Loading...
20050551.pdfDATE RECEIVED 70 PERMIT EXPIRES CITY OF EDMONDS kRMIT -NUMBER CONSTRUCTION PERMIT APPLICATION JOB ADDRESS M([S (,VISUITE IT A- OWNER NAMEINAME OF BUSINESS i3i�Q A�xcr- I PIZZA P�T NAMEISUBDIVISION NO. LOT NO. LID No LID FEE S MAILINGADDRESS �4 PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCPAp - RWP­.1A­.1. CITY ZIP EX ST114G _PROPOSED R­­ set,'My,— ITELEPHONE 0 AEOLIRED DEMCATION IT NAME METER SIZE LINEBIZE NO. OF FIXTURES PRV REQUIRED 11 I _� i YESX NO13 12 A..R�. REMARK F O.NERICSONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE 10 A E 0 VeX -7 11 Z41.42,� JCILI Wfr,�V4�` 1�5 ENGINEERING RtMtW-FDBY —j 6 '�' 1 2 AO.RES9- 16 1 zfl Ow 1,� ty Le h005 1 DATE c CITY ZIP %2�) LEPHONE JTE411� FIR(R z STATE LICENSE NUMBER EXPI No VIIANCEORCUI jaLINEORADB# — I OA -14 -1 ON I 'NSPE 2 MZQ13 SEPA I CcPPLS­ NO 0 CA ' -5- zo 'M I SIGN AREA HE GHT PROFIT TAX ACCOUNT PARCEL NO. N� All 'A'19 I tj I ALLOWS I P-OSE1 D 0 ALL-0. , 1-1-D I ZIS 7 5" STUDY 13 NEW 13 RESIDENTIAL PLUMBING I ..cH LOT COVERAGE ALL WED PROPO ED REQUIRED SETIACREAFTI PROPOSED FRONT SIDE R FRONT 1 SETBACKS (FT.) URSIDE REAR o -q A ADDITION COMMERCIAL 2 C.-MER 'AL Ei COMPLIANCE OR c HANGE OF USE 'o - Z7 2-o' M M MIXED USE E3 PARKING LOTAREA PLANNING REVIEWED By DATE REMODEL G`E [:] MULTIFAMI LY 13 SIGN RED D PROVIDED +9 0, E3 REPAIR o FENCE IYIIS X FT.) REMARKS -M cm 0 DEMOLISH � OTHER F1 TANK 0 C, -- -- C - Z, EiGARAGE CARPORT 0 RETAINING WALL 0 FIRE SPRINKLER ROOKERY FREALAR. P 0 (TYPE OF USE, BUSINESSW�TIVITWEI.ILEN T�� CONSTRUCTION c OCCUPANT GROUP —? .4 0,3 Ill NUMBER OF STO Es, NUMIEROI DWE UNITS LING SPECIAL "Sjp�TION REQUIRED CONSULTANT I-- 1;� - I-- 111UPA LOAD 'IT-7c? DESCRIBE WORK TO BE DON' 6x 1171 IT1 0 9 REMARKS 0 NEW Onl'-RAK WT 0 M C GEOT REPORT BY. m, -5Lam tA, #2-s3e"g I to C 0 STRUXURAL DESIGN 1,44b 4h1q<Se1AI4A, 106 #21455 ITIO Z r SY1 VALUATION $ 3: Description FEE Description FEE z ,an C .K v State Surcharge VESTED DATE Bu - ilding Permit City Surcharge z PLAN CHECK NObil P umbing Base Fee 0 Mechanical Awff� R537 rn THIS PERMITAUTHORIZES ON THEWORKNOTED. THIS PERMIT COVERS WORK TO t B DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBIC Grading DONMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATEPERMISSIOW Eng, Review PERMIT APPLICATION: SEE ECDC 19.00.0051A) PERMIT SEE ECDC 19,00XOS(A)(6) LIMIT, SEE BACK OF PINK PERMIT FOR MORE INFORMATION ... E1g, Inspection 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESSORS Fire Review Plan Chk. Deposit :�3� IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY .1 OIFICIALI, EMPLOYEES, AND AGENTS FROM ANY AND Fire Inspection Receipt EDMONDS, WASHINGTON, ITS ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY NO] b --- FROM THE ISSUANC OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL REDUCE ANY REQUIREMENT OF ANY CITY ORDINANC Landscapeinsp. Total Amt. Due DEEMED TO MODIFY, WAIVE OR NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION Recording Fee Receipt # I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATIO APPLI APPROVAL GIVEN IS CORRECrANDTHATIA THE OWNEFL OR THE DULY AUTHORIZED AGENT OF Thi, ,PP,'­a,n1ON THE OWNER. I AGREE COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC To CALL BL'id,�g O"'C'N ep,ty: ,,,d F­­ p.d­d ' AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMP YED ' WASHINGTON RELATING TO FOR INSPECTION OL F THE STATE OF I ATION OF THE LA C IN V A`NON WORKMENs OMPE S NIN RXNCEANDRC.18211 FFICIA SIG T DATE LTION; .,..AT.. _N 0ATESKIN10 (425) 7=- V 771-0220 I ATTef4TION EXT. 1333 �,Y �j 1015, I JD� IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI- ORIG14L-)ILE YELLOW . 1.�PEC;OR FICATE OF OCCUPANCY HAS BEEN GRANTED. UBcjog I IBC110 / IRC110. PINK -OWNER GOLD - ASSESSOR IWIM PRESS HARD -YOU ARE MAKING 4 COPIES FtLe- I - RENOVATION & ESTATE SERVICES 70112"' Ave. N. Edmonds, Wa. 98020 Ph.: 425 775-3727, Fax.:425 640-873 1, Cell: 206 372-1196 April 27, 2005 City of Edmonds Building Division copy %.,JL JL 121- 5" Av. N. Edmonds, WA. 98020 Re.: Pagliacci Pizza Project located at 10204 Edmonds Way am C m 0 In accordance with the 2003 edition of the International Building Codes Section 0 C C m 1705.3 this Contractor understands his responsibilities to insure all special inspections m are carried out in accordance with the Quality Assurance Plan and with Building Z Official approvals.. The General Contractor as required by work progress will coordinate timing of such inspections. CA Ed Chapman 4kl 0 "n m M General Contractor N 0 0 C 0) Cc: Matt Galvin, Owner m 0 ra KLEINFELDER December 13, 2004 Kleinfelder Project No.: 52109 Mr. Mike Derry Mesher Shing & Associates 506 Second Ave, Suite 3300 Seattle, Washington 98104 z —01 Subject: Geotechnical Report - f , 0 Proposed Pagliacci Restaurant Site "d Edmonds Way & 102 Place COPY R1 Edmonds, Washington CITY Vi --I 0 m Dear Mr. Derry: a V 0 This letter transmits three copies of our geotechnical engineering report for the proposed 0 C rid Pagliacci restaurant to be located on the southwest comer of Edmonds Way and 102 Place in rn In Z Edmonds, Washington. This geotechnical engineering investigation was performed in accordance with our proposal, dated December 1, 2004. Based on our geotechnical investigation and evaluation of the project design requirements, we 0 -n -n 21 believe that the proposed restaurant development can be constructed at the site, provided the In In building is founded on shallow spread footing s as recommended in our report. The 0 r- recommendations presented in the attached report must be followed for the satisfactory and . In C CA successful construction of this project, Our report includes recomniendations related to m 0 z - r earthwork, foundation, concrete -slabs -on -grade, retaining walls, and drainage. Our report also contains the findings of our Critical Areas Review, which was performed in accordance with City of Edmonds Critical Areas Ordinance, Chapter 20.15B. z Because Kleinfelder was not able to advance borings at this site as part of this project, it is z imperative that Kleinfelder be retained to perform materials testing during construction. This will allow Kleinfelder with the opportunity to veri the a ticipated site conditions and confirm fy n FIT our geotechnical recommendations. RECEIVED DEC 2 0 2004 PERMIT COUNTER 521091SWRI44.doe Page] of2 Copyright 2004 Kleinfelder, Inc. Retail D—lopment 43850-00 KLEINFELDER 2405 140th AvellLle NF, Suito A101, Bellevue, WA 98005 (425) 562-4200 1425) 562-4201 fax r77 .... . .. ... We appreciate the opportunity to provide geotechnical services to you on this project. Please contact the undersigned at (425) 562-4200 if you have any questions regarding this report or if we can prov ide assistance with other aspects of the project. Sincerely, HLEINFELDER, INC. 0 —4 M James M. Schmidt P.E. Semor Geotechmcal Engineer Vi M Attachment: December 13,2004 Geotechnical Engineering Report M 0 0 0 4 C =m Mz CE C) 0 -n m M Vi 0 0 C M 0 z z z V m Page20172 5210MEA411144.doc Retail Dexlelopment #3850-00 Copyfight 2004 Kkinfelder, Ine, KLEINFELDER 2405 140th Avenue NE, Suite Al 01, Bellevue, M 98005 (425) 562-4200 (425) 562-4201 fax Geotechnical Engineering Report z Proposed Pagliacci Restaurant Site Edmonds Way & 102 d Place Edmonds, Washington m VJeiufelder Project Number: 52109 vi m m a 0 -40 0C -4 C X M mz '0 C > z --4 r Cl) O'n CITY COPY mm a C— .0 or - CM U) 9 CA 20 ;a z -4 3: z 0 m All 19 KLEINFELDER kT1 KLEINFELDER Prepared for: Mesher Shing & Associates 506 Second Ave, Suite 3300 Seattle, Washington 98104 Geotechnical Engineering Report Proposed Pagliacei Restaurant Site Edmonds Way & 102"d Place Edmonds, Washington Kleinfelder Project Number: 52109 Prepared by: Frank D. Reinart, E.T.T. ProjectGeotechnical Engineer M-S WA James M. Schmidt; P.E.� P. Eng. Senior Geotechnical Engineer 0 At Kleinfelder, Inc. 8/31;5 7 2405 - 140th Avenue NE SuiteA101 Bellevue, WA 98005 Phone: (425) 5624200 Fax: (425) 5624201 December 13, 2004 Copyright 2004 Kleinfelder, Inc. All Rights Reserved UNAUTHORIZED USE OR COPYING OF THIS DOCUMENT IS STRICTLY PROHIBITED BY ANYONE OTHER THAN THE CLIENT FOR THE SPECIFIC PROJECT. z 0 0 C: 0 p 0 x m In z 10-4 C: z `77"7,4'- - - 77,_ kn KLEINFELDER TABLE OF CONTENTS Page 1.0 2.0 3.0 INTRODUCTION AND SCOPE ..................................................................................... I LIGENERAL ........................ ...................................................................................... I 1.2 PROJECT DESCRIPTION ............................ I ......................................................... I 1.3 PURPOSE AND SCOPE OF SERVICES .............................. .......................... 2 1.4 REFERENCES .................................................................................... ...... ............ 2 1.4.1 Standard Specifications .................................................................... 3 1.4.2 Agency/Association Initials .............................................................. 3 1.4.3 Common Abbreviations ....... .................................................................. 3 1.5 LIMITATIONS ................. ........................................................... .......................... 4 SITE CONDITIONS .......................................................................................................... 5 2.1 SURFACE ..................................................................................... w .......... .............. �5 2.2 SUBSURFACE .................................................. ...................................................... 5 2.3 GROUNDWATER .............................................................................................. 6 CRITICAL AREAS REVIEW ......................................................................................... 6 3.1 SITE RECONAISSANCE ....................... ...... __ .................................................. —.6 3.2 GEOLOGIC HAZARD CLASSIFICATION .......................................................... 7 3.2.1 Erosion ......... ... ......... 7 ..3.2.2 Landslide ................................................................................................. 7 5.2.3 Steep Slope Hazard ............................... ................................................. 8 3.2.4 Seismic Hazard ............ I ................................................................. ......... 8 3.2.5 Streams ................................................. : ......................... ........................ 9 3.3 DEVELOPMENT STANDARDS ........................................................................... 9 3.3.1 Erosion Hazard ...................... ............................................................ 9 3.3.2 * Steep Slope Hazard ................................................................................. 9 4.0 DESIGN 4.1 4.2 RECOMMENDATIONS .................................................................................. 9 GENERAL ...................................................................................................... ....... 9 SITE PREPARATION AND EARTHWORK ............. 1 ........................................ 10 4.2.1 Demolition ............................................. I ................ -: ........................... 10 4.2.2 Excavation .... ................... ................ .................................................... 10 4.3 4.4 4.5 4.6, 4.7 4.2.3 Slopes .................... ................................................................ ........ ...... I I SEISMIC DESIGN CRITERIA ...... ................................................. ........... I .... 12 4.3.1 UBC Seismic Design Criteria ...................... ******** ...... ...... 12 4.3.2 IBC Seismic Design Criteria ............................... I ....................... I ......... 13 SPREAD FOOTING FOUNDATIONS ................................................................ 13 FLOORS ............................................. .................................................................. 15 DRAINAGE .............. .......... ............... ................................................................. 15 4.6.1 Short Term .......... ................................................................................. 15 4.6.2 Permanent. ......................................................................................... .... 16 UTILITIES ........ ........................................................................................... 16 5.0 CONSTRUCTION RECOMMENDATIONS ............................................................... 52109/SFA4R144.doc 17 P-.*e I o fii Copyright 2004K]cinfeldff, Inc. Ra.11 D—Jp.crit #3850-00 Z 0, 0 m C In -4 0 rn z C > 0) O"n 'n Min 055 0 0 C K Cn in 0 X Z Z 0 in kTJ KLEINFELDER 5.1 GENERAL ................... ................................................. ............................... ....... 