Loading...
20060049.pdfCITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 121 5th Avenue North, Edmonds, WA 98020 (425) 771-0220 ORDER TO CORRECT VIOLATION cation of Violation (Address and Tax Account Parcel No): 10229 244"' Street SW, Edmonds, z UL No. 00597100000500 A 98026 Tax Account -Parcel :49i Issued To: L3mn Scovill, Property Owner V rn rn 0 —10 1h Address Of Person This Order Is Issued To: 10229 244 St SW, Edmonds, WA 98026 0 M M Code Section Violated:. International Mechanical Code Sections 106 & 107. z Description of Violation: On behalf of the property owner, Washington Energy Services obtained.. -n 'n 0 mechanical permit (#2006-0049) for a furnace, hot water tank and gas piping. The City understands the work to be comnlete but the permit cannot. be closed because no City inspection, has been performed, MT Cc CA Also, the pennit expired on.Jul-y 18, 2006. r- 0 M C Cn K 0) Corrective Action Required: Call the City Building Inspection Hotline at 425-771-0220 exte Q Z q 1333 to schedule for the required gas viving and appliance installation inspection. X z Correction is Required no later than: 5:00pm August 30, 2006 (date) -(time) If correction is not made by the date and time specified in the Order, a Notice of Cn Civil Violation shall be issued. The Notice of Civil Violation shall assess fines of z 9 $100.00 Per day, or portion of a day, during which the violation continues. 0 M Date Posted: Date Mailed: An st 16, 2006 Date Served Issuing Party Jeannine L. Graf Title Building Official.. Signature. Cc: Washin orEnergy Ser;�� GARY HAAKENSON CITY OF EDMONDS MAYOR I � I ITH -E.111F ..11T. (425) 7710220 -FAX (425) 77 1 �0221 Websile: �Ci.edmond­a­ DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering August 31, 2006 Lynn Scovill Z 0 1h 10229 244 Street Southwest :j 0 Edmonds, Washington 98026 RE: Order to Correct Violation Notice Dated August 16, 2006 q 71 K Fn 0 m Dear Ms. Scovill: C m a 0 As a follow-up to the referenced Order to Correct Violation Notice, a permit was obtained for 0 0 C installation of a furnace, gas piping and a hot water tank in your residence. The governing code m M Z authority (the International Mechanical Code) requi res that installation approval be granted by — the City Inspector. This inspection assures the health, welfare and safety of all building C > inhabitants as well as guests for the installation work. The City utilizes the Civil Penalties ordinance and fines as a last resort to gain code compliance. 0 _111 Once a Not ice of Civil violation is issued (note this is the next step in the process) fines of m m $100.00 per day are imposed and continue to accrue at the same rate until the City approves the hot water tank installation. Be advised, once fines accrue to the amount of $5,000.00 the City 0 0 r- m shall utilize our collection agency for the re-couping of fines. And, pursuant to State RCW Law, a V) 9 09 the collection company collects fines at a rate of 150% of the amount owed plus added M 0 Z administrative costs. We strongly urge you to contact our City Inspector at 425-771-0220 extension 1333 to schedule for the required inspection by September 18, 2006. This is the last correspondence you will receive in this matter, failure to schedule an inspection by September 18th shall result in the issuance ofNotice ofCivil Violation and fines of$100.00 perday shall accrue until this matter is resolved to the satisfaction of the City. Z If you have any questions please feel free to contact me at 425-771-0220 extension 1226 during 0 m City business hours Monday through Friday. Sincerely, Jeannine L. Graf Building Official 0 incorporated August 11, 1890 Permit Inspection Details Permit: BLD20060049 RERMITTRAX f 04 1- 04�*z ....... ... 0811812006 Me 20 FINALAPPROVED y Total Time: 20 Total Inspections: Total Time: 20 ie: z ITI "n M M 3: M Mn z C z 0 "n M M 0 CD 0 or- rM In M 0 z z 0 ITI 7/912009 10:02:51 AM Page I of I 777777r RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing Wall .......... .......... Pier/Porch ................. Retaining Wall .......... z Slab Insulation .......... PLUMBING: Underground Rough -in 0 ITI C: Ti Commercial Final -40 0 0 HEATING:. --I MM Gas Test ............... - ITIZ 0 --1 Gas Piping C2 Equipment ............... CA Commercial Final 0 n EXTERIOR SHEATHING NAILING .......... ............... M rill FRAMING .............. 0 OM FIRST FLOOR FRAMING.., (A Q 0 INSULATION ............ Z Floor Insulation Wall Insulation > z Ceiling Insulation :0 SHEETROCK NAILING Q) SPECIAL INSPECTION z R1 MISCELLANEOUS FINAL APPROVAL FOR OCCUPANCY 2-0 0