20050849.pdfD
FPERm IT EXPIRES
CITY OF EDMONDS
PERMIT
NUMBER
CONSTRUCTION PERMIT APPLICATION
ion SUITE/APT#
ADDRESS
OWNER NAM&NAME OF BUSINESS
PLAT NAMEISUBDIVISION NO.
LOT NO.
LID NO,
Lu
MAILING ADDRESS
LID FEE S
z
0
/f2 4-7H
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP
TESCPApproym
RW Permit Reginfed
13
0
CITY ZIP
TELEPHONE
EXISTING PROPOSED
Street Use Permit Required
Inspection Required
C3
E3
<
1_405
REQUIRED DEDICATION FT
Shlewalk Requited
underground
13
E3
Wiling required
[3
NAME 4
4F
&
METER SIZE ]
LINE SIZE
NO OF FIXTURES
I
PRV REQUIRED
YES 13 N
O/q
U
", V
W
ADDRESS
REMARKS
OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE
CITY ZIP
TELEPHONE
A, I (T
-7 -7 (!:Vq 5d
CITY
STATE LICENSE N
PROPERTY TAX A
E] NEW
RADDITION
REMODEL
REPAIR
DEMOLISH
GARAGE
CARPORT
(TYPE OF USE, BUIZN
NUMBER
OF L15111
STORIES
DESCRIBE WORKTO
ZIP TE EPHONE
EXPIRATION DATE
PARCEL NO.
1:1
RESIDENTIAL
VCOMMERCIAL
eU'�rMXED
USE
1:1
MULTIFAMILY
GRADING
CYDS
TANK
RETAINING WALL
ROCKERY
NUMBER OF
DWELLING
UNITS
CH
0< =LUMBING:AMECH
El
COMPLIANCE OR
CHANGE OF USE
SIGN
FENCE
( x
M OTHER
FIRE SPRINKLER
FIREALARM
A/.,O
Lu
Lid
z
a
z
W
14,
ENGINEER G REVIEWED BY DATE
12,
E RE WTE tB DATE
Lid
81-31 C:��
0:
ARIANCE Oh cu
i HORELINE QEQ29#_4/INSPECTION
SEPA
PY
)L
REO'D
*�s
COMPLETED
I ��
ON 01
CA#
ZONE
SIGN AREA
HE IGHT
WAIVE
ALLOWED PROPO SED
ALLOWED PROPOSED
STUDY E3
36
V4�- I -7-r,
r
LOT COVERAGE
REQUIRED SETBACKS (FT)
PROPOSED SETBACKS (FT.)
ALLOWED PROPOSED
FRONT SIDE REAR
FRONT LIR SIDE REAR
1 0 L__j
7,0 0 C)
3z
PARKING
LOT AREA I
PLANNING REVIEWED BY D4TE 111
REQ'D PRO'
III 1
11
FT.)
REMARKS
SPECIAL INSPECTIO
REQUIRED N YES
6
t:-H C LID 5 5— t7x/411�1_ U.I&Ll
'�Z�7`EC� �R �PORT_
I
BY:
STRUCTURALQE$IC
By I ZL(4.
cl;>A/ z4p;:�_ 42� 6c_f
VALUATION
Description
—
Plan Check
HEAT SOURCE
LOT SLOPE%
VESTED DATE
Building Permit
PLAN CHECK NO:
Plumbing
Mechanical
THIS PERMIT AUTHORIZES ONLY THE WORK NOiElIK THIS PERMIT COVERS WORK TO
I=
BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBIC
DONMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE
SEPARATE PERMISSION.
Grading
Engr. Review
uj
CL
PERMIT APPLICATION: SEE ECDC 19.00.005(A)(5)
PERMIT LIMIT. SEE ECDC 19.00.005(A)(6)
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
Engr. Inspection
U)
Uj
_j
xi
a
_j
0
x
*APPLICANT. ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESSORS
IN INTEREST. AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF
EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND
ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY
FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE
DEEMED TO MODIFY. WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE
NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION."
Fire Review
Fire Inspection
Landscapelnsp.
Recording Fee
I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION
GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF
a
a
CODE
CONSULTANT
THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL
TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED
IN VIOLATIOR OF THE LABOR CODjjC1f THE STATE OF WASHINGTON RELATING TO FOR INSPECTION
WORKMEN'S "Ef(�ATION INSrNC*tND RCW 18:27.
