Loading...
20060242.pdfFINAL PROJECT A7PPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: .......... FIRE DEPARTMENT DATE 3 -ENGINEERING DIVISION DATE PLANNING DIVISION DATE- P—E-N z PROJECT SITE ADDRESS, LEa 7- ...... . . ......... 0 C ro INSPECTED PERMIT #90()(, ADB# 3 -_z�­o a M 0 0 -40 ----------PATE DESCRIPTION OF WORK TO BE INSPECTED 0 C --I g = M M A field inspection was conducted to determine compliance with -approved plans. Final approval 0 denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: 0 _n Llrlz, GRANT FINAL PROJECT APPROVAL M M M g co M 0 z & I- aol' fl_'gr1q— ;o GRANT PROJECT APPROVAL WITR CONDITIONS NOL e)(-' Ot XS/"­(_ 0/- --i 0 Copy of CONDITIONS given to owner/contractor by inspector > z I FAILED FINAL INSPECTION - OUTSTANDING ISSUES z 9 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 0 rn L 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1:temp:b1dg:forms:ocaprv1 3/25/04 Permit Inspection Details Permit: BLD20060242 PERMITTPAX in 0312812006 SMITH 20 APPROVED y Total Time: 20 Total Inspections: I Total Time: 20 z 0 M M C 1710 0 C M C -4 M M 0 0 C Ch C CI) M 0 z CA z 0 M v 6/18/2009 10:02:56 AM Page i of i