Loading...
20060011.pdfFINALPROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE 4EPLE—SMIN t �_ ENGINEERING DIVISION DATE7�!h�& z 9 -PLANNING DIVISION DATE 0 =i 9n PROJEC T C SITE ADDRESS M 0 __10 0 PERMIT ____------PATE INSPECTED ���ADB# C 2: M M Z DESCRIPTION OF WORK TO BE INSPECTED - A field inspection was conducted to determine compliance with -approved plans. Final approval denotes. that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: M M 0 Vi 0 r- 0 M C co 9 Co GRANT FINAL PROJECT APPROVAL M Z 71 z GRANT PROJECT APPROVAL WITH CONDITIONS NOTED -4 3: 0 Copy of CONDITIONS given to owner/contractor by inspector co z 0 A 0 M FAILED FINAL INSPECTION - OUTSTANDING ISSUES El Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RF-INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature ktemp:b1dg:fbnns:ocaprv1 3/25/04 FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: —FIRE DEPARTMENT DATE ENGINEERING DIVISION DATE PLANNING DIVISION DATE PROfEC SITE ADDRESS 7— 3) 3 1 9-) PERMIT # . . ........ _OoiL_ADB#______—DATE INSPECTED DESCRIPTION OF WORK TO BE INSPECTED L! A field inspection was conducted to determine compliance wiih�approvr3 plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE _BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fbrrns:ocaprv1 3/25/04 z 0 4 0 0 a M M a --10 00 M M z 0 -n M M y Cn 0 r- 0 M C co K Ch M 0 Z X z C') z 9 0 M Permit Inspection Details Permit: BLD20060011 PERMIT - FRIAX 0813012006 Ed 30 y Total Time: 30 05/09/2006 M Smith 0 APPROVED y 05109/2006 M Smith 0 APPROVED y Total Time: 0 "Z" Rim z 0513012006 MG 0 APPROVED y 0 Total Timm 0 Total Inspections: 4 Total Time: 30 4 -n M C M 0 0 C IT M 0 -n n M M 0 rV 0 C M z z z M �5 6/112009 4!55:21 PM Page I of I INSPECTOR DATE APPROVED TV-\ SETBACKS ................. FOUNDATION: o., U Footing ................ Wall .............. z Pier/Porch p 0 Retaining Wall ........... M Stab Insulation .......... f, PLUMBING: 171 C: Underground ............. M 0 -40 0 Rough -in .......... I= Commercial Final M ITI z 10-1 HEATING: a > Gas Test ............ Gas Piping ................. 0 "n -n -4 Equipment ................. 3: M M Commercial Final 065 ;Ir 0 EXTERIOR SHEATHING 0 ITI NAILING .................. co 0 FRAMING........................ FIRST FLOOR FRAMING INSULATION ................... Floor Insulation z Wall Insulation ........... z Ceiling Insulation SHEETROCK NAILING 0 M SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY ..................