Loading...
20060008.pdfAll �IEIEIIIC� r CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION ER NAMEINAME OF BUSINESS CITY AD 02- ZA 2, \_SW\J EI CITY ZIP , I TELE-ONE PERMIT EXPIRES PERMIT NUMBER 2q'f1121ti19 ADDHISS A� A", He LOT He LID NO LID FEE S PLAIL ic fitcHT a, WAY PER o ... CIA L STREET MAP PROPOSED HE QUIRf D Ot OCATtON FT .1 T L 11 SIZE I LINE lIze a ol FIXTURES IRV RECLINED YES 13 NO 13 REMARKS OWNFRT.ONTRACTON RESPONSIBLE FOR EROSION CONTROUDRAINAGWII�,1-t �IIIANI 'N"G DATE DATE VAMAN�r OR CO ORAIII I INSPECTION S777 0 YREo - ­=E ES kWNO ­X IINI SIGN ARER, HEIGHT 0 STUDY 13 o 1 REQUIRED AD SEDS TBAC SETS K"'T' [ '�WW&SED E, UR� EW R SIDENTIAL PLOMIING I MSCII ALL. I FRONT BE RE. ?IT 3 COMMERCIAL COMPLIANCE OR Z4- ADDITION MIXED USE CHANGE OF USE PAR z Di KING LIDTAREA P�NN R 1I.WEG D E] REMODEL MULTIFAMILY SIGN PR!gEB FENC zC I REPAIR Y.S ( W )6�1�1 T I REMARKS DEMOLISH E] TANK El .1— P�Z=AGE 0 RETAIIING WALL Fill SPRINKLER P.RT ROCBERY 13 FREEALVIM (TYPE OF USE, BUSINESS OR ACTIVITY) EXP-H, TYPE OF CO �RUCTION OCCUP N 1 10 PA T vT_&;ADa ROU NUMBER OF UT" OF DWELLING SULTANT OCCUPANT STORIES UNITS LOAD DESCRIBE WORK TOSE DONE I E.ARKS Description FEE Description FEE Plan Check 5. State Surcharge VESTED DATE ,�GURC5 BUilding Permit City S.rch.rge PLAN CHECK NO: Plumbing Base Fee THI PERMITAUTHORIZES ONLY THE WORK NOTED, THIS PERMIT COVERS WORK TO Mechanical - 8 DONE ON PRIVATE PROPERTY NLt ANY CONSTRUCTION ON THE IUSIC U E DONMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC,) WILL RED IR G.ding SEPARUNE PERMISSION. E.g, R.,ie. PERMIT APPLICATION: SEE ECDC 19.00.005(AI(5) ECO PERMIT LIMIT, SEE C 19*00,IKSUH(s, Engr. Inspection SEE SACK Of PINK PERMIT FOR MORE INFORMATION 'A P ICANT. ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESSORS Fwe Rav­ Plan Chk. Deposil P L IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF 2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS =NYCATNO Fire Inspection Receipt ft x RE Ly < ALL CLAIMS FOR DAMAGES Of WHATEVER NATURE, ARISING DIRECTLY . FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT HE c E Landscape Insp TmI Annt. Dee DEEMED TO MODIFY. WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANG C NOR LIMIT IN ANY WAY THE CITY'S ABILITY To ENFORCE ANY ORIHNANc. 1R.WISI.N.' Raculding Fee Receipt I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION APPROVAL GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZE A.ENTOF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC CALL 8'�M,19 Oft.,.Aj V, h,g— D­ty a.d To,, �­ P,,d. TION; AND i� DOING THE WORK AUTHORIZED THEREBY� NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION WORKM3" COMPENSATION INSU=U ROW ­27. CIALSSIGNAJUIF, DATE DATE SIGNED (425) .3 7 -0220 y 71 0 SE EXT. 1333 L IS UNMWFUL T SE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI- ORIGINAL - FILE YELL.Vf INS'PECTOR FICATE OF OCCUPANCY HAS BEEN GRANTED. UBclog I JBCii0 I IRC110. PINK -OWNER GOLD � ASSESSOR 1010"I PRESS HARD - YOU ARE MAKING 4 COPIES z 0 -i �n 0 I'll C m 0 80 C: m m z Cl) o n m In 05 0 0 4= co g co M 0 Z ;0 --I z _q m (a z 9 0 m Description FEE Description FEE Plan Check 5. State Surcharge VESTED DATE ,�GURC5 BUilding Permit City S.rch.rge PLAN CHECK NO: Plumbing Base Fee THI PERMITAUTHORIZES ONLY THE WORK NOTED, THIS PERMIT COVERS WORK TO Mechanical - 8 DONE ON PRIVATE PROPERTY NLt ANY CONSTRUCTION ON THE IUSIC U E DONMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC,) WILL RED IR G.ding SEPARUNE PERMISSION. E.g, R.,ie. PERMIT APPLICATION: SEE ECDC 19.00.005(AI(5) ECO PERMIT LIMIT, SEE C 19*00,IKSUH(s, Engr. Inspection SEE SACK Of PINK PERMIT FOR MORE INFORMATION 'A P ICANT. ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESSORS Fwe Rav­ Plan Chk. Deposil P L IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF 2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS =NYCATNO Fire Inspection Receipt ft x RE Ly < ALL CLAIMS FOR DAMAGES Of WHATEVER NATURE, ARISING DIRECTLY . FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT HE c E Landscape Insp TmI Annt. Dee DEEMED TO MODIFY. WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANG C NOR LIMIT IN ANY WAY THE CITY'S ABILITY To ENFORCE ANY ORIHNANc. 