17 5.1.1 Description ............................................................................................ 17 5.1.2 Standard Specifications ......................................................................... 17 5.1.3 Reference Standards ............................................................................ -17 5.1.4 Geotechnical Engineer .......................................................................... 17 5.1.5 Geotechnical Report .............................................................................. 18 5.1.6 Construction Site Safety ........................................................................ 18 5.2 EARTHWORK ...................................................................................................... 18 I,,, I 5.2.1 Materials ................................................................... 8 5.12 Terms ..................................................................................... ................. 19 5.2.3 Quality Control .......................................... ............. ....................... 19 5.2.4 Seepage Control ....................................................... ..................... 19 5.2.5 Demo ............................................................ ........ 20 lition ....................... 5.2.6 General Excavation ................................. !—*—**-1*—'1 ... *****"***'***'** — 20 5.2.7 Structural Excavation ............................................................................ 20 5.2.8 Weather Considerations ........... .................. , .................. .......... 21 5.2.9 Structural Fill Construction ............................. !- ........... ...................... -21 5.2.10 Utility Trench Backfilling and Compaction .......................................... 22 5.3 DRAINAGE... ...................................................... ................. .............. ................. 22- 5.3.1 General .................................................................................................. 22 5.3.2 Concrete Slab -on -Grade Drainage ....... ................................................ 23 6.0 ADDITIONAL SERVICES .......................................................... .................... ............... 23 z 0 :1 '0 71 A 5i am C a in 0 80 C 3� in in C Z- 0 n FIGURES Figure 1 — Vicinity Map Figure 2 — Site Plan APPENIJICIES Appendix A — Existing Boring Logs Appendix B — Important Information About Your Geotechnical Engineering Report m m 0 Fa 0 C: K 60 in 0 z z 0 in 52109/SEA4RM.doc NgtHoffi Copyright 2004KI.i.k1drr, I.-. Mail Devrlopmrnt #3850-00 k" KLEINFELDER 1.0 INTRODUCTION AND SCOPE 1.1 GENERAL This report presents the results of Kleinfelder, Inc.'s (Meinfelder's) geotechnical engineering study for design and construction of the proposed restaurant, to be located on the southwest comer of Edmonds Way and 102 d Place in Edmonds, Washington. Our services for this study were performed in accordance with our proposal (Kleinfelder Proposal Number 51955), dated December 1, 2004. The location ofthe project site can be found on Figure I — Vicinity Map. Because Kleinfelder was not able to advance borings at this site as part of this project, it is imperative that Kleinfelder be retained to perform materials testing during construction. This will allow Kleinfelder with the opportunity to verify the anticipated site conditions and validate our geotechnical recommendations. 1.2 PROJECT DESCRIPTION Our understanding of the proposed development is based on an undated site plan designated Al. I prepared by Mesher Shing & Associates. Ile proposed development will initially consist of the demolition of the existing office building, a small wood -frame building behind the office building, the existing parking lot, site features, and a wood railroad -tie wall located at the toe of the slope southwest of the existing building. We recommend that all excavations made during demolition activities, including excavations for footings, underground storage tanks, and utilities, be backfilled with structural fill as recommended in this report., Following demolition activities, a new single -story, wood -framed restaurant building, including a new asphaltic -concrete paved parking lot, will be constructed. Based on an April 5, 2004 telephone conversation with Engineers Northwest, Inc., we anticipate structural loads will be light- on the order of 10 to 15 kips and I kip per lineal foot for isolated and continuous footing loads, respectively. The proposed building will have a finished floor elevation of approximately 300.4 feet above mean sea level (M§L). Based on the existing site grade of 300 feet above mean sea level in the footprint of the proposed building, we anticipate cuts and fills of less then 3 feet will be required to level the building pad at the proposed final floor elevation. 52109/SEA4RI44.d. Nge I of23 Copyright 2004 YJ.i.&Ider, I.e. z 0 ==5 C m M 0 C m m z C E:� 0 n n m M 0 0 M M 0 z z 0 m T S k" KLEINFELDER 3 puRPOSE AND SCOPE OF SERVICES e purpose of our study was to explore subsurface conditions at the site as a basis 'jor providing -commendations for site preparation, design, and construction of the proposed retail facility. pecifically, our scope of services included: Literature Review and Site Visit: We reviewed the boring logs from the geotech:nical study performed by Kleinfelder for Pagliacci at the property immediately south of t1iis site. We further reviewed. the City of Edmonds files for geotechnical subsurface data in the immediate site vicinity. The intent was to utilize this data and I extrapolate subsurface data onto this site. We visited the site on December 6, 2004 to confirm that surface conditions have not changed from the time of our study on the adjacent site. Geotechnical Analysis: Engineering analyse s were performed as a basis for recommendations regarding support of the proposed building and parking area. Our design recommendations, presented in this geotechnical report, included the following: Site preparation and grading including evaluation of the suitability of on -site soils for use as fill, gradation criteria for imported fill soils, and placement and compaction Z 0 0 0 C m M 0 0 M m 0 -n criteria of on -site and imported soils; 1 1 E f". I I Fieldwork performance for dry and wet weather conditions; Allowable soil bearing pressures, minimum width and depth requirements, coefficient of friction. and passive pressure to resist sliding, and estimates of foun . dation settlement for shallow foundations; The modulus of subgrade reaction for design of slabs; Support of slab -on -grade floors and pavements; Temporary and permanent site drainage and* erosion control measures; C site Uniform Building Code (IJBC) and International Building Code (IBC) seismi coefficients for use in structural analysis; and, Critical Areas Review: This task includes performing a critical areas review in general accordance with City of Edmonds, Critical Areas Ordinance, Chapter 20.15B. 1.4 REFERENCES This section identifies, in brief, the standards, agency or association initials, and abbreviations referred to in this report. 52109/SEA4RI44.d.. Copyfight 2904 Kicinfelder, Inc. Page 2 01723 M E k'g KLEINFELDER 1.4.1 Standard Specifications Where possible, we refer in this report to sections of the 2004 Edition of the State of Washington at ns Standard Specificationsfor Road, Bridge, and Municipal Construction (Standard Specific io I * 4 1 2 AgencylAssociation Initials Agency or association standards are referred to by agency or association initials and refer to the latest -edition standards published by those agencies or associations. References in this report include the following: Z AASHTO - American Association of State and Highway Transportation Officials ACI - American Concrete Institute ASTM - American Society for Testing and Materials: Annual Book of ASTM Standards a In IBC - International Building Code C 0 In 0 OSHA - Occupational Safety and Health Administration 80 C PCA - Portland Cement Association In UBC - Uniform Building Code 0-4 WABO - Washington Association of Building Officials V WISHA - Washington Industrial Safety and Health Act; Washington State's occupational 565 -n safety and health program 0 n;o WSDOT - Washington State Department of Transportation m In �0 r In 1.4.3 Common Abbreviations C Z V) The following are common abbreviations used in th e text ofthis report: M 0 F AC - Asphaltic Concrete M bgs - below ground surface Z CBR - California Bearing Ratio _q CRB - Crushed Rock Base X ESAL - Equivalent Single -axle Load Z HN - horizontal: vertical (ratio) In pef - pounds per cubic foot pcfEFW - pounds per cubic foot equivalent fluid weight psf- pounds per square foot psi - pounds per square inch sf— square feet 521091SEMR144.doc Np 3 of23 Copyrigitt 2004 Kicinfelder, Inc. k'q KLEINFELDER 1.5 LIM17ATIONS Recommendations contained in this report are based on the field explorations of the adjacent properties and our understanding of the proposed project. The investigation was performed using a mutually agreed upon scope of services. It is our opinion that this study was a cost- effective method to explore the subject site and evaluate the potential geotechnical concerns. The soils data used in the preparation of this report were obtained from exploratory boT ' ings completed for adjacent properties, It is possible that variations in soil and groundwater conditions exist between the points explored. The nature and extent of these variations may not be evident until construction occurs. If soil or groundwater conditions are encountered at this site that are different from those described in this report, our firm should be inunediately notified so that we may make any necessary revisions to our recommendations. In addition, if the scope of the proposed project, locations of facilities, or design building loads change from the descriptions given in this report, our firm should be notified. The scope of our services does not include services related to construction safety precautions and our recornmendations are not intended to direct the contractor's methods, techniques, sequences or procedures, except as specifically described in our report for consideration in design. This report has been prepared for use in evaluating the feasibility of development of the subject property by Mesher Shing and their client, in accordance with the generally accepted standards of practice at the time the report was written. No warranty, express or implied, is made. This report may be used only by Mesber Shing, their client, and their design consultants and only for the purposes stated within a reasonable time ftom. its issuance, but in no event later than one year from the date of the report. Land or facility use, on and off -site conditions, regulations, or other factors may change over time, and additional work may be required with the passage of time. Any party other than Mesher Shing, their client, and their design consultants who wishes to use Us report shall notify Kleinfelder of such intended use. . Based on the intended use of the report, Kleinfelder may require that additional work be performed and that an updated report be issued. Non- compliance with any of these requirements by Mesher Shing, their client, and their design consultants or anyone else will release Kleinfelder from any liability resulting from the use of this report by any unauthorized party and client agrees to defend, indemnify, and hold hannIess Kleinfelder from any claim or liability associated with such unauthorized use or non- compliance. 521091SEMRI44.da. Pqp,1003 C.py,ight 2004 Kkinr.lda, In.. Z m 0 80 C M 0-4 Z On -4 M M a 5) 0 0 C M Z 7-1 Z --I 3: FA Z 9 0 M k'4 KLEINFELDER it is the responsibility of Mesher Shing to see that all parties to the project including the designer, contractor, subcontractors, etc., are made aware of this report in its entirety. The use of information contained in this report for bidding purposes should be done at the contractor's option and risk. Further guidelines and information on this geotechnical report can be found in the ASIZE publication entitled Important Information About Your Geotechnical Engineering Report, which is included for your reference in Appendix B of this report. 