Loading...
20060259.pdfFINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE__.�(�_— 0 ENGINEERING DIVISION DATE — PLANNING DIVISION DAT PROJECT—L—�,-7— SITE ADDRESS V/� 'nz PERMIT 910LO �— �O2- 5_�ADB#_DATE INSPECTED_�(-6 — —0(- DESCRIPTION OF WORK TO BE INSPECTED- U5rl PU14 A field inspection was conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: uilllvb,�At' -71 S-7 I GRANT FINAL PROJECT APPROVAL &PrL('(f GRANT PROJECT APPROVAL WITH CONDITIONS NOTED (_Pr6 t2_'poc-'r,� CZ 0 Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inpector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature I:tcitip:bl(lg:ll)i*tiis:ocal)iTI 3/25/04 z 2 0 0 M C M 0 -40 0 M M z ID C: 0 -n n -4 M M � U) 0, 0 M a (n I M 0 Z r- z Cl) z 9 0 M Permit Inspection Details Permit: BLD20060259 -'N 0410k006 SMITH 30 APPROVED y Total Time: 30 Total Inspections: I Total Time: 30 z I -n -4 X im IM 0 10 M M 0 Ini im M 0 Fa 0 r- z --4 x z 0 Im 6/2212009 11:09:21 AM Page I of I 16, RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ............ Wall .......................... Pier/Porch ................. z Retaining Wall ........... Slab Insulation .......... 0 PLUMBING: Lifiderground ............. 8ough-in M C IT! 0 Final 0 Commercial 0 HEATING: ITI IT! z Gas Test .................... C Gas Piping ................. > co Equipment ................. 0 -n Commercial Final 3: EXTERIOR SHEATHING m ITI NAILING .......... .............. 0 r FRAMING ........................ 0 C ITI FIRST FLOOR FRAMING... M 0 INSULATION ................... Z r— 7-1 Floor Insulation Wall Insulation > z C� Ceiling Insulation 3: SHEETROCK NAILING z SPECIAL INSPECTION 0 hill MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY ..................