP. LIN
E
P.
PRO LM
COLSON
MTR..
or- TON
IPP[30 i
INSPECTIONS REQ'D
CALL 425-771-022-0 f *3 2 NORTH
Ate:
c_. e Cottages Lot #9. Site P la., n.-
�CITY Copy
0 a:
l'c.�Nllc)QllDLE F01R.
Pa
Lo.
CATION OF ENTRY
WILL VARY AT FLOOR AT
DOOR LINE OF
UNIT TYPE
EACH MAIN LEVEL
F.
V7 -- -- - :-, *I
LINE OF BUILDIN
FOOTPRINT AT GRADE
4RADE RNEP
EXISTING GRADE 0 SOUTHEAST CO
0 SOUTHWES CORNER EXISTING G
LtiOn Rec''l,
ht Calcule
Buildin 6RE6
T )jc�al CottaaQ
ELEVATION OF
MAX. ELEVATION AT
GE PROPOSED C2
AVERA ERAGE 4
RIDGE HEIGHT (AVI RIDGE, HEIGHT
TOTAL OF GRADE Sa
EXIST. GRADE ELEVATIONS @ EACH
LOT GRADE (TOTAL
CORNER OF BLDG. RECTANGLE IONS DIVIDED GRADE PLUS 30'
ELEVAT
BY 4)
(NOR EST. NORTHEAST, 455-91
SOU 'HW ST 459.0
HEA . SOUTHWEST)
1716.0 429.0 456-16
0 + 429.1 + 427.9 + 429.0 460'.45
430. 430.45
29.9 1721-B 461.72 456.41 OW
431.4 + 431.5 + 429.0 + 4
2 + 431.9 1726.9 431.72 456-56
431.2 + 430.7 + 433.1 .430 460.9
3 .9 456-66
1723.6
5 + 430.7 + 4-31.2 458.6 15'-
4 431.2 + 430- 17 14.4 428.6 456.41
429,1 + 428.8 + 428.3 + 428.2 429,02 459-02 uut P
5 1 16.1 456-16 6U.6
1.6 + 429.0 + 429.8 458.2
428.7 + 42E 428.2 45591
6 426.4 + 428.3 + 427.5 + 428.2 1712.7 457.6
. 427.6 454-91
7 + 427.3 + 427.2 1710.5 457,55
8 428.2 + 427.8 1710. 427,55 455-16
9 427.8 + 428.4 + 426,8 + 427.2 712, 428.22 458.22 .455 1 .41
427.7 . 1 L
428.2 + 428.5 + 428.5 + 149 4 28 -"-2 458.72 455.66
10
429.0 17 82 458.82 J(
42817 + 429.0 + 428.2 +
11 428.8 + 429.5 + 42B.7 + 428.3 17 15.3 425. 459 . .07 455.66
12 455.41
Z8 .3 + 428.9,+ 430.1 1716.3 Q9.07 460.05
429.0 + 4� - 1720.2 430.05
13 430.6 + 429-0 + 430.6 + 430.0 459.92 455.15 PERM REV. I THIS SIT
14 1719.7 429.92 454-91 TO SHOw PROPERTY LINE
429.1 456.90 DISTANCE FROM BUILDING
430.2 + 429.5.4 V' NOT B
HA
SITU
4309 + 1707.6 426,90 'M
D NG C ITY
428.8 + 428.8 +
as. for Each Lot
ilatio' .. OWN
Calm
liel ht
BuilduEl
Leight C a I c u I a un 1 -1 -"1-' -'� I i -cl, L- --L-
UNIT 4
UNIT 5
AS-0100 ROOF go
ELrvkrow .435ga
&S-BULT ROOF PEAK
nEvArom .45agg
MAX= q4,a.j
451r. tP
-751 413
. or
A
Wy
12.0'
3..
3
UNIT 3
UNIT 5
AS-OUIL I Roof PC"
AS-900 QW PEAK
EUCVAITON .4ss.g2
DLIVATIC. ..5360
-
MAX 0 2-
MAX 41el. 77.
-7 E=1 L
t, T-
UNIT 13
AS -BUILT ROOr PEAK
ELEVATION .,34.93
M,4X � f5y, o7
7593
UNIT 14
AS-DUMT ROOF PEAX
MEVATION
-7SQS7
I LO,
150
A6
t
C,
ITT
For —
UNIT 12
AS-BWLT Poor PEAK
ELEVATION .45478
UN I
�IT 1]
EA
[7AS-RtKT ROOF PEAK
�.,j
CLCVATICN .454A,
?
—1 TOT
ior
4
Ito'
UNIT 2
15-PATT Roor PEAK
ELEVATION .4SS2j
UNIT 7
UNIT 10
AS-DUILI R000r PEAX
ELEVATION -45530
AS-DO1.7 ROOF Pro
ELEVATION .451.65
MAX-- 1�5V. 2—
ow zz
15s 7
-75Y7
7.53 -7
Ila'
UNIT I
AS-DULT ROV PC"
UNIT 8
UNIT 9
ELEVATION .45532
MAY, q5q.0
AS-80tt RODr PEAK
ELEVATION Am."
AS -BUILT R" PEA,
n.EVA TLON .454 33 1
ASCMI
Lo
I;v tw `457 to
4411", � If 5 7..
(r.CVNpALON
7531
UNIT 15
AS -BOLT Roar REM
ELEVATION -431,12
-75 ;17
UNIT 16
AS -BOLT ROOr PEAK
ELEVATION .454,39
mOO-x—#G,. 7
100'
OTT
�O, a, AIR 4 20
OTT
ct
EVELOPMENt SERvICEIS C,
D of EDIA.0NDS
tow
T.
