Loading...
20051099.pdfI DATE RECEIVED J FPERMIT EXPIRES 49 e. 2 PERMIT CITY OF EDMONDS NUMBER CONSTRUCTION PERMIT APPLICATION JOB Ike SUITE/APTI$ ADDRESP OWNER NA MEINAME OF BUSINESS PLAT NAME/SUBDIVISION NO. LOT NO LID NO MAILING ADDRESS LID FEE $ U) PUBLIC RIGHT OF WAY PER OFFICIAL sTREET MAP I ESCP Approved [3 RN Patmit Required Cl Street Use Permit Requited 13 CITY ZIP T-UPHONE EXISTING PROPOSED inspection Required 13 41:0�70( _�% I (:�C� S,cju*a1k Required El REQUIRED DEDICATION FT Underground E3 _N_ /_ A--- — . Wi,,n(I ri,quited [3 NAME METER SIZE LINE'SI?E NO ZRES PRV REQUIRED YES13 No 13 tu ADDR) 6 REMARKS w OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE x W 10 Af ZIP TELEPHONE &f tic 6 IC 6 LIE!& V% ac P 4r�,' rin C NAME CBL# #AV( ANI X fq a L GINEERING REVIEWED B�/j DATE it ADDRESS r R Al� qll'�' /&In b6X q 11 IRE REVIEWED BY DATE ul ZIP TELEPHONE 0 L) MAI& 1q;z VARIANCE . OR CU SHORELINE OR ADBN INSPECTION SEPA STATE LICENSE NUMBER EXPIRATIO� DITE CHECKED BY REO'D COMPLETED EXEMPT \,\j --vc c- lk* 'W 12 1 1:3 -2 Act Mi rl 113YES 0 NO I X I CAN IW ZONE SIGN AREA HEIGH PROPERTYTAX ACCOUNT PARCEL NO. WAIVER C1 ALLOWED I PROPOSED ALLOWED PROPOSED 06 �/ 3 Oil) STUDY NEW RESIDENTIAL PLUMBING MECH LOTCOVERAGE REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (FT.) ia ALLOWED PROPOSED FRONT SIDE REAR FRONT LIRSIDE REAR 1:1 COMMERCIAL COMPLIANCE OR A-51, a 23 ADDITION -2--offitt"I -7�-i:5 lo is 51 E MIXED USE CHANGE OF USE z PARKING LOT AREA PLANNING REVIEYVED BY DATE El REMODEL SIGN REQ'D 1OVIDED ' 3( -/ D I MULTIFAMILY 1� 1 1-6,) D9 REPAIR ;!�_GW FENCE 1", AUU44#1 It 0 12,0 CYDS X —FT.) REMARKS DEMOLISH 1:1 TANK 0 OTHER Ir-2eGARAGE RETAINING WALL, o FIRE SPRINKLER z 4Z!kQARPORT ROCKERY FIREALARM 0 (TYPE OF USE, nUS11 ESS RACTIVI )EXPLAIN: TYPE OF CONSTRUCTION CODE OCCUPAN n GROUP R3 Lu NUMBER NUMBER OF 0 OF DWELLING SPECIAL INSPECTION CONSULTANT OCCUPANT W UNITS LOAD 0 STORIES �z I REQUIRED ES " DESCRIBE WORK TO BE DONE ky REMARKS z GE15H 0 Y. at B Q\./kzk_ 0 STIR G 7] BYXR�Y�A_ Or -AA 5b VALUATION LIT , CTE� 'acw:�) V�L(& 1-11-] 1P Descriptio'n FEE Description FEE Plan Check State Surcharge HEAT SO CE LOT[ E% VESTED DATE Building Permit City Surcharge 1�1\ I I le PLANXCHECK NO: Plumbing Base Fee IT COVERS WORK TO Mechanical THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERM L /0 BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBIC DONMAIN (CURBS. SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE Grading 1-230 7 ve U. FlJtl Z� SEPARATE PERMISSION. himl __/M PERMIT APPLICATION: SEE ECDC 19.00,005(A)(5) Engr. Review Uj IL PERMIT LIMIT: SEE ECDC 19.00.005(A)(6) Engr. Inspection SEE BACK OF PINK PERMIT FOR MORE INFORMATION in S Fire Review Plan Chk. Deposit in *APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESSOR Uj IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF _j M ANY AND Fire Inspection Receipt # 2 EDMONDS, WASHINGTON, ITS OFFICIALS. EMPLOYEES, AND AGENTS FRO 20&�3 =I AALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY - FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE a DEEMED TO MODIFY. WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Landscapelnsp. Total Amt. Due I 0 NOR LIMIT IN ANYWAY THE C ITY'S ABILITY TO ENFORCE ANY ORDIN ANC E PROVIS ION. Me Receipt # Recording I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION APPLICATION APPROVAL