SIGN WOR ENT( DATE SIGNED (425)
07/0 771-0220
OCCUPANT
GROUP
OCCUPANT
LOAD ,
Me -
FEE Description
State Surcharge
City Surcharge
Base Fee
a
z
3Y Is
FEE
Plan Chk. Deposit
Receipt #
Total Amt. Due
Receipt #
APPLICATION APPR6VAL
This application is not a pornia Until signed by the
Building official or his/hur Dopuly and Foos are paid and
recoillit is acknowledged in space provided
.�s IG FIE DAT E
R 11-ASED.By DA I F
STRUCTURE UNTIL r
ATTENTION EXT. 1333 tl '
IT IS UNLAWFUL TO USE 0" /PY A BUILDING OR �4' z% A
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI- ORIGINAL - FILE 'YF1 I OW 'INSFIC 14
FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC1091 IBC110 I IRCII`10- PINK - OWNER GOLD A.SSESSOR
10104 PRESS HARD - YOU ARE MAKING 4 COPIES
z
0
i
0
ITI
—1 -n
Vi —4
3:
0 M
C
M
0
0
0 C
-4 C
3: M
ITI Z
jo -1
C
0 -n
n
M M
0
0
0 M
C Cn
9 Cn.
M 0
Z
X
z
3:
0
z
0
4
0
M
F p
Zolle
Corner,.P�Flag
Setba6kc, Required ACtUal RECEIVED
Fron pun
t
AU
Sides G 1 9 2005
Rear
CITY COPY BUILDING DEPT,
Other
Bellght 157
r
FRC�ECT =)ATA b
pi
PQDwz.WY ADCOMIi
(VI
15JILONO c=66
VIM. LUVWAPQ�
4=4 SO ATAIR Aropcolibro
�ft C� e "AM
I&om htrwwoAll� mon qum w em
WIIAM �SWtlt$16
%jog 1�got SIAM gMtoMr L
&SdM �TIA4 SIAM '~ L&ftV � M4 111�111 =1 �W
�m 4=P91007T,
ZONNI COOK
90,
C4*45TF=T%C4 TYPE p
SITE AREA +
SITE CA04r
MAGI!
r
PL L L
'N6
L, L EX ST. 5UILD
=.CUPANZT LOADS z
MITKOCNI I WOO 11=� too F�� .
Fr^tME COLHT > AF0
Lu
kR*446�4 a Wall
c LL
(3ENSPA. NOTES
L ALL CChPOMI 10 tp,g 200� 16(Thch Op T.9
2. ALL �L 02 OCN! b, ACCO1%CA*.e U114 "be
PLAM Al4O PokA"T SPECfIZAT
WQSL WIWI
16 ALL LV= H ZCSrA.? 01W COhKWM 00 MLIZ�M SWJLL &E
"low
I I TTr
l I CROAROMANCIVOOO.ALL rANCRO BY �APPIQO%eVO TRAT" I ' 0 L 6 1.. � A L
AM CY,
9 ALL &= PC" UW0 P4CAW rOCMTW 11 T� 4#*MJO Off MIMMI
FOLWATION 6 LL& �O TA dMOH2 I�ALL SO 441M�W. .0
lk ALL CrW4WO* AM TO WE OP COkCX2u1. P�51 AREA OF LLO
~142 OR cammp I.00 OF CmLr" "I" ec"90 O1bQFww R<
4p. rpev Of W0ftM*jTAL pWftOMH5 H ALL MA%* LA"S AT
1 . L
W.O` ON �Ttft A 0 LL4ft P^" dML8 ft-BITIRAM SAW F�* R.2 w p
CILkb& FMSLOOA m Accomot= alr� in= Sac m& F.
OL 0"VAL COKTITAMOR -0 VWWT 4. 01-06 ". W T�d RVIDIT
OF COWO."I Oft c-ul*mb "T"IN WALS c" ftylm� T�j
FLAW& A%0 bw"C�Th" NOTPt' T�W ANCI41190 ��Af"Y.
i
& FMO'VV2 APLCO* Olt LAC04 oOT 60BA" We VALOU
�WWWOLP AT A" P0.40NAM
M�J� AM zZ
S uzz� ave-we IN&" m STOMP! Otowim.
WWWACIM IWIL.I. m7olDg To 7W VAZM OMPT. ALL WAb**%TO" -JIM
STA*X P4MY CA.=LA�KH&
62!144A�W nft�$ b&"U W XZWPW� A" MICW41,�L, wx
c:u
L W"T ALL A%OICTR
1 0 + Ff)dTIJPW*pj two C04111(4:1 OR13Y atce
AccMdWAft AS MOARCO,
7�
Q. ALL CIPOSS HOT LCKW10 SIT OrIDOOCoO ON 11`9 PLANS. WEM04
IMIATIOP4. OR OXTA" 9&4ALL IN 30 4K PP04 PA41 OF OTWI
Kcal OP vocor CM&M
tL fdm.LAt1 ALL ft"M P"* 00 "TALL AM07M) IPO A
#dU.AtION FOR &WO CCHIINOL N ALL P.LMS til L&L.Lk
W. wmticot xmnb Am"D 0 �" *0 own �ik
CMN"S ST1W.D. A�Lb A� F0.10,00104 btf=4 SITE PLM
LALLe Op pqOOp Apo ftrd� W�lSLS CO101kWob A'
owrtmllvu� co UTLIttT fd�aq fww� "Lk
44 14-- Pop
PMg* 4HO 01OOP AND ALL OT"A 438 H Ito
T4 9"H2 D�WLOIII �" ft WALIA CAJ-KNO,
+ aAA&MMO, Olt SgAT4ftjjMwmW To FMYM AN LZAK9420.
