20050638.pdfDATE RECEIVED [PERMIT EXPIRES
PERMIT
CITY OF EDMONDS NUMBER
CONSTRUCTION PERMIT APPLICATION JOB SUITEIAPTO
ADDRESS —7 Ile,
OW"E NAMEINAME OF BUSINESS
F`lra - I ( 1, PLAT NAME/SUBDIVISION NO, LOT NO LID NO
MAILING ADDRESS
uj LID FEE S
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Appieved
F�I)x c),q RW Pormil Requited
Sireel use Pernid Requited
CITY ZIP TELEPHONE EXISTING PROPOSED inspeclion Raquiled 13
C'.) "'o REQUIRED DEDICATION Sidewalk Required C3
r) '9 (_VZ�6) Ll 25 7)i FT Untief9round 13
Wainq required
NAME METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED
YES 13 NO 13 z
Lu
W VLC9 rx
1= ADDRESS REMARKS LU
x z
U OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE 0
rb C-� z
Ll V-1n Ale, uj
I
CITY ZIP TELEPHONE
enil Iry L/2,,5;�
NAME CBLN
0 ENGINEERING REVIEWED BY DATE
IX ADDRESS
2 A � A I
U (L5
FIRER01EX DATE uj
z CITY ZIP LTELEPHONE
L
0 U.
U 716 1 16ir
STATE LICENSE NUMBER EXPIRATION DATE CHECKEDBY VARItNCE OR CU SHOREtl�E OR ADB# INSPECTION' SEPA
REQ'D COIAPLETED I EXEMPT
113YES 0NO
PROPERTY TAX ACCOUNT PARCEL NO. CA# ZONE SIGN AREA HEIGHT
WAIVER ALLOWED I PROPOSED ALLOWED , PROPOSED
W
01 (V5611 67 17 00 q Of STUDY 13
NEW RESIDENTIAL PLUMBING I MECH LOT COVERAGE REQUIRED SETBACKS (FT) PROPOSED SETBACKS (FT.)
COMMERCIAL ALLOWED PROPOSED FRONT SIDE' REAR FRONT LIRSIDE REAR
COMPLIANCE OR z
ADDITION CHANGE OF USE 2
MIXED USE z
PARKING LOTAREA I PLANNING REVIEWY BY DATE 5
REMODEL 2 MULTIFAMILY SIGN REQ'D I PROVI:D] 116
GRADING FENCE
REPAIR 1:1 CYDS ( X FT.) REMARKS
El DEMOLISH 1:1 TANK DTHER
.27/�*j,ll
z 13 GARAGE. RETAINING WALL FIRE SPRINKLER
CARPORT 1:1 ROCKERY FIRE ALARM
(TYPE OF USE, BUSINESS OR ACTIVITY) EXPLAIN:
IL TYPE OF CONSTRUCTION CODE OCCUPAN
EU U*00/4�7f-�: '9 G ROUP
vi 3 R
W NUMBER NUMBER OF
r) OF DWELLING NL001f SPECIAL INSPECTION CONSULTANT OCCUPANT
M UNITS LOAD
0 STORIES REQUIRED 13 Y
CRIBE WORK TO BE DONE
REMARKS to
/4 z
Tj ohV F 7o-q
ca
'::C't,J7%Wr0 GEOTECH REPORT -
STRUCTURAL DESIGN
7, BY:
BY:
VALUATION
$
Description FEE Description FEE
Plan Check q State Surcharge
,tjEAT SOURCE LOTSLOPE% VESTED DATE
Building Permit City Surcharge
PLAN CHECK NO: Plumbing Base Fee
Mechanical
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO G
BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBIC 70c:>
:_E DONMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE Grading
SEPARATE PERMISSION. Engr. Review
PERMIT APPLICATION: SEE ECDC 19.00.005(A)(5)
W
PERMIT LIMIT. SEE ECDC 19.00.005(A)(6) Engr. Inspection
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
Fire Review
U) 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESSORS Plan Chk. Deposit E:117, tj
L1j
_j IN INTEREST. AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF
:E EDMONDS, WASHINGTON. ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND Fire Inspection Receipt #
ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY
FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE
DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE LandscapeInsp. Total Amt. Due
0 NOR LIMIT IN ANY WAY THE CITY's ABILITY TO ENFORCE ANY ORDINANCE PROVISION.*
x "Liq , I
Recording Fee Receipt # -IL —
I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION APPROVAL
GIVEN IS CORRECT� AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF This application is not a permit until signed by the
THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL Building Official or hisihor Deputy! 3nd Fees are paid, and
TION; AND IN DOING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED receipt is acknowledged in space provided
IN VIOLATION AB RCODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION
WORKMEN'S OM NSATIO22URANCE AND RCW 18:27.
