20060242.pdfFINAL PROJECT A7PPROVAL FORM
TO:
DATE:
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: .......... FIRE DEPARTMENT DATE 3
-ENGINEERING DIVISION DATE
PLANNING DIVISION DATE-
P—E-N
z
PROJECT
SITE ADDRESS, LEa 7- ...... . . .........
0
C ro
INSPECTED
PERMIT #90()(, ADB# 3 -_z�o a
M 0
0
-40
----------PATE
DESCRIPTION OF WORK TO BE INSPECTED
0 C
--I g
= M
M
A field inspection was conducted to determine compliance with -approved plans. Final approval
0
denotes that there are no objections from the above signed Department to the release of
PERFORMANCE BONDS and the granting of:
0 _n
Llrlz,
GRANT FINAL PROJECT APPROVAL
M M
M
g co
M 0
z
& I- aol' fl_'gr1q—
;o
GRANT PROJECT APPROVAL WITR CONDITIONS NOL e)(-' Ot XS/"(_ 0/-
--i
0 Copy of CONDITIONS given to owner/contractor by inspector
>
z
I
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
z
9
0 Copy of CORRECTION NOTICE given to owner/contractor by inpector
0
rn
L
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
1:temp:b1dg:forms:ocaprv1 3/25/04
Permit Inspection Details
Permit: BLD20060242
PERMITTPAX
in
0312812006 SMITH 20 APPROVED
y
Total Time: 20
Total Inspections: I
Total Time: 20
z
0
M
M
C
1710
0
C
M
C
-4
M M
0
0
C Ch
C CI)
M 0
z
CA
z
0
M
v
6/18/2009 10:02:56 AM
Page i of i