W. rm:ov of amcbm rf"OTORS 94 ALL oft 000110k C4714N= To K:�*?.
ALAI" Syffffw. I
1k At ALL 001 LAMIN TAWA PIROVOR PIRSULMIN
pqmw VAINIA W*44f To OICA"
M ALL *LAN POPSE, 6",t 04 APPAOtW GAFff� PLANNIN (01
APPROVED 5v NEI64T CULATIONSs
*6 mwvcg A0011XVIAL M�Wv �%" oc" BID" LIMAL CESCPWS�faz CA.
O"m C4 All wvvol OH FOL0*46, 0
W�L M OPHTFACTOROUNI&OD.
S*4oLL POPOCA UWA~Ctl &TAT11 "MY
CALCAATIONO TO " 6JLV@4 OW W�Sff C4C"* MW c;
so etwoomect sarctl TAX k"8111
um, 4 bloom. z
W�� a KnImco. to&ot WAM WSMIT "cAlottmI* I-W
mo CUW =9 SA V,LI, tIAM A,
uWMIW4 cq#44
nQ01004 ^fc� #%xP
MEW
U(LD ING
NOV I 2005
OTTO ROSENAU & ASSOCIATES, INC.
Geotechnical Engineering, Construction Inspection & Materials Testing
CONSTRUCTION IN SPECTION REPORT
Report Number; 30851
Description: Structural steel Fabrication
Project: Rick Steve's Europe through the Back Door Permit Number: 05-394
Address: 130 0 Avenue N, Edmonds Job Number: 05-701
Client: Rick Steve's Europe through the Back Door, Inc Client Address: PO Box 2009, Edm nds
0
Inspector
z
and Date Remarks
Douglas Graham On site at Dimensional Design to perform special inspection on structural steel fabrication per AWS
M
10/11/2005 D1.1, AISC.and approved drawings.
a -.6 1y"Veriffecivelder's-WA130 certification:
'Bernado A. Worrell, expires 01 APR 06, W04342 FCAW
31: V`
M
C
2) Performe'd visual Weld inspection on the following columns:
M
a
0
1C, 1D and 1E
C:i
3: M.
:Mz
Welds and workmanship fo und to be in c6nfor mance.
C Z:
>
0 -n
MM
0
0
C
M O�
z
X
>
Z
z
.0
0
M
Copies to:
X Client Contractor
Architect X Building Dept. Technical Responsibility:
Engineer VDavid Lyal, Technical Director
sen & Assoc
This report applies only to the items tested or reported and is the exclusive property of Otto Ro iates, Inc. Reproduction of this report,
except In full, without written permission from our firm is strictly prohibited.
Page I of 1
6747 M.L. King Way S., Seattle, Washington 98118 - Phone (206) 725-4600 or 1-888-OTTO-4-US - Fax (206) 723-2221
Fonn No.: ADMIN-63-01 (Rev 05103)
I LD
OTTO, ROSENAU &ASSOC 1ATESjNC NO
Geotechnical Engineering, Construction Inspection & Materials Testing
CONSTRUCTION INSPECTION REPORT
Report Number: 36801
Description: Structural Steel Erection
Project: Rick Steve's Europe through the Back boor Permit Number: 2005-0849
Address: 130 4th Avenue �N, Edmonds Job Number 05-701
Client: Rick Steve's Europe through the Back Door, Inc Client Address: PO Box 2009,Edmonds
Z�
01
Inspector
and Date Remarks
K
Douglas Graham On site to perform special inspection on. structural steel erection per AISC and approved drawings.
10/18/2006 1) Verified building permit and approved drawings.
-n
2) Visually inspected and verified a minimum of snug tight condition of diameter A325 HSB's
a
per drawing A-13, detail 4.
M
C
Mal
Work found to be in conformance.
0
0
Does Conform
M
M z
10--1
0 -r
M M
CO)
.0 M
C4
M 0
z
M.
Z:
COY
z
0
0
M
Copies to:
X Client Contractor
Architect X Building Dept. Technical Responsibility:
Engineer avid Lyal, Technical Director
�Assoclates,
This report applies only to the items tested or reported and is the exclusive property of Ott o Rosenau Inc. Reproduction of this,report,
except in full, without written permission from our firm is strictly prohibited.