2.0 SITE CONDITIONS 2.1 SURFACE Th bject site is located at the southwest -comer ofthe intersection between 102nd Place W and e su I Edmonds Way, in Edmonds, Washington. The site location is shown in Figure I - Vicinity Map. The finish floor elevation of the existing building is approximately 300 feet above MSL. The slope located on the property southwest of the existing building rises from approximately 302 feet to approximately 3 10 feet above MSL. The site is currently occupied by a vacant office building, which fronts to the east onto Edmonds Way. The building appears to be a wood -framed structure with a brick veneer. Based on observations of the building exterior, the existing building has either a basement or crawlspace beneath it. The building is surrounded by asphaltic concrete paved parking and drive areas on its north side. 2.2 SUBSURFACE Our literature review identified 7 borings drilled on the site immediately to the south and 2 borings drilled for the assisted care living facility immediately across 102'd Place West. The boring logs for these two sites are presented in Appendix A along with site plans illustrating their locations. Kleinfelder performed the subsurface exploration at both sites. It should be recognized that the subsurface description presented below is extrapolated from these borings and unpublished subsurface data contained in our files. No site -specific borings were advanced for this site as part of this study. Fill: Fill was encountered beneath the asphaltic concrete pavement in the borings advanced to the south of this site. The fill consists of medium dense crushed aggregate gravel and is approximately 1 -foot thick. Nge 5 o1`23 5210MEMR144-doc Copyright 2004 Kicinfelder, Inc. Z 0 q 0 In K L E IN F E L DER coijuvima: Colluvium should be expected beneath the fill. The layer consists of loose sand with varying amounts of silt, gravel, and organics. The colluvium should be expected at approximately I to 5 fe et bgs. Recessional Outwash: Recessional outwash was generally encountered beneath the colluvium. The recessional outwash consists of medium dense to very dense sand with varying amounts of silt and gravel. More detailed descriptions of subsurface conditions encountered at individual exploration locations are pre sented on the exploratory boring logs, included in Appendix A: Field Exploration. 2.3 GROUNDWATER Groundwater was not encountered at the depths explored at the site immediately to the south. The water table at this site will fluctuate seasonally, being highest during the wetter winter that Kleinfelder did not months and lower during the dry summer months. It should be noted e we performed a hydrogeologic evaluation install groundwater -monitoring piezometers, nor hav for this site. The seasonal variability in groundwater depth at this site has not been measured. 3.0 CRITICAL AREAS REVIEW 3.1 SITE RECONAISSANCE The slope southwest of the existing building is approximately 8 feet high, where it levels off to a plateau that is developed with a single-family residence. The slope continues to rise approximately 12 feet south of this residence. The slope has inclinations on the order of 20 to 50 percent. As shown in Figure 2, only the lower portion of the slope is located' on the subject property - Ground cover vegetation on the slope'consists of dense ferns adjacent to berry brambles, and young trees. The area east and south of the existing building is landscaped with grass, bushes, and trees. During our site visit, we made the followihg observations: No evidence of recent slope instability, but older trees displayed some evidence of possible historical instability when the trees at the site were younger; 521091SEA411144.doc Pagc 6 o1`23 Copyright 2OG4 Kicinfelder, Inc. z 0 M 0 M 0 80 C C F-� 0 3: M In 0 0 0 219; M 0 z z M N k'q KLEINFELDER Groundwater seepage was not visible nor was there evidence of historic groundwater seepage; No streams are present on the property; No evidence of alluvial surficial deposits was observed. 3.2 GEOLOGIC HAZARD CLASSMCATION Potential geologic hazards (erosion, landslide, steep slope, and seismic) at the site were classified in accordance with Section 20.15B.060 - Classification, of the City of Edmonds Critical Areas Ordinance, Chapter 20.15B. The specific geologic hazards are classified below. 3.Z1 Erosion An erosion hazard is specified in Section 20.15B.060 as areas containing soils that may experience severe to very severe erosion hazard. The group of soils includes, but is not limited to, the following when they occur on slopes of 15 percent or greater: Alderwood Soils (15 to 25 percent slopes); Alderwood/Evereff Series (25 to 70 'percent slopes); Everett Series (15 to 25 percent slopes). The Soil Survey of Snohomish County Washington maps that were prepared by the United States Department of Agriculture indicates that the near -surface soil on the existing slope is designated as an Alderwood/Eveiett Gravelly sandy loam (25 to 70 percent slopes). The near -surface soil in the leveled portion of the site classify as an Everett gravelly sandy loam (0 to 8 percent slopes). Therefore, the soil on the existing slope at the site does classify as an erosion hazard. However, we did not observe obvious signs of erosion on the hillside during our site visit. 3.2.2 Landslide One of the following five criteria provided in Section 20.1513.060 must be met in order for a landslide hazard to be identified at a project site. The criteria are: . Slopes with inclinations of 15 percent or greater and impermeable soil such as silt and clay interbedded with granular soils and springs or groundwater seepage; . Areas with significant visible evidence of groundwater seepage and includes existing landslide deposits regardless of slope; '210MEMR144.doo Page 7 of 23 CopyTight 2004 rJoinfelder, Inc. Z 0 0 3: in 0 0 C Z 0 ;1 m 0 -n n in M 0 5 0 0 C co M 0 Z Z 9 1 0 in 9 L ElNFEtDER Areas which have shown movement during the Holocene epoch (from 10,000 years ago to present) or which is underlain by mass wastage debris of that epoch; Potentially unstable areas resulting from rapid stream incision or stream bank erosion; ris flow Areas located on an alluvial fan, presently subject to, or potentia y subject to deb or deposition of stream -transported sediments. it is our opinion that the existing slope at the site does not fit the criteria given above. The basis for our opinion includes the following elements: Though the slope inclinations along portions of the site exceed 15 percent, the subsurface investigation performed for the adjacent sites did not identify the presence of impermeable soil, such as silt and clay, on the site. No evidence of springs or groundwater seepage was observed or noted at the site. We did not observe evidence of a deep-seated slope failure or instability during our December 6, 2004 site visit. There is a potential for some sloughing to occur within the loose, surficial colluviurn. However, this layer is only I to 2 feet in thickness on the face of the hill slope, and we believe that that colluvial sloughing should be localized. There are no streams on the site to create unstable areas. The site is not located on an alluvial fan and is not presently or potentially subject to debris flow or deposition of stn�am-transported sediments. 3.2.3 Steep Slope Hazard Section 20.1513.060 specifies a steep slope hazard as any ground that rises at an inclination of 40 percent or more. The existing slope inclinations at of approximately 20 to 50 percent. Therefore, the steeper areas of the existing slope are classified as a steep slope hazard. 3.2.4 Seismic Hazard A seismic hazard area is classified as those areas subject to severe risk of earthquake damage as a result of seismically -induced landslides, earth adjustments, settlement, or liquefaction. The Pacific Northwest region is subject to ground shaking resulting from seismic events. It should be noted that any sloped site in this region has a certain level of seismic risk associated with it, particularly during a large -magnitude seismic event. However, given the relative density 521091SEMR144.doc Np 8 of23 Copyii&2004 Kleinfelder, Inc. Z '45i Zij :� i C) in C in 0 80 C A: in C > 0 M in 0 _Cft 0 0 C Ci M 0 Z r M Z Z 0 in t k4KLEINFELDER of the glacial soil encountered at the site, the lack of groundwater within 20 feet of the ground urflace at the time of our site visit, and the lack of evidence of disturbance due to recent seismic is events (for example: the 2001 Nisqually earthquake), it is our opinion that the site is not at a :severe risk of sustaining earthquake damage. Streann ::There are no streams that pass through the property. DEVELOPMENT STANDARDS :As specified in City of Edmonds Critical Areas Ordinance, Chapter 20.15B, the steeper west :portion of the site does classify as a steep slope hazard area, and the entire slope classifies as an erosion hazard. The site does not classify as a landslide or seismic hazard. We understand that a portion of the proposed development will involve disturbance of extreme east edge of the existing slope. Therefore, a variance may be required for erosion and steep slope hazard areas. 3.3.1 Erosion Hazard Within the erosion hazard area, an approved erosion control plan will have to be prepared in accordance to Chapter 18.30 ECDC. The plan will have to be approved by the City of Edmonds d be maintained as much as possible on the prior to site development. Natural vegetation shoul surface of the slope during construction, to avoid creating potentially hazardous geological conditions 3.3.2 Steep Slope Hazard Because portions ofthe slope adjacent to the site site classifies as a steep slope hazard area, the C in rifical Areas Ordinance Aill require a buffer zone and build g setback. Typically, buffer zone in es are 50 feet and 15 feet, respectively. According to the Critical and build g setback distanc Areas ordinance, the buffer zone and building setback distance requirements can be reduced o ' f eliminated if the city grants an exemption or exception pursuant to ECDC 20.15B.040. A variance can be granted pursuant to ECDE 20.15B. I 70(A). 4.0 DESIGN RECOMMENDATIONS 4.1 GENERAL The following paragraphs present our design recommendations for use by you and your hese nsultants on this project. For satisfactory and successful construction of this project, t CO reconuriendations must be applied in their entirety and in conjunction with the construction endations provided in Section 5.0. recomm 52109/SEA4RI44.doc Page 9 of23 Copyight 2004 KkinW&r, Im. --i -n 0 m in 0 80 in in Z jo —4 i C —Z C :� —(/) I 0 -n n in M a 0 0 Fn C o) C (1) in 0 Z 74 X Z Z 0 in kn KLE1 NF EL DER 4.2 SITE PREPARATION AND EARTffWORK 4.Z1 Demolition Demolition at the site will include removal of the existing building, paved parking and drive areas, Portland cement concrete slab, and other site developments and debris found in the area of the proposed building and new parking lot. We recommend that all excavations made during demolition activities, including excavations for footings, underground storage tanks, and utilities, be backfilled with structural fili as recommended in this report. The demolition debris should be removed from the site, and disposed of properly. Alternatively, Portland cement concrete demolition debris can be crushed and used as fill. 4.2.2 Excavation Excavation: Before placing structural fill to establish foundation, floor slab, and/or pavement section grades, the exposed soil should be prooftolled or hand probed. Unsuitable soils should be overexcavated as recommended below. Excavation work can be performed with conventional earthmoving equipment. Prooftolling and Overexcavation: After general site excavation has been completed to the: planned subgrades, the exposed soil surface should be either proofrolled and/or hand probed to identify soft areas that require over excavation. Prooftolling should be performed with either a fully -loaded tandem axle dump truck, a fully -loaded scraper, and/or a fully -loaded front-end loader. A minimum of two passes should be performed when proofrolling. Prooftolling and handprobing should be performed under the guidance and observation of the geotechnical engineer. Soft soils encountered during prooftolling or probing should be overexcavated to a firm and unyielding subgrade, and replaced with structural fill. Overexcavation should extend beyond the footing a distance equal to the depth of the excavation below planned subgrade elevation. Structural Fill: Structural fill consists of the soil materials used to establish grade beneath structural elements, such as spread footings, floor slabs and pavement sections. Structural fill should consist of on -site fill, native recessional outwash, native colluviurn with organics and other deleterious materials screened out, and/or imported select fill as defined in Section 5.0; and should be compacted to the following minimum relative compaction based on ASTM D1557 (Modified Proctor) compaction test methods: Foundations and Floor Slabs: 95 Percent Pavement Subgrades: 95 Percent (upper 2 feet) 52109/SEA4RI44.doc Past 10 of23 Copyright 20W KIcirtrelder. Inc. k'9 KLEINFELDER Pavement Subgrades: 90 Percent (below 2 feet) Topsoil is not suitable for use as structural fill, but can be used for non-structural backfilling and landscaping purposes. excavating Fill Placement and Compaction Upon completion of stripping, general proofrolling/hand probing, and overexcavating, structural fill should be placed and compacted M described in Section 5.0 to achieve design elevations. 