Loading...
20050233.pdfI DATE RECEIVED FCITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OrV R(NAMEINAME OF BUSINESS I ITER N A,,0 C�_7 MAILING ADDRESS -7Li (V N7 CITY i'FP TELEPFZNE cuuq��N� dzs NAME CITY ZIP STATE LICENSE NUMBER TELEPHONE PROPERTY TAX ACCOUNT PARCEL NO. NEW RESIDENTIAL ADDITION COMMERCIAL El MIXED USE REMODEL 1:3 MULTIFAMILY REPAIR 1:1 GRADING CYDS lktEMOLISH 0 TANK EGARAGE I —1 RETAINING WALL 1:1 CARPORT ROCKERY (TYPE OF USE, BUSINESS OR ACTIVITY)§.?5eL,1kR7 PERMIT EXPIRES g� PERMIT 1� NUMBER JOB SUITEIAPT# ADDRESS (e) PLAT NAMEISUBDIVISION NO.- LOT NO� LID NO I LID FEE S PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP EXISTING PROPOSED `7C-") t-7 jrA REQUIRE&DEqftV.01 FREQ1 I I ( -.z L-�` I I N-�94�10N METER SIZE 0 IESCPApprovoa RW Po(mil Roijuirod Seem Use Perind Requiied Inspection Requirecl sidewalk Requirwi Undorgtound Mama feCILIVEld LINE SIZE d CLVA(RffW op OUIRED EET TO B 'Bift RE YE5 140 a Bit CATFEW xr — EROSION CONTROLIDRAINAGE liosEl 131B wiTH AVB INSTAUXD CBL# 0 DUMP AT "MOVED DUMP SrM ONE ulz L9 ENGINEERING %ffEtbAOLMON INSPEcrioN DATE CHECKLIST ON BACK OF JOB CARD K INSPEA,111011 11tIMt11ftftIr5I4ff 111111111 4FIRE REVIEWED%V DATE yoo PLUM13ING / MkH COMPLIANCE OR CHANGE OF USE SIGN FENCE ( — X_ OTHER FIRE SPRINKLER FIRE ALARM to z Lu Lu z F2 z ILLI uj BY VARIANCE OR CU SHORELINEORADB# I INSPECTION SEPA REO'D COMPLETED EXEMPT OYES [3 NO I CA4 ZONE SIGN AREA HEIGHT WAIVER ALLOWED I PROPOSED ALLOWED , PROPOSED STUDY'13 I I LOT COVERAGE REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (FT.) ALLOWED PROPOSED FRONT SIDE REAR FRONT URSIDE REAR z z PARKING Ej LOTAREA PLANNING REVIEWED BY DATE REQ'D PROVID I FT.) I REMARKS NUMBER NUMBER OF OF DWELLING SPECIAL INSPECTION STORIES UNITS REQUIRED 13YES DESCRIBE WORK TO BE DONE REMARKS GEOTECH REPORT BY: STRUCTURAL DESIGN BY: VALUATION tBuildingPermit Description Plan Check HEAT SOURCE LOTSLOPE% VESTED DATE PLAN CHECK NO: Plumbing Mechanical THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO Grading 2 BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBIC DONMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. Engr. Review PERMIT APPLICATION: SEE ECDC 19.00.005(A)(5) PERMIT LIMIT: SEE ECDC 19.00.005(A)(6) SEE BACK OF PINK PERMIT FOR MORE INFORMATION Engr. Inspection 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESSORS IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON, ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION.* Fire Review W _1 M ix < x 0 _j x 0 Fire Inspection Landscape Insp. Recording ee I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF a CONSULTANT THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL TION: AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LA IL CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION I'S COMPENSATI B91111SURANCE AND RCW 18:27. sl E (OWN GE DATE SIGVtD (425) 771-0220 OCCUPANT GROUP OCCUPANT LOAD FEE Description State Surcharge City Surcharge Base Fee FEE Plan Chk. Deposit Receipt # Total Amt. Due Receipt # APPLICATION APPROVAL This application is not a permit until signed by the Building Official or his/her Deputy: and Fees are paid. and receipt is acknowledged in space provided. OFFICIALS SIGNATURE -I . I DATE , ATTENTION' EXT. 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI- FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109 / IBC110 I IRC110. 110104 PRESS HARD - YOU ARE MAKING 4 COPIES L-10 ORIGINAL -FILE YELLOW -INSPECTOR PINK -OWNER GOLD - ASSESSOR (9 z z 0 i 0 IT! -4 -n 3: M M 0 0 0 C M M Z 0-1 C 0 -n In -4 x M M 0 0 0 M C cl) 9 0) M 0 Z X z 3: (j) z 0 i 0 M FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION* FROM: FIRE DEPARTMENT DATE PUMP SIGN ENGINEERING DIVISION DATE CYJS PLEASESIGN z 0 PLANNING DIVISION DATE I'LCASESIGN M ..PROJECT SITE ADDRESS ui M C /-0 M 0 PERMIT # DATEINSPECTED 0 0 OC __ADB# X M DESCRIPTION OF WORK TO BE INSPECTED M Z C z A field inspection was conducted to determine compliance with -approved plans. Final approval 3: denotes that there. are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: 0 n;0 > M M 0 Ui GRANT FINAL PROJECT APPROVAL 0 0 M C 0) 9 Cn M C) Z GRANT PROJECT APPROVAL WITH CONDITIONS NOTED El Copy of CONDITIONS given to owner/contractor by inspector z Cn Z. 0 FAILED FINAL INSPECTION OUTSTANDING ISSUES 0 El Copy of CORRECTION NOTICE given to owner/contractor by inpector M 2. 3. PIE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:ten1P:b1dg:tbnns:ocaprv1 3/25/04