Page 1 of 1
6747 M.L. King Way S., Seattle, Washington 98118 — Phone (206) 725-4600 or 1-888-OTTO-4-US Fax (206) 723-2221
OTTO ROSENAU & ASSOCIATES, INC. INS
'Geotechnical
Engineering, Construction Inspection & Materials Testing
CONCRETE REPORT
Job Number: 05-701 Report Number: 33228 Permit Number: 05-394
p
Project: Rick eve's Europe Through the Back Door Client: Rick Steve's Europe Through the Back Door
�Iht
lh
Address: 130 4 Ave N Edmonds, WA Address: 130 4 Ave N Edmonds, WA
Date: 10/07/2005 Inspector: Dusty Johnston
Description/Location: Front stem wall. Cylinders only.
Z
Resteel verified: Yes Resteel grade: 60 Manufacturer: Cascade.
0
Placement Data Design Actua[C] batch Weightsidubic Yard
M
Supplier: Salmon Bay
Cement (lbs./type): 6 SK
Mix Number: S3602100
Fine Agg. (lbs):
Slump Spec: 5"
Coarse Agg. (lbs/size):
co
W/C Ratio Spec:
Coarse Agg. (lbs/size):
Agg.
0 7:
M,
Air Spec:
Coarse (lbs/size):
C
M
Total Yards: 4
Fly Ash (lbs):
0
Placed Via: Tailgate
Water (Ibs or gal):
3
0
C:
Consolidated: Yes
Admixtures (specify): MBAE 90 1.0 oz/yd
Required Strength (psi):* 3000"
M
M Z
m at
Sapiplipgan.cl Testing Data. ...Time ,:.Cubic Water� Slu p Air%.. Conc..Jemp Ambient Truck . TIckL
'No.
ASTM C.-172.i Q 31. Made Yards Addbd� C. 1.43 -C 13V 46rnp kd�:,
C Z
>
51,
Cast Samples: 1-4 2:30 4 70' 600 32 Y530723
. .
3:
Weather: Overcast Slump Range: Air % Range:
0. -n
Date Samples Picked Up: 10/10/2005 Initial Curing Method: Excluding ASTM C31 -12.1.5 Initial Curing Temp: Excluding ASTIVI.C311 -10. 1.2
01111
M M
Other Test Methods Standards Used:
0
REINFORCING PLACEMENT: Conforms X Does Not-Confdrm
0 M
C CD
K 0)
COMPRESSIVE TEST RESULTS
M 0
Z r-,
Specimen Test Field Age Size Area Max Load Strength Type of Fracture
Number Date Cure (Days) (In.) (Sq.1n.) Weight iULSI iaaft (other than congel
1 10/14/05 7 6x12 28.20 29.26# 95,010 3370
Z
Z
Tested in general accordance to: ASTM C39 x ASTM C109 ASTM C617 ASTM C 1231 x
0
Note: Type of fracture does not apply when testing in conformance to ASTM C1231
0
M
Final curing in calcium hydroxide Water storage tank at 73* 3' F
Copies to:
X Client Contractor
Architect x Building Dept. Technical Responsibility:
Engineer Batch Plant David Lyal, Technical Director
This report applies only to the items tested or reported and is the exclusive property of Otto Rosenau & Associates, Inc. Reproduction of this report,
except in full, without written permission. from our firm is strictly prohibited.
Page I of 1.
6747 M.L. King Way S., Seattle, Washington 981.18 - Phone (206) 725-4600 or 1-888-OTTO-4-US - Fax (206) 723-2221
Form No.: ADMIN-62-02 (Rev 04104)
OTTO ROSENAU & ASSOCIATES, INC. NOV
Geotechnical Engineering, Construction Inspection & Materials Testing
CONCRETE REPORT
J,ob.Number: 0-701 Report Number: 33230 Permit Number: 05-394
Project: Rick Steve's Europe Through the, Back Door Client: Rick Steve's Europe Through the Back Door
th
Address: 1304 Ave N Edmonds, WA Address: 130 4"'Ave N Edmonds, WA
Date: 10/12/2005 Inspector- Dusty Johnston
Description/Location: Entrance (front) slab.
Z
Resteel verified: Yes Resteel grade: 60 Manufacturer: Nucor
Placement Data Design ED Actual El Batch Weights/Cubic Yard
M
Supplier: Salmon Bay
Cement (lbs./type): 370#
Mix Number: 461081
Fine Agg. (lbs): 1412#
Slump Spec:
Coarse Agg. (lbs/size): 1888#
W/C Ratio Spec:
Coarse Agg. (lbs/size):
Air Spec:
Coarse Agg. (lbs/size):
M
C
Total Yards: 61/2
Fly Ash Qbs): 60#
M 01
Placed Via: Tailgate
Water (lbs or gal): 178#
0 0
Consolidated: Yes
Admixtures (specify): 7 oz. Super plasticizer
Required Strength (psi): 3000
1 bag stealth fiber
M
�S n
-amplingo. d Testing Data, �.Tlme:: Cubic Water. SluTp.. Air.% Concjemp: lk rpblent: Truck Ticket
M
Added . C143 G 231.
