20060066.pdfFINAL PROJECT APPROVAL FORM
TO:
DATE:
MEMOTO: PE LDING DIVISION
FROM: FIRE DEPARTMENT DATE__2_ OG
ENGINEERING DIVISION DATE
PLANNING DIVISION DATE
PROJECT—
SITEADDRESS 1001", 6,06py6E -57'
PER -MIT # O(V — ADB# DATE INSPECTED
DESCRIPTION OF WORK TO BE INSPECTED
A field, inspection was conducted to determine compliance with, approved. plans. Final approval
denotes that there are no objections from the above signed Department to life release of
PE REORAIANCE BONDS and the granting of:
GRANT FINAL PROJECT APPROVAL
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
0 Copy of CONDITIONS given to owner/contractor by inspector
I
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
0 Copy of CORRECTION NOTICE given to owner/contractor by inpector
I
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
l:temp:bldg:f0mis:ocapn,I 3!25/04
z
9
0
C rn
rn 0
0
80
C
� E
M M
z
0-4
—Z
--i
C')
0 -n
n
M M
a
0
0 M
M 0
Z r-
z
z
0
1
0
m
Permit Inspection Details
Permit* BLD20060066
PERMITTRAY
0210212006 WESTFALL 20 APPROVED
y
Total Time: 20
Total Inspections:
1 Total Time: 20
z
0
ITI
—4 'n
C3
C
0C
M
C
P.
0 1
M M
C
0
0
M 0
0
z
0,
0
M
5/2812009 1:05M PM
Page I of I
RECORD OF INSPECTIONS
INSPECTOR DATE APPROVED
SETBACKS .....................
FOUNDATION:
Footing ..........
Wall ..........................
Pier/Porch .................
Retaining Wall ...........
z
Slab Insulation ..........
M
PLUMBING:
Underground .............
Rough -in ...................
M
rn
0
Commercial Final
0
C
HEATING:
rn
ITI z
Gas Test ....................
'0-4
C :5
Gas Piping:.,
>
Equipment
.. ...............
O'n
Commercial Final
EXTERIOR SHEATHING
ITI ITI
NAILING ....................
co
0
FRAMING ............ ...........
0
FIRST FLOOR FRAMING
0
INSULATION ...........
Floor Insulation
Wall Insulation . ..........
z
--I
Ceiling Insulation
x
SHEETROCK NAILING
z
SPECIAL INSPECTION
M
MISCELLANEOUS
FINAL APPROVAL FOR
OCCUPANCY ...............