TURE DATE
SIG AT DATE SIPNED (4:25) 0 tl.�
;'11D5 ;nz, -,;Z-42�6 -V.-s
67 771-ULLU RELEASED BY DATE
AtTENTI-ON EXT. 1333
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL I k
f1C -7bl
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI- ORIGINAL - FILE YELLI - INSPECTOR
FICATE aF mcuFANCY HAS Br_rfii Limmiriii i ru. uciw� iulzi ir im, I lu 1 im, 1 lu. PINK OWNER GOLD ASSESSOR
10104 PRESS HARD YOU ARE MAKING 4 COPIES
z
0
1
0
M
--i -n
M
C
M
0
0
0
0
C
M
M
0
Z
--1
C
0
n
-n
-4
3:
ITIM
0
0
M
C
K
Cn
Cn
M
Z
0
;U
>
z
z
0
1
0
M
p
Receiver).
Engineerls Inspection of the Property Located At
7503 212n d Street S.W., Edmonds, Washington JUN 2 2 2005 Page I
PERMIT COUNTE[i
June, 16, 2005
0
Inspection Report z
0
4.
M.
INTRODUCTION
=5
Washington
7503 212nd Street S. W., Edmonds
M
C
M 0
For the exclusive use of-. Pacific Northwest Property 0
Management, Attention: Mark Johnson -40
0
C
X.M
Date of Inspection: June 13, 2005 Fn
z
ry--i
C
Z.
Inspecting Engineer: Jack A. Swardz, P.E.
0)
0
al impact of the removal of a wall
The purpose of this inspection was to evaluate the structur M M
between units, to the extent that a reasonable amount of thine and conditions permit. The initial 055
0
are adequate and proper. Statements, representations or 0 M
presumption is that all elements C CD
de only when the inspecting engineer sees evidence which, in C co
conclusions to the contrary are ma
rn 0
his judgment, indicates the existence of significant deficiencies. The inspection is visual only Z
and does not involve the opening or exposure of elements concealed from view.
Wherever a deficiency of any kind is identified in this report, there is always a possibility that it
z
e problem that is
is associated with a larger, more serious, more extensive or more pervasiv
hidden from view or is beyond the scope of this inspection. Consequently, you should take X
co
whatever action is necessary to ensure that the full extent and implications of identified
z
0
deficiencies are known.
0
M
To fully understand the importance of any deficiency, you should obtain bids for its correction.
ing five to ten times the amount of low
e
Bids for repairs vary widely, with high bids sometim's be
bids for the same work. You should always obtain at least three competitive bids.
Certain limitations apply to, any inspection, including those diligently performed by a qualified
expert. The limitations on this inspection include any noted in tile body of the report together
with those listed under "Limitations on Inspections" at the end of tile report. We consider these
limitations unavoidable. If you make any use of tile information contained in this report, it is
ARE
necessary that you understand and accept these limitations. IF TIJESE LlmrrATION.S
UN . ACCEPTABLE TO YOU, YOU SHOULD NOT RELY ONTHE INFORMATION INTHIS
REPORT FOR ANY PURPOSE WHATSOEVER.
