Loading...
20050792.pdfJ-4.11.� FDATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION ER NAJOEINAME OFeStWLINESS NAME TELEPHONE ADD?VS / ��-30 0 U STATE LICENSE NUMBER PROPERTY TAX ACCOUNT PARCEL NO._ 1:1 NEW RESIDENTIAL 0 ADDITION COMMERCIAL MIXED USE 11 REMODEL MULTIFAMILY 1:1 REPAIR GRADING CYDS DEMOLISH TANK GARAGE CARPORT Ei RETAINING WALL ROCKERY jTYPE OF USE,BUSINESS ORAFIVITY) EXPLAIN. �5 i�-TL NUMBER NUMBER OF OF DWELLING STORIES 2, UNITS DESCRIBE WORK TO BE DONE UMBING MECH NCEOR CHANGE OF USE SIGN FENCE ( X FT.) OTHER FIRE SPRINKLER FIREALARM "I � I',, ., z 1---� PERMIT EXPIRES IPERMIT NUMBER JOB SUITEiAPTH ADDRESS —No — PLAT NAME/SUBDIVISION NO. LOT NO LID NO� I LIOFFIE$ PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Approved RW Permit Required E3 - - - - - - Street use Permit Required 0 Sdo,valk Required -1 !T-A, T W"I'Tt'rw 7 Tlz M�TER Siff L,I�E! S!IE�, P, FIXTURES �.V "..0, REMARKS OkiESP40!�16CEE00R 6F�'S)6t OWNENCONTRACT COj.T4Q0' 1 71 L Y.. EN91NEERINP REViEy�ED, BY, DATE,,i 1-7 L) FIRVREVIEWE�D BY '01f*�k!CAL &,,VARIANCr5-0f;4QU------ -M- SWOZZWEa 1 0 z Lu z 'LAI' 1. Irr Lu x .IE 3YREQ'D COMPLETED I EXEMPT ES 13 NOI CA# ZONE SIGN AREA HEIGHT WAIVER 13 ALLOWED , PROPOSED ALLOWED PROPOSED STUDY [3 1 1 LOT COVERAGE REQUIRED SETBACKS (FT) PROPOSED SETBACKS (FT.) ALLOWED PROPOSED FRONT SIDE REAR FRONT L/RSIDE REAR z z PARKING LOTAREA PLANNING REVIEWED BY DATE REQ'D . PROVIDED 1 1). REMARKS TYPE SPECIAL INSPECTION REQUIRED 13 YES REMARKS CONSULTANT OCCUPANT GROUP OCCUPANT LOAD I/V UmH %.-J I A I INW, GEOTECH REPORT BY: STRUCTURAL DESIGN t3y: c Ax�toe. VALUATION Description FEE Description FEE Plan Check State Surcharge HEAT SOURCE LOTSLOPE% ESTED DATE Building Permit City Surcharge PLAN CHECK NO: Plumbing Base, Fee THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO Mechanical BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBIC Grading DONMAIN (CURBS. SIDEWALKS, DRIVEWAYS. MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. Engr. Review Lu PERMIT APPLICATION: SEE ECDC 19.00,005(A)(5) IL PERMIT LIMIT: SEE ECDC 19.00.005(A)(6) Engr. Inspection 60 SEE BACK OF PINK PERMIT FOR MORE INFORMATION 0 -APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESSORS Fire Review Plan Chk. Deposit Lu IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF 2 x EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND Fire Inspection Receipt # 4 ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY x FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Landscapelnsp. Total Amt. Due / 0 x NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION.' I Recording Fee Receipt # Ir'-WI I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION P7PPLICATION APPROVAL GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY wi rH CITY AND STATE LAWS REGULATING CONSTRUC- CALL This application is not a pormil until signed by the TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED Building Official or hisihor Deputy: and Fees arc paid, and OF THE IN VIOLATION OF,THE LAS STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt is acknowledged in space provided S�QIDE WORKMEN'S CO�IPENSA- ANCE AND RCW 18:27. OFFICIALS SIGNATURE D TE SIGNP)T DATE SIGNED (425) 1 -2 — 4-1 // zt// 5 771 w0220 11 Z71 RELEASED BY VIT E MENTION EXT. 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI- ORIGINAL - FILE YELLOW - INSPECTOR FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109 / IBC110 I IRC110. PINK -OWNER GOLD - ASSESSOR 10104 PRESS HARD - YOU ARE MAKING 4 COPIES a z z 0 ­11 0 M -i -n C/) ­11 0 M C M 0 0 0 0 C: 3: M M Z jC) ­11 C 3: Cj) 0 -n M M 0 5) 0 r- 0 M C 0) C C/) Q 0 Z X > z —11 3: 0) z 0 i 0 M FINAL PROJECT APPROVAL FORM RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ................... FOUNDATION:, Footin ...................... ..Wall ...................... I.. Pier/Porch ......... z Retaining. Wall .... ...... Slab Insulation .......... M PLUMBING: 74 _5 C,9 Underground ............. IT! C Rough -In ................... M 0 __10 Commercial Final ...... C M HEATING: M�z ID Gas Test ................ C z Gas Piping ................. ca Equipment ................... 0 -n -n Commercial Final ....... M M EXTERIOR SHEATHING NAILING .......................... 0 ITI FRAMING ..... .................. C: 0) FIRST FLOOR FRAMING ... M 0 z INSULATION ................... ;U Floor Insulation ....... z Wall insulation ........... t Ceiling Insulation ....... 0) z SHEETROCK NAILING ... SPECIAL INSPECTION ... 0 ITI MISCELLANEOUS .......... FINAL APPROVAL FO R 0 OCCUPANCY ..................