20060077.pdfFINAL PROJECT -APPROVAL FORM
TO:
DATE:
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: FIRE DEPARTMENT DATE-
-ENGINEERING DIVISION DATE�_
2
PLANNING DIVISION DATE__��
PROJEC
SITE ADDRESS z.n i T 29,4� i
PERMIT 6o 7_7 ADB#___---------PATE INSPECTED )LI911v-4
DESCRIPTION OF WORK TO BE INSPECTED S" P
A field inspection was conducted to determine compliance with - approved plans. Final approval
denotes that there are no objections from the above signed Department to the release of
PERFORMANCE BONDS and the granting of:
GRANT FINAL PROJECT APPROVAL
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
0 Copy of CONDITIONS given to owner/contractor by inspector
1
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
0 Copy of CORRECTION NOTICE given to owner/contractor by inpector
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
1:temp:b1dg:fbnns:ocaprv1 3/25/04
z
2
0
in-
0
C M
M 0
-40
0
T M
M Z
'0
o 'n
M
0 Fn
0,-
0 M
C (1)
? (1)
Q 0
z
z
z
0
i
0
M
Permit Inspection Details
Permit: BLD20060077
RERMIT,rRAX
fe
02108/2006 iiNOOK 15 APPROVED y
Total Time: Is
02/09/2006 meg 15 APPROVED y
Total Time: 15
Total Inspections: 2 Total Time: 30
z
0
ITI
M
ITI
-40
0 C:
ITI
ITI
0 T,
m M
T
or-
0
C
�Iy
M 0
z
Z
0
ITI
6/11200911:10:21 AM Page I of I
RhWHIL? Ur IrI1z)rC%o I lug .40
INSPECTOR DATE APPROVED
SETBACKS .....................
FOUNDATION:
Footing ......................
wall ................
Pier/Porch . .............
Retaining Wall ...........
Slab Insulation ..........
PLUMBING:
Underground .............
Rough -In ..........
Commercial Final
HEATING:
Gas Test ....................
Gas Piping .................
Equipment ... ..............
Commercial Final
EXTER OR SHEATHING
I
NAILING ..........................
FRAMING ..........
FIRST FLOOR FRAMING
INSULATION ...................
Floor Insulation
Wall Insulation ...........
Ceiling Insulation
SHEETROCK NAILING
SPECIAL INSPECTION
z
p
-4
V
X
C M
TR
0
0
M 'T
C
0,
M M
0
C (A
ITI 0
Z r-
z
x
co
z
ITI