Engineer's Inspection of the Property Located At
7503 212n Street S.W., Edmonds, Washington Page 2
EVALUATIONS
d to combin
A wall between units has recently been remove e two apartment units into one living
unit. This modification is conunon for both buildings B & C, no modification where made to
building A. I inspected the property on November 17, 2004 and evaluat ed the wall to. be a non -
bearing element of the building. Now that the structures have been further completed, my
original assumptions are confirmed. The removed walls have not impacted the overall integrity
of the.building structure.
LIMITATIONS ON INSPECTIONS
M.
C
The limitations on this inspection include those discussed throughout the report, together with
M 0.
those listed in the following paragraphs.
0 C�
ACCESSIBILITY OF DEFICIENCIES: Statements, representations, or conclusions offered by
M
M Z:
-4 .
the engineer who conducts the inspection and/or by Noi -thwest Inspection Engineers, Inc. are
z
based solely upon a visual examination of the exposed areas of the structure inspec ted. Hidden
—1
defects could have a significant impact on the visually.based.conclusions, statements, and
CA
representations made by the inspector.
0 -n
NO WARRANTY: All statements, representations, or conclusions offered by the inspecting
M M
engineer are the considered opinion of the inspecting engineer arising from the limited inspection
0 F_
described herein. These statements, representations, or conclusions do not constitute an express
0
C M
CO)
or implied warranty of any kind.
M 0
z
As
z
V)
z
0
At
M
FIN,.L PROJECT APPROVALv ORM
BUILDING
JUN.- 6 2005
Airboir Vilaway LLC
7501, 7503, 7505 212" 'Street SW — Edmonds, WA 98026
C/O Mark J. Johnson Managing Member
#206-940-1115
June 6, 2005
RE: City of Edmonds "Stop Work Notice"
Z
Dear. Mike Snook,
0
In response to your "Stop Work Notice" we would like some clarification as to what items you
M
are requiring permits for. When you came by on Friday the 3 rd you mentioned to someone onsite-
that you had "already told the owner what he needed to do and had issued a stop work notice
CA --I
before". Your warning must have been given to the prior owner because we have never been
a M
C
given, in over 15 years of doing real estate development, management and sales or as a
rn 0
--10
homeowner in Edmonds, a "Stop Work Notice" or violation of any kind.
0
0 C
Arbor Vill a, LLC took ownership of the Arbor Villa Apartments in September of 2004. When
X.M
M Z
purchased Arbor Villa Apartments were not.in very good shape. Decks had a lot.of decay and
JO -4
interiors were. very dated. Our initial plan was to just clean up the complex but as we took
C Z
>
ownership many of the tenants moved out complaining of poor living conditions such as not
being able to use their decks due to decay an d windows leaking in cold air.* As all of the tenants
-n
moved out we embarked on a more detailed clean up and renovation of the project which has
0
-n
resulted in the decision to make Arbor Villa condor -hiniums.
X
M
So in the past few months we have improved the property with Arbor Villa, LLC acting a s its, own
M
general contactor with some subcontractors brought in for specific work such as siding and
0 M
roofing. From the beginning we have consulted with Tay lo rG regory-Butterfield Architects as to
C co
C CD
the structural issues relating to the rebuilding of the decks. It has always been our intent to have
Q 0
Z
a permit and city review of the rebuilding of the decks. At this time all we have done is removed
the, very rotten deck railing and surfaces for investigation purposes only. For safety we have
;U
sealed off all patio doors leading to the decks. No deck work has started as we are waiting on
X
drawing from T -13-13 Architects to submit to the city for permit. We would also like to add new
>
Z
carports at which time we will also submit drawing to the city for permits. It has been our
understanding that permits are needed for structural items such as decks, carport s or removing
common or bearing walls. We have not been told.permits are needed for interior improvements
0)
Z,
such as painting, carpeting, replacing appliances, installing'new ca binets door hardware,
counter tops or changing light fixtures, etc
0
M
The overall scope of work has been the following:
Roof recoating by Mike's Roofing, Inc. of Lynnwood.
Re -Siding by Side -Pro, Inc. of Woodinville.
New windows replacing the old windows in the exact same location. and size.
