20060112.pdfFINAL PROJECT APPROVAL FORM
TO: —
DATE: --
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FIRE DEPARTMENT DATE '6 C7
FROM:
ENGINEERING DIVISION DATE—
z
0
PLANNING DIVISION DATE—
-q
0
PROJECT—TL4—VA, S,
:49i
SITE ADDRESS. 40 2- t -7 R— S
C: rn
M 0
PERMIT DATE INSPECTED
--10
0
0 C
DESCRIPTION OF WORK TO BE INSPECTED CA -Z,66,
-49
X M
M z
C) --I
A field inspection was conducted to determine compliance with � approved plans. Final approval
C 2
denotes that there are no obje ctions from the above signed Department to the release of
co
0 n
PERFORMANCE B and the granting of:
-n
x
M
GRANT FINAL PROJECT APPROVAL
0-
0 r-
0 M
C CO
9 Cn
Q 0
Z
'rn
;U
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
>
z
0 Copy of CONDITIONS given to owner/contractor by inspector
I
z
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
0
rn
0 Copy of CORRECTION NOTICE given to owner/contractor by inpector
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
I:tcmp:b1dg:fc=:ocaprv1 3/25/04
Permit Inspection Details
y—
Permit: BLD20060112
PERMITTPAX
63/15/2006 �MJTH 3�'APPR6V�D
y
Total Timw. 35
Total Inspections:
Total Time: 35
M
ITI
0
80
C
M M,
0-4
C
O'n
-4 9
im ITI
or-
0 M
C 0)
90)
M 0
z
ITI
7/g/2009 10:02:28 AM
Page 1 of I
RECORD OF INSPECTIONS
INSPECTOR DATE APPROVED
SETBACKS .................
FOUNDATION:
Footing ............
Wall......................
PieriPorc'h
z
0
Retaining Wall ...........
0
Stab Insulation
PLUMBING:
Underground ... ..........
3:
C I'D
a
Rough -In . ..................
M
0
0
Commercial Final
C:
HEATING:
M
M Z
Gas Test
...........
C
Gas Piping
Equipment . ................
0 'n
-n
Commercial Final
EXTERIOR SHEATHING
ITI IT
0
NAILING ._ ......................
0
0
FRAMING ...............
C
IT 0
FIRST FLOOR FRAMING
Z
INSULATION ...................
;a
-4
Floor Insulation
x
Wall Insulation ...........
Ceiling Insulation
z
SHEETROCK NAILING
SPECIAL INSPECTION
0
I'D
MISCELLANEOUS
FINAL APPROVAL FOR
OCCUPANCY ..................
W @F