Loading...
20060225.pdfFINAL PROJECT APPROVAL FORM TO: DATE: MEMO.TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE-3 — —23 0 ENrEERING DIVISION DATE —PLANNING DIVISION DATE PROJECT /YO Ui M C SITE ADDRESS- zQ ro el— Ldz 0 0C I PERMIT #_2-00 C— ADB# INSPECTED 3 M M —DATE DESCRIPTION OF WORK TO BE INSPECTED L—A P A field inspection was conducted to determine compliance with �approved plans. Final approval denotes 0 -n that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: M M 0 GRANT FINAL PROJECT APPROVAL M C fn (n M 0 z r- z GRANT PROJECT APPROVAL WITH CONDITIONS NOTED El Copy of CONDITIONS given to owner/contractor by inspector (n z 0 M FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:fbnns:ocaprv1 3/25/04 sw**,A Permit Inspection Details v Permit: BLD20060225 PERMITT$�,�,X 03/23/2006 SMITYH 35 APPROVED y Total Time; 35 Total Inspections: I Total Tlmw. 35 0 'K, v 'n 0 0 M lm 10 z 0 -n M M 0 0 F n C0 Co IT z lm 712/2009 11:52:06 AM Page I of 1 RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS .................... FOUNDATION: Footing ...................... wait ................. Pier/Porch ................. Retaining Wall ........... z Stab Insulation .......... PLUMBING: Underground ............. Rough -in ................... x 0 Rn C Commercial Final M CI 0 HEATING: 0 C: Gas Test .................... M ITI z Gas Piping ................. C Equipment ................. -4 Commercial Final 0 "In -n La EXTERIOR SHEATHING -4- NAILING .......................... M M FRAMING ........... I ....... ..... 0) 0 0 ITI F IRS T FLO6k'FRAMjNG_ C 0) 0) INSULATION ........... 0 f— Floor Insulation Insulation .......... Celting Insulation z SHEETROCK NAILING SPECIAL INSPECTION z ITI MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. .0226l000 M