New hallway carpeting and painting -
Vacant unit upgrades include new carpet, paint and cabinets plus the removal of
nonbearing center wall combining each side unit in the B & C buildings only after
consulting with Northwest Inspection Engineers, Inc. The A building has not changed
only paint, carpet etc.
t GARY HAAKENSON
MAYOR
CITY OF EDMONDS
121 5TH AVENUE NORTH EDMONDS, WA 98020 (425) 771-0220 -'FAX (425) 771-.0221
Website: wwwxi.edmondsma.us
DEVELOPMENT SERVICES DEPARTMENT
Planning Building Engineering
June 6, 2005
Arbor Villa, LLC
Mark J. johnsonj Managing Member
z
7501, 7503, 7505 212"' Street Southwest
0
Edmonds, Washington 98026
RE: Arbor Villa Stop Work Order
'n
Dear Mr. Johnson:
b
M
In response to your letter dated June 6, 2005 we have the following inforination:
M
0
80
posted on Friday J ne. 3, 2005 was in response to. City Fire Department
The Stop Work Order u
and approvals by the City.
M
M z
infori-nation that certain.work in progress at Arbor Villa req uired pennits
work can be done on a multifamily
Z
As you I d in your letter some main tenance related
lave suggeste sed the City's work exempt
I have enclo
-4
uilding without necessity of a permit. For your convenience
b ermit
the following work requires building p
1
CD
from pen -nit handout. From your letter we asce rtain that
eed to read the exem t work handout provid ed to determine all permit
approval although. you 11 p
0 _n
_n
requirements:
X
M M
Deck Repair or Replacement, including gu ardrails (design drawings in pro cess b y T-G-B
0 r
0 M
Architects)
Carport construction (design drawings in process by T-G-13 Architects)
c1n
9 ch
M 0
Z
Exterior siding replacement (al so requires Design Board approval or Planning waiver)
71
Re -Roofing including re -coating (see enclosed handout for perrilit requirements)
-Demolition.orrelocation of non -bearing walls 5'9" or greater
z
re -coating and exterior siding) you Must
With regard to work already completed without a permit.(roof .
submit separate permit applications for each building. For interior remodeling of t he.non-bearing
-or work without a
f
0)
z
walls each unit owner must apply for their own pen -nit. Unfortunately, perforriled
e
be applied. To calculat fees
0
-4
-rnit investigation fees in addition to normal permit fees must
pei dout for
I
bids for each remodeled unit are required (see Tenant h-nprovernent Ilan
3
M
sub contractor
submittal infort -nation). If you have any permitting questions please feet free to contact me or a Permit
through Friday from 9:00am to noon
Coordinator at 425-771-0220. City office hours are Monday ..and
.
1:00pm' to 4:00prn.
Lastly, City enforcemen t records do show that tile previous owner in 2002 performed deck repair work
has no relevance oil tile
without first obtaining a permit but I assure You this past enforcement action
current enforcement case.
Sincerely,
Jeannine L. Graf
Building OfFICial
Incorporated August 11, 1890
Sister City - Hekinan, Japan
GARY HAAKENSON
CIT Y OF EDMONDS MAYOR
121 5TH AVENUE NORTH EDMONDS, WA 98020 (425) 771-0220 FAX (425) 771-0221
Website: www.d.edmondsma.us
DEVELOPMENT SERVICES DEPARTMENT
Planning - Building Engineering
C.
November 1.7, 2005
Z
Mark Johnson, Managing Member
0
Arbor Villa, LLC
Post Office ox 1044
Edmonds, Washington 98020
M
VIA FACSIMILE 425-771-1312
M 0
0
RE: Building Permits @ 7501, 7503, 7505,212"'.Strept SOLIthwest, Arbor Villa
0 0,
C
M Z
Dear Mr. Johnson,
Tile purpose of this letter is to inforril you that the State Department of Labor &
0 -n.
-ficials ii-ii ct with YOUr,
Industries Electrical Division has requested that City and State Of e
-n
contractor representatives on site for a joint inspection to �mutually determine and agree.
ITIM
what sheetrock will be removed from each unit/corrid.or in order to perfoi -m required
ca
Building, Fire and Electrical Code inspectio ns.
