20050530.pdf�'~4i DATE RECEIVED PERMIT EXPIRES Zz ld&
PERMIT
CITY OF EDMONDS NUMBER
CONSTRUCTION PERMIT APPLICATION JOB
ADDRESS SUITE/APT#
OWNER NAMEINAME OF BUSINESS '5
c7coo PLAT NAMEISUBDIVISION NO. LOT NO. LID NO.
MAILING
U LID FEE S
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Approved
0 RW Pornia Requifm 13
Street Use Permit Requited E3
CITY ZIP TELEPHONE EXISTING PROPOSED Inspection Required [3
Sidewalk Requited 13
REQUIRED DEDICATION FT_ Underground C3
Witing requited [3
NAME METER SIZE LINE Sl ZE _F�O, OF FIXTURES PRV REQUIRED
YES [3 NOM z
U a:
LU Uj
t= ADDRESS REMARKS W
OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE z
z
Uj
CRY zip I TELEPH4,4EJrl��—
-5-2.
NAME CBL#
ENGINEERING REVIEWED BY DATE
ADDRESS
0
U nz=
FIRE REVIEWED BY DATE W
CITY. ZIP TELEPHONE
VARIANCE OR CU SHOREIINEORADB# INSPEC SEPA
STATE LICENSE NUMBER EXPIRAT)ON DATE CHECKED BY O!ION
RE D COMPLETED I EXEMPT
.p� A2 13YES 13 NO
_j ACCOUNT PARCEL NO. j CA# ZONE SIGN AREA HEIGHT
< PROPE7R TAX
a I WAIVER 13 ALLOWED PROPOSED ALLOWED , PROPOSED
L _j 7)
U OF112 7AS t MW k 5 STUDY 13
NEW Q_RESIDENTIAL PLUMBING MECH LOT COVERAGE REQUIRED SETBACKS (FT.) ED SETBACKS (FT.)
1:1 ALLOWED PROPOSED FRONT SIDE REAR UR SIDE REAR
ADDITION COMMERCIAL COMPLIANCE OR z
MIXED USE CHANGE OF USE
E3 REMODEL I L MILY PARKING LOT AREA PLANNING REVIEWED BY DATE
MULT FA SIGN RECI'D I PROVIDED
E] REPAIR EJ GRADING . CYDS FENCE X FT.) REMARKS
1:1 DEMOLISH OT��
[:] TANK
GARAGE —1 RETAINING WALL FIRE SPRINKLER
z CARPORT E] ROCKERY FIREALARM
(TYPE OF USE, BUSINP9 OR ACTIVIP) EXPLAIN:
IL CODE
re &TYPEOF COSTRUCTION PANT
a!i�� I
occu
GROUP
U ff_!�=
U)
uj NUMBER NUI�41]IER OF
OF DWELLING SPECIAL INSPECTION CONSULTANT OCCUPANT
UNITS I LOAD
0 STORIES UIRED 13YES
71, DESCRIBE WORK TO BE DONE REQ
R RKS
F dArigr- C3
H ;Rt��T�
STIeUCTURAL DESIGN
BY:
VALUATION
$
Description FEE Description FEE
Plan Check State Surcharge
HEAT SOURCE LOT SLOPE0/6______7ESTED DATE Building P - ermit city Surcharge
PLAN CHECK NO: Plumbing Base Fee
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO Mechanical
BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBIC
LE DONMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE Grading
SEPARATE PERMISSION.
