20060149.pdfFINAL PROJECT APPROVAL FORM
TO:
DATE:
MEMO TO: PERM C 0 ING DIVISION
FROM: FIRE DEPARTMENT DATE 16 74r.
ENGINEERING DIVISION DATE
PLANNING DIVISION DATE
PROJEC
SITE ADDRESS -F t7494V Y 9
PERMIT 0 0C. 14? ADB#—DATE INSPECTED 764
DESCRIPTION OF WORK TO BE INSPECTED _T_ !_
A field inspection was conducted to determine compliance with approved plans. Final approval
denotes that there are no objections from the above signed Department to the release of
PERFORMANCE BONDS and the granting of:
_*4RANT FINAL PROJECT APPROVAL
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
0 Copy of CONDITIONS given to owner/contractor by inspector
I
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
0 Copy of CORRECTION NOTICE given to owner/contractor by inpector
I
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
1:1emp:bldg:fbrms:ocaprvI 3,125/04
z
0 1
0
C m
M 0
0
80
C
M
M Z
jo -4
C
0 -n
m T
0 CD
r,
C: m
Cl)
0)
M 0
z
z
-4
M
co
z
0
0
m
asses
\Tl
DEPARTMENT OF BUILDINGS
PER International Building Code Section 110
23029 Highway 99. Edmonds,..WA Building Permit 200
At:-
ories*
occupancy established by this certificate: Dwelling Units: No. St _
Rasement: No
M Type,Construction: VB
(Per IBC 1004)
Maximum occupant Load
.. main posted at .1/ times.
Room capacity signs, n
W-Ra -ad Bellevue, WA 98005
Owner of Building: Half Price Pots Inc. Address: 12828, & I E S OF THE 2003 EDIIICIN OF
THE HOA BEEN INSPECTED AND APPROVED AS cOMPLYING WITH THE REQU R MENT
TO Pots S OCCUPANCY AND THE USE FOR WHICH
- C
THE INT ICNAL BUILDING DE AS ADOPTED1iY THE CITY FOR THE GROUP AND DIVISION OF
THE PROPOSED OCCUPANCY IS CLASSIFIED.
Arch
Issued this 17th day of N! 2006
CHIEF BUILDING OFFICIAL
BY:.
This snificals shall be posted in a —spleeces Poetic am.nd shall
0.,no, lenled by the clyof El —de Willing Offidel.
t1*111, 4&1' vmh
Permit Inspection Details
Permit: BLD20060149
PERMtTTRAX
F"
03/09/2006 SNOOK 30 APPROVED,
y
Total Time: 30
y
03117/2006 SNOOK -3g'�APPROVED
y
Total Time: 30
0311712006 SMITH 30 APPROVED
y
Total Time: 30
z
0
-j
0
Total Inspections:
3 Total Time: 90
M
-1 -n
IR
xM
C
M C)
0
-40
ITI Mn
Z
0 -n
M ITI
0
>i
M 0
Z
>z
z
0
M
6/112009 4:34:59 I'M
Page I of i
RECORD OF INSPECTIONS
INSPECTOR
DATE APPROVED
SETBACKS .....................
FOUNDATION:
Footing ..............
wall...................
Pier/Porch
Retaining Wall
Stab Insulation ...........
PLUMBING:
Underground .............
Rough -in ...................
Commercial Final
HEATING:
GasTest ....................
Gas Piping .................
Equipment .................
Commercial Final
EXTERIOR SHEATHING
NAILING ........... ..............
FRAMING ...............
FIRST FLOOR FRAMING
INSULATION ..........
Floor Insulation
Wall Insulation
Ceiling Insulation
SHEETROCK NAILING
SPECIAL INSPECTION
MISCELLANEOUS ..........
FINAL APPROVAL FOR VV\%
OCCUPANCY ..................
7
C
O'n
N
M M
0
M
M
ir_
X
z
z
9
0
ITI