20060011.pdfFINALPROJECT APPROVAL FORM
TO:
DATE:
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: FIRE DEPARTMENT DATE
4EPLE—SMIN t �_ ENGINEERING DIVISION DATE7�!h�&
z
9
-PLANNING DIVISION DATE
0
=i 9n
PROJEC T
C
SITE ADDRESS
M 0
__10
0
PERMIT ____------PATE INSPECTED
���ADB#
C
2: M
M Z
DESCRIPTION OF WORK TO BE INSPECTED -
A field inspection was conducted to determine compliance with -approved plans. Final approval
denotes. that there are no objections from the above signed Department to the release of
PERFORMANCE BONDS and the granting of:
M M
0 Vi
0 r-
0 M
C co
9 Co
GRANT FINAL PROJECT APPROVAL
M
Z
71
z
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
-4
3:
0 Copy of CONDITIONS given to owner/contractor by inspector
co
z
0
A
0
M
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
El Copy of CORRECTION NOTICE given to owner/contractor by inpector
2.
3.
RF-INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
ktemp:b1dg:fbnns:ocaprv1 3/25/04
FINAL PROJECT APPROVAL FORM
TO:
DATE:
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: —FIRE DEPARTMENT DATE
ENGINEERING DIVISION DATE
PLANNING DIVISION DATE
PROfEC
SITE ADDRESS 7— 3) 3 1 9-)
PERMIT # . . ........
_OoiL_ADB#______—DATE INSPECTED
DESCRIPTION OF WORK TO BE INSPECTED L!
A field inspection was conducted to determine compliance wiih�approvr3 plans. Final approval
denotes that there are no objections from the above signed Department to the release of
PERFORMANCE _BONDS and the granting of:
GRANT FINAL PROJECT APPROVAL
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
0 Copy of CONDITIONS given to owner/contractor by inspector
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
0 Copy of CORRECTION NOTICE given to owner/contractor by inpector
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
1:temp:b1dg:fbrrns:ocaprv1 3/25/04
z
0
4
0
0
a M
M a
--10
00
M
M
z
0 -n
M M
y Cn
0 r-
0 M
C co
K Ch
M 0
Z
X
z
C')
z
9
0
M
Permit Inspection Details
Permit: BLD20060011
PERMIT - FRIAX
0813012006 Ed 30
y
Total Time: 30
05/09/2006 M Smith 0 APPROVED
y
05109/2006 M Smith 0 APPROVED
y
Total Time: 0
"Z"
Rim
z
0513012006 MG 0 APPROVED
y
0
Total Timm 0
Total Inspections: 4
Total Time: 30
4 -n
M
C
M
0
0
C
IT M
0 -n
n
M M
0
rV
0
C
M
z
z
z
M
�5
6/112009 4!55:21 PM
Page I of I
INSPECTOR
DATE APPROVED
TV-\
SETBACKS .................
FOUNDATION:
o., U
Footing ................
Wall ..............
z
Pier/Porch
p
0
Retaining Wall ...........
M
Stab Insulation ..........
f,
PLUMBING:
171
C:
Underground .............
M
0
-40
0
Rough -in ..........
I=
Commercial Final
M
ITI z
10-1
HEATING:
a
>
Gas Test ............
Gas Piping .................
0 "n
-n
-4
Equipment .................
3:
M M
Commercial Final
065 ;Ir
0
EXTERIOR SHEATHING
0 ITI
NAILING ..................
co
0
FRAMING........................
FIRST FLOOR FRAMING
INSULATION ...................
Floor Insulation
z
Wall Insulation ...........
z
Ceiling Insulation
SHEETROCK NAILING
0
M
SPECIAL INSPECTION
MISCELLANEOUS ..........
FINAL APPROVAL FOR
OCCUPANCY ..................