Loading...
20060178.pdfFINAL PROJECT APPROVAL FORM TO:- DATE: - MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: -FIRE DEPARTMENT DATE- FLEME-N ENGINEERING DIVISION DATE- Q,/ . ....... PLANNING DIVISION DATE PROJEC SITEADDRESS, �ft�U PERMIT #__22� �-Q/ ADB#__DATE INSPECTED DESCRIPTION OF WORK TO BE INSPECTED :7:4M t r1,1_.hrQi A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDSand the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector I FAILED FINAL INSPECTION - OUTSTANDING ISSUES El Copy of CORRECTION NOTICE given to owner/contractor by inpector I 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fornis:ocaprv1 3/25/04 z m 0 C M M 0 --10 00 C M M 0 > -4 o -n M T 0 CO 0 r- 0 M a rn 90 M 0 Z z z 0 m FINAL PROJECT APk0VAL FORM TO: DATE: — MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: —FIRE DEPARTMENT DATE_4�_--")� sIGN ENGINEERING DIVISION DATE P—SESiGN PLANNING DIVISION DATE— PROJEC SITE ADDRESS— g�� 0 PERMIT 424�_(. 612 ADB#__DATE INSPECTED DESCRIPTION OF WORK TO BE INSPECTED A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: X, GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector I FAILED FINAL INSPECTION - OUTSTANDING ISSUES El Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:tcmp:b1dg:forms:ocaprv1 3/25/04 z 0 0 C M MO —10 0 0 C —4 g :1 M M z '0 --1 C o n M T 0 CO r- M Cn co z 0 z co z 0 i 0 ra Permit Inspection Details Permit: BLD20060178 FERMITTP.�,x !ldl g n 05115/2006 SN OOK 20 APPROVED y Total Time: 20 7 05/04/2006 SMITH 30 APPROVED y Total Time: 30 OM y 05111/2006 BULLOCK 40 APPROVED z Total Time: 40 0 Total Inspections: 3 Total Time: 90 0 co ITI —10 C ITI z jo E: 0 -n ITI M at C/) 0 0 C ITI z co z 0 ITI 6122/2009 4:57:35 PM Page I of I RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall......................... Pier/Porch z Retaining Wall ........... 0 Slab Insulation PLUMBING: Underground ............. Rough -in ........... Commercial Final HEATING: Gas Test ............ Gas Piping ........... Equipment ................ Commercial Final EXTERIOR SHEATHING NAILING ....................... FRAMING ........................ FIRST FLOOR FRAMING INSULATION ............ Floor Insulation Wall Insulation ........... Ceiling Insulation SHEETROCK NAILING SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. .2 X& C IT M 0 0 80 C 3: M R11 z 0­1 C r- -4 3: CA 0 It _q M IT 0 0 C 90) ITI C) Z r-. z z 9 0 ITI