Loading...
20050421 (2).pdf0 Inspection Fees TO BE PAID Zf by phone i Contact notified of fees due: F correction notice given Date Paid: Receipt #: Collected B Y Engineering Notified of Payment Received REFUND Due. - Reconciled By:c_�>fm(P�MuA Date Original to: Permit File Copy to: E] Engineering' Admin (reftinds only) Revised 3/2/06 z 0 1 0 M --I -n (n --I 0 M M 0 0 M M Z C co 0 -n n ;d --j > M M 0 0 M C Cn 9 Cn M 0 Z M M z Cn z 0 0 M FINAL PROJECT APPROVAL FORM MEMO TO:. PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PLEASE SIGN ENGINEERING DIVISION DATE PLFASH SIGN z 0 PLANNING DIVISION DATE PLPASF SIGN M ROJ P ECT CCU- SITE ADDRESS. /-7V& T CO OM C M 0 0 PERMIT# .2V05- W?-f Pe ADB# DATEINSPECTED C: DESCRIPTION OF WORK TO BE INSPECTE6 P_ X M MZ .0 C 2 A field inspection was con ducted to determine compliance With -approved plans. Final approva.1 CD denotes that there are no . objections from the above signed Department to the release of 0 PERFORMANCE BONDS and the granting of: M M 0 6 0 GRANTFINAL PROJECT APPROVAL 0 M C C/) F. Cn Q 0 z r Gft ANT* PROJECT APPROVAL WITH.CONDITIONS NOTED z 0 Copy of CONDITIONS given to owner/contractor by inspector Cn z 0 FAILED FINAL INSPECTION - OUTSTANDING ISSUES M 0 Copy of CORRECTION NOTICE given to. owner/contractorby inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT.I APPROVAL Date.- Signature 1:temp:b1dg:fbrms:&aprv1 3/25/04,