1R.WISI.N.' Raculding Fee Receipt I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION APPROVAL GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZE A.ENTOF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC CALL 8'�M,19 Oft.,.Aj V, h,g— D­ty a.d To,, �­ P,,d. TION; AND i� DOING THE WORK AUTHORIZED THEREBY� NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION WORKM3" COMPENSATION INSU=U ROW ­27. CIALSSIGNAJUIF, DATE DATE SIGNED (425) .3 7 -0220 y 71 0 SE EXT. 1333 L IS UNMWFUL T SE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI- ORIGINAL - FILE YELL.Vf INS'PECTOR FICATE OF OCCUPANCY HAS BEEN GRANTED. UBclog I JBCii0 I IRC110. PINK -OWNER GOLD � ASSESSOR 1010"I PRESS HARD - YOU ARE MAKING 4 COPIES z 0 -i �n 0 I'll C m 0 80 C: m m z Cl) o n m In 05 0 0 4= co g co M 0 Z ;0 --I z _q m (a z 9 0 m 1010"I PRESS HARD - YOU ARE MAKING 4 COPIES z 0 -i �n 0 I'll C m 0 80 C: m m z Cl) o n m In 05 0 0 4= co g co M 0 Z ;0 --I z _q m (a z 9 0 m NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT� (OPIGINA GRADE SEE SURVEY P-11,1096) L DOE A� .......... . i ........ ... ... 5.59790' C, 4404.10' . . ..... 1). W7.50' ............ /4-- 393.?V Z� CKE MAX HEIGHT: 41&.75' ACTUAL HEIGHT� 415 c FOOTING: 369.50' DA51EMENT. 393-99 To zE-�W� I FLOOR: 402.50' 1 EIT MpEPVIOUr2 3UILI)JNG (+ EAVE5):2,550.17 50, FT. )KIVEWAY: 1,639,45 50. FT. C\l ATIO: 300.4�o 50. FT. 'I E (n cz rOTAL: 4,79ro.11 50. FT LOT _COVEIZAGE- 25.10 2,255.50 SQ. FT./9,912.00 90. FT, 24% 1 0 7 .50' 11 00, LOT 5LOP 15% N-S, 13.0,F. 6,36, . KA, 270-3300-010&-500 z (LOT 6 OF P-04-096) (N CON5TKUCTON INC. MICHEL 9207234TH Ft 5W EOMON05, WA. 9502ro d) nr I r .......... tn -KQOF P�IN CONNE C u u 4 [)ATum: OLYMFIIG VIEW WATEK D15TRICT (M.L.L.W.) 0 v UT -a u DENCH MARK. INVEKT OF 5ANITAKY 5EWF MANHOLE NO. 1-44, ELEV = 580-00 C�5 94 o x T w �e KIM = 591.242 Y04 DA515 OF 5EAKING: A 5ECTION 5UE501VI510N 15Y � 59 .90' KU5KIN F15HEK & A550CIATE5 397. C) C) C) ;14 MH-16" 9.13.05 REVISIONS 13-6, TYPF NO"i CIT COPY Dennis M. Bruce, P.E. M.S.C.E., M.B.,A. I -CIV.1 Engin.., to ts' Mid" L- Z in C STATEMENT. OF MINIMAL RISK. M 0 0 C The plans and specifications for the t5w k PLPW ATES,have been reviewed by this engineer and conform to the rn MZ 0,:2 Z a t those condifion s and recommendations of the analysis and r port and, provided tha recommendations are satisfied during the construction and use, and inspected and verified by. this engineer the area disturbed by construction will be stabilized and remain stable and will not incre ase the potential for soil movement, and, the risk of damage to 01 -n the proposed development and from the development to adjacent properties from soil in M C) instability will be minimal. 0 0 C cl) I PEF5 M 0 X -7� W FW Z .; C AZ 1 Z 2 57' 1 0 In SOILS FOUNDATIONS - SITE DEVELOPMENT INSPECTION DRAINAGE DESIGN a PERMIT LEGAL P.O. Box 55502 Shoreline, Washington 98155 (206) 546-9217 FAX 546-8442 Dennis M. Bruce, P.E. SFP 1 S WON M M.S.C.E., M.B.A. G..techn August 11, 2004 City of Edmonds Vy c/o Michel Construction Inc. C' co 7907 212� St. SW #102 Edmonds, WA 98026 Subject: Geotechnical Evaluation I Foundation Recommendations Pr I osed 9 Lot Single Family Residence Development 9r Ave. W and 234ih ST. SW Edmonds, Washington This engineering report presents the results of a geotechnical evaluation of the Michel Construction property at the northwest comer of 92nd Ave. W and 23,e St. SW, Edmonds, Washington. This evaluation was required due to owner concerns regarding geotechnical conditions, as well as City of Edmonds requirements. REFERENCES: 9 Vicinity Map and topographic survey by LSA 0 Grading plans by Donna Breske, P.E. * Site photographs BACKGROUND: The overall property at the northwest corner of 9�m Ave. W 23e St. SW is rectangular in shape (approximately 253 feet along 92 "d Ave W, and 334 feet along 234 th St. SVV). See site survey map. The majority of the overall property has not been developed and contains mature trees, dense shrubberies, and areas of grasses. An existing house occupies the northern central portion of the property as indicated on the survey plan. The overall site contains portions of slopes greater than 15% (less than 50%). Some of the slopes are natural in origin, and some are obviously the result of historic earthwork and associated road grading / fill activities. Visual evaluation of the property reveals no evidence of geotechnical distress: no sides, no soil tension cracks, nor any evidence of erosional degradation. SOILS - FOUNDA TIONS - SITE DEVFZoPmE1vr - INSPECTION - DRAINAGE - DESION & PER"Ir - ZSGAI P.O. Box 55502 - Shoreline, WA 98155 - (206) 546-9217 - FAX (206) 546-8442 z 9 0 M C M M 0 0 -40 0 C --i K = M M �z o"n n Ld M M 065 f 0 0 C M C) Z z --4 co z 9 0 M City of Edmonds c/o Michel Const. Inc. August 11, 2004 Page 2 Evidence of historic fill and associated debris is obvious adjacent 22W h St SW. See photographs. it is understood that Michel Construction proposes to develop the property for a total of 9 individual lots with 9 single family residences. A new entrance cul-de-sac road will also be required. See site plan and grading plan. it is understood that the existing z 0 residence will be removed. :d 0 EVALUATION -fi In order to augment site geotechnical information, a series of 6 soil test pits were a m dug on June 7, 2004. See test pit location log. 0 0 2 Test Pits (TP-1, TP-2) were dug on the slope adjacent 234�h St. SW. Both test 0 0 C pits revealed similar sub-gra de conditions, namely: m m z 0" to EY, Organics, roots, forest duff. 0 C 2 --4 8 to approx. 