GIVEN IS CORRECT; AND THAT I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF This application is not a permit Until signed by the THE OWNER. I AGREE TO COMPLY W17H CITY AND STATE LAWS REGULATING CONSTRUC. IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED CALL Building Official or his/her Deputy: and Fees are paid, and TION; AND receipt is acknowledged in space provided. IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION WORKMEN'S FF DATE 'jACNNSATIO*'qz1 RANCE AND RCW 18:27. moommonomm� 3 III S SIGNATUR sl 'WN N DATE SIGNED (425 771-0220 ARE�AbN Br--_) DATEI ATTE1111TION\ t:A L I JJJ -NA L To IT IS UNLAWFUL To 0� OR\0 4UPY i)IUILDING OR STRUCTURE UNTIL A' A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI- -FILE Y'Etw - INSPECTOA CCUPANCY HAS BEEN GRANTED. UBC109 / IBC110 / IRC110. . -ASSESSOR FICATE OF q JNIK�)LOWNEFII G 110104 PRESS HARD - YOU ARE MAKING 4 C PIES I V, 1 I Ir z 0 1 0 M --I -Ti M C M 0 0 ­40 0 C —4 M Z IC) --I C _z o -n n M M 0 0 0 rn C cl) 9 0:11 M 0 Z z C0 z 0 i 0 M ZAV,4k L.ES DESIGN ASSOCIATES -ZDAP.O. BOX 65512. SHORELINE, WA 98155 Q\ 206-362-2992 RESPB '85.0l'S 00*65,35m w OCT 14 2005 0UILDING DEPARTMENT CITY OF ED�� 2q2 At 2qo -Oli R —`RY < ci5r, NALL 2a6,,� MAX- d-E 16 H T 7 2514 252 S-A 1� �-Xv 'Z 7' W 1 1011 I. r - - - - -- 0\ z J 0 m N � XA =n- ips �2 F r m 0 mo L- -. -.: -.. J co 0 z -40, 0 C L J P3 -4 X M �ARA M z :2-76 0-1 r.>r:C.K c -z > 0 r K;6,LK CD :z t/ u) L.0 2*72 .0 101- 71 f < LIJ A.0. Ij -:2-70/1' 3: m ,�> . , ----DF�IVENA I I m m 0 = >1 , *: 11, 0 0 m c 9 cl) M 0 L Z 71 A 0 2641 z :262 X. 85-01'N 000b '351 E co 0 ComerjLQFlhg±,jD\ PATVM PT. +2*70' z Q TOP OF 55 ass 0 Setbacks ired -Actuk MANHi:)LE COVER .2-70 m 260 Front W /-Sides �J 29)a UJI Rear :> - - - - - - 266 IW Other 1�� -Aw TTIVIU-()AL ;� �:= , "P'V Heigbt -72nd AVE. LOT COVERAGE P.LAN.... 3 1 -117-'3 HEIGHT CALCS. L AREA= 13369.5 S.F. A=278.0' OT V-P-1 HOUSEAJ)ECKS= 2405 S.F. SCALE 1 =20'-O" B=276.6' COVERAGE 2405/13369,5=- 18% C=273.3'. D=269.5'.- SILVER CIl Y -1 . AVE. GR.: 1097.3 /4=274-33' LEGAL DESCRIPI ON CONSTR. INC. MAX. HT.: 274.33+251 =299.33' LOT B PO BOX 1417 ACTUAL HT,: -298.9X, SEE ATTACHMENT MLIKILTEO, WA 98275 (206) 501-5490 220-05 E, L ZAVALES DESIGN ASSOCIATES D ZDAR.O. BOX 55512 SHORELINE, WA 98155 RESUB 206-362-2992 OCT .14 2005 _85.01'S 00,55,35, W G DEPARTMEN 111L OF CIPF EWOND g6,'M ci .2q:? am :2 ��Obv < UTI :256 .4- 25 %6 Y 2a2 . 7T 174b jv-'r-7-- I -. f z 0 F — — — — — M N "n 5'� OM C 0 F_ 7 F N1 I M I -Z I I C0 0 11Z %D L 0 C W-7 :275 14- L J I t N M Z M :22 �A _-4 C RA6E DECK > N L K A 0 -n 2 4z 0'-C M M Q®r_"�7� VE 0- 0 C M e z 0) /"No 9- X 91114 1 wrl Lil O_ CD 266/ ng rmitfing the Q 0 interp 0 r AS Z f an urrently in C T'ED y 91 kre nonpo *ai 0 ERIN M 264 � lift or site 00 111 �ew ofmLhether suen pqrmi -ap t Iffidatio he tion .4 phl;� or ndi Dal ictu tion is shoWni, on t — > biiilding, tn or I--:. -Z z n kd un PT site Ian rawing. Such building, strul_� -4 :262 condition inay be- - L0 X W e t on. 85.01, N 00' -3� E 01 2 t rins� — 1 '2- MATUM FIT. +:2-T :2 - z (.;ornerjNL)FJ6 TOP or- 5!5 t� .0 Cn 0 tbacks Re . red �_N \ I ANHOLE (:',OVER w I- _)_ -1 1., . l,j;,2 6 Actuat ?5 `,.