4.Z3 Slopes Temporary Slopes (Maximum height of 10 feet) Cut: Maximum 1-1/2:1 H:V (horizontal:vertical) Compacted Structural Fill: Maximum 1-1/2:1 H:V Permanent jo�s (Maximum height of 10 feet) Cut: Maximum 2:1 HN Compacted Structural Fill: Maximum 2:1 HN Permanent gravity buttress or soldier -pile retaining walls can be designed for the heights and grades desired at the site. Temporary. Excavations General All excavations must comply with applicable local, state, and federal safety regulations including the current OSHA Excavation and Trench Safety Standard s and WISHA Safety Standards for. Construction Work. Construction site safety is the sole responsibility of the Contractor, who shall also be solely responsible for the means, methods, and sequencing of construction operations. We are providing the information below solely as a service to our client. Under no circ unistances should the information be interpreted to mean that Kleinfelder is assuming responsibility for construction site safety or the Contractor's activities; such responsibility is not being implied and should not be inferred. Excavations and Siopes The Contractor should be aware that slope height, slope inclination, or excavation depths (including utility trench excavations) should in no case exceed those specified in local, state, 52109/SEA4R144.d. Pagc I I of23 Copyright 2004 Kicinalder, Inc. z 0 a m m 40 0 m z z 0 In M D—O) 0 0 C z -4 z 0 m k'4 K L E I N F E L D E R and/or federal safety regulations (e.g., OSHA Health and Safety Standards for Excavations, 29 CFR Part 1926, or successor regulations). Such regulations are strictly enforced and, if they are not followed, the Owner, Contractor, and/or earthwork and utility subcontractors could be liable for substantial penalties. Construction Considerations Heavy construction equipment, building materials, excavated soil, and vehicular traffic should not be allowed within one-third the slope, height from the top of any excavation. Where the stability of adjoining buildings, walls, or other structures is endangered by excavation operations, support systems such as shoring, bracing, or underpinning may be required to provide structural stability and to protect personnel working within the excavation. Earth retention, bracing, or underpinning required for the project (if any) should be designed by a professional engineer registered in the State, of Washington. During wet weather, earthen berms or other methods should be used to prevent runoff water from entering all excavations. All runoff water should be collected and disposed of outside the construction limits. Slope Protection Temporary slopes should be protected from the elements by ' covering with a protective membrane consisting of plastic sheeting or some other similar impermeable material. Sheeting sections should overlap by at least 12 inches and be rightly secured with sandbags, tires, staking, or other means to prevent wind from exposing the soils under the sheeting. Permanent slopes should be planted with a deep-rooted, rapid -growth vegetative cover as soon as possible after completion of slope construction. Alternatively, -the slope should be covered with plastic, straw, etc. until it can be landscaped. 4.3 SEISMIC DESIGN CRITERIA The following seismic design criteria should be used for the design of the proposed building. Recommendations for both Uniform Building Code (UBC) and International Building Code (IBC) are provided. 4.3.1 UBC Seismic Design Criteria In accordance with Section 1636 of the 1997 UBC, the following seismic design criteria should be used: Site Profile: 52109/SEMR144.d� Copyright 20M Kicinfelder. Inc. So (Stiff Soil profile) Page 12 of23 z 0 C in -40 0 C in 10 -4 0 X in m 0 V; K 0 0 C r 20 z __4 3: z 9 0 m k 'g KLEINFELDER Seismic Zone: 3; Z 0.30 Seismic Source Type: A Seismic Coefficient, C.: 0.36 Seismic Coefficient, C,: 0.54 4.3.2 IBC Seismic Design Criteria In accordance with the 2003 IBC and based on the results of the standard penetration tests performed at the site, we believe a Site Class ofl) is appropriate. Spectral parameters for short - duration period and I -second period accelerations for Site Class D in the vicinity of the site are calculated at 1.26g and 0.65g, respectively. 4.4 SPREAD FOOTING FOUNDATIONS We judge that a conventional shallow foundation system, such as spread footings, will provide satisfactory support for the proposed development. Specific design recommendations are presented in the following section. Specific construction recommendations are presented in Section 5.0. Foundation -Bearing Soil: Firm and unyielding native recessional outwash or compacted structural fill placed directly on a firm and unyielding native recessional outwash. All colluviurn must be stripped and removed from the building footprint. Note: On -site fill and native recessional outwash are suitable for use as structural fill. Colluviurn can be used as structural fill, provided organics and other deleterious materials can be screened out. Minimum Footing Depth of Embedment Perimeter and Isolated Footings: 24 inches below the lowest adjacent final exterior grade Interior Footings: 24 inches below top of floor slab Minimum Footing Lateral Dimension Spread Footings: 24 inches Continuous Footings: 24inches 52109/SFA4R144.doc Page 13 or23 Copyright 2004 Kicinfelder, Inc. z 0 m a I ' -40 0 C mm CZ 0M .n M M 0 0 m C at (A 0 56 z z 9 0 In M KLEINFELDER Footing Excavation Protection If footing excavations are opened during the winter season or periods of wet weather, itRill be helpful, because of the moisture sensitivity ofthe exposed soils, to provide a lean concrete mud mat, gravel layer, or tent to protect the subgrade until footings are poured. Allowable Soil Bearing Pressure Foundations Bearing on Recessional Outwash: 2,000 psf Foundations Bearing on Structural Fill: 2,000 psf Note: Allowable soil bearing pressures are for 01 dead and live loads and may be 0 In C increased bypne-third for temporary short-term wind and seismic loads. In 0 C Lateral Load Resistance r , �"!; In Mz Passive Resistance: Colluvium: 150 pounds per cubic c: > foot (pcf) equivalent -n fluid weight (EFW) o Recessional Outwash or Structural Fill: 220 pounds per cubic M In foot (pef) e, quivalent Vi a 0 fluid weight (EFW) 0 m C CO Coefficient ofFriction: m 0 z Recessional Outwash & Structural Fill: 0.35 Note: The passive resistance includes a safety factor of about 2 and is based on the z assumption that all backfill around the foundation has been placed and compacted as recommended in Section 5.0. The upper foot of soil should be neglected in design Vi computations unless protected by pavement or a slab -on -grade. The coefficient of z friction includes a safety factor of 1.5. 0 M Static Settlement Total Settlement: less than I inch Differential Settlement: less than 3/4 an inch over 50 feet Time Rate: a—roximatel percern ng construction Modulus of Subgrade Reaction 52109/SEA4RI44.d. Copyright 2004 Kleinfelder, Inc. Page 14 of23 k" KI-EINFELDER K,: 200 kcf 4.5 FLOORS A concrete slab -on -grade floor system is appropriate provided the floors are underlain by firm and unyielding native recessional outwash or compacted structural fill placed directly on a firm and unyielding native recessional outwash. All colluviurn must be removed from the building footprint. The subgrade should be proofrolled or hand probed as described above prior to placing the capillary break or structural fill. In order to provide a firm base for slab construction and to provide a capillary break, we also recommend the following underslab drainage measure be included: Capillary Break: Minimum of 4 inches of free -draining gravel containing less than 5 percent fines (silt and clay -sized particles) based on the fraction passing the 3/4-inch mesh sieve. Vapor Barrier: In areas where moisture would be detrimental to equipment, floor coverings or furnishings inside the building, a vapor barrier should be placed beneath the concrete floor slab. Reinforced plastic sheeting is satisfactory for this purpose. Protection Measures: A layer of sand, approximately 2 inches thick, may be placed over the plastic sheeting to protect it from damage, to act as an aid in curing of the concrete slab, and also to help prevent cement paste from bleeding down into the underlying capillary break. Specific construction recommendations are presented in Section 5.0. 4.6 DRAINAGE Both short- and long-term drainage control measures should be included in project design and construction. 4.6.1 Short Term over the short term, we believe site and construction drainage can be reasonably well controlled by careful excavation practices. Typically, these include, but are not limited to, shallow upgrade perimeter ditches or low earthen berms, and temporary sumps in excavations to collect seepage and prevent water from damaging exposed subgrades. Drains should be included at the bottom of all temporary slopes to collect surface water flow from the slope and prevent it from flowing onto exposed building subgrades. All collected water 52109/SEA4RI44,dw hg. 15 d23 Copyriglit 2004 Kicinfelda, Inc. Z am C In -1 0 0 C M M Z Z 0 n -4 In m 0 0 0 C In 0 X Z Z In k" K L E IN F I LD E R should be conveyed under control to a positive and permanent discharge system, such as a storm sewer. 4.6.2 Permanent Over the long term, more permanent measures, such as installation of footing and retaining wall drains, should be included. All permanent drains should be conveyed to a positive and permanent discharge point well away from the structure. Roof downspouts should not be connected to footing drains, but should be tight lined separately to a positive discharge system. z This will avoid the potential for roof debris to be washed into footing drains, possibly blocking M them. Clean -outs should be provided for footing drains, retaining wall drains, and downspout tight lines. :qzfi --I M Specific site drainage details are provided below. m C M 0 Footing Excavation Drain: In event that groundwater seeps into footing excavations, it 0 C C �'z m should be possible to remove it by gently sloping the base of excavation to one or more z shallow sump pits and pumping the water from ther� to a positive, permanent discharge C: — > system. The exposed footing subgrade should be protected from softening by placement Vi oferushed rock or a lean mix material. om n • Footing Drains: These drains should be installed after construction of the building m M C-0 footings and immediately before backfilling against building stem walls. 0 0 F; C: to • Surface Runoff. Interceptor ditches or trenches or low earthen berms should be installed M 0 Z r- along the upgrade perimeters of the site to prevent surface water runoff from precipitation or other sources from floAring over the face ofexcavated slopes or onto graded areas. We recommend that a surface interceptor ditch be placed every 25 feet (slope distance) on z slopes exceeding 25 feet in height. in z 0 • Downspout or Roof Drains: These should be installed once the building�s roof is in 4 place. They should discharge in tight line to a positive, permanent drain system. Under 0 m no circumstances connect these tight lines to the perimeter footing drains. 4.7 UTILITIES The contractor should be responsible for the safety ofpersonnel working in utility trenches. We recommend all utility trenches, but particularly those greater than 4 feet in depth, be supported in accordance with state and federal safety regulations. 52IMEA411144.doo P.go 16 of23 Copyright 2004 YJ.M.1der, I... KLEINFELDER Utility trench backfill should consist of structural fill. The onsite fill and native recessional outwash are suitable for use as structural fill in utility trenches. Colluvium can be used as structural fill in utility trenches, provided organics and other deleterious materials can be screenedout. Topsoil is not suitable for use as structural fill. Altematively,an imported select fill material that meets the requirements described in Section 5.2 can be used as a structural fill. The percent compaction required for utility trench backfill is 95 percent of the maximum dry density of the backfill, as determined in the laboratory by AS'fM Standard D 1557 (Modified Proctor). Particular care should be taken to make sure bedding or fill material is properly compacted in place to provide adequate support to the pipe. Jetting or flooding is not a substitute for mechanical compaction and should not be allowed. 5.0 CONSTRUCTION RECOMMENDATIONS 5.1 GENERAL 5.1.1 Description This section presents our recommendations for the geotechnical aspects of construction. Specifically, we cover earthwork, drainage, and pavement. Our design criteria are based on these construction recornmendations; therefore, these recommendations should be incorporated into the project specifications in their entirety. S.L2 Standard Specifications Where possible, we refer to the 2004 Edition of the State of Washington Standard Specifications for Road, Bridge, and Municipal Construction (Standard Specifications). 