75 FILL: historic fi 11 material consisting of 3: sandy loam, occasional gravel, debris, 0 -n and gravels. This engineer observes -n that this fill material was most likely X MM placed in conjunction with road grading 0 activities fo I r 234 th St. SW. 0 0 75 to 10' (bottom of pits) Very dense native sands. a cl) KC0 M 0 Z .1� No water was encountered in Test Pits No. 1 or No. 2. Test pit walls remained ;U vertical (with some sloughing of the upper fill materials) and stable. > z Test Pits Number 3 through 6: 3: Test pits number 3,4,5,6 were in the central portion of the property where no fill (n placement had occurred. z portion of the site had been partially 2 It is distinctly possible that the central 0 excavated or "scraped down a few feet". m Test pit 3.4,5,6, 011 to 6' Organics roots, forest duff. 6 11 to 8' (bottom of pits) Dense to very dense sands with occasional gravels No water was encountered in Test Pits No. 3 through 6. Test pit walls remain vertical and stable. No sloughing or caving occurred. City of Edmonds c/o Michel Const. Inc. August 11, 2004 Page 3 Note: A geotechnical re -inspection on August 2004, verified the dense stable nature of the underlying native soils. See photographs. CONCLUSIONS/ RECOM ENDATIONS: Based on the findings of this engineer's investigation as well as experience in the the Michel Construction site at the NW comer of 92d Ave. W z area with similar projects, 234uSt.SWisgeotechni Ily approved for the proposed new 9 lot development and associated access road, subject to the following: M Geotechnical compliance with grading plan by D. Breske, P.E. The grading plan removal of the historic fill mate rial adjacent 234 ith St. SW and slope --i X o indicates stabilization with rockeries. o The grading plan also indicates fill material properly placed in the low M C M 0 0 central portion of the property wi th compliance to structural fill placement 80 C regulations. M M Z The individual new residences may be founded on standard reinforced 10-1 continuous and spread footings with allowable bearing pressure 2,000 p.s.f. CA Equivalent fluid pressure of 35 p.c.f. is recommended for any retaining wall 0 -n n design provided drainage zone is inspected and verified by this engineer. —4 For retaining wall design, use friction factor of 0 .55 and passive pressure of 350 M M 0- 0 p.c.f. 0 c: M V) M CO Geotechnical inspections by this engineer prior any foundation concrete rn 0 Z placement. The proposed structures can be supported on conventional continuous and z spread footings bearing on undisturbed native soils or on structu rat fill placed above See the later sub -section entitled General Earthwork and Structural Fill for --I i native soils. structural fill placement and compaction recommendations. Continuous and individual have widths of eighteen (18) and twenty-four (24) V) z 0 spread footings should minimum inches, respectively, and should be bottomed at least eighteen (18) inches below the m lower adjacent finish ground surface. Depending on the final site grades, some over -excavation may be required below Unless lean concrete is used to fill the over footings to expose competent native soils. excavated hole, the width of the over -excavation at the bottom must be at least as wide as the sum of two times the depth of the over -excavation and the footing width. For example, an over -excavation extending two feet below the bottom of a three-foot wide footing must be at least seven feet wide at the base of the excavation. City of Edmonds c/o Michel Const. Inc. August 11, 2004 Page 4 Footings constructed according to the above recommendations may be designed for an allowable soil bearing pressure of three thousand (3,000) pounds per square foot (p.s.f.). A one-third increase in this design bearing pressure may be used when considering short-term wind or seismic loads. For the above design criteria, it is anticipated that total