ASTM'C 172, C 31 Ma*de ::-Yards: 'TerniJ No. No.
Cast Samples: 1-4 9:15 6 5 gal. 51/2" 66-55' 272 590250
C
Weather: Overcast Slump Range: Air % Range:
0 -1111
Date Samples Picked Up: 10/13/2005 Initial Curing Method: Excluding ASTM C31 -12.1.5 Initial Curing Tern Excluding ASTM C31 -10.1.2
p-
-4
F� C6rnM6jj& I-— , ..... . . . .. .... .... . - - I — . .1 1
*Excluding slump, which is out of spec.
M M
Other Test Methods Standards Used:
C0
0-
r
REINFORCING I PLACEMENT: Conforms X* Does Not Conform
0 M
C CO)
COMPRESSIVE TEST RESULTS.
Cl)
ir M 0
Z r-
Specimen Test Field Age Size Area Max Load Strength Type of Fracture
Number Date Cure (Days) (In.) (Sq.1n.) Wei-ght 1!LS1 jp_s ji (other than cone)
X
1 10/19/05 7 6x12 28.18 28.81# 54,200 1920
Z
M
Z
Tested in general accordance to: ASTM C39 x ASTM C109 ASTM C617 ASTM C1231 x
Note: Type of fracture does not apply when testing in conformance to ASTM C1231
0
Final curing in calcium hydroxide water storage tank at 730 t 3' F
M
Copies to:
X Client Contractor
Architect X Building Dept. Technical Responsibility:
Engineer X Batch Plant David Lyal, Technical Director
this report applies only to the items tested or reported and is the exclusive property of Otto Rosenau & Associates, Inc. Reproduction of this report,
except in full, without written permission from our firm is strictly prohibited.
Page I of 1
6747 M.L. King Way S., Seattle, Washington 98118 - Phone (206) 725-4600 or 1-888-OTTO-4-US - Fax'(206) 723-2221
Fonn No.: ADMIN-62-02 (Rev 04104)
L
OTTO &ASSOCIATES, INC.
Geotechnical Engineering, Construction Inspection & Materials Testing
CONCRETE REPORT
Job Number: 05-701. Report Number: Permit Number: 05-394
Project:, Rick Steve's Europe Through the Back Door Client-, Rick'Steve's Europe Through.the Back Door
Address: 1304 th Ave N Edmonds, WA Address: 1304 th Ave N Edmonds, WA
Date: 10/5/05 Inspector: Brian R. Robertson
Des cription/Lo cation: Footing extensions on the west side of the building for new curtain wall.
Z
Resteel verified: 10/5/05 Resteel grade: 60 Manufacturer: Nu
0
d
Placement Data Design Z Actual E] Batch Weight�KCubic Yard
Supplier: Salmon Bay
0
rp
Cement (lbs./type): 1564#
Mix Number:- 602A
Fine Agg. (lbs): 1250#
Slump Spec: 4"
Coarse Agg. (lbs/size): %11 1910ft 0
W/C Ratio Spec: 0.43
Coarse Agg. (lbs/size):
ca
Air Spec: 5.0%
Total Yards: 5
Coarse Agg. (lbs/size):
Fly Ash (lbs):
.0 M
C
M
Placed Via: Chute
Water (Ibs or gal): 242# 000,
-1 0
Consolidated: Vibration
Admixtures (specify): MBAE 90 1.0 oz/yd'
00
C
Required Strength (psi): 3000
Sairn'p Tes !:;C,Ubi0._ . �Cdhia T' rho, "':"Arribient Truck� Ticket
.. .... .. .. er� m 6
.... .....
M
M Z
..
STM:C: C:311; M6db ryai�s,�,;:'Addbd: CJ 064 _T No.,: N'
_Z
Cast Samples: 1-4 2:45prn 5 0 gal 3Y2" 43% 670 660 68 Y530644
C
>
CIO
Weather: Overcast Slump Range: 4" 1- Air % Range: 5.0% 1.5%
0
DateSarrlples Picked Up: 10/6/2005 Initial Curing Method: Excluding ASTM C31 -12.1.6 Initial Curing Temp: Excluding ASTM C31 -10.1.2 1
-n
0
M
Other Test Methods Standards Used:
M
REINFORCING PLACEMENT: Conforms X Does Not Conform
0 r
0 M
C CD
COMPRESSIVE TEST RESULTS
M C/)
M 0,
Z r
n Test Field Age Size
Ppecime . Area Max Load Strength Type of Fracture
Number Date Cure (Days) (In.) (ScOn.) Weight 1tal il1s_al Lother than cone)
10/12/05 7 6x12 28.24 28.87# 109,300 3870
Z
Tested in general accordance to: ASTM C39 x ASTM C109 ASTM C617 ASTM C1231 x
Z
0
Note: Type of fracture does not apply when testing in conformance to ASTM C1 231
Final curing in calcium hydroxide water storage tank at 730 30 F
M.
d Copies to:
�_Technical
X Client Contractor
Architect X Building Dept. Technical Responsibili
b
Ziri 5��David Lyal,
Engineer Batch Plant David Lyal, Technical Director
Di
This report applies only to the items tested or reported and is the exclusive property of Otto Rosenau & Associates, Inc. Reproduction of this report,
except in full, without written permission from our firm Is strictly prohibited.