5.1.3 Reference Standards Reference Standards are referred to by agency or association initials and are from the latest editions of the following: ASTM -American Society for Testing and Materials: Annual Book ofASTM Standards 5.L4 Geotechnical Engineer a We recommend you retain Kleinfelder during construction to observe and test the geotechnical aspects ofthe contractor's work. This will allow us to compare the actual conditions encountered oil with those expected by this investigation and to modify our recommendations, if necessary. 52109/SEA4R144.doc Page 17 of23 Copyright 2004 YJ6nf0dtr. Int. z a m C in 0 80 C M M z 'o-4 C 0 _111 X in M a- 0 0 1 r- CTz (1) Q 0 Z ;0 z z 0 Z5 in k9 KLEINFELDER -time basis to check that the contractor's work VJeirifelder should be present at the site on a full conforms to the geotechnical aspects of the plans and specifications. The daily field reports and final reportiorm. an important record of construction. Observation and testing by the geotechnical engineer, however, should not in any way release the contractor from the responsibility of performing the work in such a manner as to provide a satisfactory job that meets the requirements of the project plans and specifications, or from meeting contractual obligations to the owner. 5.1.5 Geotechnical Report This report has been prepared for Mesher Shing & Associates and its design consultants for the design of this project only. The entire report should be provided to contractors for their bidding or estimating, but not as a warranty of the subsurface conditions. We cannot be responsible for the interpretation by others of the information contained in this report. 5.1.6 Construction Site Safety Our scope of services did not include construction safety practices and this report is not intended to direct construction means, methods, techniques, sequences, or procedures, except as specifically described, and then only for consideration in design, not for construction guidance. The contractor should be made responsible for construction site safety and compliance with local, state, and federal requirements. 5.2 EARTHWORK Earthwork consists of placing and compacting fill; utility backfilling; and all subsidiary work necessary to complete the grading of the developed areas to conform to the lines, grades, and slopes shown on the plans. 5.Zl Materials Ile on -site fill and native recessional outwash obtained at the project site during excavation are suitable for use as a structural fill beneath footings, slabs -on -grade floors, or pavements. These materials can also be used for general backfill and landscaping purposes. Colluvium can be used as structural fill, provided organics and other deleterious materials can be screened out. Topsoil is not suitable for use as structural fill, but can be used for non-structural backfilling and landscaping purposes. Imported select fill material should consist of clean, free -draining sand and/or gravel containing less than 5 percent fines (silt- and clay -sized particles), based on the fraction passing the %-inch 52109/SEMR]44.d� Pap I& d 23 C�ppiiiht 2004 KwnWda, Im z 0 M in m 0 0 C M m Z C Ft > E: :� 0 -n n ;D m M a 0 0 C co K 0) M 0 M z 9 0 m k" K L E IN IF E L D E R sieve. A greater fines content is acceptable, provided it is approved in advance by the geotechnical engineer. The contractor should submit sampleg� of each of the required earthwork materials to the geotechnical engineer for evaluation and approval prior to use. The samples should be submitted at least 4 days prior to their use and sufficiently in advance of the work to allow the contractor to identify alternative sources ifthe material proves unsatisfactory. 5.Z2 Terins Terms used in this section are defined as follows: Percent Corm)act is the required in -place dry density of the material, expressed as a percentage of the maximum dry density of the same material as determined in the laboratory by ASTM Standard Dl 557 (Modified Proctor). Optimum Moisture Con is the moisture content (percent by dry. weight) corresponding to the maximum dry density of the same material as determined by ASTM Standard DI 557. Moir Sensitive Soil is soil containing more than 10 percent fines (silt- or clay -sized particles) based on the fraction passing the 3/4-inch sieve. Structural Fill is fill material placed and compacted in areas that underlie structures or pavements. It should be compacted to the Percent Compaction specified in Section 4.2. It has a maximum particle size of 6 inches. 5.2.3 Quality Control Proper geotechnical observation and. testing during construction is imperative� to allow the geotechnical engineer the opportunity to verify assumptions made during the design process. The recommendations provided in this report are based on the assumption that an adequate program of tests and observations will be conducted during . the construction phase in order to evaluate the compliance with our recommendations. 5.2.4 Seepage Control Runoff or groundwater seepage that would interfere with the contractor's work should be controlled during construction. Control may consist of temporary drainage ditches or subsurface drains. Installation of such measures should be the contractor's responsibility. 52 1 1091SEA4RI44.d- Page 19 of23 Copyright 2004 Kleinfelder, Inc. r Z m 0 0 C -i K V� C 2 0 -n m M 0 0 m C_ K (7 0) M 0 M > Z Z m k4K L E I N F E L D E R 5.2.5 Demolition Demolition at the site will include removal of the existing buildings, paved parking and drive areas, wood railroad tile retaining wall, Portland cement concrete slab, and other site developments. The demolition debris should be removed from the site, and disposed of properly. Alternatively, Portland cement concrete demolition debris can be crushed and used as fill. 5.2.6 General Excavation General excavation consists of removing soil to sufficient depth to achieve design grades. The contractor should be responsible for excavating and disposing ofor reusing excavated material. Z -04 Based on the undated drawing provided by Mesher Shing & Associates, the proposed building mill have a finished floor elevation of 300.4 feet above MSL. Based on the existing site grade of =i __q 300 feet above MSL in the footprint of die proposed building, we anticipate cuts and fills of less m C: then I feet will be required to level the building pad at the proposed final floor elevation. M Excavation work can be performed with conventional earthmoving equipment. 0 3: M After design grade is reached, exposed soils should be prooftolled and/or hand probed to identify M Z soft or unstable areas requiring additional excavation and replacement with structural fill. These C 2 > procedures help delineate soft or weak soils. Proofrolling should be performed with either a 55 fully -loaded tandem axle dump truck, a fully -loaded scraper, and/or a fully -loaded front-end 0 -M" -TI � j loader. A minimum of two passes should be performed when prooftolling. Hand probing should —4 X C i, M M be performed by the geotechnical engineering technician with a Vinch-diameter steel bar. 0 r- Proofrolling and haridprobing should be performed under the guidance and observation of the 0 M C Co geotechnical engineer. Soft soils encountered during prooftolling or hand probing should be C CI) M 0 Z overexcavated to a firm and unyielding subgrade, and replaced with structural fill. Overexcavation should extend beyond the footing a distance equal to the depth of the excavation M below planned subgrade elevation. All final surfaces exposed by the complete excavation should Z be finished true to line and grade and present a smooth, firm surface. After a rainfall, construction equipment travel on the exposed site subgrade should be minimized Z until the soils have been allowed to dry sufficiently. Otherwise, traffic activity on the wetted m subgrade will degrade the exposed materials and result in additional excavation of the disturbed materials. S.Z7 Structural Excavation The work addressed in this section covers excavation and backfill for structural elements such as the proposed foundations, floor slab, and pavements. 52109/SEA4RI44.dw Np 20 OM C.Pyright 2004 Kitinf0der, Im. k'g KLEIN FELDER Excavation for footings, floor slab, and pavements should be performed after site preparation is completed. Excavations for footings should be -performed so as to avoid disturbing or loosening adjacent soils. Footing excavations should extend into foundation-beanng material to the depth shown on the plans. Excavations should be kept free of water at all times and all loose material should be removed from excavations prior to placement of forrinvork, reinforcing steel, concrete, or backfill. The contractor shouldinform the geotechnical engineer after the footing excavations have been z completed and before placement of reinforcing steel, formwork, or concrete. The geotechnical engineer should then observe foundation excavations and provide written confirmation that the 0 footings bear on the expected foundation -bearing material. After placing foundation concrete, =i �n backfilling with structural fill should be performed. a In C 5.2.8 Weather Considerations M 0 0 During winter weather and in areas where the exposed subgrade may consist of moisture- X In sensitive soils (soils containing more than 10 percent fines based on the fraction passing the 3/4- MZ inch sieve), the contractor should take measures to protect foundation excavations once the geotechnical engineer has approved them. These measures could include, but are not limited to, U5 placing a layer of pea gravel, crushed rock or lean concrete on the exposed subgrade, or 0 -n _n covering the exposed 'subgrade with a plastic te nt. If additional overexcavation is required because the subgrade was not protected, the cost of such additional wo rk should be bom e by the In m a Vi contractor. 0 C 001 During dry weather, the contractor should take measures to protect the foundation excavations' rn 0 exposed subgrade soils from drying out. These measures may include watering the subgrade as necessary. If the subgrade soils dry out and become loose, they should be moisture conditioned and recompacted to the percent compaction specified. z 5.Z9 Structural Fill Construction V5 z This section covers placement and compaction of earth materials to create structural fill. 9 0 in Soil used for structural fill should be moisture conditioned to within 3 percent of optimum moisture content, placed in level lifts not exceeding 8 inches in loose thickness, and compacted to �the specified Percent Compaction (as defined in Section 5.2.2) to produce a firm and unyielding surface. If field density tests indicate the required Percent Compaction has not been obtained or the surface is pumping and weaving under construction traffic, the fill material 52109/SFA4RI44.d.c Pap 21 of23 copyfight 2OD4 Kicinfelder. I- k'q KLEINFELDER should be reconditioned as necessary and recompacted to the required percent compaction before placing any additional material. Fill slopes should be compacted by slope rolling and trimming, or should be overfilled and trimmed back to plan grade to expose a firm, smooth surface free of loose material. 5.Z10 Utility Trench Backfilling and Compaction This section covers backfilling of all utility trenches at the site. Z 0 The contractor should be responsible for the safety of personnel working in utility trenches and but those than 4 feet in UST excavations. We recommend all utility trenches, particularly greater depth, be supported in accordance with state and federal safety regulations. :q -4 M C Utility trench backfill should consist of structural fill constructed as discussed above. If m 0 backfilling is performed during periods of winter weather, it may not be possible to achieve 0 C adequate compaction with structural fill material unless it is sufficiently well drained. Within M m building areas, and the upper 2 feet below grade in the surrounding parking areas, utility trench backftil should be compacted to at least 95 Percent Compaction; below 2 feet in the surrounding Z parking areas, it should be compacted to at least 90 Percent Compaction. Particular care should o"n be taken to make sure bedding or fill material is properly compacted in place to provide adequate __4 support to the pipe. Jetting or flooding is not a substitute for mechanical compaction and should mm not be allowed. 