C
L.ItJ ASSOCIATES 4862746 P.01
Dovo �evvvlo'
DAILY FIELD REPORT
17,-eTd-Re�--
Job No. Page—
LIU& ASSOCIATES, INC. 4AO42 J. Liu 1 of 1 3
'001CC
Giculcehnical Engineering, EnginecrillR0001OVY& [:Uth',
WrG S TiMe i5n Sile Date — —b—ay 67 ee
32 1:35P 4/5/2005 Tues.
19213 Ken lake Place N C. Travel Time —(Hrs) Ti—m—ebT-Mt—e —W-e—atTle—r
Kcnntorc,'Wa.jhijjgtojj 98028 1.25 2:05P Partly Clo
t idy
Plione: (425) 483-9134 Fax: (42,5) 486-2746 Vehiae rs on
— 1.75
Project ToFloca Ron Client
Cascade Cottages 212 Street SW &
76th Ave SN, Lynnwood BlUePHOL Man t
General Contractor Genpral C3ntractor �Superintenden
Received Unchecksci 13y
T. E. Briggs Construction Ron Smith z
tractor �SuPt- Teceived —Checked By
Foundation Contractor Foundation Cori
0
At the request by Doug Herman with Blueprint Management, I come on site today to verify footing be'aring. soils
for Buildings 7, &and 9, The footing trenches for these units have already been excavated down about 20 to 24
inches to their footing levels prior to my site visit. The footing bearing soils are cut in to a light-b rown to light -gray Cn
M
deposit of silty fine to medILIM sand with a trace to some gravel. Groundwater or standing surface water is not
M, 0
encountered by the footing trenches. Some loose disturbed soils are pushed into the footing trenches by --40
construction traffic. 0 C
M
M z
A steel T-bar manually pushed into undisturbed footing bearing soils can penetrate no more.than,,'2, .1p.:511inches, jo -4,
C
z
indicating the soils are dense to very dense. �' It is my opinion that the Undisturbed footing bearing soils will be @ble >
to render an allowable bearing capacity of at least'-1:
500 psl The loose disturbed soils in the footing trenches
Cl)
should be thoroughly removed down to firm undisturbed native soils prior to pouring concrete for the footings.
0 -n
M M
0 W
0-
njA G S. or
M
CD
M 0
Z
C.,
>
X
FEXPIPES 7117/ Z"
0
0
M
RECEI
2005
API",
PERMIT COUNTEP.,
Coov to:
Continued
1) Doug lierman/Blueprint Management 2)
on W:,xt
4)
Page
1por
-7r
3
ee
e
FINAL PROM CT APPROVAL FORM
_O:
DATEI;�-
MEN4.0 TO: PERMIT COOIWINATOR, BUILDING DIVISION
FROM; 1,4RE DEPARTME
'NT DATE
'[J'A. S N
'DIVISION DATE:
0
_ERING
_-ENGIN17
0
Pl'.,ANNING DIVISION DA,rE
YLXAS�SIGN
..,PROJECT
M
SITE ADI)RESS_�
m 0
0
0
c:
PERMIT A_DB/f DATE -fNSPECTED,
M
M Z
%D
DESCRIPTIOMOF WORK TO BE INSPI-LC'I.'ED
c
Fn
A. field inspe0oll Conducted* to determine compliance with -approved plans. Finat."a-00rovau
0 -n
denotes, that thcrc:.,a.r.c no objections from -the. above,: signed 'Department, -to the, f
re.case o
-n
PERriORMANCE BONDS and the granting of
m M
0
0
0 m
GRANT FINAL PROJECT APPROVAL
c/)
co
M
z 0
:E
z
�GRANT PROJECT APPROVAL.WITI-1 CONDITIONS NOTED
Co 'S gi lconteactor by i
py of CONDITtON� iv,cn to ownci nspector
M
cn
z
0.
m
�-D FINALINS1117
FAILE CTION'-OUTSTANDING ISSUES
'�Copy of CO'llllle,(�TION NOTICE given to o�vncrkontractor. by, inpector
RE, 4NSRECTE 1). OUTSTAN DING ISSU13S '-C;RAN'r:FINAL,PROJE'(�T.,,.A--Pp�".OV.AL,�.,*I
Ito,: -c
Siglia'(111
312541
RECORD OF INSPECTIONS
INSPECTOR DATE APPROVED
SETBACKS .....................
FOUNDATION:
IQ17Footing ......................
Wall ..... ......... I ........... Ll -is —o6
Pier/Porch .................
Retaining,Wall ........... Z
Slab Insulation ..........
PLUMBING: M
Underground ............. �n
Rough -In .................... M
C
Commercial Final ....... M 0
0 0
HEATING: C
M
Gas Test .................... M Z
--I
C
Gas Piping .................
z
>
r
Equipment .................
Commercial Final ....... 0 _n
n�
EXTERIOR SHEATHING
NAILING .......................... M M
FRAMING ........................
0
0 M
C C/)
FIRST FLOOR FRAMING ... C
M 0
Z
INSULATION ...................
Floor Insulation ......... ;U
Wall Insulation ...........
z
Ceiling Insulation ........
SHEETROCK NAILING ... 0)
z
0.
SPECIAL INSPECTION ...
0
M
MISCELLANEOUS .......
FINAL APPROVAL FOR
OCCUPANCY .................
Side Sewer It ........
1000000e
Amout Paid $
Leo "14-ov'res 1k.,
Date Issued
WaterMeter
AmountPaid Receipt 8
DatePurchmd
Tile Initials MT are Milton r1ow#
Th.onipson, a temporary contract,
Amount Paid $ Receipt
hispector for the City.
D.-te
" wet