20060178.pdfFINAL PROJECT APPROVAL FORM
TO:-
DATE: -
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: -FIRE DEPARTMENT DATE-
FLEME-N
ENGINEERING DIVISION DATE-
Q,/ . ....... PLANNING DIVISION DATE
PROJEC
SITEADDRESS, �ft�U
PERMIT #__22� �-Q/ ADB#__DATE INSPECTED
DESCRIPTION OF WORK TO BE INSPECTED :7:4M t r1,1_.hrQi
A field inspection was conducted to determine compliance with -approved plans. Final approval
denotes that there are no objections from the above signed Department to the release of
PERFORMANCE BONDSand the granting of:
GRANT FINAL PROJECT APPROVAL
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
0 Copy of CONDITIONS given to owner/contractor by inspector
I
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
El Copy of CORRECTION NOTICE given to owner/contractor by inpector
I
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
1:temp:b1dg:fornis:ocaprv1 3/25/04
z
m
0
C M
M 0
--10
00
C
M
M
0
> -4
o -n
M T
0 CO
0 r-
0 M
a rn
90
M 0
Z
z
z
0
m
FINAL PROJECT APk0VAL FORM
TO:
DATE: —
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: —FIRE DEPARTMENT DATE_4�_--")�
sIGN
ENGINEERING DIVISION DATE
P—SESiGN
PLANNING DIVISION DATE—
PROJEC
SITE ADDRESS— g�� 0
PERMIT 424�_(. 612 ADB#__DATE INSPECTED
DESCRIPTION OF WORK TO BE INSPECTED
A field inspection was conducted to determine compliance with -approved plans. Final approval
denotes that there are no objections from the above signed Department to the release of
PERFORMANCE BONDS and the granting of:
X, GRANT FINAL PROJECT APPROVAL
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
0 Copy of CONDITIONS given to owner/contractor by inspector
I
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
El Copy of CORRECTION NOTICE given to owner/contractor by inpector
2.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
1:tcmp:b1dg:forms:ocaprv1 3/25/04
z
0
0
C M
MO
—10
0 0
C
—4 g
:1 M
M z
'0 --1
C
o n
M T
0 CO
r-
M
Cn
co
z 0
z
co
z
0
i
0
ra
Permit Inspection Details
Permit: BLD20060178
FERMITTP.�,x
!ldl g
n
05115/2006 SN OOK 20 APPROVED
y
Total Time: 20
7
05/04/2006 SMITH 30 APPROVED
y
Total Time: 30
OM
y
05111/2006 BULLOCK 40 APPROVED
z
Total Time: 40
0
Total Inspections: 3 Total Time: 90
0
co
ITI
—10
C
ITI
z
jo
E:
0 -n
ITI
M
at C/)
0
0
C
ITI
z
co
z
0
ITI
6122/2009 4:57:35 PM
Page I of I
RECORD OF INSPECTIONS
INSPECTOR DATE APPROVED
SETBACKS .....................
FOUNDATION:
Footing ......................
Wall.........................
Pier/Porch
z
Retaining Wall ...........
0
Slab Insulation
PLUMBING:
Underground .............
Rough -in ...........
Commercial Final
HEATING:
Gas Test ............
Gas Piping ...........
Equipment ................
Commercial Final
EXTERIOR SHEATHING
NAILING .......................
FRAMING ........................
FIRST FLOOR FRAMING
INSULATION ............
Floor Insulation
Wall Insulation ...........
Ceiling Insulation
SHEETROCK NAILING
SPECIAL INSPECTION
MISCELLANEOUS ..........
FINAL APPROVAL FOR
OCCUPANCY ..................
.2 X&
C IT
M 0
0
80
C
3: M
R11 z
01
C
r- -4
3:
CA
0
It
_q
M IT
0
0
C
90)
ITI C)
Z r-.
z
z
9
0
ITI