Loading...
20060149.pdfFINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERM C 0 ING DIVISION FROM: FIRE DEPARTMENT DATE 16 74r. ENGINEERING DIVISION DATE PLANNING DIVISION DATE PROJEC SITE ADDRESS -F t7494V Y 9 PERMIT 0 0C. 14? ADB#—DATE INSPECTED 764 DESCRIPTION OF WORK TO BE INSPECTED _T_ !_ A field inspection was conducted to determine compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: _*4RANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector I FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector I 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:1emp:bldg:fbrms:ocaprvI 3,125/04 z 0 1 0 C m M 0 0 80 C M M Z jo -4 C 0 -n m T 0 CD r, C: m Cl) 0) M 0 z z -4 M co z 0 0 m asses \Tl DEPARTMENT OF BUILDINGS PER International Building Code Section 110 23029 Highway 99. Edmonds,..WA Building Permit 200 At:- ories* occupancy established by this certificate: Dwelling Units: No. St _ Rasement: No M Type,Construction: VB (Per IBC 1004) Maximum occupant Load .. main posted at .1/ times. Room capacity signs, n W-Ra -ad Bellevue, WA 98005 Owner of Building: Half Price Pots Inc. Address: 12828, & I E S OF THE 2003 EDIIICIN OF THE HOA BEEN INSPECTED AND APPROVED AS cOMPLYING WITH THE REQU R MENT TO Pots S OCCUPANCY AND THE USE FOR WHICH - C THE INT ICNAL BUILDING DE AS ADOPTED1iY THE CITY FOR THE GROUP AND DIVISION OF THE PROPOSED OCCUPANCY IS CLASSIFIED. Arch Issued this 17th day of N! 2006 CHIEF BUILDING OFFICIAL BY:. This snificals shall be posted in a —spleeces Poetic am.nd shall 0.,no, lenled by the clyof El —de Willing Offidel. t1*111, 4&1' vmh Permit Inspection Details Permit: BLD20060149 PERMtTTRAX F" 03/09/2006 SNOOK 30 APPROVED, y Total Time: 30 y 03117/2006 SNOOK -3g'�APPROVED y Total Time: 30 0311712006 SMITH 30 APPROVED y Total Time: 30 z 0 -j 0 Total Inspections: 3 Total Time: 90 M -1 -n IR xM C M C) 0 -40 ITI Mn Z 0 -n M ITI 0 >i M 0 Z >z z 0 M 6/112009 4:34:59 I'M Page I of i RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing .............. wall................... Pier/Porch Retaining Wall Stab Insulation ........... PLUMBING: Underground ............. Rough -in ................... Commercial Final HEATING: GasTest .................... Gas Piping ................. Equipment ................. Commercial Final EXTERIOR SHEATHING NAILING ........... .............. FRAMING ............... FIRST FLOOR FRAMING INSULATION .......... Floor Insulation Wall Insulation Ceiling Insulation SHEETROCK NAILING SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR VV\% OCCUPANCY .................. 7 C O'n N M M 0 M M ir_ X z z 9 0 ITI