post -construction settlement of footings founded on competent, fill up to five (5) feet in thickness) will be about one-half z native soils (or on structural inch, with differential settlements on the order of one -quarter inch. Lateral loads due to wind or seismic forces may be resisted by friction between 0 the foundations and the bearing soils, or by passive earth pressure acting on the For the latter con dition, the foundations vertical, embedded portions of the foundations. must either be poured directly against undisturbed soil or the backfill place d around the a M C M 0 outside of the foundation must be level structural fill. We recommend the following 0 80 design values be used for the foundation's resistance to lateral loading: C Paramete Design Value M M z 0 --1 Coefficient of Friction 0.55 350 p.c.f. Passive Earth Pressure -4 Where: x 9 M M 1) p.c.f. is pounds per cubic foot. (2) Passive earth pressure is computed using the equivalent fluid density. 0 0 C Cn 1 We recommend the t a safety factor of at least 1.5 be used for design of the 90 M 0 Z foundation's resistance to lateral loading. W SLABS -ON -GRAD > z Slab -on -grade floors may be supported on undisturbed, competent native soils Or Fn on structural fill. The slabs may be supported on the eAsting soils provided these soils to of the free -draining sand or gravel underneath z can be re -compacted prior placement the slab. This sand and gravel layer should be a minimum of four (4) inches thick. We a M also recommend using a vapor barrier such as 6-mil. plastic membrane beneath the slab with minimum overlaps of 12 inches for sealing purposes. PERM NENT FOUNDATION AND RETAINING WAL Retaining walls backfilled on one side only should be designed to resist lateral earth pressures imposed by the soils retained by these structures. The following recommended design parameters are for walls less than twelve (12) feet in height, which restrain level backfill: City of Edmonds cto michell Const. Inc. August 11, 2004 Page 5 Parameter Design Val Active Earth Pressure* 35 p.c.f. Passive Earth Pressure 350 p.c.f. Coefficient of Friction 0.55 Soil Unit Weight 125 p.c.f. Where: z (1) p.c,f. is pounds per cubic foot (2) Active and passive earth pressures are computed using equimaient fluid M, densities. Vi 0 C: m For restrained walls which cannot defect at least 0.002 times the wall M 0 0 height, a uniform lateral pressure of one hundred (100 p. s.f. should be 0 C: added to the active equivalent fluid pressure). M M The values given above are to be used for design of permanent foundation and fa should be applied when designing the z E: retaining walls only. An appropriate safety ctor walls. We recommend using a safety factor of at least 1.5 for overturning and sliding. The above design values do not include the effects of an, y hydrostatic pressures slopes or loads will be placed above the 0 -n M M behind the walls and assume that no surcharge if these conditions exist, then those pressures should be added to the above V 5 0 walls. lateral pressures. Also, if sloping backfill is desired behind the we Ils, then we will need of the backfill in order to provide the 0 C: M M 90) to be given the wall dimensions and slope M 0 Z appropriate design earth pressures. Heavy construction equipment should not be operated behind retaining and X foundation walls within a distance equal to the height of the wall, unless the walls are lateral resulting from the equipment. Placement > designed for the additional pressures and compaction of retaining wall backfill should be accomplished with hand -operated z equipment. Retaining Wall Backfill z 9 Backfill placed within eighteen (18) inches of any retaining or foundation walls This backfill should contain 0 m should be free -draining structural fill containing no organics. no more than five (5) percent silt or clay particles and have no particles greater than four (4) inches in diameter. The percentage of particles passing the No. 4 sieve should Due to their high silt content, if be between twenty-five (25) and seventy (70) percent. backfill, a drainage composite, such as Mirafi and the native soils are used as Enkadrain, should be p!aced against the retaining walls. The drainage composites should be hydraulically connected to the foundation drain system. City of Edmonds c/o Michel Const. Inc. August 11, 2004 Page 6 The purpose of these backfill requirements is to assure that the design criteria for the retaining wall is not exceeded because of a build-up of hydrostatic pressure behind the wall. The subsection entitled General Earthwork and Structural F contains recommendations regarding placement and compaction of structural fill behind retaining and foundation walls. EXCAVATION AND SLOPE Z 9 As stated, historic fill material had been placed adjacent 230 St. SW. 0 R1 This engineer recommends removal of approximately 6 to 8 feet of historic fill ii material in order to restore the pre -filled condition. This engineer has reviewed the grading plan by D. Breske, P.E,, dated August 11, 2004 and concurs with the proposed 0 M C M grading activities, subject to onsite inspections by this engineer. 