20050885.pdfF-E RECEIVED
L) L
CITY OF EDMONDS
CONSTRUCTION PERMIT APPLICATION
PERMIT
NUMBER 5
106 �PPTA
ADDRESS A
IE OF BUSINESS
1L1TNA.E1S..C1VI1IGNN.
ICING
11 No
I'D PEE S
PUBLI RIGHT OF WAY PER OFFICIAL STREET MAP
EXISTING __ PROPOSED
REQUIRED DEDICATION FT _
SV p-, ex.". 13
U1. P-I A.,..,. 19
11 - _E3
U� 0
Ck6 ZIP
66 r
- 70
NAME
s v®r
LIA-ZE
_
No OF RXTIN�l
I
PRV REQUIRED
YES 0 NO 13
11 ADDRESS
R MARKS
OWNEWCONTRACTOR RESPONSIB E FOR EROSION CONTROUDRAINNGE
ADDRESS
CITY
M
ra
0 NEW
RESIDENTIAL
PLUMBING i MECH
ADDITIQN
COMMERCIAL
IAIXED
COMPLIANCE OR
0
0
USE
n0l
CHANGE OF USE
'o".E.ODEL
0 V
0 MULTIFAMILY
0 SIGN
C] REPAIR
0 GRADING a,
PENCE
E] DEMOLISH
TANK
OTHER
RETAINING WALL
o F RE SPRINKLER
0 �P^8�T
EI NoCKERY
FIREALARM
TY) E—IN
10 NUMBER
OF
OF
D ELLING
STORIES
UNITS
r,
ENGINEERING REVIEWED By DATE
I LIEM UL '7/11
FIRE REVIEWED By DATE
__�A_RIANcg OR Cu
SHORELINEORAOBO
NIFEC I.N
PA
—
MEG J-PLE""
13 YES k.
"I
C 03
A. I - 90
ZONE
AREA I
HEIGHT
WAIVER EY
_SIGI
we. 1ROP-E.
�:7
STUDY 0
1 v. I
I
LOT COVERAGE
REOU RED
SET8 CKS(FT)
PROPOS50 SETBACKS (FT,)
:
ALLOWED P POSED
FRONT SIDE REAR
Y--
FROM';,
7.�T
�61,01 REAR
T �7.
26- 7 31
'7 5- -
Z 5 -5 15
7. T -i-,!'
UOTARIA
PLA!,NINGREVIEWEDBY
DATE
GCFARIGNG
RE I PN_,CE.
2-
.)1 4 10' s A-- A-,; nr�
0
TYPE OFffr
S ECIAL INSPECTION
REQUIRED 13 YES
REMARKS
GEOTECH REPORT
OC FICUPANT
G OUR
OCCUPANT
LOAD
FEE
Description
FEE
h k
Plan Check
State Zrcharge
,&CE" LOTSLOPE% VESTED DATE
�5, 410
on?'Me"'naw, 1. a *_( .
LDescrip'tion
Building Permit
g Permit
City Surcharge
.........
PLAN CHECK NO: � L aL
Plumbing
Plum I
Base Fee
Mechanical
WO
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED' THIS PERMIT COVERS
BE DONE ON PRIVATE PROPERTY ONLY, AMY CDNSTR CTION ON THE PUBIC
Great 9
DONMAIN (CURBS, SIDEWALKS. DRIVEWAYS, MARQUEES. ETC.) WILL REQUIRE
S PARATE PERMISSION.
Engr, Review
PERMIT APPLICATION: SEE ECDC 11I.0,00$(AiSi
Engr. Inspection
PERMIT LIMIT. SEE ECDC 19XB005jA)t6j
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
Fire Review
PlBoChk.D.p.sit
'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE� HEIRS, ASSIGNS AND SUCCESSOR$
IN NTERE11, AGREES TO DEFEND AND HOLD RABIVILIESS THE CITY OF
'RIM ANY AND
Receipt # 2 jq5
INDEMNIFY,
.11M NUS,WASHINGTON. TSOFFICIAII*EMPLOYEEI,AMIAIENT'
0
ALL CLAIMS FOR DAMAGES 01 WHATEVER MATURE. ARISING DIRECTLY R INDIRECTLY
FROM THE I SUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE
s
Fire "'PeCtion4
DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE
L. It _so. rsp
#R.C.
