20060259.pdfFINAL PROJECT APPROVAL FORM
TO:
DATE:
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: FIRE DEPARTMENT DATE__.�(�_— 0
ENGINEERING DIVISION DATE —
PLANNING DIVISION DAT
PROJECT—L—�,-7—
SITE ADDRESS V/� 'nz
PERMIT 910LO �— �O2- 5_�ADB#_DATE INSPECTED_�(-6 — —0(-
DESCRIPTION OF WORK TO BE INSPECTED- U5rl PU14
A field inspection was conducted to determine compliance with -approved plans. Final approval
denotes that there are no objections from the above signed Department to the release of
PERFORMANCE BONDS and the granting of: uilllvb,�At'
-71 S-7 I
GRANT FINAL PROJECT APPROVAL
&PrL('(f
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED (_Pr6 t2_'poc-'r,� CZ
0 Copy of CONDITIONS given to owner/contractor by inspector
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
0 Copy of CORRECTION NOTICE given to owner/contractor by inpector
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date Signature
I:tcitip:bl(lg:ll)i*tiis:ocal)iTI 3/25/04
z
2
0
0
M
C
M
0
-40
0
M
M z
ID
C:
0 -n
n
-4
M M
� U)
0,
0 M
a (n I
M 0
Z r-
z
Cl)
z
9
0
M
Permit Inspection Details
Permit: BLD20060259
-'N
0410k006 SMITH 30 APPROVED
y
Total Time: 30
Total Inspections:
I Total Time: 30
z
I -n
-4
X
im
IM
0
10
M
M
0 Ini
im M
0 Fa
0 r-
z
--4
x
z
0
Im
6/2212009 11:09:21 AM
Page I of I
16,
RECORD OF INSPECTIONS
INSPECTOR
DATE APPROVED
SETBACKS .....................
FOUNDATION:
Footing ............
Wall ..........................
Pier/Porch .................
z
Retaining Wall ...........
Slab Insulation ..........
0
PLUMBING:
Lifiderground .............
8ough-in
M
C
IT! 0
Final
0
Commercial
0
HEATING:
ITI
IT! z
Gas Test ....................
C
Gas Piping .................
>
co
Equipment .................
0 -n
Commercial Final
3:
EXTERIOR SHEATHING
m ITI
NAILING .......... ..............
0 r
FRAMING ........................
0
C ITI
FIRST FLOOR FRAMING...
M 0
INSULATION ...................
Z r—
7-1
Floor Insulation
Wall Insulation
>
z
C�
Ceiling Insulation
3:
SHEETROCK NAILING
z
SPECIAL INSPECTION
0
hill
MISCELLANEOUS ..........
FINAL APPROVAL FOR
OCCUPANCY ..................