0 0 C In no case should excavation slopes be greater than the limits specified in local, rn M Z state and national government safety regulations. Temporary cuts up to a height of four (4) feet deep in unsaturated soils may be vertical. For temporary cuts having a height C 2 greater than four (4) feet, the cut should have an inclination no steeper than 1: 1 (Horizontal: Vertical) from the top of the slope to the bottom of th e excavation. Under o n specific recommendations by the geotechnical engineer, excavation cuts may be -n Ld modified for site conditions. All permanent cuts into native soils should be inclined no M ITT steeper than 2:1 (H:V). Fill slopes should not exceed 2H: 1 V� it is important to note that sands do cave suddenly, and without warning. The contractors should be made aware 0 0 0 of this potential hazard. Cl) CO Water should not be allowed to flow uncontrolled over the top of any temporary M 0 or permanent slope. All permanently exposed slopes should be seeded with an appropriate species of vegetation to reduce erosion and improve stability of the surficial layer of soii. Z DRAINAGE CONSIDERATION Footing drains are recommended at the base of all footings and retaining walls. Z 9 These drains should be surrounded by at least six (6) inches of one -inch -minus washed 0 M rock wrapped in non -woven geoteWi e filter fabric (Mirafi 140N, Supac 4NP, or similar material). At the highest point, the perforated pipe invert should be at least as low as the bottom of the footing and it should be sloped for drainage. All roof and surface water drains must be kept separate from the foundation drain system. City of Edmonds c/o Michel Const. Inc. August 11, 2004 Page 7 No groundwater was observed in any of the 6 soil test pits. Seepage into the likely if excavation occurs during winter months, planned excavation is possible, and and if encountered should be drained away from the site by use of drainage ditches, perforated pipe, French drains, or by pumping from sumps interconnected by shallow connector trenches at the bottom of the excavation. The excavation of the site should be graded so that surface water is directed off Z 9 the site and away from the tops of slopes. Water should not be allowed to stand in any where foundations, slabs, or pavements are to be constructed. Any exposed e 0 area slopes to be covered with plastic to minimize erosion. Final site grading in areas be sloped at least two (2) percent away from the building, adjacent to buildings should except where the area adjacent to the building is paved. M C GENE L EARTHWORK AND STRUCTURA M 0 0 C This project (9 single family residences and new access road) will require See p Ian dated August 11, 2004 by D. Breske, X M M Z significant grading activities. grading > Z P.E. -4 r All fill material shall comply with the reco mmendations of the this report and 0 -n onsite inspections by this engineer. -4 3: Structural fill is defined as any fill placed under the building., behind permanent M M 0, retaining or foundation walls, or in other areas where the und erlying soils needs to site conditions during and after excavation C 001 C 0) support loads. This engineer should observe prior to placement of any structural fill. Q 0 Z All structural fill should be placed in horizontal lifts with a moisture content at or X near the optimum moisture content. The optimum moisture content is that moisture content which results in the greatest compacted dry density. The moisture content Of fill Z soils is very important and must be closely controlled during the filling and compaction process. Vi Z The allowable thickness of the fill lift will depend on the material type, compaction 9 0 equipment, and the number of passes made to compact the lift. In no case should the m lifts exceed twelve (12) inches in loose thickness. The following table presents recommended relative compaction for structural fill: City of Edmonds c/o Michel Const. Inc. August 11, 2004 Page 