0, 5.3 DRAINAGE drainage and drain lines in the areas 0 -4 r T :", This section covers the placement of aggregate materials X and to the lines and grades shown on the plans. Z 5.3.1 General The materials that we recommend be used for site drainage are as follows: Z Capillary Break- Minimum of 4 inches of free -draining gravel containing less than 5 percent fines (silt and clay -sized particles) based on the fraction passing the 3/4-inch m mesh sieve. Free -draining Granular Material: Should consist of clean, free -draining gravel or crushed rock meeting the requirements of Section 9-03.12 (2), "Gravel Backfill for Walls," on page 9-27 of the Standard Specifications. 52100EMR144.doc Page 22 of23 Copyright 20N KIcinfelder, Inc. k4K L E I N r E L D E R Drain Pipe: Should be smooth -walled, rigid PVC or other rigid pipe conforming to the minimum sizes and dimensions shown on the plans. Corrugated plastic pipe should not be used because it has a tendency to crush and become blocked, and is often laid without a gradient. 5.3.2 Concrete Slab -on -Grade Drainage are satisfacto y compacted and subgrade preparation After structural and utility trench backfi ril is completed, the capillary break should be placed in a manner to prevent segregation and should be compacted with appropriate vibratory equipment to provide a tight particle interlock. Any free water that has collected in the capillary break should be drained or removed by pumping before concrete is placed. 6.0 ADDITIONAL SERVICES The recommendations made in this report are based on the assumption that an adequate program of tests and observations will be made during construction to verify compliance with these recommendations. These tests and observations should include, but not necessarily be limited to, the following: observations and testing during site preparation, earthwork, and structural fill placement. Testing and inspection of concrete, masonry, structural steel, fireproofing, and roofing materials. Consultation as may be required during construction. We recommend that project plans and specifications be reviewed by us to verify compatibility with our conclusions and recommendations. In particularly, we recommend the final grading and earth retention system plans for the existing slope be reviewed by us for slope stability issues. Also, Meinfelder maintains fittly-accredited WABO-certified laboratory and inspection personnel, and are available for this project's testing and inspection needs. Information concerning the scope and cost for these services can be obtained from our office. 521091SEMR144.doc Pagc 23 of23 Copyright 2004 Kicinfelder, Inc. Z 0 om C 0 0 -4 0 -4 3: m in Z > 0 -n in M a V- 0 0 in (i) cc/) I'� in M > Z Z 0 m Copyright- 2004 Kleinfelder, Inc., All rights reserved. Not td Scale Vicinily Map FIGURE SHKLEINFELDER Proposed Pagliacci Restaurant Edmonds Way PROJECT NO. 52109 December 2004 Edmonds, Washington > o \ X NEW EXISTING T3 14 < DEMOLITION SITE- PLAN -N�E, 'p JPAMNG ADA PARKI G SIGNAGE 4 S�.I.: 1/2- 29 Me 29W W-D, -;opyright- 2004 KJoinfeWer, Inc., Urights reserved. G:52109ISitePlan z 0 0 a m -40 0 c in z 0-4 c 0 n m M 0 0 c m M 0 z z m NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. to co EXISTING ADJ. BUILDING 'j2-9Z A REMOVE EXISTING ASPHALT PAVEMEN, REMOVE ONE S RY S RY BRICK BUILDING I ING B-1 REMOVE CONC. WALL REMOVE WOOD STRUCTURE \ 1�n Le end HA- Hand-Augered boring 0 and approximate location B-1 Drilled Boring and Scale: 1"= 29 approximate location Reference: -s#e Plan-mvided by Mesher Shing Ass9clates and dated Decamber 10, 2003. Proposed Paglia-1 R ' U=L . FIGURE Edmwds WaY Site Plan r :dm-d�, W.WVf- 'IE Pmjecl. 42054 Apfil 2004 z 0 0 M C M 0 0 C Mz C 0, M M v V; I,, 0 0 C M X -4 z z 0 r" SOIL CLASSIFICATION CHART MAJOR DIVISIONS SYMBOLS TYPICAL DESCRIPTIONS GRAPH LETTER GRAVEL AND GRAVELLY SOILS CLEAN GRAVELS (LITTLE OR NO FINE�) 1;0 *;, 0 '00 '6 0 so* . * *!.*! GW WELL-GR&DED GRAVELS. GRAVEL SAND MIXTURES. 09 TO 15% FINES 0. jo Cy. a 000000 j0051 30 O�'� GP POORLY -GRADED GRAVELS. GRAMEL-SAND MIXTURES. 07 TO 15% FINES COARSE GRAINED SOIL MORE THAN 509 OF COARSE FRACTION RETAINED ON NO. 4 SIEVE - GRAVELS WITH FINES (APPRECIABLE AMOUNT OF nNES) io $00-0-1. ;a 0 04 05 GM SILTY GRAVELS, SILTY GRAVEL- SAND MIXTURES CLAYEY GRAVELS, CLAYEY GRAVEL SAN. MIXTURES SAND CLEAN SANDS SW WELL-GRADEO SANDS, GRAVELLY SANDS, OX TO 15% FINES MORE THAN 50% OF MATERIAL IS LARGER THAN NO 200 SIEVE SIZE AND SANDY SOILS (LITTLE OR NO FINES) 7: SP POORLY -GRADED SANDS, GRAVELLY SAND. 0% TO 15% FINES SANDS WITH FINES ... SM SL1Y SANDS, SILTY SA.D-GRAVEL MIXTURES. MORE THAN 50% OF COARSE FRACTION SC CLAYEY SANDS. CLAYEY SAND GRAVEL MIXTURES PASSING ON NO. 4 SIEVE RErIABLE F A. OF INES) ML INORGANIC SILTS AND VERY FINE nyDS' ROCK FLOUR.,SILTY OR EY FINE SANDS R CLAYEY SILTS WITH SLIGHT PLASTICITY FINE GRAINED SOIL SILTS LIQUID UMrr AND LESS THAN So CLAYS CL INORGANIC CLAYS OF LOW TO MEDIUM PLASTICITY GRAVELLY CLAYS, SANDY CLAK SILTY CLAYS, LEAN CLAYS OL ORGANIC SILTS AND ORGANIC SILTY CLAYS OF LOW PLASTICITY MORE THAN 50% OF MATERIAL IS SMALLER THAN NO. 200� SIEVE SIZE MH INORGANIC SILTS, MICACEOUS OR DIATOMACEOUS FINE SAND OR SILTY SOILS CH INORGANIC CLAYS OF HIGH PLASTICITY SILTS AND GRUE00kUTEIRR UMAITN 50 CLAYS OH ORGANIC CLAYS OF MEDIUM TO HIGH PLASTICITY HIGHLY ORGANIC SOILS .......... .......... ....... Pt PEAT, HUMUS, SWAMP SOLS WITH HIGH ORGANIC CONTENTSI NOTE: DUAL SYMBOLS ARE USED TO INDICATE BORDERLINE SOIL CLASSIFICATIONS m C In 0 80 C m o -n M M 0 0 0 C C CA IT, 0 > z z 9 0 m Proposed Pagliacci Restaurant Edmonds Way & 102nd Place Wes Edmonds, Washington SOIL CLASSIFICATION LEGEND Projeof; 42054 April 2004� Iq Proposed Pagliacci Restaurant Edmonds Way & 102nd Place Wes Edmonds, Washington SOIL CLASSIFICATION LEGEND Projeof; 42054 April 2004� Iq TE& 3PROGRAM U.&CS LAK iTORY LzZ�HELD ::F WELIJPIEZO SOIL DESCRIPTION CONSTRUCTION 4A IZ Surface: Asphaltic concrete p2VeMCnt 0 Paz 0— GP I Lsqllgl��can r�te mchc§tjIjiqk) P-SN GRAVEL WITH SAR5 COP): gray/brown, moist, medium dense, fine-grained. L) SAND WITH SILT AND GRAVEL (SP-SMY- yellow/brown, dry, medium dense, fine to medium grained, once roots. 6.4 (RECESSIONAL OUTWA SH) 9 SP - — — — — — — — — — — — — — — — — — — — - SAND WITH GRAVEL (SP): gray -brown, 5- 0/5.5 dry to moist, very dcnsc� medium -grained, some cobbles. (RECESSIONAL OUTWASH) It SP - - — — — — — — — — — — — — — — — — — — — - SAND (SP); gray to gray -brown, dry, dense, fine to medium -grained, som silt, truce gravel. 9 S1.2 16 X 10- 2 0 14 si -3 grades to very dense. 21 X 15- 30 10 S14 grades to dense. 14 X 20L Boring completed to a depth of 20 feet below the surface. Groundwater �vas not encountered during drilling. Boring was backfilled with cuttings and bentonite chips, and capped with Portland cement concrete. is DATE DRILLED: 3-12-04 SURFACE ELEVATION (feet): 301.0 DRILLING METHOD: USA LOGGED BY: F. Reinart TOTAL DEPTH (feet): 20.0 DRILLER: Boll REVIEWED By. J. Schmidt DIAMETER OF BORING (in): 8" CASING SIZE: N[A Proposed Pagliacci Restaurant Appendix 102nd Place West and Edmonds Way ELEINFELDER Edmonds, Washington I A-2 GEOTECHNICAL A" ENMONMENTAL ENGINEERS BORING LOG SODS =IATERIALS TESTING P..CTNUMBE-' B-1 _ PAGE I of I z 0 M :4 TI 0 -40 0 C -4 r !f, M z ,0-4 C ,n m In a aj or- 0 m c: 0) C to m M z z m U.S.( TE: Z PROGRAR__ WELLIPIEZO E� so DESCRIPTION CONSTRUCTION Z E 0 S g, -Z Surface: Asphaltic concrete p2VCnlCnt 0 GP tlLqoncLc e C' .5 Ln IvLs LhLck 'm sp GRAVEL WITH SAND (GP): gray -brown, Imois4 medium dense, fine-grained. I LD SAND WITH GRAVEL (SP): gray, dry to moist, loose, fine to medium -grained, some sflt� trace roots. 12.8: 4 S2_1 P-Sh (_CQ U�U V_R_W_ L - - - - - §A 45 WTM SILT (SP-SM): brown, 4 moist, loose, fine- to medium -grained, trace 5- 4 gravel, trace roots. (COLLUVRM SM ":m4es-to FAX-Iz'_CL—_ 2�tmqnont_s_ SILTY SAND (SM): gray -brown, moist, medium dense, fine- to meditun-grained, a some gravel. (RECESSIONAL OUTWASH) 8 S2-2 grades to trace gravel. 13 10- 16 a _X 12 S2.3 20 grades to very dense. 31 a 20 some lenses offine�grained sand, 2.0 tsf unconfined compressive strength (pocket enetrometer). (RECESSIONAL OUTWASH) Bonng completed to a depth of2O feet below the surface. Groundwater was not encountered during drilling. Boring was backfilled with cuttings and bentonite chips, and capped with Portland cement concrete. DATE DRILLED: 342-04 SURFACE ELEVATION (feet): 300.0 MULLING METHOD: USA 9! LOGGED BY. F. Ittluart TOTAL DEPTH (feel): 20.0 DRILLER: Holt REVIEWED BY: .13cbraldt DIAMETER OF BORING (in): 8" CASING SIZE: N/A Proposed Pagliacei Restaurant Appendix k"KLEINFELDER 102nd Place West and Edmonds Way Edmonds, Washington A-3 GEOTECHN11CAL AND ENVIRONMENTAL ENGINEERS SOILS AND MATERIALS TESTING BORING LOG it PROJECT NUMBER: 42054 B-2 PAGE I of I TES ; PROGRAM U.S.CIL LAB, ATORY LzZTLD OL WELLTEEZO _02, SOIL DESCRIPTION CONSTRUCTION -9 E 0z XO S-f—: uati—eg.tmi.. — — — — — — — — — sm — — — — — — SILTY SAND (SM): brown, moist, loose, fine- to coarse -grained, with roots, trace gravel. sm SILTY SAND (SM): brown, mois4 loose, fine- to medium -gained, some gravel, trace roots. SHAI-1 SM WCESSIONAL OUTWASH) grades to gray -brown, medium dense, no Toots. 5- 7 Boring terminated at a depth of 7 feet below the surface due to refusal in dense recessional outwash. Groundwater was not encountered during drilling. Boring was backfilled with cuttings. DATE DRILLED: 3-12-04 SURFACE ELEVATION (feet): 309.0 DRILLING METHOD: Hand Auger LOGGED KY.: F. Reinart TOTAL DEPTH (feet): 7.0 DRILLER: Weiaftld,r REVIEWED BY: J. Stlunkft DIANIETER OF BORING &): 3" CASING SIZE: N/A Proposed Pagliacci Restaurant 102nd Place West and Edmonds W ay k4KLEINFELDER Edmonds, Washington EAPpendix A - 4 GEOTkCHNICAL AND FNVIERONMENTAL ENGINEERS 130R-U'4G LOG SOILS ANDM[ATERIALS PROJECT NUNGF11,42054 TESTING RA -I PAGE Iorl I z 0 In 0 In C MO --10 00 C -j M ?� x In In Z 0-4 C 2 6 r- -4 0 -n n jxd In a 0 0 Fn C o) C (j) In 0 Z T" .1 z z 0 In TEST PROGRAM U.S.C.S. LABG_ JURY I FIELD WELUPEEZO > L-1 0 SOIL DESCRIPTION C ONSTRUCTION 9 o z Surface: native vegetation no a ,4 z SM SILTY SANDT9&i�. fine- to coarse -grained, with roots, trace e SIIA2-1 gravel. (COLLUVIUM) z SM SILTY SAND (SM): brown, moist, loose, fine- to triedium-grained, some gravel, trace roots. z (RECESSIONAL OUTWASH) C SM grades to gray -brown, medium dense, no z roots. 7 During terminated at a depth of 7 feet W below the surface due to refusal in dense recessional outwash. Groundwater was not E_ encountered during drilling.'Boring was < backfilled with cuttings. a z C z z 2 DATE DRILLED: 3-12-04 SURFACE ELEVATION (feet): 305.0 DRILLING METHOD: Hand Auger e, LOGGED BY: F. Reimtrt TOTAL DEPTH (feet): 7.0 DRILLER: JOeinfelder REVIEWED BY: J. Sch-idt DIAMETER OF BORING (in): 3" CASING SIZE: NIA Proposed Pagliacci Restaurant Appendix 102nd Place West and Edmonds Way ---IKLEINFELDER Edmonds, Washington A-5 GEOTECHNICAL AND ENVIRONMENTAL ENGINEERS BORING LOG SOILS AND MATERIALS TESTING HA-2 PAGE I of I PROJECT NUMER:..42054 z -24 0 In -4 -n Ar C In 0 C) 0 C -4 K f� X m M z to -q C 2 > 0 n In M a C-0 0 0 M 0 Z r- .4w X z z In -4 -n Ar C In 0 C) 0 C -4 K f� X m M z to -q C 2 > 0 n In M a C-0 0 0 M 0 Z r- .4w X z z In TES ;PROGRAM U.S.0 LAI F_ ATORY FIELD :z ff 2, WELIRIEZO q W SOIL DESCRIPTION CONSTRU CTION X 5 7 4 -Z Z Oz �0 P Surface: ..fl-"pt.1i.. 0 -- - SM — — — — — — — — — — — — — — — SILTY SAND (SM): brown, moist, loose, fine- to coarse -grained, with roots, trace gravel. �COLLLWIUM) SM ------- — — — — — — — — — — — — — - SILTY SAND (SM): brown, moist, loose, r� fine- to medium -grained, some gravel, trace SUA3-1 roots. (RECESSIONAL OUTWASH) SM grades to gray -brown, medium dense, no roots. 5 . 6 Boring terminated at a d epth of 6 feet below the surface due to refusal in dense recessional outwash. Groundwater was not encountered during drilling. Boring was backfilled with cuttings. is DATE DRILLED: 3-12-04 SURFACE ELEVATION 1,11�ct): 306.0 DRILLING METHOD: Hand Auger LOGGED BY: F. R.i.ort TOTAL DEPTH (feet): 6.0 DRILLER: Kleinf.1der REVIEWED BY: J. Schmidt DIAMETER OF BORING (in): 3" CASING SIZE: N/A Proposed Pagliacci Restaurant Appendix 102nd Place West and Edmonds Way 1114-KLEMELDER Edmonds, Washington A-6 GEOTECHNICAL AND ENVIRONMENTAL ENGINEERS BORING LOG SOILS AND MATERIALS TESTING PROJECT NUMBER: HA-3 PAGE I of I z 0 0 In 3: In In 0 00 C -4 C Nil m z 0 M In 0 0 In C (n co In 0 X 3: z m j TEST - PROGRAM U.S.C.S LABC TORY FIELD I- WELTjPff 0 SOIL DES CRIPTION CONSTRUCTION 2 2 2! z; Surface: native vegetation z sm oP_S_0JL__ J. SILTY �J_ fine- to coarse -grained, with roots, trace sm gravel. SHA4-1 SILTY SAND (SM): gay -brown, moist t medium dense, fine- to medium -grained, 3 some gravel, trace roots. 2 'Boriug��'d' OUTWASH' epth ot 3 feet below the surface due to refusal in dense recessional outwash. Groundwater was not 2 encountered during drilling. Boring was backfilled with cuttings. F C DATE DRILLED: 3-12-04 SURFACE ELEVATION (feel): 317.0 DRILLING.METHOD: Hand Auger LOGGED BY: F. Rinat TOTAL DEPTH (Ject): 3.0 DRILLER: Kicinfelder REVIEWED BY: J. Schmidt DIAMETER OF BORING (in): 3" CASING SIZE: NIA Proposed Pagliacci Restaurant Appendix 'ELDER 102nd Place West and Edmonds Way k4]KLEINF Edmonds, Washington A-7 GEOTECHNICAL AND ENVIRONMENTAL ENGINEERS BORING LOG SOILS AND MATERIALS &ROJECTNUMER: 42054 TESTING HA-4 PAGE I of I z In m C In a 0 -40 0 C M In z ,0-4 C 0 in In 0 0 m z z 0 In T LAB PROGRAM VTORY FIELD U.S.C.! 