Loading...
20050280.pdfPERMIT EXPIRES L/ DATE RECEIVED MIT B —::E; PERMIT M CITY OF EDMONDS NUMBER CONSTRUCTION PERMIT APPLICATION JOB ss JAODDRE I _r` !�) , Mm,�,u ADDRESS ER NAME/NAME OF BUSINESS " 4->A� MAIL114G ADDRESS 0;�P-5 CITY ��j 41"03 NAME LICENSE PROPERTY [3 NEW R�(ADDITION <REMODEL R EPAIR DEMOLISH GAR.01,GE CARPORT (TYPE OF USE, 8 7 PLAT NAME ISU BDIVI SION NO LOT NO LiD NO. ,1,4 t-, ZIP TELEPHONE foywo I ZIP I TELEPHONE 2 CBL# LID FEE S PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP 7ESCP Approved RW Permit Required Street Use Petirria Requited EXISTING PROPOSED inspection Required ____ Sidewalk Required REQUIRED DEDICATION FT undergiound Witinti required METER SIZE LINE SIZE NO, OF FIXTURES PRV REQUIRED YES 13 NO 13 REMARKS OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROLIDRAINAGE 10 -3 1 -d7 N.9W I AA 0 "A rA4 S ENGINEERING FIRE REVIEWED BY i -Y, DATE DATE 0 z E W uj z W uj 0: rL ,I N�j W, Ulf M VARIANCE OR cu SHORELINE OR ADBN INSPECTION REO'D SEPA EV�ATION 0 CHECKE BY I I — I IYYES ONOI COMPLETED I EXEMPT VO CA# ZONE S31GN AREA I HEIGHT DARCEL NO, 0 0 1 WAIVER 13r' )WED PROPOSED ALL( I ] ALLOWED ED I PROPOS a/Z n STUDY E3 7� 5 ZO. 7, �jrRESIDENTIAL LUMBING / MECH LOT COVERAGE REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (FT.) FRONT URSIDE REAR P�F ALLOWED PROPOSED FRONT SIDE REAR 0 COMMERCIAL COMPLIANCE OR 'L &j. S 17. I 7. '5 j �'/2 x 'Z7 - '140 5 z. E3 MIXED USE CHANGE OF USE PARKING : LOTAREA 1 PLANNING REVIEWED BY DATE MULTIFAMILY SIGN REQ*D PROVIDED 7� 7, I -7 oo '4 2�� FENCE CYDS ( X FT.) REMARKS sew TANK OTHER RETAINING WALL FIRE SPRINKLER ROCKERY FIREALARM ACTIVI AIN: 4::'2 TYPE ORC STRUCTION CODE ut��Urm ­ ) I NUMBER OF STORIES NUMBER OF WELLING UNITS SPECIAL INSPECTION REQUIRED 13YES DESCRIBE WORK TO BE DONE REMARKS Ic/ I GEOTECH REPORT BY: e7f - " n-- �1, 21 STRUCTURAL DE�JGN BY: k,.\, v � VALUATION $ LV Description Plan Check HEATSOURCE LOT SLOPE,9��- �2 VESTED DATE Building Permit PLAN CHECK NO: Plumbing Mechanical THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBIC DONMAIN (CURDS, SIDEWALKS, DRIVEWAYS. MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. Grading Engr. Review PERMIT APPLICATION: SEE ECDC 19.00,005(A)(5) PERMIT LIMIT: SEE ECDC 19.00.005(A)(6) SEE BACK OF PINK PERMIT FOR MORE INFORMATION Engr. Inspection 'APPLICANT. ON BEHALF OF HIS OR HER SPOUSE. HEIRS, ASSIGNS AND SUCCESSORS IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON. ITS OFFICIALS, EMPLOYEES. AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION. - Fire Review Fire Inspection Landscape Insp. Recording Fee I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF 6 -L-L-j", CONSULTANT THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL IrION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYEDD �v_�j N VIOLATION Pk THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION um ORKMEN��f NN S AND RCW 18:27. ,��SATION IN�VNCE NS SIG AG T DATESIGNED (425) 771 .0220 GROUP �L �_�) OCCUPANT -7 LOAD FEE Description State Surcharge City Surcharge Base Fe e 7 -2 Irl � FEE Plan Chk. Deposit Receipt # Total Amt. Due R pt tj d 'eceipt # 7." z M lz� APPLICATION APPROVAL This application is not a pernlit until signed by the Building Official or hisJher Deputy, and Fees are paid. and receipt is acknowledged in space provided F16N EXT. 1333 AT E Nl IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI- FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109 / IBC110 / IRC110. 10104 PRESS HARD - YOU ARE MAKING 4 COPIES BY OAT E ell rj L, '0:& Z__ ORIGINAL , FILE YELLOW I PINK -OWNER GOLD - a z a z 0 A 0 M —11 -n 0 M C M 0 0 0 0 C M M Z _z 0) 0-1 MITI q 0 0 M C cl) C C/) M 0 Z X z X C/) z 0 A 0 M EXIST. WOOD FEWCE EL. 56.1' N ED APPROVED AS NOT BY EN(�N IN EER EXIST. FEWCE _MV-/ Af ........ Da e: EXIST. CAR PM NOTEt NO DIRT. MO, rs. ............... . ................. SOIL OR DEBRIS TO BE EXISTIOATE - - ------------- ----- -------- TRACIKED TO 114E STREET (IIECK IS L156 TWM 39)' N HEIG$4T) ROC EXIST. DRIVEWAY ....... EXIST. DECK TO BE (IfErK,*7 'S6 "" X TO W I bJEW CONIC. WALK MODFI�ED 10 MANTAN .0.6 1 (ASPWALT) Sfl SE A VWSETeArl< FROM I PROPERIT LINE - - - - - - - - - - - - - - Lff S ------- ------- 1 ADD GJTTER S/DOWNSPO (EXISTM) EL W-4 At ID SPLASHBLOCKS JSL BILT FEW-E AS REO-D 48' FIR FK E FLOP EL. SW L. 54 F 48* FIR REMOVI 20, OFFSET R APPROVED BY PLANNING I 4b WFIR EL. SIM 1- 0 REMOVED U '00 1� - - — 24'FIR EL. JIM 0 36'FIR § I ! . 0 0 36' FIR Zoi eRs - z Corner V �lag g As- FIR Required - - - - - - - - — - EL. *JI.44' SeMacks C U Z C5 EL.%W #OVAM "/ 12. n F -ont(S"".) E XIST. LW FIINCE S ides (o'ltv) '7. S' R ter C� 7 224tK Street South EL. 7W COW- MONLMT W CASE- TrP CITY OF EDMONDS DEVELOPMENTSERVICES DEPARTMENT 121 5th Avenue North, Edinonds, WA 98020 -0220 (425)771 ORDER TO CORRECT VIOLATION Location of Violation (Address and Tax Account Parcel No): 22327 95"' Place West, Edmonds, �MA. 98026 Tax Account Parcel No. 54420020140104 Issued To: Lisa LayLie & Chris Gould, Owners Address Of Person This Order Is Issued To: 22327 95"' Place West, Edmonds, WA 98026 Code Section Violated:. Edmonds Community Development Code Chapter 16.20, Setbacks. Failure to respond to Planning Division comments dated February 10, 2006 Description of Violation:- -0280. establishina a March 6, 2006 deadline, for deck work associated with building permit #2005 Copy of plan review comments attached. Corrective Action Required: 1) Submit a guardrail detail for the deck, 2) Remit review fee of $50.00, ---- :-contact Meg 3) Remove portions of the rear yard deck that encroach into the required rear yard setback Gruwell, City Senior Planner directly if you have rear yard setback guestions, and 4) Once deck is altered contact Mrs. Gruwell, to schedule for the required setback inspection. (date) Correction is Required no later than: 5:00pni (time) April 17,2006 0 If correction is not made by the date and time specified in the Order, a N tice of Civil Violation shall be issued. The Notice of Civil Violation shall assess fines of $100.00 per day, or portion of a day, during which the violation continues. Date Posted: Date Mailed: March 17, 2006' Date Served Official Issuing Part Jeannine L. Graf Title BUilding Signature Z %or z 0 M M �ca M0 80 C Xrn r" z 10-1 C 2 C 0 .M n M M 0 0 M C co C CD M 0 z M z 0) z 0 0 M GARY HAAKENSON CITY OF EDMONDS MAYOR -AX (425) 771-0221 1215MAVENUE N0111H EDMONDS.WA98020 (425) 771-0220 F Website: wwwdedmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning BUIlding Engineering C. July 7, 2006 Lisa Layne and Chris Gould 22327 _ 951h Place W. Z Edmonds, WA 98020 A- Dear Ms. Layne and. Mr. Gould: rM This letter is in regards to Your building permit for your addition and remodel, our file BP2005-0280, for y our residence at 22327 — 95"' Place W. 0 M The site plan for that permit showed in existi g deck a nd noted "(Deck is less than 30 inches in height). 0 M 0 --I 0 aintain a 5 foot 0 inch setback from property line" (see attached). -xisting deck to be modified to in, E 0 C Though typically side setbacks in the single-Fainily.Resic1ciltial (RS -8) zone are required to be 7.5 fact M" since tile deck is less than 30 inches high, and is not covered it can go into the setback not more than M Z. one-third of the setback per I"Idnionds Community Development Code (ECDC) 16.20.040.C. I also madd C a note on the face ofthe building permit that "Rear deck to mect.5 foot setback." E: —4 0) You have informed me that the deck was that way when you,purchased the property. I reviewed the 1.997. 0 -n survey from short plat file S-1997-1 53 and determined that the deck is not shown.on it. The staff report _n for that plat state that the cast property lines for this lot shall have 7 .5 foot setbacks and also state that a �3: M M workshop existing within those setbacks will have to be removed. While the deck may not have required 00 a building permit for its construction, it would have been required to meet setbacks. Any,constructioi . 