Page 1 of 1
6747 M.L. King Way S,, Seattle, Washington 98118 - Phone (206) 725-4600 or 1-888-OTTO-4-US - Fax (206) 723-2221
Form No.: ADMIN-62-02 (Rev 04104)
OTTO ROSENAU & ASSOCIATES, INC.
Geotechnical Engineering, Construction Inspection & Materials Testing
CONCRETE REPORT
Job Number: 05-701 Report Number: 33228 Permit Number: 05-394
Project: Rick Steve's Europe Through the Back Door Client: Rick Steve's Europe Through the Back Door
Address: 1304 th Ave N Edmonds, WA Address: 1304 th Ave N Edmonds, WA
bate: 10/07/2005 Inspector: Dusty Johnston
Description/Location: Front stem wall. Cylinders only.
Z
Resteel verified: Yes Resteel grade: 60 Manufacturer: Cascade
0
Placement Data Design Z Actual El Batch Weights/Cubic Yard
0
Supplier: Salmon Bay
Cement (Ibsdlype): 6 SK
Mix Number: S3602100
Fine Agg. (lbs):
Slump Spec: 5"
Coarse Agg. (lbs/size): W
W
W/C Ratio Spec:
Coarse Agg. (lbs/size):
Air Spec:
Coarse Agg. (lbs/size):
Total Yards: 4
Fly Ash (lbs):
C M
Placed Via: Tailgate
Water.(Ibs or gal):
3
M
0
Consolidated: Yes
Admixtures (specify): MBAE 90, 1 .0 oz/yd
__10
0
Required Strength (psi): 3000
C
S T 1, Me
i: :b i i�' ':.'Cubic:-: :�:�:Water.:'�::..Slunlp 6
anhpIlh9:afid.�Tds ing: -Air 0/('- Cbn6i:T .:Tr.uck:.- TickeC
M
M Z.
1�1:':��Adddd:; �':�:�:C143, C:1064� Joffiip'..
-ASTM:C172::C:31�.: Yiirds-� C:2311::�:: O�: No.
Cast Samples: 1-4 2:30 4 5 5.3 70! 60' 32 Y530723
C Z
Weather: Overcast Slump Range: Air % Range:
Excluding ASTM C31 -
Date Samples.Picked Up: 10/10/12005 Initial Curing Method: Excluding ASTM C31 -12. 1.5 Initial Curing Temp: 10.1.2
:Com
O..M
-n
ments
Other Test Methods Standards Used:
M M
REINFORCING PLACEMENT: Conforms X Does Not Conform
.0
0
M
COMPRESSIVE TEST RESULTS
C (n
(n
Specimen Test Field Age Size Area Max Load Strength Type of Fracture
M 0.
Z
Number Date Cure (Days) (In.) (ScI.In.) Weight (other than cone)
1 10/14/05 7 6x12 28.20 29.26# 95,010 3370
2 11/4/05 28 6x12 28.15 29.16# 113,800 4040
3 11/4/05 28 6x12 28.15 29.46# 131,500 4670
Z
4*
*Discarded
CO)
Tested in general accordance to: ASTM C39 x ASTM C109 ASTM C617 ASTM C1231 x
Z
0
Note: Type of fracture does not apply when testing in conformance to ASTM C 1231
Final curing in calcium hydroxide water storage tank at 730 3* F
01
M
Copies to:
X Client Contractor
Architect x Building Dept. Technical Respons ibility:
Engineer Batch Plant L�-' David Lyal, Technical Director
This report applies only to the items tested or reported and is the exclusive property of Otto Rosenau & Associates, Inc. Reproduction of this report,
except in full, without written permission from our firm is strictly prohibited.
Page 1, of I
6747 M.L. King Way S., Seattle, Washington 98118 - Phone (206) 725-4600 or'l-888-OTTO-4-US - Fax (206) 723-2221
Form No.: ADMIN-62-02 (Rev 04104)
OTTO ROSENAU &ASSOCIATES, INC.
Geotechnical Engineering, Construction Inspection & Materials Testing 2095
CONCRETE REPORT
Job Number: 05-701 Report Number: 38826 Permit Number:. 05-394
Project: Rick Steve's Europe Through the Back Door Client: Rick
th Reye's Europe,Through the Back Door
th
Address: 1304 Ave N Edmonds, WA Address: �Avb N Ed' nds, WA
mo
Date: 10/5/05 Inspector: Brian R. Robertson
Description/Location: Footing extensions on the west side of the building for new curtain wall.