'P WELOMZ0 > Z; t. 2W 0 SOIL DES CRIPTION ;� C ONSTRUCTI[ON E g, z HE z Surface; native vegetation 73Z 0 -c; z sm fine- to coarse -grained, with roots, trace SM gravel. I STI Y SAND (SM): brown, moist, loose, fine- to medium -grained, some gravel, trace roots. (RECESSIONAL OUTWASH) SM grades to gray -brown, medium dense, no SHA5-1 roots. 6L— Boring terminated at a depth of 6 feet below the surface due to refusal in dense recessional outwash. Groundwater was not encountered during drilling. Boring was backfilled with cuttings. DATE DMLED: 3-12-04 SURFACE ELEVATION (feet): 308.0 DRILLING METHOD: Road Auger LOGGED BY: F. Rehutrt TOTAL DEPTH (feet): 6.0 DRILLER: Kleinfelder REVIEWED BY: J. Sthcnidt DIAMETER OF BORING (in): 3" CASING SIZE: NIA Proposed Pagliacci Restaurant A endix pp 102nd Place West and Edmonds Way JEW = KLEINFELDER Edmonds, Washington A-8 GEOTECHNICAL AND ENVIRONMENTAL ENGINEERS BORING LOG SOILS AND MATERIALS PROJECT NUMBER: 42054 - - TESTING HA-5 PAGE I of I z 9 0 in -4 'n Fn -4 a 'in Co 0 0 C m z z — (1) ;�� 0 _11 n;0 M m H0 M 0 ;D -4 x z --I I ca z 0 m -4 'n Fn -4 a 'in Co 0 0 C m z z — (1) ;�� 0 _11 n;0 M m H0 M 0 ;D -4 x z --I I ca z 0 m k" KLEINFELDER Sunrise Development Site 102,d Place West North A'�ross z 55 C m M 0 0 Mz m M 055 0 0 C cl) Q) M 0 z 0 z 0 m 5! w 4 M, 6V E7� V "4; s ik�WGB-2 411 A EX C.B. Or LEGEN GB-1 Boring number and approximate location 9 40 0 APPROXIMATE DRAWING SCALE: I *= 40' Reference: Prelilrninary Site Plan. Prepared by Lovell Sauerland and Associates. Inc.. Dated August 15, 2000 KLEINFELDER Site Plan FIGURE Edmonds Way and 102nd PL West Edmonds, Washington 2 Project: 60-2100-01 August. 2000 98020 z C m m 0 0 80 C m M 6) 0, -n m T a 0 0 C TO 0 r Z m SOIL CLASSIFICATION CHART SYMBOLS TYPICAL MAJOR DIVIS ONS DESCRIPTIONS GRAPH LETTER WELL -GRADED GRAVELS. GFLAVEL CLEAN GW S D MIXTURES. Ln rLE OR NO AINNE GRAVEL GRAVELS F S 0 GP POORLY -GRADED GRAVELS. GRAVEL - SAND MIXTURES, LITTLE AND WTTUE OR NO FINES) GRAVELLY SOILS OR NO FINES z GM SILTY GRAVELS. GRAVEL - SAND - COARSE GRAVELS WITH SILT MIXTURES GRAINED MORETHAN50% FINES m SOILS OFCOARSE FRACTION APPRECIABLE AMOUN G C V - SAND - CLAYEY GRAVELS, GRAVEL - SAND - RETAINED ON NO. OF FINES) CLAY MIXTURES -n 4 SIEVE WELL -GRADED SANDS. GRAVELLY m C ANDS Sw _.RA..L,y SAN DS, LITTLE OR NO FINES m 0 0 CLEAN -40 0 SAND MORE THAN 50% AND (LITTLE OR NO FINES) OF MATERIAL Is S P 'LNE.j POORLY -GRADED SANDS, GRAVELLY SAND. LITTLE OR NO C -4 C M LARGER THAN NO. SANDY FINES 4 200 SIEVE StZE SOILS c — z S M SILTY SANDS. SAND - SILT )� SANDS WITH MORE THAN 50% OF COARSE FINES MIXTURES 0 FRACTION PASSING ON NO- 4 LAPPREciAmr: AMOUN SIEVE SC CLAYEY SANDS. SAND - CLAY MIXTURES -n -4 OF FINES) 'C SILTS AND VERY FINE x m IN R13AN 0 PLO UR. SILTY OR ac-0 M L S AN R - FIN. SAN OR CLAYEY �:'Y. -C S 0 LASTICITY INORGANIC CLAYS OF LOW To o C (n (A SILTS LIQUID LIMIT C L MEDIUM PLASTICITY. GRAVELLY CLAYS . SANDY CLAYS, SILTY 0 I. - AND LESS THAN 50 FINE CLAYS LEAN CLAYS.._ T ;a GRAINED CLAYS ORGANIC SILTS AND ORGANIC SOILS 0 L SILTY CLAYS OF LOW PLASTICITY z INORGANIC SILTS, mICACEOUS OR MH DiATOMACEOUS FINE SAND OR rj) I MORE THAN 50% SILTY SOILS z OF MATERIAL IS 9 -Rs,=S,ZE SILTS LIQUID LIMIT NO. 200 CH INORGANIC CLAYS OF HIGH PLAST ICITY 0 m AND GREATER THAN 50 CLAYS ORGANIC CLAYS OF MEDIUM TO OH HIGH PLASTICITY. ORGANIC SILTS 4L PT PEAT HUMUS SWAMP SOILS WITH CONTENTS OILS HIGH-6RGANI� NOTE. DUAL SYMBOLS ARE USED TO INDICATE BORDERLINE SOIL CLASSIFICATIONS SOIL CLASSIFICATION LEGEND KLEINFELDER copvt 19" - j FIGURE A-1 Proiecl mov __jffFj_N OGRAM U.S.C.S. MOM I FIELD Wee SOIL DESCRIPTION WELLTIEZO jw W CONSTRUCTION Z� A.02 x 1 z z at ';z' a S JRFACE- _P.-V-1-1 on; Z N�, —medi— SAND (SP-SM, b d%,c in me 2� ;P/S1*Af dense, fine- d'i gra d, trace silt. Z� ZZ 0 U�i 5- 13 X GB =z r z1j to- 6 GB-1-2 becomes dense Z:4 31 z e 115- 2 12 X GB-1-3 becomes very dense Z C 25 OZ 31 W-< JZ 0 20- to Ga-14 21 k- 27 1.5 Borin terminated a surface on 7/27/00. Groundwater was not encountered during drilling. Boring was backfilled with bentortite on 7/27/00. > DATE 7-27-00 SURFACE ELEVATION Met): NIA DRILLING METHOD: HSA Auger LOGGED BY: R. Yates TOTAL DEPTH (feet): 21.5 DRILLER: Gregory Drilling REVIEWED BY: Jim Schmidt DIAMETER OF BORING Qn): N/A CASING SIZE: NIA Sunrise Development FIGURE 102nd P1. West and Edmonds Way, &M—ELEINFELDER Edmonds, WA A GEOTECHNICAL AL ENGINEERS BORING LOG PAGE I of I ?ROJECTNWIBEIL- 60-2100-01 GB-1 0 TESTV U.S.C.S. LABOK SOIL DESCRIPTION es CONSTRUCTION cd 2 z W �z 'SURFACE. No SAND (SP-SM), brown, dm mcdiu ;P/Sfv dense, finc- to medium -grained, trace silt. 10- 3 GB-2-2 becomes moist 15- 5 GB-2-3 becomes dense 13 20- 13 GB-24 becomes very dense 34 is DATE DRILLED: 7-27-00 LOGGED BY' R. Yates fl—q,h-ldt z 0 d 0 0 M M 0 -40 C M M z C 0 3: M M a 0 0 M C o) C 0) M 0 Z Z z 0 In surfh,�; an 7/27/00. Groundwater -was not encountered during drilling. Boring was backfilled with bentonite on 7/27/00, SURFACE ELEVATION (fee* N/A DRILLING MTHOD; BSA Auger TOTAL DEPTH (feet). 21.5 DRILLER: Gregory DrflUg DIAMTER OF BORING (in): N/A CASINGSIZE: N/A Sunrise Development FIGURE 102nd Pl. West and Edmonds Way, KLEINFELDER Edmonds, WA A-3 GE.TEC,%CA1,=,E.rO.. IA ERIALSTEST.j�MNEERS BORING LOG FRO'JECTNUNIBER' 60-210"1 GB-2 PAGE I -f I za 2C E�- z 2 0.4 z W Z Z C z E-= ZC 0z C. nu iac NOV 18 '05 03:50PM MESHER SHING&ASSOC. P.3/3 CITY Copy MICROFILM MESHERISHING RESUB November 18, 2005 NOV 18 2005 Z BUILDING DEPARTMENT To: Ann Buflis, Assistant Building Official CITY OF EDMONDS 0 M 425-771-0221 In From: Bob Mesher Me&her Shing Fcr— A4�� Z-r�coj cr— In C IT 0 V", 206-6224981 Pax -40 OC N, 206-682-4289 � r. Re: Revision to Permit #2005-0551 IT M Project: Pagliaccl Pizza Project Address: 10200 Edmonds Way PC: Z Dear Ann: 0 In -n in response to your review comments, November 17,2005: 1. The new location ofthe ADA parking stall is now closer than the original approved design M M 0 and conforms to IBC 1106.6 for the shortest acOcssible rOUTO Oftravel, as shown in attached OM plaul. The distance oftravel is 65 feet versus the approved plan distance oftravell of75 lbet- C ot Also there is no ramp required as the property is at the same grade in the back where The new M 0 stall is located as the elevation ofthe front door. r 2. We have adjusted the exterior stairs to so the handrail does not infringe into the right-of-way, X per Plan 2. 3. We have reinstalled the public walkway that was approved in the original plan per Plan 2. Z -4 4. The clearance between the building and front column is 4'-6' and shown per Plan 2. Z I have also stamped Plan 2 and bugged the changes and revisions. 0 ITI Sinc Rob esher AIA Attached: Plan I & stamped copy of Plan 2, Copy ofReview Comments 506 Second Avenue. Suite 3300, Seattle. WA 98104 206.621,1981 '1 206,682.4269 F jIOV IB '05 03 S. m t. , .9, X 04 , 7�4- 19, '96. m 0 m m M m M 0 :z 0 < cl) G 0 10 m Ln IT, —1 m ;0 3) A m (n PLAN 0 q, �IS��N�. O�IMGIIIION �SIIE kI SITE SECTION A —A 2 A l(RiLyli STO NLY (D (D 0 �P LAN ,,A_A PAfflK111�0ACE TRAFFIC SICNS 001 pAllpllll.,Ell*ll.l. A K N.� NTO 'n T, _T� II..I. RE t).J. il-18.06 "TE w (I(P CTIT A. VE3", 01 NOV 18 2005 ql'ATI-'. OF 1.7A�!j j.'JG T(X,4 BUIL ING DEPARTMENT RW 4.. Height Calculation Worksheet Date Permit Number C>S-S I Address_VQ,�-�j 4f� �YA Inspector AAS Z. r Average Grade "30e Max Height (25'+Ave.) Actual Reight (A+B+C) 32 13 rn C: C 0 -40 0 X M M C + 9, A rwj) O"n -n M -4 3 <; =(C 1Oj 0 C 45 z M, Z Z M Elevation of transit above Datum (B) (P Datum Q— Elevation (A) 99'C&2 l/temp/building/fon-ns/height workshed '77T, RENOVATION & ESTATE SERVICES T 701 12 "Ave. N. L, Edmonds, Wa. 98020 Ph.: 425 775-3727, Fax.:425 640-873 1, Cell: 206 372-1196 IV! April 27,2005 City of Edmonds Z Building Division 0 =j 121- 5" Av. N. 0 Edmonds, WA. 98020 F, Re.: Pagliacci Pizza Project located at 10204 Edmonds Way C m In accordance with the 2003 edition of the International Building Codes Section m a 0 1705.3 this Contractor understands his responsibilities to insure all special inspections 0 8 C are carried out in accordance with the Quality Assurance Plan and with Building m Official approvals.. The General Contractor as required by work progress will m coordinate timing of such inspections. A Ed Chapman 0 -n -n n General Contractor 4 m M vi 0 Cc: Matt Galvin, Owner 41� 0 C C 01) TO -4 Z CW4 Z m FIELD. No. 57187 REPORT CASCADE TESTI—J LABCRATORY, INC . TESTING & INSPECTION ­1 N.E. I 26TH PLACE IA251823-9800 DATE 3"1 XIRKLAN , —1-ItNOTON 9803A EVERETTO (,1251 �-- 17 PROJECT P COMPRESSION REPORT LOCATION � 0 -1- .0 5:) CIJZ TO: BLDG. PERMIT NO. JOWNER WEATHER T111 AT AM - ----------- i- n- W G (f,l 57 4,,< AT I PM ENGINEER I OCT ARCHITECT ATTN: THE FOLLOWING WAS NOTED: CONTRACTOR DATA -X 7-3 FIELDTEST , f TICKET NO, 011f MIX NO.— TRUCK SAMPLED ET --T--�.ADJUS�TE 4 WEIGHTS M % GIST GIST, D WEIGH S -7 TIME -2�;)—jFTRUCK I, %AIR T W L�NIT WEIGHT �JT� YIELD YIELD EIEN c T I CIA.T.FT T. A ICEMENT FLY ASH, ASTLMUCM-P143 ST.'G M '. ASTMC-138 I CONG I AIR t t2 TO C.A. AIRTESTMETHOD: E]PRESSURE ASTM C-231 OR 0 VOLUME ASTM 0-173 EQUIPMENT USED I.D. SLUMP CONE CSLCOO THERMOMETER CCOTH0— AMMETER CCOAID— OTHER TYPE OF BREAK: ��)�.one __ ­ �­' E) Co�n�e, a n d IT E a r I -- CYLINDER NUMBER DATE MADE DATE T STED ---�G­E DAYS — SIZE AREA (SQ. IN) TOTAL _LOAD STRENGTH PSI --i�iP­E BREAK 41on 'e'v r, Z9,42 6S ff/ 7z5 QW5 / ��-ZB CONCRETE COMPRES51ON MAUHINE LO.ffUL,-UV- 0 ASTM C-1231 SAMPUNG IN ACCORDANCE WITH SAMPLE P/U DATE TEST METHOD 0 ASTM C-617 APPLICABLE CODES & SPECS. CU.YARDS PLACED CEMENTTYPE L SUPPLIER ENGTH e2 '�D C AFA ADMIX. CAC1, % DESIGN STR PLACSMENTAREA& NOTrS- TEST RESULTS A PLY ONLY TO THE ITEMS H REIN TESTED. THIS REPORT SHALL NOT INSPECTOR(S), NAME(S) PRINTED BE REPRODUCED EXCEPT IN FULL, WITH- OUT�EWRWTENAPP OVALOFCASCADE TESTING LABORATORY. INC. INSPECTOR SIGNATURE REVISED SIGNED BY COPIESTO: z 0 a m c M 0 80 c m m 0 n Lu A rn 061) 0 0 c M 0 z 0 0 m FIELD 57� CASCADE TESTINQ LABORATORY, INC. REPORT No. .....-No. TESTING & INSPECTIONN Ece:IVE:r) OAT — 9 N.E. 126TH PLACE —HINGTON 9603A 1425)`�3,9.00 '9-3"l KIRKLAND, B-117T S& 2 fi�"-" PROJECT 1 .6 p COMPRESSION Wd?QWT SERVICES LOCATION OTR CITY OF EDMONOS -7 4) ef:) L... PERMIT NOP OWNER TO:- /'qa/ WEATHER TEMR ENGINEER ARC4�'4 ATTN: THE FOLLOWING WAS NOTED: CONTRACTOR FIELOTEST DATA (3 3 73 TRUCK TICKET NO. MIX NO, F DESIG WEIG TRUCK SAMPLED UNIT TEMP CEMENT % AIR WEI HT C_138 ASTMG YIELD CEMENT C T FA R C CID C 106 At FLY ASH CA. CA. AIRTEST METHOD: El PRESSURE ASTM C-231 08 0 VOLUME ASTM C-173 OA EQUIPMENT USECIM� T:K SLUMPOONE CSLCOC�— THERMOMETER CCOTHO [TOTAL AMMETER CCOAIB�_ OTHER TYPE OF BREAK: bh— VZ 7 AM IJUSTED EIGHT ml� 111111111 CONCRETE COMPRESSION MACHINE i.D. #(;(;OL;UOO 0 ASTM C-1231 SAMPLING IN ACCORDANCE WITH SAMPLE PlU DATE TEST METHOD 0 ASTM C-617 APPLICABLE CODES & SPECS. J IS CEMENTTYPE ....... SUPPLIER CU,YARDS PLACED % DESIGN ST RENGTH AEA ADMIX. CAC12— PLACEMENT AREA & NOTES, TEST RESULTS APPLY ONLY TO THE ITEMS HEREIN TESTED. TH16 REPORT SHALL NOT INSPECTOR(S), NAME(S) PRINTED BE REPRODUCED EXCEPT IN FULL, WITH. OUTTHE WRITTEN APPROVAL OF CASCADE 'URE TESTING LABORATORY. INC INSPECTOR SIGNAI REVISED BIN SIGNED BY COPIES TO: 19 t C-) 2 e- 5 z 0 P 0 ITT c M 00 c M Z to 01 n mm a 0 m ch M 0 ;a z z 9 0 m k" K L E I N F E L D E R Construction Observation Report Date---' Project Name Client Project No. DFR No. ....... Time Arrived Project Location Contractor Bldg. Permit No. Time Departed Reviewed by Date Reviewed Travel Time . ....... D Masonry D Batch plant D Foundations 0 Concrete Type of observations D Welding D Reinforcement Steel [J Fireproofing _j Sail D Bolting pro -post Tensioned Tendon D Metal Decking Li Other Documents Referenced —I;ummary �,A Eti�eport items comply 0 Report items incomplete 0 Report items comply wi�h exceptions �cknowledged by -IZI —ki-einfelder Representative Signature Representing Page _ of Kleinfelder Representative Print Name (9m) KLEINFELDER Project Name Pa C� k' C' C Project Location Contractor P-"4 Weather — Earthwork Q DFR Given to (or left at)--, Reviewed b Y Observations/Remarks: Daily Field Report (DFR) Project No. CI -Z�C%&K- Cat I Ect,,�!n­t, �, -'�N� % , Time Arrived Technician C Time Departed Travel Time I z Qn\l Total Time (Hours) 0 Q Mileage Date Reviewed DIFR No. M C 0 1110 80 C -4 K X M �4 C 'I't M 0 E: "n X C' e—t,— d, Q 9p� Q_ �e ck m m a ro I— c_ 6s 0 0 M C M 0 Z r- M -4 X > z �'K V_/_ C Q�'NLtL W 1� \-C"r C' \I CUH-1, J, C P C. �)c C t�� r z 0 IM N�A NOTE: observations, passifaii evaluations, and/or recommendations (it applicable) provided herein have not been reviewed by an Kleinfelder Representative Signature engineer and, therefore, should be considered preliminary and subject to change. _r -,. L Kleinfelder Representative Print Name Page— of k" K L E I N F E L D E it Construction Observation Report Project Name Data Client - Project No. DFR No. Project Location t TimeArrived- Contractor Bldg, Permit No. Time Departed Reviewed by Date Reviewed.