lz PERMIT APPLICATION: SEE ECDC 19.00.005(A)(5) Engr. Review
W
IL PERMIT LIMIT: SEE ECDC 19.00.005(A)(6)
SEE BACK OF PINK PERMIT FOR MORE INFORMATION Engr. Inspection
U) *APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESSORS Fire Review Plan Chk. Deposit
U)
Ui IN INTEREST. AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF
_j
:E EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND Fire Inspection Receipt #
0: ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY
91
x FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT 13E
0 DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Landscapelnsp. Total Amt. Due
NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION. -
Recording Fee Receipt #
1 HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION AP �FIROVAL
GIVEN IS CORRECT, AND THAT I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF This application is not a permil until signed by the
THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL Building Official or his/her Deputy: and Fees are paid. and
TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED cerit is acknowledged in space provided
IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION /T
WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. OF I N TU DATE
(0 NE T—)—: (425)
SIGNATUR OR AGEN DATE SIGNED
lyz �r .1 or ."Lop 771-022 _U by
17'r- RELE'ASF
ATTENTION EXT. 1333
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI- ORIGINAL - FILE - YELLOW - INSPECTOR
FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109 I IBC110 If IRC110. PINK -OWNER - GOLD - ASSESSOR
10/04 PRESS HARD - YOU ARE MAKING 4 COPIES
z
0
M
0 M
C
M
0
10
0 C
M
M Z
,C) -4
C
z
0
x
M M
0
0
0 M
C CO)
C 0)
Q 0
Z
X
3:
>
z
3:
z
0
0
M
Page I of I
Graf, Jeannine
From: Graf, Jeannine
Sent: Tuesday, Septembe* r 20, 2005 10:51 AM
To. Snook, Mike
Subject: FW: Roof repair Permit #2005 -0530
Mike Snook,
Mr. Gatjens is requesting a,final roof inspection for Tuesday, September 27. th. Please.mark this on your future
calendar. Thanks Graf
--Original Message -----
From: Harry Gaqens [mailto:hgaqens@conversay.com]
Ri
Sent: Tuesday, September 20, 2005 10:46 AM
To: Graf, Jeannine
Subject: RE: Roof repair Permit #2005-0530
M�_
C
I have left an inspection request on the building departments hotline. They do not indicate whether or not they
M 0
V"'
confirm the inspection dat so I do not yet know if it is truly confirmed. I guess I will know if they show up next
0�
C
Tuesday.
M,
Harry M.'Gatjens
M z
---- Original, Message ------
From: Graf, Jeannine [i-nailto:Graf@ci.edmonds.wa.us]
Sent: Monday, September 19, 2005 11:44 AM
0 -n
To: Har*ry,Gaqens
-n,
Subject: Roof repair Permit #2005-0530
Dear Mr. Gatjens,
�O r
Our inspector has not received a request for inspection yet. Would you like me to schedule it for you? If
0 M,
so, what doys/times this week or perhaps next week are convenient? Sincerely, Jeannine Graf
C Ca
m 0
Z
4.
Z.
6j)
Z:
0
9/20/2005
Page I of I
Graf, Jeannine
From: Harry Gatjens [hgatjens@conversay.com]
Sent: Thursday, September 08, 2005 4:03 PM.
To: Graf, Jeannine
Subject: RE: 8306 186th St SW
Everything is done orscheduled. I will call the building'depa.rtment tomorrow to.
make an inspection request. I Just missed them. today.
Z.
Harry -M. G.atjens
0
M
- ----- Original Message-
M, 6
From: Graf, Jeannine mailto:Graf ci.edmonds.wa.us].:
80'
Sent: Tuesday, August 23, 2005 11:31 AM
M:
M
To: Harry Gatjens
Subject: 8306 186th St SW
Dear Mr. Gatjens,
Did I understand your email of July 11, 2005 correctly? In that email you said the work started on the
0 _n,
weekend of the -first (July.1 st) and. it was to be complete by the week's end. If the roof work is complete
MM.
please call the building inspection hotline at 425m771-0220 extension 1333 to schedule for inspection.
CD
0
Sincerely, Jeannine Graf
0 Fn!.
C C4
C Cn:
M0.
Z
X
z
01
M
9/9/2005
Graf, Jeannine
From: Harry, Gatjens [hgatjens@conversay.com]
Sent: Friday, August 26, 2005 8:04 AM
To: Graf, Jeannine
Subject: RE* 8306 186th St SW
Sorry for my delayed response. I have been out of the office for the past two weeks. I was waiting for my gutter man to
install the gutters for the inspection. The roof itself is done.
