20060158.pdfPermit Inspection Details
Permit: BLD20060158
PERMIT-I-F4AX
. ..........
03124/2006 MS 40 APPROVED
y
Total Time: 40
S,
y
03/24/2006 MS APPROVED
Total Time: 20
y
15 APPROVED
Total Time: 15
Total inspections:
3 Total Time: 75
z
0
M
M
0
IT!
M rTi
0 -n
-n
M M
(j)
0
0 IT!
C to
C')
M 0
z
z
0
—i
IT!
Page 1 of I
5129/2009 9:59�05 AM
777777r'
RECORD OF INSPECTIONS
INSPECTOR
DATE APPROVED
SETBACK$ .....................
FOUNDATION:
Footing ......................
wall ....................
Pier/Porch .. ...........
Retaining Wall ...........
Stab Insulation
PLUMBING:
Underground .............
Rough -in ...................
Commercial Final
HEATING:
Gas Test .................
Gas Piping ............
Equipment .................
Commercial Final
EXTERIOR SHEATHING
NAILING ..........................
FRAMING ........................
FIRST FLOOR FRAMING
INSULATION ...................
Floor Insulation
Wall Insulation ...........
Ceiling Insulation
SHEETROCK NAILING
SPECIAL INSPECTION M
MISCELLANEOUS ..........
OR a L
FINAL APPROVAL F
OCCUPANCY ...............
p