2005-0793 Nelson rockery revision2.doc
City of Edmonds
TH
121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
DEVELOPMENT SERVICES DEPARTMENT
Planning • Building • Engineering
Plan Review Corrections
Application : Date:
# 2005-0793 Revision November 15, 2006
th
Project Name/Address:
Nelson / 20429 88 Ave W
Contact Person/Address/Fax:
Bob Nelson / fax: 425-776-0135
Reviewer: Jeanie McConnellDivision:Engineering
During review of the subject submittal it was found that the following information, corrections, or
clarifications will need to be addressed:
1. 11/14 - Please provide a site plan that accurately shows the location of the rockery in relation to the new garage and
driveway. The entire length of rockery does not run parallel to the new garage and driveway as shown on the site
plan dated 11/3/06.
The site plan should show the driveway and planting strip as it will be on site, at final project approval.
11/15 – A “black” area is still shown on the site plan, which should just be shown as planting strip,
o
consistent with how the rest of the planting strip is shown. Do not label as “cut asphalt to create
planting strip”. Please just shown the planting strip.
The rockery is to be shown in plan view (looking down on it from above) and therefore only one rock row should be
shown for each tier. I thought I remembered one more tier closer to the house, but maybe I am mistaken.
11/15 – It has been confirmed there is one more tier closer to the house, which is not shown on the
o
site plan. The site plan must accurately show what is presently on site.
2. Provide actual dimensions from the corners of the garage to the rockery.
11/15 – Actual dimensions have not been provided.
o
3. Provide actual dimensions from the gravel and asphalt driveway to the rockery. Again, this is the actual dimension
that will be verified on site at final project approval. Ensure the asphalt and gravel driveway is no closer to the
rockery than a distance equal to the height of the rockery.
11/15 – Actual dimensions have not been provided.
o
4. Provide actual heights of the rockery from finished grade to the top of the rockery. Provide in several locations
along the rockery as the actual height varies.
11/15 – Actual height has not been provided. Plan shown that rockery varies in height, but actual
o
heights at specific points along the rockery need to be identified.
5. The site plan provided is not to scale and should be no smaller than 1” = 20’. It is becoming more difficult to read
as changes are being made. Please provide a new site plan that even if not to scale is sized no less than 1”=20’.
11/15 – The site plan provided is still less than 1”=20’.
o
Pease resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. JoAnne
Zulauf is your City contact for this project. Please contact me at 425-771-0220 or by e-mail at
mcconnell@ci.edmonds.wa.us if you have specific questions regarding these plan corrections.
DATE FAXED 11/15/06 PAGE(s) 1