20060225.pdfFINAL PROJECT APPROVAL FORM
TO:
DATE:
MEMO.TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: FIRE DEPARTMENT DATE-3 — —23 0
ENrEERING DIVISION DATE
—PLANNING DIVISION DATE
PROJECT /YO
Ui
M
C
SITE ADDRESS- zQ ro el— Ldz
0
0C
I
PERMIT #_2-00 C— ADB# INSPECTED 3
M M
—DATE
DESCRIPTION OF WORK TO BE INSPECTED L—A P
A field inspection was conducted to determine compliance with �approved plans. Final approval
denotes
0
-n
that there are no objections from the above signed Department to the release of
PERFORMANCE BONDS and the granting of:
M M
0
GRANT FINAL PROJECT APPROVAL
M
C fn
(n
M
0
z r-
z
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
El Copy of CONDITIONS given to owner/contractor by inspector
(n
z
0
M
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
0 Copy of CORRECTION NOTICE given to owner/contractor by inpector
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
1:temp:b1dg:fbnns:ocaprv1 3/25/04
sw**,A Permit Inspection Details
v
Permit: BLD20060225
PERMITT$�,�,X
03/23/2006 SMITYH 35 APPROVED
y
Total Time; 35
Total Inspections: I Total Tlmw. 35
0
'K,
v
'n
0
0
M
lm
10
z
0 -n
M M
0
0 F
n
C0
Co
IT
z
lm
712/2009 11:52:06 AM
Page I of 1
RECORD OF INSPECTIONS
INSPECTOR DATE APPROVED
SETBACKS ....................
FOUNDATION:
Footing ......................
wait .................
Pier/Porch .................
Retaining Wall ...........
z
Stab Insulation ..........
PLUMBING:
Underground .............
Rough -in ...................
x
0
Rn
C
Commercial Final
M CI
0
HEATING:
0
C:
Gas Test ....................
M ITI
z
Gas Piping .................
C
Equipment .................
-4
Commercial Final
0 "In
-n La
EXTERIOR SHEATHING
-4-
NAILING ..........................
M M
FRAMING ........... I ....... .....
0)
0
0 ITI
F IRS T FLO6k'FRAMjNG_
C 0)
0)
INSULATION ...........
0
f—
Floor Insulation
Insulation ..........
Celting Insulation
z
SHEETROCK NAILING
SPECIAL INSPECTION
z
ITI
MISCELLANEOUS ..........
FINAL APPROVAL FOR
OCCUPANCY ..................
.0226l000
M