2006_001 (2).pdfBËYLERcoN$utTtÌ,ic
June 20, 2019
JoAnne Zulauf , Engineering Technician
City of Edmonds
121 sth Ave N, Edmonds, WA 98020
Phone: 425-77L-O220
APPLTCATTOff # ffiLDzo:"814ð7
FRÐ.}ËCTI CHilF¡G - SINËLE FAþTTLY N.ES3ËE}ICfi
PR$JECT &DþnË$Sz 73,9 ËÐ;4ÐFtÞS UIfAY LOT 3
Dear JoAnne,
Please find attached revised site plans, which reflect the changes as requested in the plan
review dated March 25,20L9. Our response to each comment is shown below in bold,
GENERAL
1. Submit side sewer permit application.
This was submitted by the property owner.
2. A Stormwater Covenant is required to be recorded against the property based on the
proposed stormwater facilities for the project. Please complete the covenant, including
notarization and any required exhibits and submit to the city. Ensure the stormwater
covenant meets Snohomish County Record Drawing requirements. The document must be
complete, but will not be recorded prior to permit issuance. Prior to construction, final
location of facilities are to be verified (by field inspection and asbuilt) and then the covenant
will be recorded,
Noted.
TESC
3. Construction entrance is to protect the right of way from debris. It should be located at
the entrance of the short plat on Lot 3. The area where the construction entrance is shown
now is proposed to have pervious pavement. Outline the area and make note that heavy
equipment should avoid the area as much as feasible. Show construction entrance on the
plans and incorporate and reference New City standard details.
The entrance of the short plat on Lot 3 will have been constructed and therefore
paved, so the construction entrance cannot be placed in that location. It has been
moved west to be away from the permeable pavement area.
Lþ,KïWQ$* *trw*
RE;
5920 100kh 5t 5W, Ste #25
Lakewood, WA 98499
phone: 253-3Ot-4I57
fax: 253-336-395û
Plan. Ðesign. Manage
f,:Vll & SlltU{;ïUliAL L:l\UIt:i¿lZt:TllNí3 | tÂFi} SURVÍ;YTNü | f¡Lqf'Jli,lNG
pftfjjfiÇ.T þ1/tl'lÅürMr:Nï 1 rc.A5tr"t-T.:rY I FmeMIT ËXr&ûTTï.Nl;
RESUB
AUG 0I 20t9
"'éfifry'F#8m5*
4. Future location of pervious pavement should be protected to the extent possible, Please
add fence to part of it. Orange protective barrier fencing shall be placed at the drip line of
trees to remain and around areas proposed for low impact development techniques, such as
rain gardens, infiltration systems, etc., to protect the area from compaction.
The construction entrance has been moved to avoid the permeable pavement area.
Orange fencing was added to the pavement area.
STORM
6, Please show the location they will discharge into the soil per note on C3. Show where the
footing drains will discharge.
Footing drain discharge location has been shown on the plans.
Thank you for your time and assistance in the review of this project. Should you need any
additional information, please do not hesitate to contact me at 253-984-2900 or via email at
m keller@beylerconsu lting.com,
Sincerely,
Beyâer" Consuåting
Mark Keller, P.E.
g