0 r
0 M
C
-ollowing dates and
Our offices areavailable to meet with. your representatives on the f
M 0
Z r*
times, please check Your contractor availability and call back to confi'rm:
Wednesday, November 30"' between 2-3pm
Thursday, December I" between 2-3pm
Z
Thank you for Your assistance and cooperation in this matter.
0)
z
0
Sincerely,
M
Jeannine L. Graf
Building Official
42s 2 90- 3 -7-5
& ries Electrical Division
Cc: State Department of Laboi -Indust
City Fii -e Marshal
Incorporated August 11, 1890
S istp-r Citv - Hekinan, Japan
DE C 122005
PERM COUNTER,
Arbor Villa LLC
I'D BOX 1044 — EDMONDS, WA 98020
Telephone #425-M-4100 Fax #425-M-1312
9th
Decemb er 2005
Z
th
RE: Building Permits (9 7501, 7503, 7505 212 Street SW, Arbor Villa
0
M
Dear Jeannine Graf,
As you know on December 1, 2005 @ 2pm myself and my contractors met with State
M
Department of Labor & Industries Electrical Division representatives Jim, Hinrichs &
0
0
0
Rand Jones as well.as Mike Smith & John Westfall of the Fire Department. To my
C
disappointment John Westfall stated that nobody from the Building Department was
M
able to make it and he would also be representing the Building Department.
M Z
We met in one of the existing combined units #C1 02 (which is a similar floor plan of all
Z
12 units in buildings B & C) which we had cut open sheetrock to expose wiring and
Cn
plumbing. The intent of the meeting was to try to mutually agree as to the final
o -n
requirements to satisfy and finalize the outstanding permits of Arbor Villa.
-n
M M
In response to the correction notice done by Mike Snook on 10/12/05; we have
reviewed each item and our conclusion and response is as follows:
0 M
1. The powder room fan run which was on.the approved plans pages A4.00, A4.10
C (D
9 W
& A4.20 for both B & C buildings had no notations about lining the joist bays with
Z
1 hr rated sheetrock. This existing joist bay like the other two existing bathroom
fans runs are not lined in sheetrock thus it would seem a bit excessive to make
just this one run fire rated. I completely understand the reason for wanting to fire.
>
Z
rate the joist bay and you did note and we have complied in building a new 1 hr
fire rated chase for the dryer vents in all units. Abandoning the existing exhaust
Cn
runs and using an alternative routing of the bathroom fans was discussed and
Z
would be very intrusive to the completed units and I am not sure that it would
make the building any safer. Though we will comply accordingly I would like to
0
request one final time that you do not require the existing powder bath exhaust
M
run be fire rated due to the fact that we reused an existing exhaust run which was
already in place for the kitchens.
2. New plumbing, which was for the new powder room, laundry and hot water tanks,
will be exposed as needed to verify the proper fire stopping. *View on next
inspection.
3. We will comply with all storage areas under stairways will have 2 layers of 5/8"
type sheetrock on lids. *View on next inspection.
4. 2 layer of 5/8" sheetrock required for joist channel for new vent chase but not for
-m il tome on 12/1/05.
entire ceiling membrane as per John Westfall's e a
This has been complied with for the new dryer vent runs and we are asking for an
exception for the powder room run.
5. Assembly detail for 1 hr dryer vent chase is on the approved plans and stamped
by the architect of record. No other stamped 1 hr assembly is required.
.6. Dryer vent shafts in hallways for buildings B & C have had sheetrock added.on
the top and bottom to comply with the 1 hr fire rating. *View on next inspection.
7. Electrical permits are being issued upon final review from L&I. Jim Hinrich from
L&I stated he was no t requiring other units to be opened after seeing #C1 02.
z
8. Guardrails & handra ils on both north & south stairwell of buildings B & C have
0
been installed. *View on next
0
M
9. �Wewill remove all interconnected smoke detectors in the common hallways of
buildings B & C. *View on next inspection.