Total Amt. Due
NOR LIMIT I N ANYWAY THE CITY's ABILITY To I.RCE AM
Receipt #
I HEREBY ACKNOWLEDGE THAT I HAVE REA. THIS APPLICATION; THAT THE INFORMATION
APPLICATION"�P IROVAL
GIVEN IS CORRECT, A ORAT E DULY AUTHORIZE. AGENT OF
No THATAM THE OW-ER6
THA p"'r."., P.-I t,' 11.
ST TE LAWS REGULATING C.NST
THE OWNER, I AGR E TO COMPLY WITH CITY AN Rue*
E
WILL BE EMPLOYED
CALL
Budd— OM-1 .1 h1r1hAI D-IY r,rd I`- - pl,l.
TION: AND IN DOING THE WORK AUTHORIZED THERE BY, NO PERSON
LABOR CODE OF THE STATE OF WASHINGTON RELATING TO
FOR INSPECTION
r..P. �. r_g. aP p-ded
IN vIOLAT
WORKMEN!S ATION INSURANCE AND ROW 18:27.
11 SSIGNAT E DATE
(425)
771-0220
By ATE
ATTENTION
�ATE
EXT. 1333
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI-
POOR
ORIGI AL FILE YE LOW � INSPECTOR
FICATE OF OCCUPANCY HAS BEEN GRANTED. USC1091 IBC110 I IRC110.
LOWINS
-OWNER - ASSE'.OR
10104 PRESS HARD - YOU ARE MAKING 4 COPIES
z
0
i
Fl
zi:9
U5 --i
0 3:
cm
MO
--1 0
0 0
C
--I K
ITI
z
to
C
r--4
� 2.;
o"n
In
3:
TIT Th
Fn
0
. -M
C 0)
90)
111 0
Z F
-4
z
3:
(1) 1
z
0
0 Comer_Flag
o'�7 Setback Reguired
Actual RESUB
JTTERS/DOWNSPOUTS
IT Front 7-!j, A.-
TO EXIST. Sy,
3 7, ��-
JUN —8 2005 DATUM PT. 0.00'
ONNUCT
Sides -75
.S—b�aq EXISTING CL
Rear
2,4, BUILDING DEPARTMENT OF ROADWAY
CITY OF EDMONDS
PROPERTY LINE Odier
APPROVED BY
HeivM
------ - - - -- I
7,a=
----- ---- ------- ---------------------------
-
I INU I
r
EXIt,
EAVE DRIVEWAY I
1105 SF
- - - - - - - - - I I
ECOND EXISTING 1 21'-
GARAGE ;r I
OVERHA
PROPOSED SIDEWALK
2 6'- 4" 1 b GARAGE 550 SF b
I
1 20 SF 22' _ 4"
i
41-0�
zo O� I EXISTING
EXIS NG I
AWNING
RESIDENCE
4- L - - - - - - - - - EAVE 400 SF
920 SF
I OVER.ANG
EAVE
EX STING
OVERHA G SIONALK
24'-0' PROPOSED LANDING
AND PATIO
75 SF
49'-()'
100 SIT
SAVE
OVERHANG 0
--- ----
--- --- ------
-- -----------------------
—
-----------
PROPOSED
5
171'-0"
AWNING EXTENSION -r IRA f'
'�C,F
Ltf
I � EF
51N(,t� lq,)l
IMPERVIOUS SURFACE CALCS-
CITY Copy
EXISTING RESIDENCE ROOF OUTLINE: 885 SF (PRIOR TO 1977)
OUTLINE- 950 SF (AFTER 1977)
6�r
PROPOSED RESIDENCE ROOF
1j,
JUAI,?3
EXISTING GARAGE ROOF OUTLINE: 550 SF (PRIOR TO 1977)
40041
+
EXISTING PATIO AWNING ROOF: 400 SF (AFTER 1977)
L60 zft BUILDI'vo
PROPOSED PATIO AWNING ROOF: 100 SF (AFTER 1977)
C/7-y
om
EXISTING SIDEWALK AND PATIO: 75 SF (AFTER 1977)
EXISTING DRIVEWAY: 1105 SF (*F-TE14�- 19771
SCALE: I" = 20'
SECOND GARAGE ROOF OUTLINE: 520 SF
z
0
m
�n
0
m
C
m 0
0
m m
ol
m M
o �)
0 �
(') M
C Cn
i�: (n
M
z
4 M
70
--i
z
Cf)
z
0
m
bsurmng--,'o 'Av
ou Permission or the reinoVa
'fin
xg Ion, or ieon&A
(it Iment ot thN Ndtic6 N bufii hAle by e
s"
N
visloll
City ofEdnionds Development Serviceg Department Building Di
(425)771
1215" A �e Edm6�&;'WA 98020 -0220
Boum M-F 9-12 an
d 1-4
Office
L
OTICE
TO PERMITTEE AND/011 OWNER
DO NOT REMOVE
PA' TIA
Job Add, Ss
Ll WORK DESCRIBED BELOW HAS BEEN INSPECTED AND IS APPROVED
z
0
0
APPROVED PLANS AND JOB CARD MUST BE AVAILABLE TO INSPECTOR ON SITE
M
CORRECTIONS LISTED BELOW MUST BE MADE: BEFORE WORK CAN BE APPROVED AND/OR THE NEXT PHASE
:45i
OF WORK IS STARTED
C ra
M 0
RECALL FOR INSPECTION Q $50 REINSPECTION FEE MUST BE PAID PRIOR TO INSPECTION REQUEST
-10
00
STOP WORK -UNTIL AUTHORIZED TO CONTINUE BY CITY INSPECTOR
x
A rn
z
NO PERMIT -STOP WORK-REMOV E CONSTRUCTION OR OBTAIN PERMIT AND MAKE WORK COMPLY WITH
JD
C
> z
ALL APPLICABLE CITY CODES
v)
0 n
n