—Front W — M Sides 101 WkwooTiffc- -1 S 0-F kovo't, TO — Rear _BE_ W I Other C_ -DETENT40N SYS Help �ht 'rap CIT Y. __P 0-gy LOT COVERAGE 20- PLAN 3117-*3 PLANNING CONDITION: Height of rockeries shall not AR LOT EA= 13369.5 S.F. -A A exceed three (3) feet in the I­IOUSE_3x.,Q.ECKS= 2405 S.F. setback area as measured from top of rock to COVERAGE 2405/13369.5= 18% original grade. SILVER CITY LEGAL DESCRIPTION. CONSTR. INC. AVE. R.: 10973 /4=274.33' LOT B cc MAX. HT.,. 274,33+25, =299.331 a. PO BOX 1417 ACTUAL HT.: —298-.99' �:^'EE ATTACHMENT MUKILTEO,.WA 98275 2(, _z (:��l kv W (206) 501-5490 9' -)2--5 20-05 Dennis M. Bruce, P.E. M.S.C.E., M.B.A. Geotechnical /Civil Engineer December 9, 2005 City of Edmonds Community Services Divi sion PAY' 4 A-5" -r7vl 121 5t'Ave. Edmonds, WA 98020 Subject: Field Reports — Geotechnical Inspections DEC 15 "Ut z .0 nd 15719 72. Ave. W, Edmonds, Washington 1 N G I H ING DN'610N 'Silver City Construction New Residence City of Edmonds Permit No. 05-1099 Cn 7M This engineering report presents the results of ongoing ge otechnical inspections �co ; " I . I M n for the new residence by Silver City Const ruction at 15719 72.0 Ave. W, Edmonds, -4 0 Washington. These inspections were required as a condition of permit by the City of 0 0 C Edmonds. M M z REFERENCES: C Z� > 0 City of Edmonds approved Project Plans 0 -n * Geotechnical Report b D. Bruce, P.E. dated June 20, 2005 y City of Edmonds Special Inspectio n Agreement 'm Site photographs M 0 Vi 0 0 rM INSPECTIONS: CO) 9 C0 This engineer provides ARgy on -site geotechnical inspections during periods of MO Zr active geotechnical work (excavation, foundation preparation, any fill placement, subsurface drainage, etc.). At a minimum, 21nspection visits are provided each week. z Inspection Items: Soil Cuts: This engineer verified excavation cuts into the dense native sub7g rade Cn, z soils (dense sands with gravels) as anticipated by the Geotechnical Report. 0 0 M All excavation cuts are stable through this date (Dece mber 9, 2005). TemporaDL Shoring: On -site geotechnicalinspections have verified stable soil cuts and sufficient declination for stability. No temporary shoring is required through this date (December 9, 2005). Ongoing inspectio ns to continue monitoring. Foundation Sub -Grade: This engineer verified the presence of dense, glacially solidated sub -grade soils easily providing 2,000 p.s.f. bearing capacity. SOILS FOOMW rIONS SITE L7EVELOPMENT , INSPE077ON - DRAINAGE , DESIGN &PERMIT , LEGAL P.O. Box 55502 Shoreline, WA 98155 (206) 546-9217 FAX (206) 546-8442 P.O. Box 55502 Shoreline, WA 98155 (206) 546-9217 FAX (206) 546-8442 D Bruce, P. E_ eUb b'4,b tJt4e_ P. Ma�j 05 06 oo: 3.1 a City of Edmonds Re*: Sliver City Construction, April 26, 2006 Page 2 rade soils TemporaDLShorilng: As previously discussed, the dense stable sub g of cut. No temporary allow for open cut excavation with appropriate slope shoringwas required for thissouthern lot. Z Foundation Sub -Grade: Previously verified at 2,000 p.s.f. bearing capacity. [is in. Contractor subsequently placed foundation footings and stem wa monds approved Plans. accordance with City of Ed Additionally, this engineer vkrified dense sub -grade soils providing excellent C0 M tiered keystone block walls on the lot. foundation support for the C M 0. -grade purposes. 