The gutter man keeps flaking out and not showing up. I will get on him today and make sure the gutters are done next
week and then call for the inspection. If I can't get the gutters done in. that time, I will call and have at least the roof
z
a
inspected anyway.
Thak you.
01
Harry M. Gatjens
----- Original Message-----
Urn
C
From: Graf, Jeannine [mailto:Graf@cLedmonds.wa.us]
M 0
Sent: Tue 8/23/2005 11:30 AM
O�
0
To: Harry Gatjens
C,
Cc:
Subject: 8306 186th St SW
Z'
C Z,
E:
Dear Mr. Gatjens,
0 -1111
Did I understand your email of. July 11, 2005 correctly? In that email you said the work started on the weekend of
-n
the first,(July 1st) and it was to be complete by the week's end.� If the roof work is complete please call the building
M M
inspection hotline at 425-771-0220 extension 1 333 to schedule for inspection. Sincerely, Jeannine Graf
0
Ev
.0 M
ay,
C.Cn�
0;
Zr
Z11
z
0
0
Page I of I
Graf, Jeannine
From: Graf, Jeannine
Sent: Tuesday, August 23, 2005 11:31 AM
To: 'hgatjens@conversay.com'
Subject: 8306 186th St SW
Dear Mr Gatjens,
Z.
Did I understand your email of July 11, 2005 correctl ? In that email you said the work- started on the weekend of
y
the first (July.1 St) and it was to be complete by the week's end. If the roof work is complete please call the
0,
building inspection hotline at 425-771-0.220 extension 1333 to schedule for inspection. Sincerely, Jeannine Graf
nl�
.0-
-n,
M 01
0.
0
M Z,
> Z
E:
0 -n
-n Lq�,
M1,
M
CD
0
Orn�
C
C W
Q 01,
z
Z:
z
0,
M
8/23/�005.
Page I of I
Graf, Jeannine
F rom: Graf, Jeannine
sent: Tuesday, August 09, 2005 8:23 AM
To: 'hgatjens@conversay.com'
Subject: 8306 186th St SW--Re-Roof Permit #2005 -0530
Dear Mr. Gatjens, ion 1333 to
-771-0220 extens
If the roof work is complete please call our City Building Inspection hotline at 425.
schedule for inspection. Sincerely, Jeannine Graf
z
�O
CD
M,
0
0
M
M Z.
C Z.
0 n
M M,
'0� r
0
C'M
M'-O�
Z�,
Z I
0
0
M,:
8/9/2005
Graf, Jeannine
From: Harry Gatjens [hgatjens@conversay.com]
sent, Monday, July 11, 2005 3:29 PM
To: graf@cLedmonds.wa.us
Subject: 8306 186th SW
This is in response to your letter of June 27.
The permit was acquired on June 30 or Julyl st, I.forget the exact day. Rainy weather earlier in the
u
month had put Alfa Roofing behind sched 'le on getting to work.
z
�0,
They started the weekend of the 1 st and the only thing we are waiting on now before getting final
inspection is the installation of gutters. I hope to' have that done.before this week's end. The roof
itself is now on.
Cn
will let you know when everything is coplete.
0'
Sincerely,
.0
X.M .
Harry M. Gatjens
M Z,
o -n-
-n
IM
0 V)
0
0 M
CO
M 0�
;U:
z
X
Z: .
0
M,
GARY HAAKENSON
CITY OF EDMONDS MAYOR
121 5TH AVEN UE NORTH EDMONDS, WA 98020 (425) 771-0220 FAX (425) 771-0221
Websile: www.dedmondsma.us
DEVELOPMENT SERVICES DEPARTMENT
c. Planning Building - Engineering
June 27, 2005
Z�:
0
0
M
Mr. Harry M. Gatjens
C
M
8306 186"' Street Southwest
0
Edi-nonds,, Washington 98026
RE: 8306 186"' Street Southwest,. Edmonds.