10. Call for inspection of building A. *View on next inspection.
U5 --I
a
C M
Other items discussed:
M 0
A. Add 4" stortz adapter to the fire hydrant by building B. Completed *View
.0
C
on next inspe ction.
M
M z
B. Exterior gyp inspection before coverin g.under decks. Work being
10--I
completed we will call for inspection When completed.
z
C. Fire extinguiE ;hers to be placed at bottom of each stair and one in the
*View
nd rd on next
center lobby on t he 2 & 3 floors. We will comply.
0
M sijection.
/fpq- 110n
We will await your.answer on the powder room venting and will proceed accordingly.
M M�
Please forward your response to. Mike Adams of TGB Architects, as he is our
0 rh
0-
r
contact person of record. We would like to bring closure to this as soon as possible.
0 M
C CD
C CA
Furthermore to help things run smoot her we have hired Mr. Al Larson with over 40
Q 0
Z r
. y rs of construction experience to oversee the completion of this and other projects.
ea.
We take great pride in the quality of our projects and though this renovation has,
been a new undertaking due to the combining units we are very proud. of taking a 30
Z
yea, r old run down eyesore of a building and making it shine and We hope the city
shares in the improvement of the area as well as increased tax b ase by about 275%.
U5
z
Sincerely,
0
Mark J. Johnson
M
Mark J. Johnson
Managing Member For Arbor Villa, LLC
ARY HAAKENSON
G A
CITY OF EDMONDS MAYOR
121 5TH AVENUE NORTI f EDMONDS, WA 98020 (425) 7 71.-0220 FAX (425) 7 7 1 -022 1
Website: vAmci.edmondsma.us
DEVELOPMENT SERVICES DEPARTMENT
Planning Building Engineering
C.
December 14,2005
z
0
M
Mark J. Johnson, Managing Member
n
Arbor Villa, LLC
Post Office Box 1044
M
C
ington 98020
Edmonds, Washi
MO
0
0 0
C
RE: Arbor Villa Outstanding Corrections for Bit ildings B & C
X 1. "
M
Mz
VIA FACSIMILE
10
z
Dear Mr. Johnson,
In response to your letter dated December 9, 2005 requesting certain inspection waivers and/or.
0 -n
code requirement waive rs oil the Subject project I have the following response:
M M
1. Tile City Would. entertain a rC(ILICSI ilor modification from, the architect or record
0
0 M
ath
(processing Fee $180.00) concerning the matter of lining the joist bays where the b,
C CD
9 co
vent ing was extended. The request ror modification Should include argument concerning
Q 0,
Z r-
the original. building rating, dwelling separation, shaft enclosure issues, etc. Please
instruct the Architect to subra it tile letter, (stamped and signed) by December 20, 2005.
X
2. Plumbing (potable water piping and waste) was installed and covered -without City
inspection. Verifying fire stopping does not address proper materials, connections., slope
z
City would accept�an
etc. of plumbing.. Therefore all Plumbing shall be exposed, or the I
b
affidavit signed.by the licensed plumber of record stating all plumbing work performed
0)
meets all rilininium requirements of the 2003 Uniforn-i Plumbing Code. The fire stopping
z
0
ect of inspection would be Subject to field inspect ion and fire stopping products would
asp I.
-4
0
need to be verified by the inspector.
M
3. Agreed, Subject to field inspection (two layers must be visible via an opening).
4. Agreed, s ibject to field inspection (two layers 111LIst be visible.via at I Opening).
5. We are unsure of your comment to this itern, however only one layer of 5/8 Type x gyp
is required on the ceiiing or each unit however, the architect. of record indicates two
layers oil the.approvcd plan (shect A4.00 detail 5). The architect sliall subi ;nit a revised
cut shect showing this field change for the permit file.
6. Subject to field inspection. (slicetrock layers must be visible via all opening).
7. Final State electrical inspection approv, il required prior to BUildino Division approvals.
Incorporated August -11, 1890
Sister Citv - Heldnan, Japan
q b.
Deccniber,.14, 2005
Mr. Johnson
Page'rwo
8. Subject to field inspection.
9. Subject to field inspection.
Z'
0.