---- TravelTime--- Documents Referenced _FC, C A C C Ir l LQ� I ---Summary C. EC- C-1 \J V _-C c V, PLIReport items comply El Report it6ms incomplete 0 Report items comply with exceptions _4knowledged by Kleinfelder Representative Signature Representing �, o Page f Kleinfelder Representative Print Name z 9 0 m m M 0 80 C __4 M T, M m M z 0 _n 'n m M a 0 0 C m M 0 z 'I -4 z CA z M k" K L E I N F E L D E R Construction Observation Report Date :1, ProjectName— Client Project No. DFR No. Project Location TimeArrived Contractor Bldg. Permit No. Time Departed Reviewed by Date Reviewed Travel Time z Type of Obsemations El Masonry 0 Batch plant [I Foundations 0 Concrete E) Welding 0 Reinforcement Steel 0 Fireproofing b� soil EJ Bolting 0 Pre -Post Tensioned Tendon 0 Metal Decking 0 Other 0 M C m 0 Documents Referenced 0 C M M Z 10-4 > 0 n "n In m mmary A Ce�,�, A ck A� A. 0 0 r- 01 MO 1p­'r S c,,-, > z 't c. A� 55 z 0 m 4 — ------------- ------ -----------Lo� g Report items Comply Report items incomplete 0 Report items com ly with a t, Ar,. jwledged by Kleinfelder Reprisentative Signature Representing L.,U__ci:Jk Page — of ­(96n) Kleinfelder Representative Print Name wn,truoimi ac�Mw exempt �rom i 1, noke limit, ECC .0 "'I"trult"M iti, PERMII#: 1,1 1—suant w ECC5.3o. 120. EXPIRES'�jjlqjq City of Edmond I s ISSUED: THIS CARD MUST BE POSTED ON SITE AND AVAILABLE TO THE INSPECTOR Owner: Site Address- Jk).-..) Setbacks for �' i\j Zone Front 24�) '. -]�� Side: 0 ' - I Height: Variance#: -- Inspections Approve a e otes #1 ENGINEERING MOBILI 6ATION AND EROSION CONTROL INSTALLA711ON MUSTBE APPROVED PRIORTO CONINIENCEMENTOFADDITIONAL WORK. (425) 771-0220 x1326 Mobilization / Erosion Control I Tightline Detention Forms (sidewalk, driveL4±4) Water Service - - - - - - - - - - I - - - - - - - - - - - - - - - - - - - - - - - - I - - - - - - - - -- - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - Side Sewer �ermit # Ri�1,1�'ol-',Yay) t, (s, '. P-mg #2 SITE/DEMOLITION Pre -Demolition Asbestos PSCAA Permit Sewer Cap Cleaned Site, MI)s ssFeAd"Or— - J ITS 1 #3 FOUNDATION Setbacks Footings Foundation Wall Piers Retaining Wall Slab Insulation Zlk� fL%A __ _ _ ----------- ----------------- --- --------------------- ------------- -------- ---------------------- — #4 PLU BIN G Ground Work P, I Rough in Grease Fixture M5 erce Adh4 i+wu' L) - - - - 0�'R -------- M5 M— Il #5 PUBLIC WORKS Cross Connection Control (425) 771-0235 ,Trash Enclosure L —46 —MECH/HVAC Gas Test/Pil) Permit # Equipment TE 7 CR; #7 FRAMING Exterior Sheathirli Shear Nailing First Floor Framing Framin Height Cl,—�* I I L�4* :-� Q --------------- - ----- ----------- #8 INSULATE/ CAULK Floor Ceiling ------- --- - -------- -------- J-1 #9 SHEETROCK NAIL M� 0- 154 Olp #10 FIRE Hydrant (425) 771-0215 Fire Protection S stem Extin uishers Addressing Visibility — --- ---- ---------------- ----------------------- -------- -------------- .......... --------- it 91�IR-?R 1111. INA I, rn"Jjrl!�!Ivtli 1, I —11�p APPLICABLE,QITY D PARTMENTS HAVE GRA A FINAL APPROVA Call (425) 771-0220 x1333 for BUILDING INSPECTIONS z M 0 M C M 0 80 C M M z C > z 0 M M 0 0 0 M C 07 K co Q 0 z z 9 0 M Graf, Jeannine From: Larry Holmes [Larry@ovwater.com] Sent: Friday, March 17, 2006 12:03 PM To: Graf, Jeannine Subject: RE: Pagliaccl Pizza MICROFILM Jeannine, I looked over backfiow installations at *2(5'4 Edmonds way and have copies of test reports. They installed backflow assemblies for the irrigation system and premises isolation inside the building to avoid the use of Hot Boxes. If you have any questions please let me know, Thanks, Larry R. Holmes Olympic View Water & Sewer District 0 k" 23725 Edmonds Way Edmonds WA 98026-8981 Larry@ovwater.com -q "n Ph: 425 774-7769 Fax: 425 670-1856 m M 0 N 80 m 01 0 "T1 n X m m 0 0- 0 n CO 0 6 777777 M FINA,u PROJECT APPROVAL I %JRM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: -FIRE DEPARTMENT DATE- F-ESIGN ENGINEERING DIVISION DATE_J/_7ek�1_ PLANNING DIVISION DATE-_ PROJECT SITE ADDRE SS� (dWQ PERMIT �5.ADB#___________�DATE INSPECTED 7/0 (P DESCRIPTION OF WORK TO BE INSPECTED____&SJAJfaa�.. A field inspection was conducted to determine compliance with � approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS ad the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fbnw:ocaprv1 3/25/04 0 71 M M 0 -40 OC M M z 0 --1 0 _n 4 = 9 M M U co 0 r- 0 M C co 9 0) M 0 z 70 -4 z co z 0 A 0 M FINA� PROJECT APPROVAL F %jRM TO: DATE: — MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: —FIRE DEPARTMENT DATE— I— SIGN _______________�ENGINEERING DIVISION DATE�_ 2_x�� —PLANNING DIVISION DATE_____1LZ!La,_,_ PROJEC SITE ADDRESS lc)2�- fA-­ti &Igi PERMIT #___________—_--__--ADB#—DATE INSPECTED 3/17/G,& DESCRIPTION OF WORK TO BE INSPECTED Pks* 1, A field inspection was conducted to determine compliance with�approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS -and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED Z' Copy of CONDITIONS given to owner/contractor by inspector 1. L_A�'L� t�?3 � �I�U. 0 d4A 14. ;* FAILED FINAL INSPECTION - OUTSTANDING ISSUES q.3% 0*7 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 1. 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:forms:ocaprv1 3/25/04 z 0 C M M a __4 0 0 0 C M M z '0 o -n 3:9 M M U C/) 0 1, M co ri) M 0 Z z z 0 i 0 M FINAL PROJECT APPROVAL FORM TO: DATE:,Lko _(' MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: PRETREATMENT PLANT DATE 31Lk_L_C(0 .......... PROJECT SLCC.*� SITEADDRESS f—'Q'%OJi Wf-1 PERMIT '.10016"-0551 ADB# # INSPECTED DESCRIPTION OF WORK TO BE INSPECTED G-re--14 A field inspection was conducted to determine compliance with Approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature BTEM P\13U ILDNOF-OkM STRETREA-m ENTAPPROVAL. DOC 1/4/2005 z 0 :j 0 Vi -4 X M M a __4 0 0 0 a: M ra 0 _n M M 0 6 0 r- 0 M C: (/) J C (n M Z z --I Cn z 9 0 in FINAL PROJECT APPROVAL FORM TO: — DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION ��FIRE DEPARTMENT FROM: DIVISION DATE— —ENGINEERING z PLANNING DIVISION DATE— 0 0 P—E smN PROJEC in- --i SITE ADDRESS 6 -2-0 0 6i2l—k4e�t/P­3 0 rn PERMIT ADB#__________PATE INSPECTED 3—/6 —22 C.— __10 0 0 C -4 K M DESCRIPTION OF WORK TO BE INSPECTE 5 (--JP 60 C, M z A field inspection was conducted to determine compliance wiih�approved plans. Final approval denotes that there are no objections from the above signed Dep artment to the release of 0 PEPXORMANCE BONDS nd the granting of: :z mT 0 GRANT FINAL PROJECT APPROVAL 0 M C CD M 0 GRANT PROJECT APPROVAL WITH CONDITIONS NOTED z 0 Copy of CONDITIONS given to owner/contractor by inspector 1. Cn z FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 rn 0 Copy ofCORRECTION NOTICE given to owner/contractor by inpector 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fonns:ocaprv1 3/25/04 Cit? Of 0moubo DEPARTMENT OF BUILDINGS Of Ott"alit? PER International Suilding Code Section 110 —ru. --rids We ---�Building Permit #: 2005-0551 occupancy established by this certificate: Dwelling Units: NIA A2 Type, Construction: VB Basement: N/A Maximum occupant Load tbr (Per IBC 1004) Room capacity signs, when,required, must remain Posted at all times. Owner of Building: Pagliace! Pizz_aAddress: 10200 Edmonds THE: P I I a Restaurant_"Jillb BEEN INSPECTED AND ROVED AS COMPLYING WITH THE REQUIREMENTS OF THE ---RR29229ELZ�� LOING CODE AS ADOPTED By THE CITY FOR THE GROUP AND DIVISION OF OCCUPANCY AND THE 2 3 E—N OF THE INTERNATIONAL BUI 0' OVID U — SE 'OR WHICH THE PROPOSED OCCUPANCY IS CLASSIFIED. issued this 20 th day of _March .06 CHIEF B1kILeWG FFICIAL BY: t7l�� a, lims. Any dbang.., —apdry cruse mquired a building p,naft and d new Thl�,dnftmandl b. pa,a.d in, d.,Vl..aa publilluddlund dual a., da, ra...d. nnnilaNul d, ab—adlynd ah.11 ad -uu.luad In lagibul dd-dad- -1 C.Alfi.t.af od.p.rdy laduad by Md city af Ed-rd, Building Ofifid.l. 4 . . . . . . . . . . GARY HAAKENSON CITY OF EDMONDS MAYOR 1215TH AVENUE NORTH - EDMONDS, WA98020 - �425) 771-0220 FAX (4251771-0221 webSile: ~.dedmondsma.us DEVELOPMENT SERVICES DEPARTMENT 8913 Planning Building Engineering 3-24-08 Z Indeminity Company of California Karen L. Staffanson, Attorney 9759 3rd Ave NE #305 Seattte, WA 98115 uj m m Re: Maintenance Civil Site Bond Account # 576723S 0 0 Pagliacci Pizza Restaurant 10200 Edmonds Way, Edmonds, WA a m Dear Karen L.Staffanson, Attorney: In Z The City ofEdmonds hereby authorizes the release of the Maintenance Civil Site Bond in the amount of $4,264.20 from the above referenced account. All interested City 0 _n departments have approved release of this bond amount. -n Sme9rely, m M 0 0 C 0 Theresa m a.g (wa na 0 Senior Permit Coordina or Z r- cc: Applicant File Z Z '0 0 M Incorporated August 11, 1890 Sister Citv - Hekinan. Jar)an MAi "ENANCE BOND RELEASE i RMC TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: ENGINEERING INSPECTOR DATE: PLANNING DIVISION DATESENTTO: . ....... . . . DUE BACK �'RECEIVED:_ PERMIT# - �025�1��AI)Bff z PROJEC 9 0 SITE ADDRESS- OWNER OT CM rn 0 OWNER ADDRESS 0 80 C -4 K TYPE OF BOND TO BE RELEASED X M M Z 0­1 136NDEXPIRES C 2 BONDDATEPOSTED ......... . 05 0 -n Please field inspect at your earliest convenience for the release of the subject bond. If there X 9 M M are outstanding requirements, please note in the space provided. Failure to respond by the 0 co noted bond expiration date constitutes Department approval and automatic release of the 0 0 bond. It is each Departmenfs responsibility to contact the developerlowner when outstanding C: cn 90) 1 issues prevent the release of the bond. Please copy the Permit Coordinator on all City Q 0 Z correspondence sent regarding this bond. OND IS APPROVED FOR RELEASE z BOND IS NOT APPROVED - OUTSTANDING REQUIREMENTS NOTED 0 z 1 2 2. 3. 0 M -WORK TO BE COMPLETED WITF11N __________�DAYS SUSPENSE TO COPY TO FILE TO DEVELOPER/CONTRACTOR Lten1p:bIdg;forms;bondrcI 3/25/04 % _R GARY HAAKENSON CITY OF EDMONDS MAYOR i2l 5THAVENUC NORTH -EDMONDS, WA 98020 - 1425l 771-0220 -FAX (425) 771-0221 WeWte: �dedmond­­ DEVELOPMENT SERVICES DEPARTMENT (I? C) 1) Planning Building Engineering 3-24-08 Z 0 ludeminity Company of California Karen L. Staffanson, Attorney 71 9759 3rd Ave NE 4305 Seattle, WA 98115 Re: Landscaping Maintenance Bond A ccount # 576716S M C M C; Pagliacci Pizza Restaurant / 10200 Edmonds Way, Edmonds, WA 0 X Dear Karen L.Staffanson, Attorney: m jo The City ofEdmonds hereby authorizes the release ofthe Landscaping Maintenance C: — > E :1 "", Bond in the amount of$4,394.87 from the above referenced account. All interested City 4 80 , i departments have approved release of this bond amount. 0 _n _n Sin ly Rba�h M m 0 0 The ugO� C ca Senior Permit Coordinator M C.' cc: Applicant X File Z Z 0 0 m Incorporated August 11, 1890 Sister 0tv - Hekinan. Janan MAL. fENANCE BOND RELEASE I, ORN TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: ENGINEERING INSPECTOR DATE:--i� �'o G&TVAlk, -PLANNING DIVISION DATE SENT TO: JQF2 .-----�DUE BACI�- 011";W RECEIVED: - PERMIT# OZO ADB# z 0 --1 0 SITE ADDRESS-10MD 6)(MV-7 0 M OWNER Pk� U R ab­­ P42;A: C: MO 0 OWNER ADDRESS 0 C -4 M 2: M TYPE OF BOND TO BE RELEASED M T BOND DATE POSTED 72�QLP BOND EXPIRES vi 0 n Please field inspect at your earliest convenience for the release of the subject bond. If there n :0 9 are outstanding requirements, please note in the space provided. Failure to respond by the m T 0 U) noted bond expiration date constitutes Department approval and automatic release of the 0 r- bond. It is each Department's responsibility to contact the developerlowner when outstanding 0 M C co the release of the bond. Please copy the Permit Coordinator on all City M (0 1 ,issues prevent M0 correspondence sent regarding this bond. z V/ BOND IS APPROVED FOR RELEASE > z BOND IS NOT APPROVED - OUTSTANDING REQUIREMENTS NOTED 3: I z 2. 2 0 3. M -WORK TO BE COMPLETED WITHIN _DAYS SUSPENSE TO TO FILE COPY TO DEVELOPER/CONTRACTOR Ltemp:b1dg;Fbrms;bondreI 3/25/04 RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall.......................... Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: CS Underground .......... Rough -in Commercial Final HEATING: Gas Test ................ a Gas Piping ................. Equipment ................. Commercial Final EXTERIOR SHEATHING NAILING .......................... FRAMING . ..................... FIRST FLOOR FRAMING INSULATION ............ Floor Insulation Wall Insulation ........... Ceiling Insulation SHEETROCK NAILING SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR (go _10L, OCCUPANCY .................. swseww# Ree*t#- wwrmewslzi A011111111111111tPidd P towl 26 DOUtMed -7