20060191.pdfFINAL PROJiCT APPROVAL FORM
TO:
DATE: —
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: FIRE DEPARTMENT DATE 3
—ENGINEERING DIVISION DATE
PLANNING DIVISION DATE —
PROJECT
SITE ADDRESS 0 Uelk(—"U7
PERMIT �_ADB#__DATE INSPECTED
— / P Cf/--
DESCRIPTION OF WORK TO BE INSPECTED 'q
A field inspection was conducted to determine compliance with -approved plans. Final approval
denotes that there are no objections from the above signed Department to the release of
PERFORMANCE BONDS and the granting of:
GRANT FINAL PROJECT APPROVAL
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
0 Copy of CONDITIONS given to owner/contractor by inspector
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
0 Copy of CORRECTION NOTICE given to owner/contractor by inpector
2.
3.
GRANT FINAL PROJECT APPROVAL
RE -INSPECTED OUTSTANDING ISSUES
Date Signature
1:temp:b1dg:fonns:ocaprv1 3/25/04
z
=5
C M
M 0
0
80
a
-19
x M
M z
a -i
C
0
n
"'T
0 Cn
0
0
M 0
Z
z
--i
X
V)
z
0
M
"I
Permit Inspection Details
Permit: BLD20060191
PERMITTi—�-%-
IF re� na j-
;mF
03/1412006 �mith 30 APPROVED
y
Total Time: 30
Total Inspections: I
Total Time: 30
z
01
M
-49
C z
Cl)
0 -n
'n
In M
Cl)
0
0
C
ri)
Im 0
Z
M
-4
z
z
IM
6111/2009 2:35:52 PM
Page I of I
7777�`
RECORD OF INSPECTIONS
INSPECTOR DATE APPROVED
SETBACKS .....................
FOUNDATION:
Footing ......................
wait ............. —
Pier/Porch .................
z
Retaining Wall ...........
Slab Insulation
PLUMBING:
Underground
—4
R.ough-In
ITI
C
............
M
0
Commercial Final
0
HEATING:
C
g
M
ITI Z
Gas Test ....................
ID --I
Gas Piping ................
>
Equipment ..........
0
Commercial Final
T!
EXTERIOR SHEATHING
M ITI
NAILING .....................
C/)
0 f-
FRAMING ...................
0 171
C 0)
FIRST FLOOR FRAMING
M 0
INSULATION ...................
Floor Insulation
Wall Insulation
z
Ceiling insulation
CA
S HEETROCK NAILING
z
SPECIAL INSPECTION
0
lTI
MISCELLANEOUS ..........
FINAL APPROVAL FOR
OCCUPANCY ..................
wr