8 Location of Fill Placement Minimum Relative Compaction Beneath footings, slabs or walkways 95% Behind retaining walls 90% Beneath pavements 95% for upper 12 inches of Sub -grade, 90% below that level Where: Minimum relative compaction is the ratio, expressed in percentages, of the compacted dry density to the maximum dry density, as determined in accordance with ASTM Test Designation D-1 557-78 (Modified Proctor). Use of On -Site SOi s If grading activities take place during wet weather, or when the sandy, on -site soils are very wet, site preparation costs may be higher because of delays due to rains and the potential need to import granular fill. The on -site soils are generally sandy and whe thus are not particularly moisture sensitive. Grading operations will be difficult n the moisture content of these soils greatly exceeds the optimum moisture content. Moisture sensitive soils will also be susceptible to excessive softening and pumping" from construction equipment traffic when the moisture content is greater than the optimum moisture content. Ideally, structural fill, which is to be placed in wet weather, should consist of a granular soil having no more than five (5) percent silt or clay particles. The percentage of parficles passing the No. 200 sieve should be measured from that portion of the soil passing the three -quarter -inch sieve. The use of "some" on -site soils for fill material may be a ceptable if the upper organic materials are segregated and moisture contents are monitored by engineering inspection. DRAINAGE CONTROLS: No drainage problems were evident to this engineer during June, July, or August or 2004, A buried drainage outfall pipe was called out on the project survey and observed by this enwineer. It is assumed that this outfall pipe releases drainage from the catch basins in 23& St. SW. The sub -grade sandy soils will allow for onsite infiltration if desired by project developer. z 9 ?5 C M M a i 0 80 C: M M z C > z 0 M M 0 0 0 M C cf) KV) Q 0 Z X z —i z 9 0 M City of Edmonds c/o Michel Const. Inc. August 11, 2004 Page 9 Compliance with City of Edmonds drainage controls are geotechnically acceptable. CONCRETE: All foundation concrete (footings, stem wa Ils, slabs, any retaining walls, etc.) Z 0 shall have a minimum cement content of 5-1/2 sacks per cubic yard of concrete mix. 0 ROCKERIES: This project requires extensive grading activities, both cutfing and filling. See a m C grading plan. a M 0 -40 In order to provide erosional stabilization, rockeries; are required along 23e St. C SW and "wrapping around" the west property line. Additionally, interior rockeries are M proposed for individual lot grading purposes. > Geotechnical inspections of the project rockeries are required. Inspections shall verify the following: o -n 9 Dense dub -grade soils M M * Base rock embedment a 0 * Rock linkage and size 0 C m CO * Rock face better (D M 0 * Drainage zone INSPECTIONS: X __4 The recommendations of this report are only valid when key geotechnical aspects are inspected by this engineer during constru 0 Soil cuts Z * Fill removal and grading activities 0 & Foundation sub -grade verification M 0 Retaining wall, or rockery placement 0 Fill placement 9 Subsurface drainage installation * Final erosion control and grading City of Edmonds c/o Michel Const. Inc. August 11, 2004 Page 10 ,SUMMARY: The proposed 9 lot development at the NW corner of 92"' Ave. W and 2341h St. Edmonds, Washington is geotechnically viable when constructed in accordance with the recommendations herein, compliance with City of Edmoads approved plans and requirements, and key geotechnical inspection AgljM construction. GEO HNICAL REVIEW I FUTURE RESIDENCES: At the time of this report, specific house plans were not available for review. This geotechnical report refers to overall property grading and development prior to individual house construction. As discussed in this report, dense native sub -grade soils capable of providing excellent bearing capacity for foundations are present on the site. Overall property development will include significant grading activities (as discussed herein). After overall property development, individual houses may be constructed after review and approval by this enginee No significant foundation problems were anticipated for the future residences providing overall property grading activities are inspected. CLOSURE: The findings and recommendations of this report were prepared in accordance with generally accepted professional engineering principles and practice. No other