1 0 0 M that did not meet code becomes the responsibility of the current owner to correct. C UY M 0) I have twice inspected tile site and that,the deck has not yet been cut back to meet the required. M0 Z r— five-foot setback. Please modify the deck to maintain a.fiv6-foot setback by.luly 28, 2006. Please call me when it is > Z ready for inspection. If the deck has not been modified by that date, I will turn it over to code e -it deadline, you are welcome to call and enforcement. If you have any reason why you cannot tile t th, 3:r, Cn discuss it with me. Z: 0 Thank you for your help. If you have any questions, please contact me at (425) 771-0220, extension 1330. M Sincerely, Meg Gruwell Senior Planner QMicliael Thies, Code Enforcement 4� �VCddr mifdr Incorporated Au ust 11, 1890 4 9 RNAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PLEASESIGN ENGINEERING DIVISION DATE PLEASE ICNI S z 0 PLANNING DIVISION DATE P -ASf LI: S(GN M PROJECT /-4Z �114e, :n �SS �Z7 SIT.E ADDRE M C I PERMIT #2_005- DATE INSPECTED.. M0 0 0 C .02AO _ADB// DESCRIPTION OF woRKTO BE INSPECTED (6117qt.- (ce�. MM MZ 7 C > z A field. inspection was conducted to -determine compliance with -approved plans. Final appioval denotes that there are no objections from the -above. signed Department to the release of Cn PERFORM ANCE BONDS and the granting o f 0 _n _n MM GRANT FINAL PROJECT AP PROVAL Or- OM C C/). 9 Cn M 0 Zr M GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contra6tor by inspector. z Cn z 0. FAILED FINAL INSPECTION OUTSTANDING ISSUES 0 0 Copy of CORRECTION NOTICE given to.owner/contractor by inpector M 2.. 3. RE-INSPECTED'OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature He 11q):b1dg:fonns:&aprv1 3/25/04 FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO:. PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PI EA E SIGN ENGINEERING DIVISION DATE PLEASE SIGN z DIVISION DATE 0 —PLANNING F_AVF G N M PROJECT CT., CIO SITE ADDRESS z 7- 3 2--7 �5'­ P" M C M 0 PERMIT# 2_az:,5_02�?o ADB# DATE INSPECTED— 2-18'loc� 0 0 C: M M Z DESCRIPTION OF WORK TO BE INSPECTED ? C z A field inspection was conducted to determine flnal compliance with approved plans. Final approval a: Cn denotes that.. there are no objections from the above signed Department to the release of 0 -n PERFORMANCE BONDS and the granting of: M M 0 ui GRANT FINAL PROJECT APPROVAL 0 M C a) 9 Cl) MO z r GRANT PROJECT APPROVAL WITH CONDITIONS NOTED z a Copy of CONDITIONS given to ovmer/contractor by inspector __q z FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 M u Copy of CORRECTION NOTICE given to 6wner/contractor by inspector 4- r^43 an N"" 3. RE -INSPECTED OUTSTANDING ISSUES GRANT FINAL PROJECT APPROVAL Date Si ocaprvl.doc.l:temp:bldg:fonnsIO/OI FINAL PROJECT APPROVAL FORM TO: DATE: MEMOTO: PERMIT COORDINATOR,- BUILDING. DIVISION FROM: FIRE DEPARTMENT DATE P1.11A.0 SIGN DIVISION DATE z -ENGINEERING PLEASII SIGN 0 PLANNING DIVISION DATE- M VIXA R PROJECT cn M SITEADDRESS 2_4 3 Z' 7- '95-1 Pi, w. M 0 0 0 Q C . _ADB#' -DATEINSPECTED PERMIT X M M Z DESCRIPTION OF WORK TO BE INSPECTED �z C z A field inspection was conducted to determine compliance with approved plans. Final approval., vi e o objections from the above sigi ied Department to the release of denot s that there are n 0 n, -n PERFORMANCE BONDS and the granting of: M M co 0 r GRANT FINAL. PROJECT APPROVAL. 0M C Cn 9 Cn M, 0 Z r- 3: GRANT PROJECT APPROVAL WITH CONDITIONS NOTED z Copy of CONDITIONS given to owner/contractor by inspector 3: cn �z 0 FAILED. FINAL INSPECTION - OUTSTANDING ISSUES M Copy of CORRECTION NOTICE given to owner/contractor by inpector L RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL. Date $ignatu re 1:temp:b1dg:fbm1s:ocapry1 3/25/04