Loading...
20060129.pdfDATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION �1]114AME!NAME OF BUSLUESS M LU MAILING ADD�RE ss z R. - 0 _22LrUL. - E CITY NAME U W ADDRESS CITY NAME tr ADDRESS 0 L) M �Z_ CITY 0 L) STATE LICENSE NUMBER ZIP PROPERTY TAX ACCOUNT PARCEL NO, T TELEPHONE NEW [:] RESIDENTIAL E] ADDITION kq--CbMMERCIAL MIXED USE LgrMODEL MULTIFAMILY 1:1 REPAIR GRADING CYDS E] DEMOLISH TANK GARAGE RETAINING WALL CARPORI ROCKERY (TYPE OF USE, BUSINESS Q5 ACTIVITY) EXPILAIN NUMBER OF STORIES Wei-1:99110MA HEATSOURCE PLAN CHECK NO: PIRATION DATE DWELLING UNITS LOT SLOPE% CBLO / /V 67 .1 1 PERMIT EXPIRES /PERMIT NUMBER 261 JOB ADDRESS SUITEYAPTP PLAT NAME, SUBDIVISION NO LOT NO I LID NO LID FEE S PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TLSCII Apprcea H%1W P01M.1 Flec"apa 0 EXISTING PROPOSED Strew Uso Perrm ke,jaccl 4 0 13 lnspecl:on ReqLs red Soe6a-, Req,wed 13 REQUIRED DEDICA1 ION FT undergro"rti 13 Mr-OC) fel".10d 11 METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED YES0 NO 13 REMARKS OWN E R /CONTRACTOR RESPONSIBLE FOR EROSION CONTROLJDRAINAGE It CHECKED 13Y I FIRE REVIEWED BY PLUMBING,'MECH COMPLIANCE OR CHANGE OF USE SIGN DFENCE ( X 1:1 OTHER EFIRE 3 SPRINKLER FIRE ALARM VESTED DATE THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: SEE ECDC 19.00.005(A)(5) PERMIT LIMIT. SEE ECDC 19.00.005(A)(6) SEE BACK OF PINK PERMIT FOR MORE INFORMATION VARIANCE OR CU CA# 0 WAIVER 0 STUDY Nu !n ED BY LOTCOVEHAGE ALLOWED PROPOSED FT.) PARKING REO. D I PROVIDED REMARKS 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESSORS IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION.' I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTFIIIC- TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKM'S,C ,�MPFW��TION INSURANCE AND RCW 18:27. SIG TU R A G E N T)e--,-, DATE I NED ,72,jb/� REQUIREDO YES REMARKS BY 9T-1 BY- DATE DATE DATE AUB4 PEC�ION I SEPA I INS�Eoo COMPLETED EXEMPI 1:1 YES 13 No I I SIGN AREA HEIGHT ALLOWED PROPOSED I ALLOWED PROPOSED 0 z EE Uj W z 0 z LU Uj cc LL REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (FT) FRONT SIDE REAR FRONT LIR SIDE REAR 0 z 1 2 z 4 LOTAREA PLANNING REVIEWED BY DATE _j I M CONSULTANT lewsm, PANT VALUATION Description FEE Description FEE Plan Check State Surcharge Building Permit /I City Surcharge Plumbing Base Fee Mechanical m Grading Engr. Review Recording Fee Engr. Inspection Plan Chk. Deposit Fire Review Receipt ft Fire Inspection Total Amt. Due Landscapelnsp. Receipt # �3 CALL FOR INSPECTION (425) 771-0220 E T. 1333 APPLICATION APPROVAL This apocation is not it pefrnti uniii signed by trio Budamg Otficial o, hisitior Deputy ano Fees are paio too sackno,&iedged in space Provided OF 0 GN E IL nil 'D 25/ /DATE - ATTENTION I IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CFERTI- FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109 / IBC110 / IRC11 0. 6/05 PRESS HARD - YOU ARE MAKING 4 COPIES ORIGINAL FILE YELLOV�' -INSPECTOR PINK -OWNER GOLD - ASSESSOR 0 z z 0 i 0 M --i "n X M M 0 ­10 0 C: M M z j) --I C 0 _T1 MM 0 _Cf) 0 r- 0 M c:: Cf) 90) M 0 Z z z 0 1 0 M 04/18/2002 23:07 14253533399 KINTIGH PAGE 01 RECEIVED FEB 2 4 L VJ DEVELOPMENT SERVICES Z 0 February 23, 2006 0: Theresa Umbaugh Permit Coordinator City of Edmonds 0 M C th 1215 Avenue N M 0 Edmonds, WA 98020 0 0 C Re: Avalon Inn Permit Extension — 22816 Edmonds Way M M z Theresa, C > We will be able to begin work within 2 weeks of issuance of the necessary permit and estimate that it will talce one work week to complete the sprinkler riser room, one 0 -n -n work week per floor to complete soffitting of the common area sprinkler pipe and two rn work Nveeks per floor to complete tile soffitting of the sprinkler pipes in t1le living units. rn 0 C/) Any questions feel free to call me. 0 0 M Thank you, M0 Z X Robert D. KGQ) > Pres./C.E.O. z z 0 M One Call FIXes All! DoQrs -Windows Handyman RernodpItNew - Insurance 18908 Hwy. 99, Suite B - Lynnwood, WA 98036 Phone; (425) 640-3620 Fax: (425) 640-3947 Lic. U. PROPEHr,95 1137 FINAL PROJECT APPROVAL FORM TO: DATE: MEMOTO: PEW7C, DINATOR, BUILDING DIVISION FROM: FIRE DEPARTM ENT DATE 3-119/0c, ?L V 1,SE I M ENGINEERING DIVISION DATE KFASU SUM PLANNING DIVISION DATE ?LEASL SIGN PROJECT IN/J SITE ADDRESS PERMIT# D6:,-o)2_2 ADB# DATE INSPECTED. DESCRIPTION OF WORK TO BE INSPECTED X��6�� fLy— P69A-1 t7_ 04- - cl"7 A field inspection was conducted to determine cornpliance with approved plans. Final ipproval denotes that there are no objections from the above signed Department to (lie release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT A-PPROVAL WITH CONDITIONS NOTED El Copy of CONDITIONS given to owner/contractor by inspector I FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature IAe1np:bIdg:fbnns:ocaprvI 3/25/04 z 0 1 0 M —i -n —j X M C M 0 0 --j (-) 0 C: ­4 K 3: M M Z r') —i C 0 _n r1;0 _j > M � M M 0 0 0 M C/) M C) Z r- M X --I M z --i M Cl) z 0 A 0 M !1 RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... ---------- Wall .......................... z Pier/Porch ................. ---------- 0 Retaining Wall ........... M Slab Insulation .......... PLUMBING: Underground ............. M C M 0 0 --1 0 Rough -In ................... 0 C --I Commercial Final ...... M M Z HEATING: C > Gas Test .................... ---------- 0) Gas Piping ................. 0 -n Equipment ................. Commercial Final ....... M M 0 Cn 0 r— EXTERIOR SHEATHING 0 M NAILING .......................... C: co Cn FRAMING ........................ Q 0 Z FIRST FLOOR FRAMING... INSULATION ................... M > Floor Insulation ......... z Wall Insulation ........... C/) Ceiling Insulation ....... z 0 SHEETROCK NAILING ... 0 M SPECIAL INSPECTION ... MISCELLANEOUS .......... FINAL APPROVAL FOR NO'S OCCUPANCY .................. 20 6-0 1 z t? woo' IIIIIIIII