warranty, either expressed or implied, is made. The conclusions are based on the results of the field exploration and interpolation of subsurface conditions between explored locations. if conditions are encountered during construction that appear to be different than those described in this report, this engineer should be notified to observe the situation and review and verify or modify the recommendations. If there are any questions, do not hesitate to call. a Z, Dennis M. Bruce, P.E. DMB:jpb VA ti�l Geotechnical / Civil Engineer I EXPMES 12aY z 9 0 C M M 0 -4 0 0 0 C: X M M z jo-1 C -4 o -n M M 055 f 0 0 C M In co Q 0 z z 9 0 m Dennis M. Bruce, P.E. M.S.C.E., M.B.A. Geotechnicai /Civil Engineer January 2, 2007 ftc 't-.1 JAIV City of Edmonds D.S.D. 0 8 Michel Construction, Inc. AYXD1&G z c/o 7907 2121h St. SW, # 102 0,: DtpA� 0 Edmonds, WA 98026 M Subject: EINAL Regort — Geotechnical Inspections — Lot Nos. 4, 6 and 6 208,9209,9207 234"'PI.W, Edmonds, Washington— 9 9 0 M C Michel Construction, Inc. Project 0 In 0 -40 City of Edmonds Permit Nos. 2006 — 0019, 0216, and 0008 0 a: -4 r = M M z This engineering report presents the final results of geotechnical inspections for 0-4 p C 2 nd Lot Nos. 4, 5, and 6 at the Michel Construction, Inc. development at 92 Ave. W and > 2 th 34 K W, Edmonds, Washington. These 3 lots represent the last inspections for the overall development of 9 lots total. Previous geotechnical reports have addressed 0' inspection issues at the other 6 lots. -n REFERENCES: 0 a City of Edmonds approved Project Plans, orn C Cn - Geotechnical and inspection reports by D. Bruce, P.E. MO Z * Photographs INSPECTIONS: As previously stated, this engineer has provided ongoing geotechnical z inspections, as required by City of Edmonds permit conditions for the overall 9 lot z development. This report concludes inspections for Lot Nos, 4, 5, and 6. Soil Cuts: All excavation and soil cuts remained stable throughout the project. rn No geotechnical adverse conditions were observed. Fill Removal: A small amount of fill (up to 18 inches thick) was removed durin 9 initial excavation and site clearing. Approved. Foundation Sub -Grade: Previously verified and approved. All foundation footings were properly placed in accordance with City of Edmonds approved plans. SOILS - FOUNDAT70NS - SITE DEVELOPMSVr - imspEc77cm - DaVmAGE - DEstoN & PERmrr - LEa4i. P.O. Box 55502 - Shoreline, WA 98155 - (206) 546-9217 - FAX (206) 546-8442 City of Edmonds c/o Michel Construction, Inc. January 2, 2007 Page 2 Rockeries: As previously reported, the perimeter rockeries for the overall development were completed at the beginning of the project (see previous reports). All rockeries have performed properly (good performance through the record November 2006 rains). All rockeries are approved as placed. - Fill Placement, None required for geotechnical foundation support purposes. calized gravel was utilized to improve working surface conditions. All fill material and placement is approved. - Subsurface Drainacle: All subsurface drainage for the new houses on lots 4, 5 and 6 were inspected, verified, and approved as placed. NOTE: The rear (westerly side) of Lot No. 5 contains a significant drainage "junction" (see photographs). This engineer understands that project drainage engineer (Donna Breske, P.E.) has submitted plans for City of Edmonds review and approval regarding the "bypass" of the upper City of Edmonds street r drainage to the "low spot" of the rear of Lot 5, Significant volumes of storm wate continue to flow at this point. Erosion Con : Michel Construction properly maintained all erosion control measures throughout the project. Perman erosion control measures have been installed as of the last geotechnical inspection (January 2, 2007). Lawn, shrubbery and beauty bark have been properly placed (see photographs). There are no exposed earth surfaces. During construction, temporary Eco-Blocks were placed at the rear of Lot No. 5 for slope stabilization purposes. This engineer recommended that these temporary Eco-Blocks be removed and slopes "back -graded" to avoid any potential surcharge on the temporary Eco-Blocks. The rear of Lot No. 5 has been satisfactorily back -grades with beauty bark placed as an erosion contro stabilizer. Additional erosion control rockeries and one -block high Eco-Block walls have been properly placed to improve erosion control measures. All permanent erosion control measures are gpAto-yed. Z 9 1 1 0 R1 C M M 0 0 80 C: 3: M M Z 0 n M M 0 0 0 C M U) 90 M 0 Z .4 X Z -4 X V; Z 9 0 M City of