Loading...
20051155.pdfi DATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAME/NAME OF BUSINES MAILING ADDRESS CITY ZIP I TELEPHONF MME ADDRESS NAME e;,? tr ADDRESS 0 L) 'z'; CIT 0 STATE LICENSE NUMBER ZIP TELEPHONE ra___ &_ x EXPIRATION DATE PROPERTY TAX ACCOUNT PARCEL NO. CBL# / x t) 4;L, NEW �RESIDENTIAL PLUMBING I MECH ADDITION COMMERCIAL COMPLIANCE OR E] MIXED USE CHANGE OF USE REMODEL MULTIFAMILY SIGN REPAIR GRADING CYDS FENCE X FT.) DEMOLISH TANK 01HER oGARAGE CARPORT RETAINING WALL ROCKERY El FIRE SPRINKLER FIREALARM (TYPE OF USE. BUSINESS OR ACTI\4(TY) EXPLAIN: k FE Y Lxq_­V L) LU NUMBER NUMBER OF OF DWELLING 0 STORIES UNITS DESCRIBE WORK TO BE DONE EXPIRES PERMIT PERMIT NUMBER JOB ADDRESS SUITE/APT# :5,V PLAT NAME/StUBDIVISION NO. LOT NO. I LID NO, LID FEE S PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP T L SCV APWOVOCS H�V PefM4 ROQJ If-d EXISTING PROPOSED_. slr�el Use Fermi Reqjaed Inspecton florl.aed S,(JoAaix Heq,jaed HLOUIRED DEDICA1 ION rT Undef9round Vi'r'n'j Wn"4K) MEIER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED YES113 NOD REMARKS �21: IvItAt lk-ji It A" 0 OWNER/CONTRACTOR RESPDXI GE z EBMOCOEM R UL_ I uj RELAOM OR CAP z RECYCLE REVIEWED BY KS REVIEWED BY DAT FIRE REVIEWED BY DATE Uj x VARIANCE OR CU SHOPELINEORADB# INSPECTION SEPA REQ'D 01 COMPLETED I EXIMPT 13YES 13N CA# ZONE SIGN AREA HEIGHT 0 WAIVER ALLOWED PROPOSED ALLOWED , PROPOSED OSTUDY I I LOT COVERAGE REQUIRED SETBACKS (FT.) PROPOSED SET BACKS (FT.) ALLOWED PROPOSED FRONT SIDE REAR FRONT LJR SIDE REAR z z z PARKING LOT AREA I PLANNING REVIEWED BY DATE PIEQ*D i PROVIDED REMARKS SPECIAL INSPECTION' REQUIRED 1113 ? REMARKS GEOTECH REPORT BY: STRUCTURAL DESIGN BY, VALUATION Description Plan Check HEAT SOURCE LOT SLOPE% VESTED DATE Building Permit PLAN CHECK NO: Plumbing 9 _j w ul THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. Mechanical Grading PERMIT APPLICATION: SEE ECDC 19.00.005(A)(5) PERMIT LIMIT: SEE ECDC 19.00.005(A)(6) Engr. Review SEE BACK OF PINK PERMIT FOR MORE INFORMATION Engr. Inspection Lu _j cc 4 x *APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESSORS IN INTEREST, AGREES TO,INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITY's ABILITY TO ENFORCE ANY ORDINANCE PROVISION., Fire Review Fire Inspec lion Landscapelnsp. I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT. AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF CALL THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC. TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED FOR INSPECTION IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENS ,��NSURANCE AND RCW 18;27. (425) 771-0220 EXT. 1333 IIE 9 DA R AGI DATE SWIGND,,,, ATTINTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI- FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109 / IBC110 / IRC110. UUUU'�J�D � GROUP CONSULTANT OCCUPANT LOAD FEE Description State Surcharge City Surcharge Base Fee FEE Recording Fee Plan Chk. Deposit Receipt # Total Amt. Due Receipt # Z?� APPLICATION APPROVAL This application is not a pwtnit uniii signed by the Building Official or his1her Deputy and Fees ire paid. and reApI is acknowlKqed in space provig 3d OF =1A L )ATE "C L S' RE . LEAS ED BYZ& )ATE 6/05 PRESS HARD -,YOU ARE MAKING 4 COPIES ORIGINAL - FILE YELLOW - INSPECTOR PINK -OWNER GOLD - ASSESSOR 0 z 3 _j 5 M 11 z 0 A 0 M —1 -n M C M 0 -40. 0 C M M z JO ­11 C 0) 0 _n n M M 0) 0 r- 0 M C C/) 9 C11) M 0 Z X z co z 0 0 M 111111111 FINAL PROJECT APPROVAL FORM TO. DATE: MEMO TO: PERMIT COORDINATOR, BUILDING. DIV IS ION FROM: FIRE DEPARTMENT DATE C—C)s PUAK SIGN ENGINEERING DIVISION DATE I'LEASH SIGN PLANNING DIVISION DATE— 0 PLEASESIGN PROJECT M '49 SITE ADDRESS 65 2:1 OM C PERMIT #4q-0 5 �ADB# DATE INSPECTED M 0 C) 0 C DESCRIPTION OF WORK TO BE INSPECTED 4FZ%2 L.7= M M Z A field inspection was conducted to determine complianc e with -approved plans. Final approval C > denotes that there are . no objections from the above signed Department to the release of (n PERFORMANCE BONDS.and the granting of: 0 -n IN MM GRANT FINAL PROJECT APPROVAL 0 0 0 M Cn M 0 GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector. z co 0 FAILED FINAL INSPECTION OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector M 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fornis:ocaprv1 3./25/04 RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ............ ........ FOUNDATION: Footing ...................... Wall .......................... Pier/Porch ... .............. Retaining Wall ........... Slab Insulation .......... M PLUMBING: Underground ............. Cn Rough -In ................... M C M Commercial Final ....... C HEATING: M Mz Gas Test .................... 107-1 C Gas Piping ................. F— --i Cl) Equipment ................. 0 -n Commercial Final ....... EXTERIOR SHEATHING MITI NAILING .......................... CO) FRAMING ........................ 0M C FIRST FLOOR FRAMING... Q 0 Z INSULATION ................... Floor Insulation ......... Wall Insulation ........... Z Ceiling Insulation ... SHEETROCK NAILING ... z SPECIAL INSPECTION M MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. ,lee