10. Subject to field inspection
.11. Regarding the other noted items; subject to field inspection.
12. Regarding non-bcaring framingthat was installed without inspection the City shall accept
an affidavit fi�oni the framing supervisor on site stating that all framing was installed per
ca
plan and is in compliance with the International Building Code.
M
C
M 01
Please'feel free to contact me if. you have any other questions, I can be reached at 425-771.-0220
0i,
0�cl
extension .1226 during City business hours. All affidavits, letters, and other requested
3: m:
M.Z"
information shall be submitted to the City prior to final inspection request.
C
r
Sincerel Y,
0 -n
M M
0 r
Jeannine L. Graf
0 M
C'
K co
Building Official
M 0.
Zr -
c �- .
X
Cc: Ma or Haakciison
y
'@, 654 5"' Avellu' South, Suite 300
Mike Adams, TGB Architects Ucv e
>i
Z.
z
01
0
M
yi GARY HAAKENSON
�CITY OF EDMONDS MAYOR.
121 5TH AVENUE NORTH EDMONDS, WA 98020 (425) 771-0220 FAX (425) 771-0221
Website: wwwdedmondsma.us
DEVELOPMENT SERVICES DEPARTMENT
III C. go�) Planning Building - Engineering
December 21, 2005
Mr. John F. Taylor, AIA
Z;
0
Taylor -Gregory -Butterfield Architects
1h
6545 Avenue South, Suite 300
Edmonds, Washington 98020
h St
Arbor Villa @ 7503 & 7505 212 reet Sbuthwest?.Buildings; B & C,
Cn
M:
Request for Modification on Lining Joist Bay to Accommodate Ductwork
M 0
0
Dear Mr. Taylor,
X M
-or this projecti to consider a
The City is in receipt of your request, as Architect of Record. f
M Z
C
modification to waive the current code requirement of protecting joist bays with one-liour fire
>
resistive construction that house modified (extended) ductwork. As your letter -indicates the
original building construction is void of such protection and the extension of ductwork
Therefore,
0 -n
7n
(approximately. 14 feet in two places on each floor) is considered.minimal. your
modification request is hereby approved —where ductwork is extended (as noted on the approved
M M
plans under building permits #2005-0627 to 632 and #2005-0633 t 0*, 638 no lining of joist bays
0
shall be required.
M
t
Note,,this approval is not granted because of perceived d.isruption to existing tenanp nor is it
M 0
Z F.
based on an opinion of construction impracticality. The i ication is approved because only a
nodif
in -ily or the
very small a ode while the vast ajot
rea of the duct run would be protected to current c
X.
existing duct runs would still be unprotected within the building. Furtherrilore, overall sLrLiCtural
>
0
and fire integrity of the building in general is not lessened by the granting of this modificati n.
Please note this modification approval pertains only to the specific location and assei nbly noted.
This decision is not precedent setting nor shall it apply to any other project on this site or within
0
City limits.
0
Sincerely,
4--of I
Jeannine L. Mf
Building Official, CBO
Cc: Mike Adams TGB Architects
Dennis Mikk Isen, TGB Architects
c
Mark Johnson, Managing Partner, Arbor Villa LLC
Incorporated August 11, 1890 e
Sister City - Hekinan, Japan
��TAYLOR- GREGORY- BUTTERFIELD
RrCC- IVE D
L
A R C H I T E C T S
DEC 2 12005
PERMIT COUNTER
DATE: December 21, 2005
TO: Jeannine Graf, Building Official, City of Edmonds
z
0
FROM: Michael Adams
d
RE: Arbor Villa Outstanding Corrections for Buildings B & C
.0
th
Project Address: 7503 & 750 5 212 Ztreet SW, Edmonds
Cl)
M
C
In response to your letter dated 12-14-05 item number 1 regarding the Arbor Villa Outstanding Corrections for
�Ma
0,
Buildings B & C, please except this request for modification per IBC 401.10:
0
C
In regards to the existing exhaust duct that serviced the existing kitchen stove exhaust. The existing building
M
z
was built to a 1 -Hour rating in 1973, per City,of Edmonds approved plans permit #750140 and 750141. This,
included the floor/ceiling assembly as well as the dwelling separations. In this construction it was not required to
rate the joist bay while using it for vent ducting. With the addition of the Powder room we added the required fan
�a nd used the existing kitchen duct venting that had been abandoned with the relocation of the kitchen range.
co
Since this joist bay was not required to be lined in the existing construction and we are not lessening the life and
0 -n
fire safety or the structural requirements of the ceilingMoor assembly we feel it is impractical to add lining now.