Edmonds c/o Michel Construction, Inc. January 2, 2007 Page 3 SUMMARY: All special geotechnica I inspection items have been properly completed and are verified as of January 2, 2007, including permanent erosion control measures. It is understood that th e "storm water junction zone" at the rear of Lot No. 5 Z complies with City of Edmonds approved drainage designs. F) M This report completes geotechnical inspection duties by D. Bruce, P.E. If there are any questions, do not hesitate to call. CD M M 0 0 M. C: W, MAL 0 T 0 0 Off==3 Dennis M. Bruce, P.E. C Geotechnical Civil Engineer M 0 DMB:abj ;0 cc: Michel Construction, Inc. Z Z 0 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN THIS NOTICE IT IS DUE TO THE QUALITY OF THE DOCUMENT. Height Calculation Worksheet Date Permit Number' q--Jo - o a a Address 1� Inspector z AverageGrade 393 "-?15 Max Height (25'+Ave.) 41 (3, '75 Actual Height (A+B+Q41(),<?— OM MO 0 0 C M z > r 0 M M =(C 4, C6- C CO CO M 0 '75 M > z ca z 0 M Elevation of transit above Datum (B) Daturninn 14 Elevation (A) '37/ 1/temp/building/fornis/height worksheet Permit Inspection Details Permit: BLD20060008 PERMIT i 1077 - E-Engineering Final Complete? Y 01/0212007 Sibref 30 OK to Final Y Total Time: 30 1106 - B-Setbacks Complete?. Y 03/2?J2006 MS 20 SETBACKS APPROVED PER STRUNG PROPERTY LINES y Total Time: 20 1108 - B-Footings, Complete?. Y 0312212000 MS 20 FOOTINGS APPROVED y z Total Time: 20 1110 - B-Foundation Wall complete? Y 04106/2006 MS 20 FOUNDATION APPROVED Total Time; 20 1118 -S-Slab Insulation Complete? y 06/0112006 MS 15 SLAB INSULATION APPROV613' y Total Tim.: is 0 Im 1120 - B-Plumb Ground Work Co lete?,� TIP Yi� C mo 0 -40 05126/2006 MS 20 UNDERGROUND PLUMBING APPROVED y 0 C: Total Time: 20 -4 C X m 1126 - B-Plumb Rough In Comi leti?: p 0710712006 MS 20 R OUGH IN PLUMB ING APPR OVED y z Total Time: 20 1128 - B-Gas TeSt/Pipe Complete?. Ts� GV1912006 MS 20 GAS TEST AND GAS PIPING APPROVED y 0 -n Total Time: 20 1132 . B.Exterior Sheathing CompjeteT� In M 0�/�,If2006 MS 20 CORRECTION NOTICE WRITTEN IN a 07/19/2006 MS 20 EXTERIOR SHEATHING APPROVED y 0 0 Total Time: 40 1136,.B.ShearNailin 91 orn Cn M 0 07/19/2006 MS 20 SHEAR APPROVED y Z r- Total Time: 20 , �)r .4p 1140 - BuHelght,Verlficatlon.. comilete? I 09112/2006 MS 30 APPROVED y > Total Time: 30 z 1142 - B-Framing. Complete? 07/19/2006 MS 25 CORRECTION NOTICE WRITTEN N 09/1212006 MS 20 APPROVED Y Total Time: 4 5 1144 - S-Wall insulation/Caulk: com�plete?,l :y! 0 IT 09/15/2006 MS 20 APPROVED Y Total Time: 20 1146 - B-Floor Insulation/Caulk complete? l� 09/15/2006 MS 20 APPROVED y Total Time: 20 1148 - B-Celling Insulation/Caulk Complete?, Y' 09115/2006 MS 20 APPROVED Y Total Time: 20 7/9/2009 9:14:36 AM Page I of 2 ki a 1166:4;s eeii6c NW, 09/27/2006 Snook APPROVED Total Time: 20 0 C ritiol 01,03/2007 Snook 25 APPROVED Total Time: 25 Total Inspections: 19 Total Time: 405 M M 40) 0 -n M C: M 0 7/9/2009914:36AM Page 2 of 2 J4W owgPancy ART I M 11 E . NT BUILDINGS DM PER INTERNATIONAL RESIDENTIAL CODE SECTION R1 10 AT: 9207 230 PI SW Building Permit M 2006-0008 Occupancy established by this certificate: R3 Dwelling Units: No. Stories: 1 Basement: I Type of Construction: VB Owner of building: Michel Con , struction, hic.. The Sinale Family Residence at 9207 — 2 4" PI?SW- � �. _�� has! boron Inspected and approved complying with the requirements of the 2003 edition of the International Residential Code as adopted by the.City for the group and division of occupancy and the use for which the proposed occupancy is classified. Issued this 0 day of January, 2007 Chief Building Official By:_ Any change of occupancy or use requires a building permit and anew Certificate of Occupancy Issued by the City of Edmonds Building Official. RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ................... FOUNDATION: Footing .................. Wall ....................... .. Pier/Porch ................. Retaining Wall ........... z Slab Insulation .......... 9 PLUMBING: vv) 0 Underground ............. Rough -In ................... x 0 in C Commercial Final a ITI 0 HEATING: 0 Gas Test ........... 07 1- M ITI 0 Gas Piping C Equipment ................ E: Commercial Final 0 _n EXTERIOR SHEATHING n _q = NAILING .......................... to IT ITI 0 C/) FRAMING ................ 0 FIRST FLOOR FRAMING 0 4= C/) 1710 INSULATION .............. .4po Z Floor Insulation ;U Wall Insulation ........... Ceiling Insulation z —4 SHEETROCK NAILING SPECIAL INSPECTION z ITI MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY ............ C), V.