20060005.pdfPermit Inspection Details
Permit: BLD20060005
PERMITTnAx,
Y,
0111712006 Snook 0 APk&ED y
Total Time: 0
v -R.
.... . . . . .
01/1712006 Snook 20 APPROVED y
Total Time: 20
z
F r
t—,4
12/15/2008 Snook 20 APPROVED y
0
Total Time: 20
Total Inspections: 3 Total Time: 40
n
C1
MC
0
0
C
m
C
0 -n
n
Im 171
0
ro
M 0
r
;u
z
M
7/2/200911:33:11 AM Page I of I
Detailed Written Scope of
Work Worksheet
Owner:— N\amtf VA Ah.wMaiD
Address: -0
z
Plan Check #:
Provide a complete detailed written scope of work for the proposed project.
4'fi
Additions (additional square footage): Specify room use, floor level and square footage
m
00
and direction ifapplicable (i.e. 545 square foot master bedroom/bathroorn addition on the
m
80
second floor with 140 square foot deck and 245 square foot kitchen addition on the main
C
floor, South side of house).
m
Remodels (interior renovations): Specify room uses and floor levels (i.e. combine
bedrooms I and 2 on the main floor to create new master bedroom/bathroom; replace
z
-4
dinning room sliding glass door with new French doors, reconfigure kitchen with ne v
r-
X
island prep counter and install new gas fireplace in the living room).
Vi
0 -n
-n
61ayaap— A
m M
il"�
mmif- r�OVjpo "�4v /I
C—n
0
A
0
C o)
rp
-a'
C Co
MO
Z
D V-.P
&)Iy- (�A 61 gr 4(
U
1
t tri ein rAR ir pplk A ky [A I 6VP DA VI&
- '14A
cA lio
AV) 6di J i I 44�1-v,
: 1) M(I n ry 19111 /70
z
am: /tN U XW VA -to
0
m
L/temp/building/fomis/scope ofwork
DST
I
4
RECORD OF INSPECTIONS
INSPECTOR
DATE APPROVED
SETBACKS .....................
FOUNDATION:
Footing
Wall ....................
Pier/Porch .................
Retaining Wall ...........
z
0
d
Stab Insulation ..........
0
PLUMBING:
Underground ............
IT!
Rough -in ...................
C
M
Commercial Final
0
0
HEATING:
C
M
M
GasTest .............
0
C
Gas Piping .................
>
Equipment .................
g:
C/)
0 -n
commercial Final
EXTERIOR SHEATHING
M M
NAILING .....................
FRAMING ....................
0 M
a cl)
FIRST FLOOR FRAMING
M 0
INSULATION .............
Floor Insulation
Wall Insulation ...........
z
Ceiling Insulation
SHEETROCK NAILING
z
SPECIAL INSPECTION
0
ITI
MISCELLANEOUS ..........
FINAL APPROVAL FOR
OCCUPANCY ..................