M M
THE ACTIONS OR CORRECTIONS INDICATED ABOVE ARE REQUIRED TO BE CORRECTED WITHIN
CALENDAR DAYS OR PENALTIES MAY BE APPLIED. FOR INSPECTION CALL 425-771-0220
I C1 Fire Q Public Works
Building U Planning Engineering Inspector Date
y yv
White: Permit File Pink: Enforcement Buff. Applicant
BUILDING
March 28, 2005 MAR 3 3 2005
Ms. Jeannine L. Graf
Building Official
Development Set -vices Department
Building Division
1215"' Avenue North
Edmonds, WA 98020
RE: "Stop Work At Once" Notice
Issue Date: March 24, 2005
Residence Owner: Darrell Schlaegel
Contractor: Darrell Scblaegel
Residence Address: 7631 242" St. SW Edmonds, WA 98026
Dear Ms. Graf,
My initial scope of work was reasonably small, and I believe did not require a building permit,
Shortly after I began the work though, I discovered that parts of the original construction were
sub -standard and in desperate need of repair, removal, and replacement. One thing led to another,
and I never stopped long enough to think about the proper course of action that I should have
taken. Unfortunately, in my mind, I neglected to recognize that as my scope grew much larger
than originally intended, I would also need to apply for a construction permit. As a result of this
oversight, I was issued a "Stop Work At Once" Notice.
ry s
Friday morning, March 25, 2005, 1 drove down to the City of Edmonds Development Se ice
o of your employees. They
Department Building Division and discussed my predicament with tw
were very friendly and helpful, and instructed me as to the required steps needed to be taken in
order for me to resume work. I now have a Construction Permit Application, Permit Submittal
Requirements, and several Sample Plan Sheets.
I also talked to one of your planners to discuss property line set -back ordinances and overhang
allowances. She also was very friendly and helpful, and discussed with me what the Site
Development Standards were for an RS-8 Sub -District Residence.
My intention at this point is to submit the Construction Permit Application, all associated Plan
Sets and Details, in addition to any other paperwork required no later than April 8, 2005. 1 trust
this will be an acceptable timeline, and fall within your normal standards for this type of situation.
Thank you for your time and consideration concerning my initial oversight, and expedient
compliance with City of Edmonds Development Services Department Building Division
construction requirements.
Sincerely,
Darrell Schlaegel
RECEIVED
May 6, 2005 MAY 0 6 2005
Ms. Jeannine L. Graf PERMIT COUNTER
Building Official
Development Services Department
Building Division
121 5'� Avenue North
Edmonds, WA 98020
RE: "Stop Work At Once" Notice
Issue Date: March 24, 2005
z
Residence Owner: Darrell Schlaegel
Contractor: Darrell Schlaegel
0
Residence Address: 7631 242"' St. SW Edmonds, WA 98026
Dear Ms. Graf,
Uj --I
Monday April 18, 2005, 1 wa s involved in a serious motorcycle injury accident. I was riding tire
m
C: 0
m
motorcycle. I sustained serious injury to my right knee, broken right tibeal plateau and crushed
8 0
0
kneejoint, as well as additional miscellaneous traurna to my lower body. As a result of this event
C
in mv life, I have become more dependent upon friends who have expertise in structural
3: m
engineering, building inspection, and CADD to address the corrections documented by Ms.