-n
The exhaust run in the Kitchen is inaccessible without demolishing the finished ceiling, cabinetry and trim work
M M
therefore making it impractical to add GWB lining to the joist bay.
.0
0
.0 M
C CD
M 0
Zr
7-1
Sincerely,
36 05M
3605 REGIS ED
z
Michael Adams
�J.
MA/sb
J0
i HN YL R
HN AYL R
TATE OF A
TATE OF 1
z
0
rn
654 5th Ave. South,. Suite 300, Edmonds, WA 98020 Phone 425.778.1530. Fax 426.774.7803 WWWJGBArchitects.corn
indorporated in the State of Washington
'Dear Jen.nine. Graf,
In,response to your letter dated 12-14-05 regarding the Arbor. Villa,
Outstanding Corrections for Buildings B & C:
.1. Concerning the matter of lining the joist bay where the bath venting
was extended. The existing building was built to a 1 —Hour rating in
1973. This, included the floor/ceiling assembly.as well as the dwelling
separations. In this construction it was not required to rate the joist
bay while using it for vent ducting. With the addition of the Powder
we added a required fan and used the existing kitchen vent z
room
ducting. Since this joist bay was not required to be lined in the
existing construction we feel it is. not necessary to add lining now. M
show the existing
5. Detail 5 Sheet A4.00 has been changed to
-Se M
loo /ceili e detail this page.
construction 'of the f r ing assembly. 0 1
C
Mo.
0
1/2" SOUND BOARD
C.
3: M
ITI
z
5/8", PLYWOOD SUBFLOOR
r
OISTS 0 16" O.C.
2x10 J 0
3:
M M
-r .77
0
F_
0 IT1
C
C Cn.
5/8" TYPE 'Y' G.W.B.
M
0
Z
THIS DETAIL REFERS TO THE ORIGINAL RATED
FLOOR/CEILING ASSEMBLY (PER CITY OF EDMONDS
'APPROVED PLANS PERMIT #750140) AND IS TO BE
Z,
AND/OR RESTORED WHERE THE CEILING
MAINTAINED
AND/OR INTERRUPTED.
HAS BEEN REPLACED
z
0
�FLOQ R�/C E I L ING DETAIL
0
IT!
4 3605
REGISTERED
ARCHITECT
JOHN F. "L
TE OF ASHINGTON
12-20-05
CITY OF EDMONDS FIELD CORRECTIONS. SK- 001
SHEET A4.00
TAYLOR - GREGORY - BUTTERFIELD ARCHITECTS
ARBOR VILLA
Tele 425.7M.1530- Fox 425.714.7803- infoOtgborchitects.com
S, WA 98020
EDMOND M!W- I
lot; 654 5th Avenue South, Suite 300, Edmonds, WA 98020
TGB..PROJECT 04065
5 REG]
AR
JOHN F
T 0
A E F
MEMORANDUM
January 25, 2006
TO: Jeannie McConnell, Engineering Technician
FROM: Steve Fisher� Recycling Coordinator
RE: Change in garbage. and recycle enclosure status
Z'
0
2005�-0623 Arbor Villa
I have determined that the number of required garbage and recycle enclosure sites at the,
7n'
Arbor Villa property can be red uced to tWo sites instead of the originally planned and
a
M
approv ed three sites.
rn:
01
0
Therefore there is no longer a requirement. t o provide such a structure for the B Building
C
at 7503 212"' St. SW-
M..
M Z
10
C
0 -n
-n
rn M
0
M�
ch:
fft
-41
0)
.0