Loading...
20060112.pdfFINAL PROJECT APPROVAL FORM TO: — DATE: -- MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FIRE DEPARTMENT DATE '6 C7 FROM: ENGINEERING DIVISION DATE— z 0 PLANNING DIVISION DATE— -q 0 PROJECT—TL4—VA, S, :49i SITE ADDRESS. 40 2- t -7 R— S C: rn M 0 PERMIT DATE INSPECTED --10 0 0 C DESCRIPTION OF WORK TO BE INSPECTED CA -Z,66, -49 X M M z C) --I A field inspection was conducted to determine compliance with � approved plans. Final approval C 2 denotes that there are no obje ctions from the above signed Department to the release of co 0 n PERFORMANCE B and the granting of: -n x M GRANT FINAL PROJECT APPROVAL 0- 0 r- 0 M C CO 9 Cn Q 0 Z 'rn ;U GRANT PROJECT APPROVAL WITH CONDITIONS NOTED > z 0 Copy of CONDITIONS given to owner/contractor by inspector I z FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 rn 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature I:tcmp:b1dg:fc=:ocaprv1 3/25/04 Permit Inspection Details y— Permit: BLD20060112 PERMITTPAX 63/15/2006 �MJTH 3�'APPR6V�D y Total Timw. 35 Total Inspections: Total Time: 35 M ITI 0 80 C M M, 0-4 C O'n -4 9 im ITI or- 0 M C 0) 90) M 0 z ITI 7/g/2009 10:02:28 AM Page 1 of I RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ................. FOUNDATION: Footing ............ Wall...................... PieriPorc'h z 0 Retaining Wall ........... 0 Stab Insulation PLUMBING: Underground ... .......... 3: C I'D a Rough -In . .................. M 0 0 Commercial Final C: HEATING: M M Z Gas Test ........... C Gas Piping Equipment . ................ 0 'n -n Commercial Final EXTERIOR SHEATHING ITI IT 0 NAILING ._ ...................... 0 0 FRAMING ............... C IT 0 FIRST FLOOR FRAMING Z INSULATION ................... ;a -4 Floor Insulation x Wall Insulation ........... Ceiling Insulation z SHEETROCK NAILING SPECIAL INSPECTION 0 I'D MISCELLANEOUS FINAL APPROVAL FOR OCCUPANCY .................. W @F