0 Fi I Material: No fill material required for foundation sub 0 M ne block wall construction. Localized gravel required in conjunction with keysto M Z All fill material properly placed. Z per placement.of ied pro subsurface Drainage: This engineer inspected and verif 3: ved Plans. subsurface drainage in accordance with City of Edmonds appro 0 _n _n e Wall P ment: Contractor has properly installed a two- Z Rocke,ry I Keyston _lace e blo k wall at the rear (easterly) and the north sides of the 16t (see M M tiered keyston c cted gravel on photographs). All base block were properly founded in compa '0 r d drainage zone comply with 0 M dense sub -grade material. Block linkage, batter an C 0) the manufacturers recommendations, geotechnical inspections and good C ch: roved as Q a Z 0 practices. All keystone block walls on the southern lot are gpRL-, c trUcted.. ons properly maintain Temporary Erosion Control Measures: Contractor continues to the rocked construction entrance and down -slope siltation fencing (see Z p hotographs), Mid�dlle Lot (15715 72 nd Ave. SWI_ Z Soil Cuts: Dense sub -grade soils were verified during the excavation phise., All M excavation cuts remain stable (see photographs). -grade soils and t ense sub Tempora[y Shoring. No required due to extremely d benching" of the.excavation cuts by the project excavator. r verified dense native soils easily providing Foundation Sub -Grade: This enginee formwork, .2,000 p.s.f. bearing capacity. "OK" to proceed with foundation R F_ C E I V F_ TD 'y DEVELOPMENT SERVICES CTR. CITY OF EDMONDS nati un uta ua;-j1a t3r*uGL- r C' City of Edmopds Re: Silver City Construction, Apri126,2006 Page 3 reinforcing steel and concrete placement in accordance with approved Plans.. House foundations have been subsequently placed (see photographs). Fill Material: No fill material Was required for foundation sub -grade purposes. Z 0 Backfill has begun adjacent the foundation stem walls. This engineer inspec led 0 and verified proper placement of imported gravel as well as placement of native, material. All fill material placement is approved through this date (April 26, 2006). ca am Subsurface Drainage: Ongoing. — inspections continue to monitor. C M 0 Rockery I Keystone Wall: Not yet. It is understood that Silver City Qonstruction 0 0 C�, proposes to incorporate a terraced system of keystone block walls at th e rear m a d north portions of this middle lot (similar to the,already placed keystone Walls n m Z at the southern lot). Z, Temporary Erosion Control Measures: Contractor continues to maintain CD appropriate temporary erosion control measures as with the south ern lot. 0 -n -n nd Northern Lot (15711 72 Ave. SWI: ic M m Soil Cuts: Recent (April 20, 2006) inspections have verified extremely dense, U5 0 r glacially consolidated sub-gra de soils as anticipated by the Geotechnical- Report 0 m C CAI and similar to the dense sub -grade soils encountered on the southern. and middle ..0 CA lots (see photographs). M 0 Z All excavation cuts were stable through this date (A pril 26, 2006). X This engineer recommended to Silver City Construction and project excavator to Z 'lay back" the top 3 feet of excavation to minimize the potential for erosional sloughing. Geotechnical inspections continue to monitor soil cuts. CD e Temporary Shoring: Not yet required geotechnical inspections continu to Z C monitor.soil cuts. m F undation Sub -Grade: Verified dense, glacially consolidated soils easily 0 providing 2,000 p.s.f. bearing capacity. Fill Material: None yet required. RE 44-V 4,j U DEVELOPMENT SERVICES CTR CITY OF EDMONDS