Loading...
20060156.pdfAIE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAMONAME OF BUSINESS �3cyylpri MAILING ADDRESS ZIP I TELEPHONE NAME CBLI ADDRESS 7 CITY TILEPHO I STATE LICENSE NUMBER EXPIHA!jUN 9ATE I tV 7/ <D12 PERMIT EXPIRES NUMBER ADDRESS PLAJ NALIE2SUBDIVISION NO FLOT _10 LID No LID FEE S PUBLIC RIGHT OF WAI PER OFFICIAL STREET MAP F.— E­TING I PROPOSED U_= REQUIRED DEDICAI tOR __ FT METER SIZE LINE S111 NO 01 IIXTIREI PR' REQUIRED I I ISE E3 NO 13 REMARKS owNERDo TRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE 113 YES 13 No 0OVS-OC 7")0 NEW E.I.ENTIAL. P UMBfNG LIEC. X GM [3 WAIVER Z AS 0 SIGN AREA A- PROPO­ HEIG AT AUUCwE. PROPOSE. COMP11AND A 0 STUDY LOTCOVERAGE LL PROPOSED A OWSO RE UIREDSETBAC�S (IFT I OU A FRONT SIDE BEAR ACK Tj PROPOSED SETBACKS I I E S (FT BEAR FRONT LIRSIDE A 0 ADDITION 0 E] LIVED... CHANGE OF USE F1 REMODEL 0 1ULNIAN11 SIGN #PLANNING 0 REPAIR 0 GRADING CYCS 0 FENCE X_FT) PARKING UOTAREA L REVIEWED BY DATE DEMOLISH TANK 0 OTHER REQLO PROVIDED GARAGE RETAINING WALL o F RE SPRINKLER CARPORT 0 ROCKERY FIRE ALARM REMARKS o BUSINESS OR Aci iviry) -PLAI V (TYPE OF USE. NUMBER OF STORIES I NUMBER OF OWE LING UNITS ly's 75NTBU, OCCUPANT GROUP REQUIRED YES In GEOTECH RE AT By r addifinn fn th,-. required suretrelief valvelan,,approved Iffifed expansion tank shall be ins on all hot water tanks. Descripti E Plan Check State Surcharge REA S RPLAA CHECK NO: Building Permit City Surcharge -_ A� Plumbing � 131 Base Fee I TH S PERMIT AUTHORIZES ONLY THE WORK NOTED, THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC Mechanical , DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE I SEPARATE PERMISSION. Grading i — PERMIT APP ]CATION: SEE CCOC 19.00,005(A)(5) — 7;g, Review — Recording Fee PERMIT LIMIT, SEE ECDC, 1a0a0QS(A)ru Engn Inspection Plan Chk, Deposit Be BACK OF PINK PERMIT FOR MORE INFORMATION S SCS B 'APPLICANT, ON BEHALF OF His OR HER SPOUSE, HEIRS. ASSIGNS AND SUCCESSO S IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OFWHATCVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE 0 THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CtTY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION' Fife Review Receipt It Fire Inspection Total Amt. Due Landscapeinsp. Receipt N I HEREBY AD NOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION GIVEN IS CO RECT. AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- TION; AND IN DOING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RDW 18;27 CALL FOR INSPECTION (425) 771-0220 EXT. 1333 APPLICATION APPROVAL rIPI-1— 1.1 - - P-1- ­11 �19­ �' - 011,­1 .1 hl-.F ­ 1.­­ pd. nF ­Ipt 11 11k1­vvI1­n IF,— P111,d1d OF C LS SIGN TUBE DATE c .ATE S IGNE. _j IEIEA�EIBIAY IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI- ORIGINAL - FILE YELLOW - IRSIECTOR FICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109 / IBCI10 I IRC11O- PINK -OWNER GOLD - ASSESSOR 6105 PRESS HARD - YOU ARE MAKING 4 COPIES z 2 0 M C 0 M 0 80 C M ITI z 0 -n X mT 0 0 ITI M 0 Z z --I z 2 0 M Permit Inspection Details Permit: BLD20060156 RERMITTi;�;,X V� 031=2006 SNOOK 35 APPROVED y Total Time: 35 Total Inspections: 1 Tot.] Tim.: 35 M M a 0 0 C M M z 0 -n -4 :C T"T rA 0 C Co M 0 z 0 -4 0 M 7/912009 9:54:33 AM Page I of I 777777� RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... z wait ............... Pier/Porch ................. 0 Retaining Wall ........... Slab Insulation --j 0 PLUMBING: IT C M 0 Underground 0 ............. Rough -in ................... C --I C = IT IT Z Commercial Final C HEATING: > Gas Test .......... 0) 0 Gas Piping .......... -n ;0 > C 9 Equipment ................. M M 0 Commercial Final 0 0 M EXTERIOR SHEATHING C= rj) 9 C/) NAILING .......................... M 0 FRAMING .............. z 7*1 ;13 FIRST FLOOR FRAMING INSULATION ................... Floor Insulation 3: Wall Insulation ........... z 0, Ceiling Insulation 0 SHEETROCK NAILING IT SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR 3- -7 OCCUPANCY ...............