Z
Resteel verified: 10/5/05 Resteel grade: 60 Manufacturer: Nu
0
__4
Placement Data Design Z . Actual El Baitch Weights/Cubic Yard
0
Supplier: Salmon Bay
Cement (lbs./type): 1564#
Mix Number: 602A
Fine Agg. (lbs): 1250#
Slump Spec: 4
Coarse Agg. (lbs/size): 19110#
rn
W/C Ratio Spec: 0.43
Coarse Agg. (Ibs/iize):
Air Spec: 5.0%
Total
Coarse Agg. (lbs/size):
M
Yards: 5
Fly Ash (lbs):
C
M
Placed Via: Chute
Water (Ibs or gal):
0
Consolidated: Vibration
Admixtures (specify): MBAE 90 1 .0 oz/yd 3
0
C
Required Strength (psi): 3000
T; .
':S d-.Te6t* 'D It Ti -:�:_Cubi W It
ipg . 0 a. me: . cl qmp:; �..Omo �:,�.��Amojqn :!�Jruclk'.: Ticket
M
M Z
.......
:C:2 .:::,:C:106
ASTWC172:C:31 :::Madbl Y6rft' :�::Ad1ded,':'::iC143`:: 1 4` 0.
0 m Ip N" NO.
Cast
Samples: 1-4 2:45pm 5 0 gal 3 1/2" 4.3% 670 660 68 Y530044
0)
Weather: Overcast Slump Range: 1.
4 Air % Range: 5.0% 1.5%
0 -T1
Date.Sa.mples Picked Up: 10/6/2005 Initial Curing Method: Excluding ASTM C31 -12.1.5 Initial -Curing Temp: Excluding ASTM C31 -10.1.2
_n
Comments:.'.
M
Other Test Methods Standards Used:
M
REINFORCING PLACEMENT: Conforms X Does, Not Conform
0
0 M
C 0)
COMPRESSIVE TEST RESULTS
Z 0)
Q 0.
Z r—
Specimen Test Field Age Size Area Max Load Strength Type of Fracture
Number Date Cure. (Days) (in.) (Sg.1n.) Weight Ital Isil (other than cone)
10/12/05 7 6x12 28.24 28 87# 109,300 3870
2 11/2/05 28, 6x12 28.25 28.99# 141,150 5000
3 11/2/05 6x12 28.25 29.10# 139,810 4950
Z
A 4*
*Discarded
0)
Tested in general accordance to' ASTM C39 x ASTM C 109 ASTM C617 ASTM C1231 x
Z.
0
Note: Type of fracture does not apply when testing in conformance to ASTM C 1231
d
Final curing in calcium hydroxide water storage tank at 73' 3' F
0
M
Copies to:
X Client Contractor
Architect x Building Dept. Technical Responsibility:
Engineer Batch Plant (,,-David Lyal, Technical Director
This report applies only to the items tested or reported and Is the exclusive property of Otto Ro.senau & Associates, Inc. Reproduction of this report,
except in full, without Written permission from our firm is strictly prohibited.
Page I of 1
6747 M.L. King Way S., Seattle, Washington 98118 — Phone (206) 725-4600 or 1-888-OTTO-4-US — Fax (206) 723-2221
Form No.: ADMIN-62-02 (Rev 04104)
0 ROSENAUAASSO
TTO GIATES/,�NC.
ials
Geotechnical Engineering, Construction Inspection & Mater �i
CONCRETE REPORT
Job Number: 05-701 Report Number: 33230 Permit Number: 05-394
Project: Rick Steve's Europe Through the Back Door Client: :.Rick Steve's Europe Through the Back Door
Address: 1304 th Ave N Edmonds, WA Address: th Ave N Edmonds, WA
Date: 10/12/2005 Inspector: Dusty Johnston
De scriptio n/Lo cation: Entrance (front) slab. Z
Resteel verified: Yes Resteel grade: 60 Manufacturer: Nucor
Placement Data Design Z Actual F1 Batch Weights/Cubic Yard
Supplier: Salmon Bay Cement (lbs./type): 370#
Mix Number: 461081 Fine Agg. (lbs): 1412#
Slump Spec: 51, Coarse Agg. (lbs/size): 1888#
C,)
W/C Ratio Spec:, Coarse Agg. (lbs/size):
Air Spec: Coarse Agg. (lbs/size): M
C
M
Total Yards: 61/2 Fly Ash (lbs): 60#
mi 0
Placed Via: Tailgate Water (Ibs or gal): .178# 0.