M Z
Readwin upon her examination ofmy preliminary plan Submittal.
I have discussed my predicament with Ms. Readwin, and she informed me that a two week turn-
around for revisions to a plan set is considered stan dard by the City of Edmonds, Today, May 6,
to that in
2005, is the end of that two week period. I am requesting a 30 day extension period
order to be able to submit a complete plan set that addresses each of Ms. Readwin's documented
rn M
s
corrections. I will be working with each of the three previously mentioned friend over the next
0 Cn
30 days to develop a complete set of plans foi- the scope of work which I am currently working
0 Fn
tinder.
C (1)
Thank you for your time and consideration concerning my current predicament, and desire to
M, 0
r-
comply with all City of Edmonds Development Services Department Building Division
construction requirements.
z
Sincerely
07
z
Darrell Schlaegel
0
In
�05
June 6, 2005
Ms. Jenny Readwin,
Plans Examiner RESUB
Development Services Department
Building Division JUN - 8 2005
121 5�'Avcnue North
BUILDING DEPARWENT
Edmonds, WA 98020 orry OF EDMONDS
RE: Plan Review Comments
Plan Check Number 05-141
z
Project Exterior Recon struction
Residence Owner: Darrell Schlaegel
M
Contractor: Darrell Schlaegel
Residence Address: 7631 242�" St. SW Edmonds V;A
M
C
M 0
-40
0 C
Scope of Work
M M
z
. Rebuild House RoofStructure and Attach Patio Awning RoofStructure to House Roof Structure
-4
r- -4
3:
0 Replace Existing Roof Shiplap Sheathing with 7/16"OSB
. Replace Existing Roofing with Architectural Composition Roofing
0 -n
n
Install New Insulation above House Ceiling
5�
Replace Existing House Front Gutter with New Painted White Aluminum Gutter
M ITI
Rebuild Existing Patio Awning Roof Structure
(ZI
0 r-
Build Proposed Patio Awning Roof Structure Extension and Roof Support Structure
M
Cn
Replace Existing 4x6 Beam in Patio Awning Roof Support Structure and Proposed Patio Awning
90)
Roof Support Structure with4xl2 Beam
Q 0
F
. Sheet Existing and Proposed Patio Awning Roof Structure with 7/16" OSB
0 Replace Existing Champion High Rib Extruded Roofing with New Painted Gray Champion
Extruded Roofing
>
- Replace Existing Patio Awning Roof Gutter with New Painted White Aluminum Gutter
z
. Install New Insulation in House Exterior Walls
. Replaced Existing Exterior Wall Shiplap Sheathing with 7/16" OSB
. Replace Existing House Siding with New 10" Bevel Cedar Siding
z
. Install New Insulation below House Floor
9
0
M
GARY HAAKENSON
CITY OF EDMONDS MAYOR
121 STH AVENUE NOHTH EDMONDS, WA 98020 1425) 771-0220 FAX (425) 771-0221
Website: �.cj.edmcnds.wa.us
DEVELOPMENT SERVICES DEPARTMENT
Planning Building - Engineering
z
July 1", 2005
Darrell Schlaegel
7631242", St SW
Edmonds, WA 98026
m
a
RE: Permit 2003-0531 expiration and Application 05-141 remaining items due
0
0
C:
m
Dear Mr. Schlacgel;
m
10
The issued permit #2003-0531 will expire on July 17"', 2005. It is imperative that you
C: Z
>
r X
have at least one inspection done this year in order to renew prior to the expiration date
Cl) f
for $200.00. Our records show that sheetrock nailing your next required inspection. If
-n
-n
no inspection is performed and approved, and your permit is not renewed prior to the
3:
M
expiration date, new plans updated to the current code and new plan review and permit
m
0 c—n
fees will be required. Please call our inspection line at 425-771-0220 x1333.
0
0
a
The current application for the exterior remodel is just about ready to be issued. Below is
9 Cn
M C)
a list of the remaining items needed:
Z r-
1. A letter to the building official stating what your schedule is for obtaining the
M
permit (to continue work on the project); and
2. The fee $483.25.
permit of
z
If you have any questions please don't hesitate to contact me.
co
Sincerely;
z
0
m
Theresa Urnbaugh
Permit Coordinator
Incorporated August 11, 1890
7.
