Loading...
20060138.pdfDATE AECOV:� CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION ED NAMEINAME C/USINI�S I NG ADORE S ?02' S / /'�k P J_ )1711 otdi "IJ�)2�: 1 .2" 00"'/', 3 6 33 4� PERMIT EXPIRES PERMIT N MBER JOB 5��2 ADDRESS PLAT NAMEISUBDIIISION NO LOT 10 111100 LID FEE S PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP E�IST NG PROPOSED REQUIRED DEDCAI ON __ FT MEIER SIZE I LINE SIZE NO, 01 1111UIIES Pw REOUI11D YES 13 No 13 REMARKS OWNE'RICONTRACTOR RESPONSIBLE FOR EROSION CONTROIJORAINAGE an approved installed on all hot water tanks. ONE 0 TELEPH ILI 17 7t/(--W 2�0 PROPERTY UNIT PAID L NO -7.5'-rD VARIA"CiEORCU SHOFEE—LIKE—ORAD61 I 1191EITION REGO R, 1�­ISTS no <�� —2- Ce, 00 13 YES 13 NO ZONE BIG AREA HEIGHT 0 NEW � RESIDENTIAL PLUMBING � MECH FWAI�Ell CAEN P..P-- I ALL . FPOPBSED 13 ADDITION COMM RCIAL COMPLIANCE OR 13 STUDY I ROPO Kai rj MIXED USE CHANGE OF USE LOTGOVERAGE ALLOWED PROPOSED RE UIRED SET ACK IFTI FRONT SIDE SEAS I FRONT LJ8SiDE REAR REMODEL MULTIFAMILY SIGN REPAIR GRADING EINCE DYES 13 X FT.) PARKING UOTAREA PLANNINO IEVIEWT— DATE —7— El DEMOLISH 0 TANK 0 OTHE REDID I PROVIDED I ri GARAGE o RETAINING WALL o F ESPRINKLER C Fill ARPORT PUCKERY REAILARM REMARKS N MBER OF 0 ELLING UNITS REQUIRED 13 YES 0 CUPANT GROUP ey VALUATION P// 'r7 N Description FEE Description FEE HEAT SOURCE# I LOTSLOPE-� t -GTE. DATE Plan Check State Surcharge City Surcharge J6- PLAN CHECK NO: Building Permit Plumbing Base Fee THI PERMIT AUTHORaES ONLY THEWORK NOTED. THISPIER COVER WORKTO, S MIT ON S P BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION THE UBLIC Mechanical DOMAIN JCURSS, SIDEWALKS. DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. Grading PERMIT APPLICATION: SEE ECDC 19.00.005(A)(5) En9r. Review Recording Fee PERMIT LIMIT: SEE ECDC 19.00.006(A)(6i Plan Chk. Deposit SEE BACK OF PINK PERMIT FOR MORE INFORMATION Emir. Inspection -APPLICANT. ON BEHALF OF HIS OR HER SPOUSE, HEIR% ASSIGNS AND SUCCESSORS u , IN INTEREST. AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY E EDMONDS, WASHINGTON, ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT DEEMED To MODIFY. WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY 0 ROMANCE NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION OF Fire ReView Receipt 0 BE Fire Inspection Total Amt. Due ------------------ Landscapainsp Receipt III I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPUCATION� THAT THE INFORMATION GIVSN IS CORRECT' No THAT I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF THE OWNER, I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC. IRON;ANDIN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPEN 10 INSURANCE AND RCW 18:27. CALL FOR INSPECTION (425) APPLICATION APPROVAL TII,A .,pI­r..­ - A p,,­1 II A, IP- SuIld1r, O"11I_' �'r'hll IPIVY — _rfe 'p— P—B. DATI HINA (OWNE OR 771-0220 ELEASED By EXT. 1333 WFT-i-N-TION IT IS UNLAWFUL TO USE OR OICIUP��BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI- FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109/ IBC11O1 IRC110. ORIGINAL - FILE - YELLOW -INSPECTOR PINK � OWNER - GOLD � ASSESSOR 6105 PRESS HARD - YOU ARE MAKING 4 COPIES z C PIT M a 0 0 M M z co o -n 'n X MT 0 0 M It") 0) 0 z CO z Permit Inspection Details Permit: BLD20060138 PERMITTIZAN, .. .. .... 05/li��006 MS 20 CORRECTION NOTICE WRITTEN IN 0611412006 MS 20 FINALAPPROVED y Total Tim: 40 Total Inspections: 2 Total Time: 40 0 0 i4 im C a 0 0 C M rn z 0 -n n R�..... . . . . . 0 0 C: urns M 7/712009 4:39:16 PM Page I of 1 RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing Wall .......... Pler/Porch Retaining Wall ........... Stab Insulation .......... PLUMBING: Underground ............. Rough -in ................ Commercial Final HEATING: Gas Test ............ Gas Piping ................. Equipment ............ Commercial Final EXTERIOR SHEATHING NAILING .......................... FRAMING ........................ FIRST FLOOR FRAMING INSULATION ................... Floor Insulation Wall Insulation ........... Ceiling Insulation SHEETROCK NAILING SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR nr('11PANCY ............... !2,0 zo� z 9 0 ITI