0 C
Consolidated: Yes Admixtures (specify): 7 oz. Super plasticizer
Required Strength (psi)' 3000 1 bag stealth fiber
M
M Z
'A i r, 9% ',Co.':T
Sampling and Testing Data Time Cubic, Via'ter :-..SIump,,,:i, ,!Ic:;..emp7.,�.::�Ambient:::,.- Truck :,:.Ticket-
;N&:�::: No;
-��i�Adld6d::� C143,"-C:231,::
ASTWC172,,C:.31 �,Miide::' '.�Yarft� ;:.-C:1064:�:�
Z
Cast Samples: 1-4 9:15 6 5 gal. 5 1/2'. 66- 55 7i 590250
3:
Weather: Overcast Slump Range: Air % Range: 0 -n
10/13/2005 Excluding ASTM C31 -10.1.2
Date Samples Picked Up: Initial Curing Method: Excluding ASTM C31 -12.1.5 Initial Curing Temp:
Comments
M M
*Excluding slump, which is out of spec.
Other Test Methods Standards Used:
0
REINFORCING PLACEMENT: Co r
nforms X* Does Not Conform 0
M
C CO
M co
COMPRESSIVE TEST RESULTS
M
Z 0
f
Specimen Test Field Age Size Area Max Load Strength Type of Fracture
Number Date Cure (Days) (In.) (Sq.1n.) Weight IL—sa (other than cone)
1 10/19/05 7 6x12 28.18 28,81# 54,200 1920
.2 11/9/05 28 6xl 2 2.8.23 28.96# 80,970 2870- Z
*Low. Remaining cylinders being held for 56 day breaks. Client notified. Z
Tested in general accordance to: ASTM C39 x ASTM C 109 ASTM C617 ASTM C1231 x
Note: Type of fracture does not apply when testing in conformance to ASTM C1231 0.
Final curing in calcium hydroxide water storage tank at 73* 30 F M.
Copies to:
X Client Contractor i
ility:
Architect X Building Dept. Technical Responsib
Engineer X Batch Plant David Lyal, Technical Director
This report applies only to the items tested or reported and is the exclusive property of Citto.Rosenau & Associates, Inc. Reproduction of this report,
except in full, without written permission from our firm is strictly prohibited.
Page 1 of 1
6747 M.L. King Way S., Seattle, Washington 98118 — Phone (206) 725-4600 or 1-888-OTTO-4-US — Fax,(206) 723-2221
Form No.: ADMIN-62-02 (Rev 04104)
FINAL PROJECT APPROVAL FORM',.
TO:
DATE:
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: FIRE DEPARTMENT DATE
KICASE SIGN
ENGINEERING DIVISION DATE
z
0
PLEASESIGN
PLANNING DIVISION DATE
M
PLEASE SIGN
PROJECT 9 L C.,�
9
o
C
�Q A, V_g Al
M 0
.SITEADDRESS
PERMIT #U 5 0 FS7��ADB# DATE INSPECTED
0
0 C.
M
M Z
DESCRIPTION OF WORK TO BE INSPECTED T
C
A field inspection was conducted to determine I compliance with -approved plans. Final approval
5
-n
denotes that there are no objections from the above signed Department to the release of
0
-n
PERFORMANCE BONDS and the granting of:
M M
0 U5
0
GRANT FINAL PROJECT APPROVAL
0 M
C C/)
Q C-)
Z r
X
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
El Copy of CONDITIONS given to owner/contractor by inspector:
z
0
M
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
0 Copy of CORRECTION NOTICE given to owner/contractor by inpector
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signattire
1:teMP:b1dg:f6.nnS:ocaprv1 3/25/04
FINAL PROJECT APPROVAL FORM
FINAL PROJECT APPROVAL FORM
TO:
DATE:
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: FIRE DEPARTMENT. DATE
PLEASE SIGN
DIVISION DATE.
0
-ENGINEERING
\J PfEASESIGN
M
PLANNING DIVISION. DATE
PLEASE SIGN
VIS
M
PROJE CT
C
SITE ADDRESS-
mo
0
—10
0
PERMIT ADB# DATEWSPECTED C12 -
#
C:
M
Mz
DESCRIPTION OF WORK TO BE INSPECTED I�D
C
r -4
CD
A field inspection was conducted to. determine compliance with -approved plans. Final approval
0 -n
n
-denotes that there are no objections from the above signed Department to the release of
PERFORMANCE BONDS and the granting of:
M M
0
0 M
C Cn.
GRANT FINAL PROJECT APPROVAL
C/)
Q 0
z
\GVANT PROJECT APPROVAL WITH CONDITIONS NOTED
Copy of CONDITIONS given to owner/contractor by inspector
Z
f 71 i7
0.
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
M
0, Copy of CORRECTION NOTICE given to owner./contractor by inpector
.2.
.3.
RE -INSPECTED OUTSTANDING. ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
1:ien1p:b1dg:fbnus:ocaprv1 3/25/04