July 28, 2005
Ms. Jeannine L, Graf
Building Official
Development Services Department
Building Division
1215"' Avenue North AUG 4 2005
Edmonds, WA 98020
RE 1: "Stop Work At Once" Notice
z
Issue Date: March 24, 2005
Residence Owner: Darrell Schlaegel
0
Contractor: Darrell Schlaegel
Residence Address: 7631242"' St. SW Edmonds, WA 98026
RE 2: Opening of Building Permit for "Exterior Re construction Projecf' for the address noted
ui
0 M
C
above.
m
-40
Dear Ms. Graf,
0
On May 17, 2005 1 had a second surgery performed on my right knee. This surgery was
M z
0-4
necessary as a result of an infection that developed in the incision initially created to surgically
C -
z
repair my right lateral tibeal plateau and crushed right knee joint. Following the second surgery, I
was left with a large wound over most of the initial incision area. I am currently undergoing
Vi
wound therapy and have been for the last 10 weeks, and will continue to for a minimum of
0 -n
another six to eight weeks.
-4
I do not believe that it would be prudent for me to begin a full scale construction effort on my
m M
a 60
home until the wound is fully healed. There are certain items that I can be working on though in
0
0
the meantime, that would require less than a full scale construction effort. Therefore I would like
C 0)
to inform you that I will not be opening the permit for the "Exterior Reconstruction Project" for
9 ca
M C)
the address noted above until, at the earliest, the middle of August.
z
Thank you for your time and consideration concerning my current predicament, and desire to
;0
--4
comply with all City of Edmonds Development Services Department Building Division Building
X
>
Permit Requirements.
z
Sincerely,
Vi
z
0
m
Darrell Schlaegel
FINAL 11ROJECTAPPRON/Al, FORM
DATE:
MEMIOTO: IIF,,[�MI'I'COORDINA'1*01�.BLJII-,I)INC; DIVISION
FROM: —FIRE DEPARTMENTDAT13
7
DA 11, I_
—C—D—ENGINEERING DIVISION
PLANNING DIVISION DATE —
PROJECT
SITE ADDRESS
P E kN41T 11 ADB/f DATE INSPECTED
DESCRIPTION OF WORK TO BE INS PECTrD__t__ E S C—
A field inspection Nvas conducted to deterilline colupliance with approved plaus. Final app"oVal
denotes that there are no objections froo, tile -ll)ove signed Department to the release of
PERFORMANCE BONDS and the granting of:
'__��_GRANT FINAL PROJECT APPROVAL
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
0 Copy of CONDITIONS given to owner/contractor by inspector
I
FA[LED FINAL INSPECTION - OUTSTANDING ISSUES
0 Copy ofCORRECTION NOTICE given to owner/contractor by inpector
2.
3.
RE_fNsPEc'rED OUTSTANDING ISSUES - GRANTFINAL PROJECT APPROVAL
Date Signature
I:tcmp:b1dg:fonns:ocaj)rvI 3125/04
0
4
0
c: m
M 0
0
80
c
m m
z
g) --i
c
0 _n
n
rn M
0 Fn
0,
OM
C cn
9 (a
M 0
Z
7-1
z
z
2
0
m
RECORD OF INSPECTIONS
INSPECTOR
DATE APPROVED
SETBACKS ............
FOUNDATION:
Footing ............
Wall ................
Pier/Porch .................
Retaining Wall ...........
z
Stab Insulation ..........
PLUMBING:
Underground .............
-4
Rough -in
:E
0 IT
.............
C
M
Commercial Final
-4 0
0
0 C
HEATING:
IT z
Gas Test ....................
Gas Piping ....... . ........
Equipment ................
commercial Final
0 -n
-n ;U
-4
EXTERIOR SHEATHING
q
x
NAILING ..........
M M
0
FRAMING ..........
C.)
FIRST FLOOR FRAMING...
C
90)
M 0
INSULATION ...................
Z
Floor Insulation
insulation
Wall
Ceiling Insulation
ezi,
0)
SHEETROCK NAILING
z
SPECIAL INSPECTION
IT
MISCELLANEOUS
FINAL APPROVAL FOR
J(
OCCUPANCY ..................