Loading...
20050809.pdf9 DATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAME/NAME OF BUSINESS MAILING ADDRESS ,-7-'( 'Pty\j'C_ CITY ZIP TELEPHONE ell C NAME ADDRESS NAME CBL4 CblikjT�2CL ADDRESS 'P. C? - CITY ZIP TELEPHONE 1�), ��35­ S.5cy­ y cftl C) STATE LICENSE NUMBER EXPIRATION DATE f CiJFC�ED BY j I K, T't- R (!- (-) x C. k l —�4 PROPERTY TAX ACCOUNT PARCEL NO 92-012 6 G() k c,2 6 (!" 0 NEW RESIDENTIAL ADDITION COMMERCIAL MIXED USE REMODEL L7' MULTIFAMILY REPAIR GRADING CYDS DEMOLISH TANK EGARAGE ] CARPORT El RETAINING WALL ROCKERY (TYPE OF USE. BUISIVESS,OR ACTIVITY) EXPLAIN PLUMBING / MECH COMPLIANCE OR USE CHANGE OF D SIGN FENCE ( X OTHER ,4 FIPF R921hl.!�LER NUMBER NUMBER OF DWELLIV STORIES 2, 6+w, I UNITS DESCRIBE WORK TO BE DONE IN IRE e :.�' e PERMIT EXPIRES PERMIT NUMBER JOB ADDRESS �_p 15 SUITE �P`rts 7 PLAT NAMEiSUBDIVISION NO. L01 NO CID N 0' I LID FEE S PUBLIC RtGHT OF WAY PER OFFICIAL STREET MAP TESCPAppiroved RW Point Required Sifeet use Permit Requited EXISTING PROPOSED inspecti3n Requited Sidewalk Requited REQUIRED DEDICATION ___ FT I undergiound Witing roquired METER SIZE LINE SIZE NO. OF FIXTURES I PRV REQUIRED YES 13 NOM REMARKS OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE ENGINEERING REVIEWED BY DATE FIRE REVIEWED BY DATE VARIANCE OR CU SHORELINE OR AOB# I INSPECTION SFPA REQ'D COMPLETH) FAFKIPT OYES 13 NO I I CAP ZONE I AREA HEIGHT WAIVER13 , PROPOSED I ALLOWED , PROPOSED STUDY 13 LOTCOVERAGE ALLOWED PROPOSED PARKING REO'D , PROVIDED FT.) I REMARKS 0 z R UJI W z a z W REQUIRED SETBACKS (FT.) I PROPOSED SETBACKS (FT.) I FRONT SIDE REAR FRONT URSIDE REAR C) z z LOTAREA I PLANNING REVIEWED 13Y DATE n 10. OF CONSTRUCTION SPECIAL INSPECTION REQUIRED C1 YES REMARKS GEOTECH REPORT BY: STRUCTURAL DESIGN BY: VALUATION CODE CONSULTANT OCCUPANT GROUP 10011 0 z Description FEE Description FEE Plan Check State Surcharge HEAT SOURCE LOT SLOPE% VESTED DATE Building Permit City Surcharge PLAN CHECK NO: Plumbing Base Fee Mechanical THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO l'- BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBIC DONMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE Grading SEPARATE PERMISSION. 2 Engr. Review m PERMIT APPLICATION: SEE ECDC 19.00.005(A)(5) W CL PERMIT LIMIT: SEE ECDC 19.00.005(A)(6) Engr. Inspection SEE BACK OF PINK PERMIT FOR MORE INFORMATION V) "APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS. ASSIGNS AND SUCCESSORS Fire Review Plan Chk. Deposit Uj OLD HARMLESS THE CITY OF _1 IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND H 2 EDMONDS, WASHINGTON. ITS OFFICIALS, EMPLOYEES. AND AGENTS FROM ANY AND Fire Inspection Receipt # m / pa� - ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE Vie— E Landscape Insp. Total Arrit. Due DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANC �O NOR LIMIT IN ANY WAY THE CITY's ABILITY TO ENFORCE ANY ORDINANCE PROVISION.* imi - Recording Fee I Receipt ill P1 711,eT ;L I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION APPROVAL GIVEN IS CORRECT; AND THAT I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF This application is not it permit unlit signed by the THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL Building Otficlal of hisMur Deptity and Fees are paid and TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED ter.eipt isacknowledqed it) space provided IN VIOLATION OF THE LA60R COMF;_OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION I WORKMEN'S COMPENSAT��URANCKirD RCW 18:27. 0 __Ici�A _s1 t L I F DATE (425) SIGNATURE (0 R 0 AGENT DATE SIGNED ILI 771-0220 R Ve- A DBY I I / DATE EXT. 1333 Vill jell ATT E N T 10 N IT IS , UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI.. ORIGINAL - FILE - YELLOW - INSPECT FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109 / IBC110 if IRC110. PINK -OWNER - GOLD - ASSESSOR 10104 PRESS HARD - YOU ARE MAKING 4 COPIES z 0 i 0 m Cn 0 M I m 0 0 --j 0 0 C M M z 0 —1 C m cin o -n n� MITI 0 0 0 M cit) Cn M Z .AT X z C/) z 0 i 0 m FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE PLEASESIGN ENGINEERING DIVISION DATE PLEASE SIGN -PLANNING DIVISION DATE PLEASE SIGN PROJECT SITE ADDRESS__7 PERMIT t'�Qej�Xl ADB# DATE INSPECTED 7- DESCRIPTION OF WORK TO BE INSPECTED If A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES El Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:ten1p:b1dg:forms:ocaprv1 3/25/04 z 0 M -n M 0 0 __10 0 C --i K M M M Z 0 -n n;U > M M 0 0 0 M C Cn 9 Cn Q 0 Z 7' r z C0 z 0 i 0 M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ...................... FOUNDATION: Footing ...................... Wall .......................... Pier/Porch ................. Retaining Wall ........... Slab insulation .......... PLUMBING: Underground ............. Rough -In ................... Commercial Final ...... HEATING: GasTest .................... Gas Piping ................. Equipment ................. Commercial Final ....... EXTERIOR SHEATHING NAILING .......................... FRAMING ........................ FIRST FLOOR FRAMING ... INSULATION ................... Floor Insulation ......... Wall Insulation ........... Ceiling Insulation ....... SHEETROCK NAILING ... SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. z 0 1 0 ITI =i =5 C IT! M 0 0 0 0 C M M Z 0 -Ti M M 0 0 0 M C Cn r, Cl) Q 0 Z M z Cf) z 0 M