Loading...
20060217.pdfDATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION a IIIII!M CITY _ro b0K '7-�55 ), CITY RE _�5ea.ale q?j III TCLEPIIO '7,7 tip STATE LICENSE NUMBER EXPIR4TION DATE I CHECKED BY HOPERTY TAX ACCOUNT PARCEL NO. OOt4 16) 0-) e) I NEW PIL.11ING I ADDITION COMMERCIAL C MPLIANCE OR CHANGEOPUSE E] REMODEL MULTIFAMILY SIGN GRADING F NCE REPAIR Me ( X Fr) E3 DEMOLISH 02"rANK OTHER ciGARAGE REMININGWALL F RE SPRINKLER CARPORT ROCKERY FIREALARM (TYPE OF USE, BUSINESS OR'TFPLAIN: NUMBER Hum En OF C `RCA�IAILIIO-er— 0 F STORIES DWELL NG U NITS AREAS 'UM.E 2 DESCRIBE WORK TO BE DONE PERMIT EXPIRES USE PE MIT HE 10 N U �11 �E�,, Z jou SUITEIAPT# 'Do"s" '�K,5 ill () i a) L PLAT NAMEISUBDIVISION NO. LOT Ito, L�D 0* I L D EE $ PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP n"', "p— W EXISTING — PROPOSED 5". — P.. 103 REQUIRED DEDICATION— FF METER SIZE LINE MIS NO. 01 11-URES RE I I I YEPRV E E3 No 13 REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROIJOR MADE FIRE REVIEWED BY DATE 1"O'D POSITS. 0YEFS1 [IN. is SEPA REVIEW SIGN AREA HEIGHT COMPLETE EXEMPT ALLOWED , PROPOSED ALLOWED , PROPOSED .X Lo COVERAGE REQUIRED SETBACKS (Fr.) PROP 0 SETBACKS ("I ALLOWED PROPOSED FRONT SIDE REAR FRONT UR SIDE REAR PARKING LET AREA I PLANNING REVIEWED BY DATE REaD I PROVIDED I CHECKEDBY JTYPE!,F�.ONSTA OCCUP7,/ "OU, C SPECIAL INSPECTION REQUIRED 0 YES JAREA f.-AF.0 PA NT REMARKS PROGRESS INSPECTIONS PER USC 1108/1FINAL INSPECTION REGO E 9 $ 1 Description FEE — Descripti In FEE ADATE Plan Check State Surcharge HEAT SOURCE GLAZING LOT SLOPE X Building Permit City Surcharge PLAN CHECK NO: VESTED Plumbing Base Fee Mechanical THISPERMITAUT ORIZES ONLY THE WORK NOTED, THIS PERMIT COVERS WORK TO 8. DONE ON PRIVATE PRCIPER� ONLY. ANY CONSTRUCTION ON THE PUBLIC 2 DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES. ETC.) WILL REQUIRE 3 Grading SEPARATEPERME SSION. Engr. Review PE VITAPPLICATION: ISODAYS PERMIT LIMIT. I YE,kR - PROVIDED W RK IS STARTED WITHIN 180 DAYS Engr. Inspection SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLI ANT, ON BEHALF OF HIS OR HER SPOUSE. HEIRS, ASSIGNS AND SUCCESORS Fire Review Plan Chk, Deposit I. INTEREST, AGREES To INDE.181 DEFEND AND HOLD H RMLESS THE CITY OF 2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE ARISING DIRECTLY OR INDIRECTLY Fire Inspection Receipt # FROM THE ISSUANCE OF THIS PERMIT ISSUANCi OF THIS PERMIT SHALL NOT BE D EMED TO MODIFY, WAIVE OR RED CE ANY REQUIREMENT OF ANY CITY ORDINA OF E U Landscapainsp. TbtalAmt.Due L o NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION, ... . ........... Recording Fee Receipt # I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF APP ICATION APPROVAL T E OWNER. I AGREE TO COMPLY WITH CI AND STATE LAWS REGULATING CONSTRUC, CALL Th­ppfi�fl.. I, n.l. p.-II-til Mgmd by th. TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE 0 WASHINGTON RELATING TO B.11,11na Offid.1 ., hWhI,, Op.ty: nd F­ — p1d, tId FOR INSPECTION Ip,Ia.k.-I.dg.dH­p ... p­ld.d. 1 WORKMEN'S COMPENSATION INSURANCE AND RCVV 18.27� �GNATUII O� DATE SIGNED (425) vO L/ 771-0220 _2mvl/ R.EEA§. EIr ATTENTION EXT 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 ORIGINAL . FILE - YELLOW . INSPECTOR PiNK-OWNER - GOLD -ASSESSOR 09/03 PRESS HARD -YOU ARE MAKING 4 COPIES z 9 0 M C MO 0 0 a 3: M m 0 C X to 0 -n I = M in A a 0 0 C CQ r. 0) In 0 z .1� X z -4 X (a z 0 q 0 m FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: —FIRE DEPARTMENT DAT —ENGINEERING DIVISION DATE PLEME-N PLANNING DIVISION DATE ­E PROJECT 0 4- r) A,,' -?A L_ Z- SITE ADDRESS-'?- I ?_,�r . ..... ... pERM1T#-d,06(,—Cy�_1--1 __AD]3# ...... DATEINSPECTED DESCRIPTION OF WORK TO BE INSPECTED IPUIL-IiO A field inspection was conducted to determine compliance with approved plans. Final approval denotes that there are no objections from the above signed Depart It to the release ' of PERFORMANCE BONDS nd the granting of: [7SL_16'�t-lo�e Di R'F c) D G /Z L 7A < GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector I FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:forms:ocaprv1 3/25/04 z 9 0 !�l C ra rn 0 -4 0 0 0 C � K M M o -n n 3:9 MT 0 CA 0 0 Fn C 0 M 0 Z r- X :0 z W z 9 0 M Permit Inspection Details Permit: BL020060217 PERMITTPAX .. ........ . 03/28/2006 smith 20 APPROVED y Total Time: 20 Total Inspections; 1 Total Time: 20 z C M 0 IT 10 > 0 1 M M 0 0 0 IT 0 711/200911:50:52AM Page I of I RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS FOUNDATION: Footing................. Wall .................. Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: ITI Underground ............. Rough -in ................... M Commercial Final C: IT 0 HEATING: -40 0 0 C Gas Test .................... IT! M Gas Piping ................. C Z Equipment ................. Commercial Final 0 EXTERIOR SHEATHING n NAILING ............... .......... -4 x ITIM FRAMING .............. 0 0 FIRST FLOOR FRAMING C co INSULATION ............ M C) z 7-1 Floor Insulation Wall Insulation ........... > Ceiling Insulation z SHEETROCK NAILING __4 SPECIAL INSPECTION z 0 -i 0 ITI MISCELLANEOUS FINAL APPROVAL FOR OCCUPANCY