20060202.pdfFINAL PROACT A-'PPkOVAL FORM
TO: -
DATE:_
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: FIRE DEPARTMENT DATE
S =12
ENGINEERING DIVISION DATE
PLANNING DIVISION DATE-
z
0
0
PROJECT
SITE ADDRESS, :102-9, 199 SY . ...... Ee-J
q,fi
in- -4
ox
PERMIT # 2200(� Q INSPECTED__'7�1_'_2_)_
C M
M0
0
80
DESCRIPTION OF WORK TO BE INSPECT
M
M Z
A field inspection was conducted to determine compliance with -approved plans. Final approval
C: 2
-4
denotes that there are no objections from the above signed Department to the release of
PERFORMANCE BONDS and the granting of:
0 -n
-n
n rn
GRANT FINAL PROJECT APPROVAL
0 vi
0 r-
0 M
a co
9 W
In 0
Z r-
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
q
0 Copy of CONDITIONS given to owner/contractor by inspector
>
I
z
__q
Cn
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
z
9
0 Copy of CORRECTION NOTICE given to owner/contractor by inpector
0
M
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
1:temp:b1dg:fbrms:ocaprv1 3/25/04
Permit Inspection Details
1z
Permit: BLD20060202
P1 �AX
4i &I RF
9
03/30/2006 SIBREL 45 APPROVED
y
Total Tim: 45
lid 0 �B� trio ItIon J K.",
03/27/2006 SNOOK 35 APPROVED
y
Total Time: 35
04/12/200�' SNOOK 25 APPROVED
y
z
Total Time: 25
Total Inspections: 3
Total Time: 105
R1
--4 -n
Ca
M
C
0
X M
ITI
C 5t
0 -n
-n ;�D
M ITI
0
0
C
W j
0
71812009 8:40:56 AM
Page I of I
7777.
RECORD OF INSPECTIONS
INSPECTOR DATE APPROVED
SETBACKS .................
FOUNDATION:
Footiri'g
wall
Pier/Porch
z
Retaining Wall ...........
Slab Insulation
0
PLUMBING:
—I
Underground .............
3:
171
Rough -in ...................
0
0
commercial Final
C:
3: rn
HEATING:
GasTest ....................
Gas Piping .................
to
Equipment ... ..............
0 -n
'n ;D
Commercial Final
3� >
K
M ITI
EXTERIOR SHEATHING
a @
NAILING ..........................
0
0
FRAMING .......... .............
C
9 (A
rn 0
FIRST FLOOR FRAMING
INSULATION ...................
Floor Insulation
>
Wall Insulation ...........
z
--I
3:
Ceiling Insulation
Vi
SHEETROCK NAILING
.
z
9
0
SPECIAL INSPECTION
171
0A,1
MISCELLANEOUS
FINAL APPROVAL FOR