Loading...
20050733.pdfDATE ROCEIVE1 CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION 4E OF B Sl E MAILING A9DRESS 716 CITY zip TELEPHONE. ii��Vf I I e I ) I -le- . C/J�111 7j; I I NAME ADDRESS NAME ADDRESS IC\-2:b\ PvJC- \rJ CITY ZIP STATE LICENSE NUMBER S� U-1 Q C_ I �V I I �%y PROPERTY TAX ACCOUNT PARCEL NO. NEW RESIDENTIAL ADDITION COMMERCIAL MIXED USE REMODEL MULTIFAMILY REPAIR GRADING CYD DEMOLISH TANK EiGARAGE CARPORT RETAINING WALL ROCKERY (TYPE OF USE, BUSINESS OR ACTIVITY) EXPLAIN P RMIT NUMBER JOB ADDRESS PERMIT EXPIRES SUITEIAPT# PLAT NAMEISUBDIVI SION NO. LID NO� LID FEE S PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCPApproved 13 RW Permit Required Street Use Permit Required 13 EXISTING PROPOSED inspection Required 13 Sidewalk Requiremcl 13 REQUIRED DEDICATION FT Uncicirgiound 13 __ wiring required METER SIZE LINE SIZE NO OF FIXTURES PRV REQUIRED YESO NOO z REMARKS z 15 OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE ENGINEERING REVIEWED BY DATE W FI(REV WtBY DAT ui TELEPHONE lf'�2_LA EXPIRATION DATE I IANCE OR CL( ELINEORADBO INSPECTION SEPA REO'D COMPLETED I EXEMPT 13 YES [3 Nol CA# ZONE SIGN AREA HEIGHT WAIVER 13 1 ALLOWED PROPOSED I ALLOWED PROPOSED STUDY 13 1 1 LOTCOVERAGE REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (FT.) PLUMBING I IVIECH ALLOWED PROPOSED FRONT SIDE REAR FRONT URSIDE REAR LD z COMPLIANCE OR 2 CHANGE OF USE I — z PARKING LOTAREA PLANNING REVIEWED BY DATE SIGN R E O'D PROVIDED FENCE S x FT.) REMARKS OTHER FIRE SPRINKLER FIRE ALARM ,�-_ I aL-- h L./.r Ot., IN D LD TYPg OF CONSTRUCTION A. NUMBER OF STORIES BER'OF DWELLING NITS A .1 SPECIAL INSPECTION REQUIRED 13YES DESCRIBE WORK TO BE DONE REMARKS 'Tc m GEOTECH REPORT BY: 'V* L L /-i (L STRUCTURAL DESIGN BY: VALUATION $ ------- Q A Description Plan Check HEAT SOURCE LOT SLOPE% VESTED DATE Building Permit PLAN CHECK NO: Plumbing Mechanical THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBIC DONMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. Grading Engr. Review PERMIT APPLICATION: SEE ECDC 19.00.005(A)(5) PERMIT LIMIT: SEE ECDC i9.00.005(A)(6) SEE BACK OF PINK PERMIT FOR MORE INFORMATION Engr. Inspection 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESSORS IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES. AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION.- 1--- 11116 miiiiii4 Fire Review Fire Inspection Landscapelnsp. Recording Fee I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF 1 CODE OCCUPANT �_/CM3 IGROUP _E2 CONSULTANT OCCUPANT LOAD THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL TION; AND IN DOING TH W RK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF TH LA�BOR CODE OF VE STATE OF WASHINGTON RELATING TO FOR INSPECTION WORKMEN'S COMP S�T RAN?F,^D RCW 18:27. SIGNATURE (0 ER 0 ENT DATE SIGNED (425) 77-1 norm ATItNTION EXT. 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE'AND APPROVAL OR A CERTI- FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109 I IBC110 f IRC110- `10104 PRESS HARD - YOU ARE MAKING 4 COPIES FEE Description State Surcharge City Surcharge Base Fee FEE Plan Chk. Deposit Receipt # Total Amt. Due It Receipt # APPLICATION APPROVAL This application is not a pound until signed by the Building Official or hisilhor Deputy: and Fees are paid. and receipt is acknowledged in space provided. D Tljo(�_ kL --FILE IqLOW - INSPECTC - OWNER VOLD - ASSESSOR z 0 i 0 M ­11 -n M C M 0 0 0 C -mj M x M M Z 10-1 C 0 -n ­n -4 M M 0 Cjj 0 f- 0 M C (1) ic Cn M 0 Z X > z C/) z 0 0 M FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: —FIRE DEPARTMENT -DATE R- PLrASESIGN ENGINEERING DIVISION DATE z PLEASE SIGN 0 PLANNING DIVISION DATE M PLEASE SIGN PROJECT_,V�e' SITE ADDRESS 0 M C Mo. 0 PERMIT # ADB# DATEINSPECTED (f —3/—(u C) 0 C X M M Z DESCRIPTION OF WORK TO BE INSPECTED C A field inspection was conducted to determine compliance with approved plans. Final approval co denotes that there are no . objections from the above signed Department to the, release of 0 -n PERFORMANCE BONDS.and the granting.of.: M M 0 cn 0 r FINAL PROJECT APPROVAL 0 M C Cn 9 (n -GRANT MO Zr GRANT PROJECT APPROVAL WITH CONDITIONS NOTED z 0 Copy of CONDITIONS given to,owner/contractor by inspector z FAILED FINAL INSPECTION - OUTSTANDING ISSUES. 0 M [:1 Copy of CORRECTION NOTICE given to owner/contractor by inpector .2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fbrms:ocaprv1 3/25/04 FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION DATE FROM: FIRE,DEPARTMENT -9' PLEASE SIGN ENGINEERING DIVISION DATE z 0 PLEASESIGN 0 PLANNING DIVISION DATE M PLEASESIGN zn PROJECT S2X(a/y-� X M C M 0 0 SITE ADDRESS 1-4 6 -10 0 PERMIT #_2����ADB# DATE INSPECTED 7-0 M MZ p DESCRIPTION OF WORK TO BE INSPECTED C Cn A field inspection was conducted to determine compliance with -approved plans. Final approval 0 -n denotes that there are no objectio s from the above 'sig ned Department to the releas e of n PERFORMANCE BONDS and the granting of; M M 0 0 M C CO 9 GRANT FINAL PROJECT APPROVAL Cj) M 0 z r M z GRANT PROJECT APPROVAL WITH CONDITIONSNOTED 0 Copy of CONDITIONS given. to owner/6oniractor by inspector Cn z 0 M FAILED FINAL INSPECTION - OUTSTANDING ISSUES El Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING. ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fbrms:ocaprv1 3/25/04 RECORD -OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing...................... Wall............................ z Pier/Porch ................. 0 Retaining Wall Slab Insulation .......... =i 75 C/) PLUMBING: M ............. MUnderground 0 Rough -in ................... C Commercial Final ...... M M Z HEATING: z GasTest .................... 0) .Gas Piping ................. 0 -n Equipment ................. M M Commercial Final ....... CO. EXTERIOR SHEATHING 0 C M 0) NAILING .......................... FRAMING ......................... �Mo Z r— FIRST FLOOR FRAMING ... 70 INSULATION ................. . x > Z Floor Insulation ... Wall Insulation ........... C/) z Ceiling Insulation ..... . SHEETROCK NAILING ... .0 ITI SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .......... 11110000, 75 3