MZ1
-1
Dear Mr. Gatjens:
Thank you for your letter dated June 7, 2005 explaining what action you will be taking on your
0 n:
-n
residence. At your earliest convenience please provide me an update on the progress for the re
M
roofing job. A check of pen -nit records reveals that we do not yet have a. permit issued to you
M
and your letter projected that the work would start the week of June 20, 2.0105.
0
0 M
C
If you prefer you can email me at pra[@ci.edrnonds.wa.us, or contact me by phone (luring
M 0�
normal business hours Monday through Friday, 9:00am to noon and 1:00pm to 4:00pni, at 425
'extension
�z
771-0220 1226.
Sincerely,
z
co
z
:0
M
J n
ea nine L. Graf
Building Official
1hcorporated A ugusi 11, 1890
Siste Jarian
r Citv - Hekinan
GARY HAAKENSON
J
b. CITY OF EDMONDS MAYOR
i%
121 5TH AVENUE NORTH EDMONDS, WA 98020 (425) 771-0220 FAX (425) 771-0221
Website: www.dedm6ndsma.us
DEVELOPMENT SERViCES DEPARTMENT
Z Planning - Building Engineering
C.
May 12, 2005
Z
0
0:
M
Ms. Ada Gatjens
8306 186"' Street Southwest
Edmonds, W ashington 98026
Cn
Q
M
C
0
RE: 8306 186"' Street S uthwest, Edmonds
M
0
0
0 C'
Dear.Mrs. Gatjens:
3: M
M Z
The purpose of this letter is to infon-n you that a citizen has filed a land use complaint against
property you own at 8306 186"' Street Southwest in Edmonds. If you are not the current owner
of this property please inform our office immediately.
Cn
0 -n.
The nature of the complaint alleges that the building may be a dangerous building; that the roof
is deteriorated and is under stress with the pot ential for failure. In order to respond to this
M M.
the property and residen -or
-mission to enter f
'complaint the City is requesting your pei ce
co
0 r
inspection purposes. The inspection will deter mine if structural defects exist or if additional
.
0 M
C ca,
investigation is required. to make such det ermination. Or, you may choose.to enlist the.services
Cn'
Q0
of a professional engineer to make an inspection of Dangerous Buildin Code provisions on your
9
Z r-
behalf. If you choose this option the engineer shall be required to submit.a written report Of
his/her findings to the City. Any noted repairs identified by either the City Inspector or your
private engineer shall require a building repair permit to correct. Please infori -n the City by June
8, 2005 with your plan of action.
Z
-nal bu iness hours Monday
If you have, any questions please feel free to contact me during non S
through Friday, 9:00am to noon and 1:00pm to 4:00p m, at 425-771-0220 extension 1226. If you
wish to meet in person please call in advance for a meeting since as I am frequently assisting
0
other customers and may not be immediately available.
M
i Sincerely,
Jeannine L. Graf
Building Official
Incorporated August 11, 1890 0
Sister Citv - Hekinan, Janan
RECORD OF INSPECTIONS
INSPECTOR
DATE APPROVED
SETBACKS .....................
FOUNDATION* -
Footing ......................
Wall.........................
Pier/Porch .................
z
Retaining Wall ...........
0
Slab Insulation ..........
PLUMBING:
Underground .............
Cf)
0
M
C
Rough -in ...................
M 0
Commercial Final ......
0
C
HEATING:
ITI z
Gas Test ....................
g) I I '' . I I
C
Gas Piping .................
EZ
Equipment .................
0 -n
Commercial Final .......
_11
EXTERIOR SHEATHING
M IT!
0 co
NAILING ..........................
0 m
FRAMING ........................
C CD
C ca
FIRST FLOOR FRAMING ...
Q 0
Z
INSULATION ...................
Floor Insulation .........
x
Wall Insulation ............
z
Ceiling Insulation .......
z
SHEETRO,CK NAILING ...
SPECIAL INSPECTION ...
0
ITI
MISCELLANEOUS ..........
FINAL APPROVAL FOR
OCCUPANCY ..................
Wool,""